© TE Studio, Ltd. 2017 1
MinnePHit Passive House Retrofit, Brazelton Residence – Minneapolis, MN (USA) (Passive House project database ID 2069) http://www.passivhausprojekte.de/#d_2069 Technical drawings in this document are not drawn to scale. 1 ABSTRACT
Passive House Object Documentation
© TE Studio, Ltd. 2017 2
1.1 Data of Building The MinnePHit Passive House Retrofit is a single-family home located in Minneapolis, Minnesota (USA) that was gut & retrofit to the (at the time) new EnerPHit standard. Based on the Passive House Institute’s EnerPHit moniker & its Minneapolis locale, the clients coined this project the MinnePHit house. The final design included demolition and reconstruction of a small part of the footprint, a small addition, many different wall sections, a fully updated and upgraded building envelope, and new interior finishes throughout. Construction was completed in 2011-2012. The project is North America’s first certified EnerPHit project & the first certified Passive House Retrofit in a very cold climate in the world. Special features Working with the structure of the existing house Fully updated home fits within historic neighborhood fabric Earth-friendly interior and exterior finishes throughout Automated continuous ventilation system with over 90% efficiency Successfully fit complex client program into small amount of space Year of construction 2011-2012 U-value exterior wall (avg.) 0,11 W/(m²K) U-value basement slab 0,17 W/(m²K) U-value roof 0,073 W/(m²K) U-value window 0,77 W/(m²K) Effective heat recovery 89%
PHPP annual heating demand 27 kWh/(m²a)
PHPP primary energy demand 120 kWh/(m²a)* Pressure test n50 0.65 h-1
Passive House Object Documentation
© TE Studio, Ltd. 2017 3
1.2 Brief Description The MinnePHit House is a 5-bedroom, 3-bath, 185m2 home that began as a 3-bedroom, 2-bath, 128m2 home in Minneapolis MN. Commissioned by a private client, this home is the first certified Passive House EnerPHit in a very cold climate on the planet. It sits on an urban lot in an established neighborhood, near parks and trails and the historic Minnehaha Falls. With solid structural underpinnings but significant performance and size challenges for a family of five and two large dogs, the existing home was a prime candidate for a Passive House EnerPHit pilot. It demonstrates the amazing potential of high-efficiency retrofit design for existing homes in a cold climate. Find more about this project at http://testudio.com/projects/minnephit-house/.
Passive House Object Documentation
© TE Studio, Ltd. 2017 4
1.3 Responsible Project Participants Project Designer, Implementation Planning, Building Systems, Building Physics, Passive House Project Planning, Construction Management
Dipl.-Ing. Tim Delhey Eian - TE Studio, Ltd. (http://testudio.com)
Structural Engineering Certifying Body Certification ID
Erik Bunkers, Mattson Macdonald Young (http://www.mattsonmacdonald.com) Passivhaus Institut Darmstadt 2069
Author of Project Documentation Date, Signature
Janneke Schaap, Intern Architect – TE Studio, Ltd. (http://testudio.com) 25 May 2017
Passive House Object Documentation
© TE Studio, Ltd. 2017 5
2 PROJECT ELEVATIONS AND PHOTOS 2.0 Existing Conditions
West elevation, before
Southwest perspective, before
Passive House Object Documentation
© TE Studio, Ltd. 2017 6
2.1 Exterior
West elevation (covered entry and street facade)
5
6
33 3 9
2
4
1 1
1
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
26'-2
"
DECORATIVE CHIMNEY
RIDGEVENT
W2.3 W2.2 W2.1
W1.2 W1.1
RETROFITRECONSTRUCTION
7
1. Sidewall flashing 2. Standing seam metal roofing 3. Cement board lap siding 4. Stone veneer 5. Sheetmetal cap 6. Timberframe entry canopy 7. Pier footing 8. Egress well 9. Functional shutters
Passive House Object Documentation
© TE Studio, Ltd. 2017 7
East elevation (rear patio entrance)
2
3 3
2
5
1
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
E1.3
E1.2
E2.3 E2.2 E2.1
E1.1
RECONSTRUCTIONRETROFIT
1. Sidewall flashing 2. Standing seam metal roofing 3. Cement board lap siding 4. Stone veneer 5. Sheetmetal cap 6. Timberframe entry canopy 7. Pier footing 8. Egress well 9. Functional shutters
Passive House Object Documentation
© TE Studio, Ltd. 2017 8
North elevation
South elevation
A
1
1
4
4
2
2
2
33
5
6
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
RIDGEVENT
N1.3
N2.2 N2.1
N1.1 N1.2
RETROFIT ADDITION
7
1. Sidewall flashing 2. Standing seam metal roofing 3. Cement board lap siding 4. Stone veneer 5. Sheetmetal cap 6. Timberframe entry canopy 7. Pier footing 8. Egress well 9. Functional shutters
A
3
5
2
8 8
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
1'-0
"
5'
RIDGEVENT
CRICKET
S1.1 S1.2 S1.3
S1.4 S1.5
S2.1 S2.2 S2.3
S0.1 S0.2
ADDITIONRETROFIT
1. Sidewall flashing 2. Standing seam metal roofing 3. Cement board lap siding 4. Stone veneer 5. Sheetmetal cap 6. Timberframe entry canopy 7. Pier footing 8. Egress well 9. Functional shutters
Passive House Object Documentation
© TE Studio, Ltd. 2017 9
Southwest perspective Northeast
Passive House Object Documentation
© TE Studio, Ltd. 2017 10
2.2 Interiors Living room Kitchen
Passive House Object Documentation
© TE Studio, Ltd. 2017 11
3 BUILDING SECTIONS
S-N Building Section @ Retrofit S-N Section @ Addition N-S Section @ Entry
E-W Building Section @ Stair The building envelope of the MinnePHit house is more diverse than most in effort to work seamlessly between new and existing assemblies. The basement slab was removed to insulate underneath a new concrete slab with rigid EPS foam. South and West below-grade exterior walls were excavated and insulated with rigid EPS applied to the exterior and closed cell spray foam from the interior for air barrier, while North and East below-grade walls received closed cell spray foam from the interior only for both insulation and air barrier, as excavation at these walls was not feasible. All new and existing above-grade exterior walls received new sheathing and i-joist framing added to the outside with dense-packed cellulose insulation, and the home has a completely new roof truss package that was meticulously air-sealed and insulated with loose-fill cellulose. New durable fiber-cement siding and Passive House windows complete the exterior package, and the result is a continuously air-sealed and insulated envelope that provides an efficient and comfortable interior in a cold climate year-round.
