    Passenger Transportation PlanFiscal Year 2011 Update to the Fiscal Years 2010-2013 Plan

    Des Moines Area Metropolitan Planning OrganizationCentral Iowa Regional Transportation Planning Alliance

    April 2010

  • 7/28/2019 Passenger Transportation Plan 2011

    2/33

    Des Moines Area Metropolitan Planning OrganizationCentral Iowa Regional Transportation Planning AllianceMerle Hay Centre 6200 Aurora Avenue, Suite 300W

    Urbandale, Iowa 50322Telephone: (515) 334-0075

    Fax: (515) 334-0098E-mail: [email protected]

    Website: www.dmampo.org

    2010 Des Moines Area Metropolitan Planning OrganizationPlease call (515) 334-0075 for permission to use.

    The preparation of this document was financed through federalfunds provided by the United States Department of Transportation,

    Federal Highway Administration, and/or Federal TransitAdministration

    2

  • 7/28/2019 Passenger Transportation Plan 2011

    3/33

  • 7/28/2019 Passenger Transportation Plan 2011

    4/33

    1.2 HISTORY OF THE PASSENGER TRANSPORTATION PLAN

    Numerous entities provide transportation assistance, including public transit systems and

    human service agencies providing transportation to specific clientele for specific purposes.

    These providers often receive public funding for transportation through state or federaldepartments, such as Departments of Health and Human Services, Transportation, Veterans

    Affairs, and so on. Public funding available for passenger transportation is limited;

    consequently, federal, state, and local governments are recognizing the need to coordinate

    transportation services to efficiently utilize these limited funds.

    In 2004, Executive Order 13330 established the Coordinating Council on Access and

    Mobility. This federal interagency council began the United We Ride initiative to coordinate

    transportation services nationally.3 Signed in August 2005, the Safe, Accountable, Flexible,

    and Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) continued the

    United We Ride initiative by providing $52.6 billion nationally through FY 2009 for federally

    funded transit programs. SAFETEA-LU calls for an increased effort in coordinating

    transportation services, particularly services intended for elderly persons, persons with

    disabilities, and low-income persons. SAFETEA-LU requires a locally developed, coordinated

    public transportation/human service plan to award projects funds from the Federal Transit

    Administrations (FTA) Special Needs, Job Access and Reverse Commute (JARC), and New

    Freedom programs. These funding sources are of particular importance, as they aim to increase

    the mobility of elderly persons, persons with disabilities, and low-income persons.4

    Similarly, Chapter 324A of the Iowa Code requires that all agencies expending public

    funds for the provision or purchase of passenger transportation services, other than public school

    transportation, must coordinate or consolidate that funding and the resulting services with the

    respective public transit system in their area.5

    To comply with SAFETEA-LU guidelines, the Iowa Department of Transportation (Iowa

    DOT) requires Iowas nine metropolitan planning organizations (MPO) and eighteen regional

    planning affiliations (RPA) to complete a PTP or a PTP update annually. The PTP serves as the

    required, locally developed, public transportation/human service coordination plan. In addition

    to the federal requirement for a public transportation/human service coordination plan, the IowaDOT requires the PTP to include projects selected for funding from all FTA and Iowa DOT

    funding programs. Funding amounts and sources for any project included in an MPO or RPAs

    Transportation Improvement Program must be derived from and justified in the PTP.

    3 www.unitedweride.gov4 http://www.fta.dot.gov/leg_reg.html5 http://coolice.legis.state.ia.us/cool-ice/default.asp?category=billinfo&service=iowacode&ga=83&input=324A

    4

  • 7/28/2019 Passenger Transportation Plan 2011

    5/33

    2 P lanning P rocess

    The Iowa DOT requires MPOs and RPAs to develop the PTP with assistance from human

    service agencies and transportation providers in order to consider all passenger transportation

    needs and services. The Des Moines Area MPO and the CIRTPA formed the Transportation

    Advisory Group (TAG) comprised of transportation providers, health and human service

    agencies, and other interested stakeholders to comply with the Iowa DOTs requirement. The

    TAG, in turn, has several subcommittees that work on various aspects of human service

    transportation coordination. The Des Moines Area MPO and the CIRTPA, via the TAG and its

    subcommittees, also collect public input, as needed, to assist in their planning efforts. This

    chapter documents the TAGs coordination efforts, and public input received, since the FY

    2010-2013 PTPs completion in April 2009.