SHEET TITLE
DESCRIPTION
PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT
EPH-01 Brazelton for Presentation.pln
MARK DATE
A-3.1
TE Studio, Ltd.
5/9/17 Date printed
A-201101
BID SET6/13/116/29/11 PERMIT SET
/Use
rs/te
stud
io/D
ropb
ox/T
E St
udio
Tea
m F
olde
r/Pro
ject
s/ 0
- Pr
ojec
t Arc
hive
/A-2
0101
201
Braz
elto
n/5
- Bra
zelto
n Do
cum
enta
tion
(DO
CU)/B
raze
lton
PHI S
ubm
ittal
/EPH
-01
Braz
elto
n fo
r Pre
sent
atio
n.pl
n
CLIENTSDesiree and Paul Brazelton612-208-8197
BUILDING SECTIONS
BRAZELTONRESIDENCE
TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418
612-246-4670 office612-605-3200 fax
testudio.com
Holistic design for sustainable homes.
PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418
CONSULTANTS
TE S
tudi
o pr
ints
on
recy
cled
post
-con
sum
er p
aper
. Ple
ase
recy
cle.
TDE, JCCTDE, JCC
1
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
1
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
1
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
TRUSSED HIP ROOF
TRUSSED ROOF
A
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
3'-1
3/4
"
RAILING
WALL AT STAIR
ADDITION RETROFIT
BASEMENT STAIR(11) 10" TREADS/ (12) 7-3/4" RISERS
MAIN STAIR(13) 10" TREADS/ (14) 7-3/4" RISERS
SCALE: 1/8" = 1'-0"1 S-N SECTION @ RETROFITSCALE: 1/8" = 1'-0"2 S-N SECTION @ ADDITION
SCALE: 1/8" = 1'-0"3 N-S SECTION @ ENTRY
SCALE: 1/4" = 1'-0"4 E-W SECTION @ STAIR
SHEET TITLE
DESCRIPTION
PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT
EPH-01 Brazelton for Presentation.pln
MARK DATE
A-3.1
TE Studio, Ltd.
5/9/17 Date printed
A-201101
BID SET6/13/116/29/11 PERMIT SET
/Use
rs/te
stud
io/D
ropb
ox/T
E St
udio
Tea
m F
olde
r/Pro
ject
s/ 0
- Pr
ojec
t Arc
hive
/A-2
0101
201
Braz
elto
n/5
- Bra
zelto
n Do
cum
enta
tion
(DO
CU)/B
raze
lton
PHI S
ubm
ittal
/EPH
-01
Braz
elto
n fo
r Pre
sent
atio
n.pl
n
CLIENTSDesiree and Paul Brazelton612-208-8197
BUILDING SECTIONS
BRAZELTONRESIDENCE
TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418
612-246-4670 office612-605-3200 fax
testudio.com
Holistic design for sustainable homes.
PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418
CONSULTANTS
TE S
tudi
o pr
ints
on
recy
cled
post
-con
sum
er p
aper
. Ple
ase
recy
cle.
TDE, JCCTDE, JCC
1
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
1
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
1
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
TRUSSED HIP ROOF
TRUSSED ROOF
A
-7'-10"BSMNT PLAN
±0"1 FLOOR PLAN
+8'-11"2 FLOOR PLAN
+17'-6 1/2"ROOF PLAN
3'-1
3/4
"
RAILING
WALL AT STAIR
ADDITION RETROFIT
BASEMENT STAIR(11) 10" TREADS/ (12) 7-3/4" RISERS
MAIN STAIR(13) 10" TREADS/ (14) 7-3/4" RISERS
SCALE: 1/8" = 1'-0"1 S-N SECTION @ RETROFITSCALE: 1/8" = 1'-0"2 S-N SECTION @ ADDITION
SCALE: 1/8" = 1'-0"3 N-S SECTION @ ENTRY
SCALE: 1/4" = 1'-0"4 E-W SECTION @ STAIR
Passive House Object Documentation
© TE Studio, Ltd. 2017 12
4 FLOOR PLANS
Basement floor plan – before Basement floor plan - after The basement level houses the kids’ play room, which may double as a guest room with egress to the South when needed. A combination workout – mechanical room is used for exercise, equipment and storage. All below grade spaces are accessed from the North via a reconstructed stairway traveling through all levels. Two unexcavated areas flank the usable space – one existing to the North, one new under the addition to the East.
Main level floor plan – before Main level floor plan - before The main level holds the existing living area, as well as the expanded kitchen dining area, new mudroom and front entry with a walk-through powder room between.
SHEET TITLE
DESCRIPTION
PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT
EPH-01 Brazelton for Presentation.pln
MARK DATE
A-7.2
TE Studio, Ltd.
5/9/17 Date printed
A-201101
BID SET6/13/116/29/11 PERMIT SET
/Use
rs/te
stud
io/D
ropb
ox/T
E St
udio
Tea
m F
olde
r/Pro
ject
s/ 0
- Pr
ojec
t Arc
hive
/A-2
0101
201
Braz
elto
n/5
- Bra
zelto
n Do
cum
enta
tion
(DO
CU)/B
raze
lton
PHI S
ubm
ittal
/EPH
-01
Braz
elto
n fo
r Pre
sent
atio
n.pl
n
CLIENTSDesiree and Paul Brazelton612-208-8197
DESIGN PLANS
BRAZELTONRESIDENCE
TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418
612-246-4670 office612-605-3200 fax
testudio.com
Holistic design for sustainable homes.
PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418
CONSULTANTS
TE S
tudi
o pr
ints
on
recy
cled
post
-con
sum
er p
aper
. Ple
ase
recy
cle.
UP
WORKOUT/ ME RMA: 181.55 sq ft
H: 7'
KID'S ROOMA: 210.39 sq ft
H: 7'
BSMT STRA: 22.90 sq ft
UNEXCAVATED
EXISTING UNEXCAVATED
RE
F
D W
LIVING ROOMA: 240.43 sq ft
H: 8'
ENTRY VESTA: 52.06 sq ft
H: 8'
KITCHENA: 199.00 sq ft
H: 8'
FAM/DIN ROOMA: 315.70 sq ft
H: 8'
MUD ROOMA: 106.87 sq ft
H: 8'
PWDRA: 28.65 sq ft
H: 8'
LDGA: 13.75 sq ft
STRA: 37.24 sq ft
H: 7'-9"
BEDROOM 1A: 145.84 sq ft
H: 8'
BEDROOM 2A: 150.99 sq ft
H: 8'
MASTER BRA: 145.17 sq ft
H: 8'
M HALLA: 82.49 sq ft
H: 8'
M BATHA: 53.07 sq ft
H: 8'
WCA: 22.46 sq ft
H: 8'
FULL BATHA: 69.02 sq ft
H: 8'
BEDROOM 3A: 150.25 sq ft
H: 8'
UP STRA: 36.77 sq ft
UPSTAIRS HALLA: 63.51 sq ft
H: 8'
SOFFIT
BRICK CHIMNEY,SEAL AIRTIGHT
DEMO EXIST. SOFFIT
REMOVE AND SALVAGEWNDWS, TYP.
REMOVE AND SALVAGEDOORS AS INDICATED
DEMO LANDING
DEMO STAIRS,UP AND DOWN
UPDN
DN
DN
DN
2x10sV.I.F.
2x10sV.I.F.
2x V.I.F
.
LIVING ROOM
KITCHEN- DEMO ALL BUILT-INS- DEMO & SALVAGE EQUIPMENT
DINING ROOM
KID'S ROOM
ENTRY VEST.
DEMO FLOOR SYSTEMABOVE SLAB
DEMO FLOOR SYSTEMABOVE SLAB
First Floor Plan
SHEET TITLE
DESCRIPTION
PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT
EPH-01 Brazelton for Presentation.pln
MARK DATE
A-7.2
TE Studio, Ltd.
5/9/17 Date printed
A-201101
BID SET6/13/116/29/11 PERMIT SET
/Use
rs/te
stud
io/D
ropb
ox/T
E St
udio
Tea
m F
olde
r/Pro
ject
s/ 0
- Pr
ojec
t Arc
hive
/A-2
0101
201
Braz
elto
n/5
- Bra
zelto
n Do
cum
enta
tion
(DO
CU)/B
raze
lton
PHI S
ubm
ittal
/EPH
-01
Braz
elto
n fo
r Pre
sent
atio
n.pl
n
CLIENTSDesiree and Paul Brazelton612-208-8197
DESIGN PLANS
BRAZELTONRESIDENCE
TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418
612-246-4670 office612-605-3200 fax
testudio.com
Holistic design for sustainable homes.
PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418
CONSULTANTS
TE S
tudi
o pr
ints
on
recy
cled
post
-con
sum
er p
aper
. Ple
ase
recy
cle.
UP
WORKOUT/ ME RMA: 181.55 sq ft
H: 7'
KID'S ROOMA: 210.39 sq ft
H: 7'
BSMT STRA: 22.90 sq ft
UNEXCAVATED
EXISTING UNEXCAVATED
RE
F
D W
LIVING ROOMA: 240.43 sq ft
H: 8'
ENTRY VESTA: 52.06 sq ft
H: 8'
KITCHENA: 199.00 sq ft
H: 8'
FAM/DIN ROOMA: 315.70 sq ft
H: 8'
MUD ROOMA: 106.87 sq ft
H: 8'
PWDRA: 28.65 sq ft
H: 8'
LDGA: 13.75 sq ft
STRA: 37.24 sq ft
H: 7'-9"
BEDROOM 1A: 145.84 sq ft
H: 8'
BEDROOM 2A: 150.99 sq ft
H: 8'
MASTER BRA: 145.17 sq ft
H: 8'
M HALLA: 82.49 sq ft
H: 8'
M BATHA: 53.07 sq ft
H: 8'
WCA: 22.46 sq ft
H: 8'
FULL BATHA: 69.02 sq ft
H: 8'
BEDROOM 3A: 150.25 sq ft
H: 8'
UP STRA: 36.77 sq ft
UPSTAIRS HALLA: 63.51 sq ft
H: 8'
REPLACE GLASS BLOCKW/ EGRESS WNDWS
DEMO GLASS BLOCK& FILL TO MATCH
FND. WALL
PERIMETER OF STRUCTURE ABOVE
CHIMNEY ABOVE
DEMO STAIR
DEMO AND REPLACELOAD BEARING WALL
& FOUNDATIONTEMP. BRACE FLOOR
UP
2x10s@ 16" O.C.
2x10s@ 16" O.C.
UNEXCAVATED
DEMO FLOOR SLAB& EXCAVATE FOR NEWASSEMBLY
LAUNDRY ROOM WORKOUT ROOM
BATH- DEMO & SALVAGE FIXTURES
Basement Floor Plan
Passive House Object Documentation
© TE Studio, Ltd. 2017 13
`
Upper level floor plan – after Upper level floor plan - before The upper floor contains the more private bedrooms and bathrooms. Space for two bedrooms was gained over the dining room addition below at the East, including that for a true master suite with walk-through closet and en-suite bathroom with shower. The existing bath was remodeled and is primarily used as a dedicated kid’s bath, with a separate water closet moved to the hallway to accommodate multiple users at once.
SHEET TITLE
DESCRIPTION
PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT
EPH-01 Brazelton for Presentation.pln
MARK DATE
A-7.2
TE Studio, Ltd.
5/9/17 Date printed
A-201101
BID SET6/13/116/29/11 PERMIT SET
/Use
rs/te
stud
io/D
ropb
ox/T
E St
udio
Tea
m F
olde
r/Pro
ject
s/ 0
- Pr
ojec
t Arc
hive
/A-2
0101
201
Braz
elto
n/5
- Bra
zelto
n Do
cum
enta
tion
(DO
CU)/B
raze
lton
PHI S
ubm
ittal
/EPH
-01
Braz
elto
n fo
r Pre
sent
atio
n.pl
n
CLIENTSDesiree and Paul Brazelton612-208-8197
DESIGN PLANS
BRAZELTONRESIDENCE
TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418
612-246-4670 office612-605-3200 fax
testudio.com
Holistic design for sustainable homes.
PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418
CONSULTANTS
TE S
tudi
o pr
ints
on
recy
cled
post
-con
sum
er p
aper
. Ple
ase
recy
cle.