    2.1 TRANSPORTATION ADVISORY GROUP

    The TAG meets regularly during the PTPs development, and as needed throughout the

    year, to:

    Assist with data collection;

    Collect public input;

    Analyze unmet transportation needs using available data; Develop and recommend programs and projects to address these unmet needs; Recommend funding for the PTP; and, Help implement projects and strategies included in the PTP.

    The TAG began as a group of participants representing agencies that work with elderly

    individuals, persons with low incomes, and persons with disabilities. However, the TAG

    continually evolves to include other organizations that have expressed an interest in public

    transportation/human service coordination.

    The TAGs subcommittees meet as needed to discuss specific issues of interest to theTAG. Subcommittees include the Marketing Subcommittee, the Coordination Subcommittee,

    the Mobility Matters Workshop Planning Subcommittee, and the Boone County TAG.

    5

  • 7/28/2019 Passenger Transportation Plan 2011

    6/33

    Marketing Subcommittee

    When creating the first PTP (FY 2007-2011 PTP), 6 the TAG realized that many

    transportation issues raised by human service agencies and citizens stemmed from the lack of

    information regarding transportation services available in central Iowa. As a result, the TAG

    created the Marketing Subcommittee to raise the publics awareness of passenger transportation

    options available in central Iowa. The Marketing Subcommittee helps update transportation

    databases of information referral services, such as Iowa 211, Iowa COMPASS, and Aging

    Resources of Central Iowa, and markets those services as resources for transportation

    information. The Marketing Subcommittee also publishes the Mobility Matters Newsletter, a

    quarterly newsletter containing passenger transportation-related news.

    Coordination Subcommittee

    During the development of the FY 20072011 PTP, the TAG discovered that many

    transportation providers operate independently of one another and, therefore, often use available

    resources inefficiently. The TAG created the Coordination Subcommittee to explore the

    feasibility of various coordination opportunities, including the development of a mobility

    manager system and resource sharing strategies.

    Mobility Matters Workshop Planning Subcommittee

    The TAG created the Mobility Matters Workshop Planning Subcommittee in 2008 to

    help plan the first Mobility Matters Workshop held in October 2008. The subcommittee

    reconvened to plan the second workshop held in October 2009. Subcommittee participants

    helped to develop invitee lists, arrange meeting venues, and plan the workshop programs.

    Boone County Transportation Advisory Group

    In FY 2009, Boone County representatives formed their own advisory group (the Boone

    County TAG) to evaluate transportation coordination opportunities within Boone County. The

    Boone County TAG is an outcome of the October 2008 Mobility Matters Workshop and

    provides more localized input to the entire TAG. If successful, the TAG will encourage other

    counties to form county-level TAGs in the future.

    Table 2.1 summarizes the number of TAG meetings, TAG subcommittee meetings, and

    meeting participants since the FY 2010-2013 PTPs adoption in April 2009.

    6 The Des Moines Area MPO and the CIRTPA have developed three previous PTPs: the FY 2007-2011 PTP, theFY 2009-2012 PTP, and the FY 2010-2013 PTP. These documents are available for download atwww.dmampo.org/library/documents.