UP
WORKOUT/ ME RMA: 181.55 sq ft
H: 7'
KID'S ROOMA: 210.39 sq ft
H: 7'
BSMT STRA: 22.90 sq ft
UNEXCAVATED
EXISTING UNEXCAVATED
RE
F
D W
LIVING ROOMA: 240.43 sq ft
H: 8'
ENTRY VESTA: 52.06 sq ft
H: 8'
KITCHENA: 199.00 sq ft
H: 8'
FAM/DIN ROOMA: 315.70 sq ft
H: 8'
MUD ROOMA: 106.87 sq ft
H: 8'
PWDRA: 28.65 sq ft
H: 8'
LDGA: 13.75 sq ft
STRA: 37.24 sq ft
H: 7'-9"
BEDROOM 1A: 145.84 sq ft
H: 8'
BEDROOM 2A: 150.99 sq ft
H: 8'
MASTER BRA: 145.17 sq ft
H: 8'
M HALLA: 82.49 sq ft
H: 8'
M BATHA: 53.07 sq ft
H: 8'
WCA: 22.46 sq ft
H: 8'
FULL BATHA: 69.02 sq ft
H: 8'
BEDROOM 3A: 150.25 sq ft
H: 8'
UP STRA: 36.77 sq ft
UPSTAIRS HALLA: 63.51 sq ft
H: 8'
BRICK CHIMNEY
DEMO STAIR &LANDINGS
DEMOBALCONY
REMOVE AND SALVAGEWNDWS, TYP.
REMOVE AND SALVAGEDOORS AS INDICATED
DN
DN
DN
DN
MASTER BEDROOM BEDROOM
BATH- DEMO & SALVAGE FIXTURES
OFFICEDEMO ROOF SYSTEMABOVE ENTRY
Second Floor Plan
Passive House Object Documentation
© TE Studio, Ltd. 2017 14
5 CONSTRUCTION DETAILS
5.1 Typical retrofit assemblies section
EX
IST.
WA
LL
RE
TRO
FIT
WA
LL
20"
10 3/4"
5 1/
2"
± 9
1/4"
1 1/
2"
9 1/
4"7"
24"
+1'-8"
0'-0"
-0'-3"
+0'-0 1/2"
EXIST. ROOF FRAMINGTO BE DEMO'D
INSECT SCREEN
VENT CHUTES
GUTTER
MAINTAIN CONT. AIR BARRIER W/ SIGABRAND TAPE AT SHEATHING TO TOP PLATE
MAINTAIN CONT. AIR BARRIER W/ SIGABRAND TAPE AT SHEATHING TO TOP PLATE
CONT. VENTING
BACKFILL
RETROFIT ABOVE-GRADE WALL, TYPE 1
INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING, EXISTING DENSE-PACK WITH CELLULOSE (3.5 LBS/ CU FT), OR FIBERGLASS BATT INSULATION• 3/4" T&G EXTERIOR SHEATHING, EXISTING• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ EXIST. STUDS WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR
RETROFIT BELOW-GRADE WALL, TYPE 4
INTERIOR• 5/8" WALL BOARD• 3-1/2" STEEL FRAMING @ 24" O.C. WITH MIN. 2-1/2" CLOSED-CELL SPRAYFOAM INSULATION VAPOR BARRIER & AIRTIGHTNESS LAYER• 11-5/8" CMU WALL, EXISTING• (2) 3" EXTERIOR GRADE EPS INSULATION (EIFS)• STO FLEXYL (EIFS) WEATHER RESISTANT BARRIER & FINISH (TIE TO FACE OF FOOTING)EXTERIOR
FLOOR SLAB RETROFIT, TYPE FS1
NOTE: REMOVE EXISTING SLAB & EXCAVATE TOACCOMODATE RETROFIT ASSEMBLY
INTERIOR• 4" CONCRETE SLAB WITH RADIANT IN-FLOOR HEATING SYSTEM• 6-MIL POLY VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT ALL JOINTS AND PROTRUSIONS• 6" BELOW GRADE EPS INSULATION BOARD, COMPRESSIVE STRENGTH PER SE• MIN. 2" GRAVELEXTERIOR
MAIN VENTED COLD ROOF
NOTE: REMOVE EXISTING ROOF STRUCTURE,BUILD PERIMETER KNEE WALL AND SET NEWTRUSSED HIP ROOF PER STRUCTURAL DRAWINGS
EXTERIOR• STANDING SEAM METAL ROOFING @ 16" O.C.• GRACE ICE & WATER SHIELD HT ROOFING UNDERLAYMENT, WEATHER RESISTANT BARRIER• 3/4" STRUCTURAL PLYWOOD SHEATHING• ATTIC AIRSPACE, OR VENT CHUTES• STRUC. TRUSSES @ 24" O.C. WITH MIN. 22" CELLULOSE INSULATION• 5/8" OSB SHEATHING, SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 5-1/2" INSTALLATION CAVITY, 2X6 FURR-FRAMING OR SUSPENSION SYSTEM• 5/8" WALLBOARD CEILINGINTERIOR
WEATHER RESISTANT BARRIER (WRB)
AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR)
RETROFIT FRAMING
EXIST. WALL
TRU
SS
BE
AR
ING
210
T.O. KNEEWALL
T.O. EXISTING WALL
T.O. EXISTING R.O.
T.O. ADDITION R.O.s
CLE
AR
@ O
UTS
IDE
OF
STU
DW
ALL
SNOW GUARDS PER MANUF.
Passive House Object Documentation
© TE Studio, Ltd. 2017 15
The building envelope of the MinnePHit house comprises a combination of existing and new assemblies. Connection details at interior walls and floors do not present a protrusion of the airtightness or insulation layers. Above grade walls, typical All existing 2x4 walls are insulated with batt insulation. OSB sheathing is added to the existing sheathing, which is taped at seams and transition details to provide the air barrier. 9 ¼” [235mm] I-Joists are fastened to the existing studs. The newly created cavities are dense packed with cellulose providing an overall R-Value of 44 [Usi =0.128 W/(m2K)]. Permeable fiberboard sheathing allows for drying potential to the outside. The new fiber cement board siding is mounted to furring strips (ventilated rainscreen) and gives the house a durable new façade that fits well with the historic original house and surrounding neighborhood. Below grade walls, typical 6” [152mm] of EPS is added to the outside of the existing 11 5/8” CMU walls where accessible (South and West sides). On the inside 2” [51mm] of closed cell spray foam provide the air barrier. On the North and East sides excavation is not possible, thus 4 ½” closed cell spray foam on the inside provide the air barrier and insulation in these areas. The below grade walls offer an R-value from 32 [Usi =0.176 W/(m2K)] to 41 [Usi =0.138 W/(m2K)]. Basement stair wall Due to space restrictions at interior and inability to excavate at exterior, the below grade wall adjacent basement stair is insulated to the inside with Vacuum Insulated Panels glued to the block wall, taped at seams to provide the air barrier and covered with drywall. The R-value for this assembly is 26.9 [Usi =0.211 W/(m2K] and is factored into the typical below grade average above. Slab The existing slab was removed and ground excavated to the bottom of the footing. A new 4” concrete slab sits over 6” [152mm] of EPS insulation and two layers of 6 mil polyethylene membrane—taped at seams and transition details, which provide the air barrier. The new slab offers an R-value of 26 [Usi =0.219 W/(m2K)]. Footing Existing footings are insulated with rigid EPS to the exterior where excavation occurred, and new footings have rigid EPS at interior and exterior as well as underneath. Roof The existing roof was removed. The new roof is a cold roof finished with asphalt roofing. The 2nd story ceiling is insulated with 22” [559mm] of loose fill cellulose providing an R-value of 76 [Usi =0.074 W/(m2K]. The underside of the trusses is sheathed with OSB taped at seams and transition details providing the air barrier. A suspended ceiling houses lighting and the ventilation ducts.
Passive House Object Documentation
© TE Studio, Ltd. 2017 16
5.2 Typical transitions and assemblies
Typical corner at retrofit Existing to addition connection Typical corner at addition
1" 3 1/2"
MATCH HEIGHT OF EXISTING BASEMENT WALL
SEAL AIRTHIGHT WITH SPRAYFOAM
NEW ABOVE-GRADE WALL, TYPE 2
INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING @ 24" O.C. WITH 3-1/2" DENSE-PACK (3.5 LBS/ CU FT) OR FIBERGLASS BATT INSULATION• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ 24 O.C. WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR
TYPICAL STEMWALL
INTERIOR• 11-5/8" CMU WALL TO FROST FOOTING• 3" EXTERIOR GRADE EPS INSULATION (EIFS)• STO FLEXYL (EIFS) WEATHER RESISTANT BARRIER & FINISH (TIE TO FACE OF FOOTING)EXTERIOR
FLOOR SLAB ADDITION, FS3
INTERIOR• 3/4" FINISHED FLOORING, TIME OUT WITH EXISTING FLOORING• 1-1/2" SELF-LEVELING OVERPOUR• 8-1/2" EPS INSULATION (> 1.8 LBS/ CU FT) TOP LAYER WITH IN-FLOOR HEATING PIPES• (2) 6 MIL POLYETHYLENE, VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT JOINTS AND PROTRUSIONS• 4" STRUCTURAL SLAB• MIN. 2" GRAVELGRADE
EXISTINGFIRST FLOOR
EASTADDITION
EXISTINGBASEMENT
AADDITIONRETROFIT
RETROFIT BELOW-GRADE WALL, TYPE 5
INTERIOR• 5/8" WALL BOARD• 3-1/2" STEEL FRAMING @ 24" O.C. WITH MIN. 4-1/2" CLOSED-CELL SPRAYFOAM INSULATION VAPOR BARRIER & AIRTIGHTNESS LAYER• 11-5/8" CMU WALL, EXISTING• EXTERIOR
SHEET TITLE
DESCRIPTION
PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT
EPH-01 Brazelton for Presentation.pln
MARK DATE
A-4.2
TE Studio, Ltd.
5/10/17 Date printed
A-201101
BID SET6/13/116/29/11 PERMIT SET
/Use
rs/te
stud
io/D
ropb
ox/T
E St
udio
Tea
m F
olde
r/Pro
ject
s/ 0
- Pr
ojec
t Arc
hive
/A-2
0101
201
Braz
elto
n/5
- Bra
zelto
n Do
cum
enta
tion
(DO
CU)/B
raze
lton
PHI S
ubm
ittal
/EPH
-01
Braz
elto
n fo
r Pre
sent
atio
n.pl
n
CLIENTSDesiree and Paul Brazelton612-208-8197
WALL SECTIONS
BRAZELTONRESIDENCE
TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418
612-246-4670 office612-605-3200 fax
testudio.com
Holistic design for sustainable homes.
PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418
CONSULTANTS
TE S
tudi
o pr
ints
on
recy
cled
post
-con
sum
er p
aper
. Ple
ase
recy
cle.
TDE, JCCTDE, JCC
42"
8"
4"
MATCH HEIGHT OF SIDINGON OTHER FACADES
BOND BEAM,SEE STRUCT NOTES
REMOVE LANDING SHEATH.& MATCH FINISH HEIGHT W/EXISTING FIRST FLOOR
PROPOSED CMU BLOCK
1" EPS
SILL SEAL
TAPE POLY TO SHEATHING
PROPOSED CMU BLOCK
LAP STO FLEXYLOVER CONC.
SEAL AIRTIGHT WITH SPRAYFOAM
TYPICAL SECTIONEAST & WEST SIDE(R-47)
INSIDE- 3/4" FINISHED FLOORING, TIME OUT WITH EXISTING FLOORING- 1-1/2" SELF LEVELING OVERPOUR- MIN. 9" EPS INSULATION TOP LAYER WITH IN-FLOOR HEATING PIPES- SAND FILL TO EXISTING SLAB- 6 MIL POLYETHYLENE, VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT JOINTS AND PROTRUSIONS- EXISTING SLABGRADE@ EXISTING
FIRST FLOORLANDING
EXISTINGBASEMENT
NOTE:
@ WEST WALL A STEM WALL EXISTSSIMILAR TO NORTH WALL BUT ALIGNMENT W/ADDITIONAL PROPOSED CMU BLOCK MATCHESEAST WALL CONDITIONS.
ONLY EAST WALL REQUIRES A BOND BEAM.