    6

  • 7/28/2019 Passenger Transportation Plan 2011

    7/33

    TABLE2

    .1

    TAG

    Mee

    tings

    Since

    Adop

    tiono

    fF

    Y2010-2

    013PTP

    Committee

    MeetingDates

    (Asof4.30.10)

    MeetingAttendees

    TransportationAdvisory

    Group(TAG)

    1.May4,2009

    2.June15,2009

    3.November17,2009

    4.January19,2010

    5.February16,2010

    6.March16,2010

    7.April20,2010

    JamesAndrew,CentralIowaS

    helterandServices

    ShariAtwood,CyRide/AmesA

    reaMPO

    LorenBawn,BureauofRefugeeServices

    ChetBor,DesMoinesAreaRe

    gionalTransitAuthority

    CyndiChen,IowaDepartment

    ofHumanRights

    CatlinCurry,Candeo

    MargaretDeSio,AgingResourcesofCentralIowa

    ChrisFrantsvog,PolkCountyHealthDepartment

    MarvinGrace,WarrenCounty

    KristinHaar,HeartofIowaRe

    gionalTransitAgency

    AdamHammes,UrbanAmbassadors

    KathiHarris,EyerlyBallResid

    ential

    BeckyHedges,EasterSeals

    GenaHodges,IowaDepartmen

    tofPublicHealth

    GayeJohnson,ChildServe/Des

    MoinesAreaRegionalTransitAuthority

    LindaKelly,Nimbleocity

    CorinneLambert,UnitedWay

    ofCentralIowa

    CarolLundberg,BooneCountyTransportation

    GailMiller,BroadlawnsMedicalCenter

    SusanMinks,CityofDesMoines

    RonMuecke,MercyMedicalC

    enter

    DylanMullenix,DesMoinesA

    reaMPO/CIRTPA

    CarmenMurillo,WestDesMo

    inesHumanServices

    DaroldPowers,Citizen

    ElizabethPresutti,DesMoines

    AreaRegionalTransitAuthority

    JessicaPruitt,CommunitySupportAdvocates

    GunnarOlson,DesMoinesAreaRegionalTransitAuthority

    LauraSands,HealthActionPa

    rtnership

    TimSchoh,UnitedWayIowa211

    MarySchmidt,LutheranServicesinIowa

    FrankStrong,CentralIowaCenterforIndependentLiving

    JimTishim,DesMoinesAreaRegionalTransitAuthority

    JerryTormey,BroadlawnsMedicalCenter

    JimWilkie,LinkAssociates

    7

  • 7/28/2019 Passenger Transportation Plan 2011

    8/33

    TABLE2

    .1

    TAG

    Mee

    tings

    Since

    Adop

    tiono

    fF

    Y2010-2

    013PTP(con

    tinue

    d)

    Committee

    Committee

    Committee

    TAGMarketing

    Subcommittee

    June8,2009

    (Hasworkedinformallyaswellvia

    e-mailfortaskssuchasdevelopingthe

    quarterlyMobilityMattersNewslette

    r)