7-1/2" TRIM
RETROFIT ABOVE-GRADE WALL, TYPE 1
INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING, EXISTING DENSE-PACK WITH CELLULOSE (3.5 LBS/ CU FT), OR FIBERGLASS BATT INSULATION• 3/4" T&G EXTERIOR SHEATHING, EXISTING• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ EXIST. STUDS WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR
CONTINUOUS 5/8" SHEATHINGCONNECTS EXISTING AND NEW CONSTRUCTIONVAPOR BARRIER & AIRTIGHTNESS LAYER
NEW ABOVE-GRADE WALL, TYPE 2
INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING @ 24" O.C. WITH 3-1/2" DENSE-PACK (3.5 LBS/ CU FT) OR FIBERGLASS BATT INSULATION• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ 24 O.C. WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR
LINE UP BLOCK WALL WITH OUTLINEOF FIRST LAYER OF EXTERIOR INSULATION
OUTLINE OF WALL ABOVE
STO FLEXYL, W.R.B.
EXISTING BASEMENT UNEXCAVATED @ ADDITION
SCALE: 1 1/2"= 1'-0"5 TYP. NORTH ADDITION STEMWALL & BASEMENT CONNECTION
SCALE: 1 1/2"= 1'-0"1 TYPICAL CORNER @ RETROFITSCALE: 1 1/2"= 1'-0"2 EXIST. TO ADDITION CONNECTION
SCALE: 1 1/2"= 1'-0"3 TYPICAL CORNER @ ADDITIONSCALE: 1 1/2"= 1'-0"4 BASEMENT TRANSITION
WEATHER RESISTANT BARRIER (WRB)
AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR)
Passive House Object Documentation
© TE Studio, Ltd. 2017 17
Basement transition
Typical North addition stemwall and basement connection
SHEET TITLE
DESCRIPTION
PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT
EPH-01 Brazelton for Presentation.pln
MARK DATE
A-4.2
TE Studio, Ltd.
5/10/17 Date printed
A-201101
BID SET6/13/116/29/11 PERMIT SET
/Use
rs/te
stud
io/D
ropb
ox/T
E St
udio
Tea
m F
olde
r/Pro
ject
s/ 0
- Pr
ojec
t Arc
hive
/A-2
0101
201
Braz
elto
n/5
- Bra
zelto
n Do
cum
enta
tion
(DO
CU)/B
raze
lton
PHI S
ubm
ittal
/EPH
-01
Braz
elto
n fo
r Pre
sent
atio
n.pl
n
CLIENTSDesiree and Paul Brazelton612-208-8197
WALL SECTIONS
BRAZELTONRESIDENCE
TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418
612-246-4670 office612-605-3200 fax
testudio.com
Holistic design for sustainable homes.
PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418
CONSULTANTS
TE S
tudi
o pr
ints
on
recy
cled
post
-con
sum
er p
aper
. Ple
ase
recy
cle.
TDE, JCCTDE, JCC
42"
8"
4"
MATCH HEIGHT OF SIDINGON OTHER FACADES
BOND BEAM,SEE STRUCT NOTES
REMOVE LANDING SHEATH.& MATCH FINISH HEIGHT W/EXISTING FIRST FLOOR
PROPOSED CMU BLOCK
1" EPS
SILL SEAL
TAPE POLY TO SHEATHING
PROPOSED CMU BLOCK
LAP STO FLEXYLOVER CONC.
SEAL AIRTIGHT WITH SPRAYFOAM
TYPICAL SECTIONEAST & WEST SIDE(R-47)
INSIDE- 3/4" FINISHED FLOORING, TIME OUT WITH EXISTING FLOORING- 1-1/2" SELF LEVELING OVERPOUR- MIN. 9" EPS INSULATION TOP LAYER WITH IN-FLOOR HEATING PIPES- SAND FILL TO EXISTING SLAB- 6 MIL POLYETHYLENE, VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT JOINTS AND PROTRUSIONS- EXISTING SLABGRADE@ EXISTING
FIRST FLOORLANDING
EXISTINGBASEMENT
NOTE:
@ WEST WALL A STEM WALL EXISTSSIMILAR TO NORTH WALL BUT ALIGNMENT W/ADDITIONAL PROPOSED CMU BLOCK MATCHESEAST WALL CONDITIONS.
ONLY EAST WALL REQUIRES A BOND BEAM.
7-1/2" TRIM
RETROFIT ABOVE-GRADE WALL, TYPE 1
INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING, EXISTING DENSE-PACK WITH CELLULOSE (3.5 LBS/ CU FT), OR FIBERGLASS BATT INSULATION• 3/4" T&G EXTERIOR SHEATHING, EXISTING• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ EXIST. STUDS WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR
CONTINUOUS 5/8" SHEATHINGCONNECTS EXISTING AND NEW CONSTRUCTIONVAPOR BARRIER & AIRTIGHTNESS LAYER
NEW ABOVE-GRADE WALL, TYPE 2
INTERIOR• 5/8" WALLBOARD• 2X4 FRAMING @ 24" O.C. WITH 3-1/2" DENSE-PACK (3.5 LBS/ CU FT) OR FIBERGLASS BATT INSULATION• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ 24 O.C. WITH DENSE-PACK CELLULOSE INSULATION (3.5 LBS/ CU FT)• 1/2" BILDRITE FIBERBOARD SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR
LINE UP BLOCK WALL WITH OUTLINEOF FIRST LAYER OF EXTERIOR INSULATION
OUTLINE OF WALL ABOVE
STO FLEXYL, W.R.B.
EXISTING BASEMENT UNEXCAVATED @ ADDITION
SCALE: 1 1/2"= 1'-0"5 TYP. NORTH ADDITION STEMWALL & BASEMENT CONNECTION
SCALE: 1 1/2"= 1'-0"1 TYPICAL CORNER @ RETROFITSCALE: 1 1/2"= 1'-0"2 EXIST. TO ADDITION CONNECTION
SCALE: 1 1/2"= 1'-0"3 TYPICAL CORNER @ ADDITIONSCALE: 1 1/2"= 1'-0"4 BASEMENT TRANSITION
WEATHER RESISTANT BARRIER (WRB)
AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR)
42"
8"
4"
MATCH HEIGHT OF SIDINGON OTHER FACADES
BOND BEAM,SEE STRUCT NOTES
REMOVE LANDING SHEATH.& MATCH FINISH HEIGHT W/EXISTING FIRST FLOOR
PROPOSED CMU BLOCK
1" EPS
SILL SEAL
TAPE POLY TO SHEATHING
PROPOSED CMU BLOCK
LAP STO FLEXYLOVER CONC.