    LindaKelly,LindaKellyCons

    ulting

    GailMiller,BroadlawnsMedicalCenter

    DylanMullenix,DesMoinesA

    reaMPO/CIRTPA

    TimSchoh,Iowa211

    TAGCoordination

    Subcommittee

    HasNotMetSinceAdoptionofFY2010-2013PTP

    TAGWorkshopPlanning

    Committee

    1.July20,2009

    2.August17,2009

    3.August24,2009

    4.September14,2009

    5.September28,2009

    LorenBawn,BureauofRefugeeServices

    KristinHaar,HeartofIowaRe

    gionalTransitAgency

    LindaKelly,LindaKellyCons

    ulting

    GailMiller,BroadlawnsMedicalCenter

    SusanMinks,CityofDesMoines

    RonMuecke,MercyMedicalC

    enter

    DylanMullenix,DesMoinesA

    reaMPO/CIRTPA

    JimWilkie,LinkAssociates

    BooneCountyTAG

    1.April6,2009

    2.May27,2009

    3.August5,2009

    4.November3,2009

    SaraBehn,BooneCountyHospital

    CarrieDunwald,YSS

    TomFoster,CountyBoardofSupervisors

    JohnGrush,BooneCountyCentralPointofCoordination/MentalHealth

    KristinHaar,HeartofIowaRe

    gionalTransitAgency

    JillHiggins,BooneCountyPublicHealth

    MichelleHull,BooneCountyRSVP

    BrandonJerrod,YSS

    JeffKehoe,BooneCountyTransportation

    CarolLundberg,BooneCountyTransportation

    BillLusher,CountyBoardofS

    upervisors

    CatherineMiller,GenesisDevelopment

    DylanMullenix,DesMoinesA

    reaMPO/CIRTPA

    JulieNash,BooneCountyEmpowerment

    KarenNaumes,BooneCounty

    CARES

    LukeNelson,CityofBoone

    PamNystrom,BooneCountyS

    chools

    SandraPuntenney,BooneCountyHospital

    PattyReed,BooneCountyTransportation

    ScottSmith,BooneCountyLandfill

    8

  • 7/28/2019 Passenger Transportation Plan 2011

    9/33

    2.2 REVIEW OF PUBLIC INPUT

    Previous Public Input

    Since its creation, the TAG has sought input from local citizens, human service agencies, and

    transportation providers through surveys, focus groups, and workshops. These input strategies have

    included the following:

    Mobility Action Planning Workshop April 2006;

    Human Service Agency Survey Fall 2006;

    Transportation Provider Survey Fall 2006;

    Joint Human Service Agency and Transportation Provider Survey Fall2007;

    Citizen Survey Fall 2006 and 2007

    Focus Groups Fall 2006 and 2007;

    Public Input Meetings January 2008; and,

    Mobility Matters: Creating Community Transportation Solutions Workshop October 2008.

    The FY 2010-2013 PTP includes a summary of these input strategies, and the FY 2010-2013

    PTPs appendix includes complete results of each input strategy.

    New Public Input Strategies

    In addition to the public input strategies listed previously, the TAG considered results from

    four new public input strategies when developing the FY 2011 PTP update. These new public input

    strategies include the following:

    Des Moines Area MPOHorizon Year 2035 Metropolitan Transportation Plan PublicInput Meetings May 2008 through August 2009;

    Mobility Management Meeting October 2009;

    2ndAnnual Mobility Matters Workshop October 2009; and,

    Des Moines Area Regional Transit Authority (DART) Public Input Meetings December 2009 through January 2010.

    Horizon Year 2035 Metropolitan Transportation Plan Public Input

    The Des Moines Area MPO adopted the Horizon Year 2035 Metropolitan TransportationPlan (HY 2035 MTP) in September 2009.7 The Des Moines Area MPO held numerous public input

    meetings and issued public surveys throughout the HY 2035 MTPs development. In total, the Des

    Moines Area MPO held 27 public input meetings and collected survey responses from 311 citizens.

    7 www.dmampo.org/library/documents

    9

  • 7/28/2019 Passenger Transportation Plan 2011

    10/33

    While the HY 2035 MTP meetings solicited input on a wide range of transportation issues,

    many of the comments and survey responses related to passenger transportation. The following list

    summarizes common passenger transportation-related comments identified during the HY 2035 MTP

    public input process:

    Develop regional intercity bus service connecting the Des Moines metropolitan areato communities outside the area, such as Ames, Indianola, and Newton;

    Reestablish old bus routes;

    Expand existing bus routes;

    Provide longer hours of bus service;

    Examine the potential for light rail;

    Incorporate passenger rail (Amtrak) into the transportation system;

    Maintain existing transit service;

    Create compact development that promotes transit and alternative transportation;

    Improve connectivity among different modes of transportation;

    Provide secure bike storage near transit facilities;

    Develop bus routes and provide transfer hubs that do not require traveling throughdowntown Des Moines;

    Develop shelters at more transit stops;

    Provide high occupancy vehicle lanes;

    Offer all-day bus passes;

    Identify stable sources of funding for passenger transportation; and,

    Allow for more competition for taxi services.

    Mobility Management Meeting

    In October 2009 the TAG invited Rex Knowlton, a United We Ride Ambassador for the

    Community Transportation Association of America, to facilitate a discussion on developing amobility management system for central Iowa. Eighteen people representing transportation

    providers and human service agencies participated in this meeting and worked with Mr. Knowlton to

    develop an action plan for developing a mobility management system.

    The group identified five focus areas with regard to mobility management: administration,

    operations, technology, funding, and customer service. Within each focus area, the group

    identified three priorities/goals that would help improve mobility management in central Iowa.

    AdministrationPriority 1: Formalized, Top End SupportThis includes support from federal and state agencies, as well as support from

    local administrators and policy boards.

    Priority 2: Understanding ElementsProblems with the existing transportation system must be clearly identified and

    understood. This includes understanding eligibility options for trips and funding,

    10

  • 7/28/2019 Passenger Transportation Plan 2011

    11/33

    understanding the various transportation and funding options available in the

    community, and understanding the unmet transportation needs.

    Priority 3: Creative ImplementationOnce problems are understood and solutions are developed, the stakeholders must

    follow through with real action to implement solutions.

    OperationsPriority 1: CoordinationTrips among various providers must be coordinated. Trips should be thought of

    in terms of the individual, not the mode or vehicle. In particular, fixed route

    inter-county trips should be better coordinated with demand responsive trips.

    Priority 2: AccessibilityThe presence of a service is not enough the service must be accessible for the

    rider. Areas identified for improved accessibility include bus stops and other

    pedestrian facilities. In addition, reducing geographic service gaps could helpimprove the accessibility and convenience of passenger transportation.

    Priority 3: Universal Swipe CardDeveloping a universal payment system would help riders use multiple

    transportation providers seamlessly to complete their trips and may also improve

    administrative procedures related to funding.

    TechnologyPriority 1: Centralized Dispatch and BillingCentralized dispatch and billing would improve the efficiency of the passenger

    transportation system and would help coordinate multiple providers.

    Priority 2: Video Cameras for VehiclesThe presence of video cameras on vehicles provides a sense of security for drivers

    and passengers.

    Priority 3: Centralized Trip PlanningCentralized trip planning, possibly web-based, could help riders and potential

    riders become more comfortable with the system.

    FundingPriority 1: Leverage FundingNumerous funding streams exist at the federal, state, and local level for passenger

    transportation. Breaking down funding silos, coordinating funding among

    agencies, and improved measurement of funding needs and funding uses may help

    the area to better leverage available funding.

    11

  • 7/28/2019 Passenger Transportation Plan 2011

    12/33

    Priority 2: SustainableFunding for passenger transportation must be sustainable. Some funding

    streams are available only for a few years, and local stakeholders must then

    determine how to continue the service or potentially be forced to discontinue the

    service due to lack of funds. A quality passenger transportation system will

    require funding that is constant and sustainable.

    Priority 3: Energy EfficientFunding and transportation service should strive to meet energy efficiency goals.

    Customer ServicePriority 1: AccessibilityTo reach all customers, service should be accessible on many levels. Service

    should be physically accessible by all customers, should be accessible at all hours

    of the day, and should be available in all areas.

    Priority 2: Education/MarketingExpanded education/marketing may help more people use passengertransportation. In particular, bus schedules should be easy to read and

    understand.

    Priority 3: Rider SafetyRiders must feel safe and comfortable if they are to use passenger transportation.

    Priority 4: Modal ExpansionThe central Iowa area should continue to expand passenger transportation

    options available to provide a variety of complementary services, including:

    express buses, fixed-route buses, rapid transit vehicles, demand responsive

    services, taxicab services, and so on.

    Mobility Matters Workshop

    In October 2009 the TAG hosted its second Mobility Matters Workshop. This workshop

    built upon the first, with participants focusing on ways to address needs identified during the first

    workshop. A total of 48 people representing 36 agencies participated in this workshop. Table 2.2

    includes a list of agencies represented at the workshop.