SEAL AIRTIGHT WITH SPRAYFOAM
TYPICAL SECTIONEAST & WEST SIDE(R-47)
INSIDE- 3/4" FINISHED FLOORING, TIME OUT WITH EXISTING FLOORING- 1-1/2" SELF LEVELING OVERPOUR- MIN. 9" EPS INSULATION TOP LAYER WITH IN-FLOOR HEATING PIPES- SAND FILL TO EXISTING SLAB- 6 MIL POLYETHYLENE, VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT JOINTS AND PROTRUSIONS- EXISTING SLABGRADE@ EXISTING
FIRST FLOORLANDING
EXISTINGBASEMENT
NOTE:
@ WEST WALL A STEM WALL EXISTSSIMILAR TO NORTH WALL BUT ALIGNMENT W/ADDITIONAL PROPOSED CMU BLOCK MATCHESEAST WALL CONDITIONS.
ONLY EAST WALL REQUIRES A BOND BEAM.
Passive House Object Documentation
© TE Studio, Ltd. 2017 18
5.4 Window Details
Typical window head and sill Typical window head and sill, basement
Typical window jamb Typical window jamb, basement
8 7/8" (225 MM)
4" 5 1/2"
RO
UG
H O
PE
NIN
GR
OU
GH
OP
EN
ING
EPS WEDGE
EPS INFILL
AIRTIGHTCONNECTION
AIRTIGHTCONNECTION
COMPRESSIONTAPE
DRIP EDGE
OPT. 2X4
L-SECTIONEND CAP
8 7/8" (225 MM)
1 3/
4"3/
4"
STO FINISH PROFILE
STO DRIP EDGE
WINDOW R.O.
BLOCK R.O.
EXIST. R.O.WINDOW R.O.
U-SECTIONEND CAP
REFERENCE DETAILS:- STO W 710- STO W 425-2
4"4"5
1/2"
ROUGH OPENING
WINDOW SET POINT
OPT. 2X4
L-SECTION SILL END CAP
EXTERIOR ALUMINUM SILL
INTERIOR WOOD SILL
EPS FOAM STRIP
PLYWOOD STRIP
FILL VOID WITH EPS FOAM
MIN
. 1-3
/8"
1 3/4"
EXIST. ROUGH OPENING
WINDOW SET POINT
1" POLYISOCYANURATE FOAM BOARD
3/4" PLYWOOD BUCK
STO GUARD WET-FLASHING SYSTEM
STO FINISH PROFILE
AIR TIGHT CONNECTIONDOUBLE SIDED BUTYL TAPEPER MANF.
RETROFIT ROUGH OPENING
REFERENCE DETAILS:- STO W 425-1- STO W 501
NOTE:VERIFY DIMENSIONSWITH ACTUAL PRODUCT
INTERIOR
EXTERIOR
Passive House Object Documentation
© TE Studio, Ltd. 2017 19
The MinnePHit house has all new German-made Optiwin windows that are built into the insulation layer of the walls and eliminate thermal bridges. Frame: Optiwin, Alu2Wood
Aluminum-clad wood frame with cork insulation and Passive House certified at wall installation
Uf = 0.93 W/(m2K) Glazing: Glas Trösch TRII 0,5 triple pane,
4mmm Eurofloat/ TRIII-/ Eurowhite 4mm/ Ar 95Lu5 18mm TRIII/ Eurofloat Ug = 0.5 W/(m2K) g = 52 %
The windows deliver an installed overall Uw of 0.76 W/(m2K).
Passive House Object Documentation
© TE Studio, Ltd. 2017 20
Air sealing at window
Air sealing at sheathing
Air sealing at slab
Air tightness test in progress
6 DESCRIPTION OF THE AIRTIGHTNESS LAYER; INCLUDING TEST RESULTS Two layers of polyethylene membrane, which are sealed and taped at connections and protrusions, provide the airtightness of the basement slab. Below grade exterior walls’ airtightness is achieved with between 2-1/2” and 4-1/2” of closed cell spray foam insulation applied to the interior side. Above-grade exterior walls both new and existing are clad in a layer of OSB sheathing, taped at seams and transition details, which provides the airtightness. The underside of the new roof trusses is clad with OSB taped at seams and transition details, again providing the air barrier. Windows and doors are sealed with tape. Protrusions are caulked and foamed. The Energy Conservatory with the help of the Tectite software using the prescribed DIN EN 13829 protocol performed the pressure test. The building averaged 195 CFM50, for depressurization and 197 CFM50 for pressurization for an average of 196 CFM50 or 0.65 ACH50.
Passive House Object Documentation
© TE Studio, Ltd. 2017 21
6"6"
UP
VE
NT
EX
HA
US
TV
EN
TILA
TOR
VE
NT
INTA
KE
ADDITIONRETROFIT
18
18
12
GA
S
CL
RE
CO
NS
TRU
CTI
ON
RE
TRO
FIT
BOILER
WORKOUT/ ME RMA: 182 sq ft
H: 7'
KID'S ROOMA: 210 sq ft
H: 7'
BSMT STRA: 23 sq ft
UNEXCAVATED
EXISTING UNEXCAVATED
1
A
7 VENTILATION LAYOUT The ventilation system in the MinnePHit House revolves around a Paul Novus 300 HRV from Zehnder. It provides balanced ventilation with a rated heat recovery rate of 93%. An electric resistance pre-heater keeps the ventilator frost-free. The duct system is home run. Outside air is supplied to living spaces and bedrooms, exhaust air returned from the kitchen, baths, and mechanical space. Adjustable diffusors are used to control air volumes. A common wall in the center of the home is used to keep vertical runs and overall duct lengths short. The ventilation machine is installed in the Workout / Mechanical room in the basement level adjacent the common wall that runs through all levels. Air intake and exhaust pipes connect straight through the wall. Basement level ventilation plan
Passive House Object Documentation
© TE Studio, Ltd. 2017 22
RE
F
D W
6"
6"
3'-8"
ADDITIONRETROFIT
12
36
24
12
12
CL
CL
RE
CO
NS
TRU
CTI
ON
RE
TRO
FIT
LIVING ROOMA: 240 sq ft
H: 8'
ENTRY VESTA: 52 sq ft
H: 8'
KITCHENA: 199 sq ft
H: 8'
FAM/DIN ROOMA: 316 sq ft
H: 8'
MUD ROOMA: 107 sq ft
H: 8'
PWDRA: 29 sq ft
H: 8'
LDGA: 14 sq ft
STRA: 37 sq ft
H: 7'-9"
1
A
2'
8"
3'-2"
8"
ADDITIONRETROFIT
12
24
12
12
12
CL
CL
CL
CL
CL
CL
RE
CO
NS
TRU
CTI
ON
RE
TRO
FIT
BEDROOM 1A: 146 sq ft
H: 8'
BEDROOM 2A: 151 sq ft
H: 8'
MASTER BRA: 145 sq ft
H: 8'
M HALLA: 82 sq ft
H: 8'
M BATHA: 53 sq ft
H: 8'
WCA: 22 sq ft
H: 8'
FULL BATHA: 69 sq ft
H: 8'
BEDROOM 3A: 150 sq ft
H: 8'
UP STRA: 37 sq ft
UPSTAIRS HALLA: 64 sq ft
H: 8'
1
A
12
12
24
Main level ventilation plan Upper level ventilation plan
Passive House Object Documentation
© TE Studio, Ltd. 2017 23
Zehnder Paul Novus 300 HRV Zehnder ComfoDuct insulated exhaust
Zehnder ComfoTube supply and return ducts The ventilation system was laid out by TE Studio and commissioned by Zehnder. The ventilation machine offers a summer bypass to maximize passive cooling when available. Central Unit: Zehnder Paul Novus 300 Type: HRV Specific Values: 93% heat recovery/ 0.24Wh/m3 electric efficiency
Passive House Object Documentation
© TE Studio, Ltd. 2017 24
8 HEATING STRATEGY The heat load for the home (approx. 4 kW) is delivered by an existing natural gas boiler connected to hydronic in-floor heat and the domestic hot water (DHW) system. It’s efficiency is rated at 84%. The roof is engineered to receive a Solar thermal or PV system at a later date to further reduce the primary energy demand. The DHW system is home run.
Existing boiler: space heating and DHW In-floor heat and DWH distribution system
Passive House Object Documentation
© TE Studio, Ltd. 2017 25
9 PHPP AND ENERPHIT 9.1 PHPP Verification Page
PHPP, Verification 20121219_PHPP_2069.xls
EnerPHit verification
Photo or Drawing
Building: "MinnePHit House", Brazelton ResidenceStreet: 5605 Bloomington Avenue S.
Postcode/City: Minneapolis, MN 55417Country: USA
Building Type: Single Family DetachedClimate: Minneapolis
Home Owner(s) / Client(s): Paul & Desiree BrazeltonStreet: 5605 Bloomington Avenue S.
Postcode/City: Minneapolis, MN 55417
Architect: Tim Eian - TE Studio, Ltd.Street: 212 2nd St.SE #222
Postcode/City: Minneapolis, MN 55414
Mechanical System: TE Studio, Zehnder USA, Paul BrazeltonStreet:
Postcode/City:
Year of Construction: 2011-2012 Interior Temperature: 20.0 °CNumber of Dwelling Units: 1 Internal Heat Gains: 2.1 W/m2
Enclosed Volume Ve: 795.4Number of Occupants: 5.9
Specific building demands with reference to the treated floor area use: Monthly method
Treated floor area 207.3 m² Requirements Fulfilled?*
Space heating Annual heating demand 27 kWh/(m2a) - -
Heating load 20 W/m2 - -
Space cooling Overall specific space cooling demand kWh/(m2a) - -
Cooling load W/m2 - -Frequency of overheating (> 25 °C) 4.5 % - -
Primary EnergySpace heating and
dehumidification, DHW, Auxiliary Electricity and
cooling, household electricity. 120 kWh/(m2a) 134 kWh/(m²a) yes
DHW, space heating and auxiliary electricity 80 kWh/(m2a) - -Specific primary energy reduction through solar electricity 0 kWh/(m2a) - -
Airtightness Pressurization test result n50 0.7 1/h 1 1/h yes
EnerPHit (retrofit): according to component quality
Building envelope Exterior insulation to ambient air 0.11 W/(m²K) - -
average U-Values Exterior insulation underground 0.17 W/(m²K) - -
Interior insulation to ambient air W/(m²K) - -
Interior insulation underground 0.17 W/(m²K) - -
Thermal bridges ΔU 0.01 W/(m²K) - -
Windows 0.77 W/(m²K) - -
External doors 0.79 W/(m²K) - -
Ventilation System Effective heat recovery efficiency 89 % - -* empty field: data missing; '-': no requirement
EnerPHit building retrofit (acc. to component quality)? PILOT CERTIFICATE FOR COLD CLIMATE yes
We confirm that the values given herein have been Name: Registration number PHPP:determined following the PHPP methodology and basedon the characteristic values of the building. The PHPP Surname: Issued on:calculations are attached to this application.
Company: Signature:
Passive House Object Documentation
© TE Studio, Ltd. 2017 26
9.2 EnerPHit Certificate
Passive House Object Documentation
© TE Studio, Ltd. 2017 27
10 BUILDING COST Withheld per owner request.
Passive House Object Documentation
© TE Studio, Ltd. 2017 28
11 DESIGN OVERVIEW The building was designed from the outset to solve programmatic and spatial challenges while meeting EnerPHit criteria. The first PHPP was completed during schematics as a tool to explore the bounds of the retrofit and present potential opportunities to the clients, and was subsequently kept current with design evolutions. The construction methods were selected specifically with airtightness in mind, as the local building industry does not have a lot of experience with airtight buildings, especially in a retrofit application. Fenestration and glazing were fine-tuned using the PHPP. In an effort to deliver a holistic and sustainable design, specifications were guided by their impact to indoor environmental quality and occupant health, water conservation, resource efficiency, site and community impact as well as comfort and energy performance. The home was designed by Dipl.-Ing. Tim Delhey Eian of TE Studio, Ltd. with the help of Barbara Schmidt of Studio BStyle (interior design). 11.1 Technical Design The technical systems were designed by Dipl.-Ing. Tim Delhey Eian of TE Studio, Ltd. 11.2 PHPP Modeling & Calculation The PHPP modeling was done by Dipl.-Ing. Tim Delhey Eian of TE Studio, Ltd. The Passive House Institute of Darmstadt, Germany certified the building. Wolfgang Feist of the Passive House Institute in Darmstadt issued the EnerPHit certificate on 10 January 2013. 11.3 Structural Engineering Eric Bunkers, P.E. of Mattson Macdonald Young provided structural engineering for the project.
Passive House Object Documentation
© TE Studio, Ltd. 2017 29
12 REFERENCES • Project on architect website: http://testudio.com/projects/minnephit-house/