    12

  • 7/28/2019 Passenger Transportation Plan 2011

    13/33

  • 7/28/2019 Passenger Transportation Plan 2011

    14/33

    Winter 2009 Workshops

    DART held 17 workshops along current bus routes across its service area. The

    intent of the workshops was to listen to riders and potential riders about current

    services and to discover improvements that DART could implement to make its

    service more attractive and use friendly. Approximately 130 people attended these

    workshops.

    July 2009 Transit Hub Concept Design Workshops

    DART held two workshops on July 8 and 9, 2009, to get input on the preliminary

    design of the proposed Multimodal Transit Hub. Approximately 55 people attended

    the workshops.

    Winter 2010 FY 2011 Budget Shortfall Service Reduction and Fare IncreaseMeetings

    DART held 9 meeting across its service area to receive input on proposed service

    reductions and fare increases stemming from an anticipated budget shortfall for FY

    2011. Approximately 125 people attended the meetings, and DART received an

    addition 66 written comments. The main comments received were as follows:

    Most comments were in support of Route 5 and in support ofmaintaining weekend service;

    Cutting night service by an hour would reduce the ability of serviceindustry workers to get home because their jobs do not end until 9:00p.m.;

    Riders living between Valley Junction and Valley West Malladvocated extending the proposed Route 1/Route 11 to AshworthRoad between 8th Street and 13th Street in West Des Moines;

    Reducing frequency on the routes would make the service lessconvenient;

    Reducing service would reduce ridership;

    The reduction of service is contradictory to DARTs overallobjectives of increasing ridership and being green; and,

    Raising fares and reducing service is a double negative for thecustomer and DART should not do both it should be one or theother.

    14

  • 7/28/2019 Passenger Transportation Plan 2011

    15/33

    3 Status o f P rev ious ly

    R ecommended P ro jects

    This chapter summarizes the status of projects recommended in the FY 2010-2013 PTP.

    Categories used in the FY 2010-2013 PTP include service-related projects, and fleet, facility, and

    equipment projects. The following sections summarize the status of each project by noting whether

    the projects were funded and/or implemented and discussing the projects impact on passenger

    transportation needs.

    3.1 SERVICE-RELATED PROJECTS

    In June 2009 DART expanded service in the northwestern quadrant of the Des Moines

    metropolitan area. As proposed in the FY 2010-2013 PTP, DART expanded its demand

    responsive on-call service to include all of Clive and a portion of Urbandale that was not

    previously served. DART also made adjustments to two express routes (Routes 91 and 93);

    DART streamlined the routes to reduce service duplication and to reduce trip times. No

    services have been discontinued thus far in FY 2010, although DART anticipates making some

    service reductions in June 2010 due to budget constraints (see Chapter 4 for additional

    information on possible service reductions). The Heart of Iowa Regional Transit Agency

    (HIRTA) implemented three of the four new services recommended in the FY 2010-2013 PTP,including the Boone-Jefferson service, the Boone-Des Moines service, and the rural Boone County

    service. Table 3.1 summarizes the status of projects identified in the FY 2010-2013 PTP to meet

    existing and unmet passenger transportation needs.

    While not included in the FY 2010-2013 PTP, Executive Express, a private for-profit service,

    began operating out of its new Ames branch in August 2009. Executive Express provides daily

    service from over 25 central Iowa communities to the Des Moines International Airport up to 9 times

    per day, 365 days per year.8

    In addition to the DART and HIRTA projects summarized in Table 3.1, the TAG proposed

    other passenger transportation projects in the FY 2010-2013 PTP to help address unmet

    transportation needs. These projects are not necessarily specific to one transportation provider;

    instead, they are overall coordination initiatives to improve passenger transportation service. Table

    3.2 summarizes the status of these TAG-developed projects.

    8 Executive Express press release, available at www.executiveexpress.biz.

    15

  • 7/28/2019 Passenger Transportation Plan 2011

    16/33

    3.2 FLEET, FACILITY, AND EQUIPMENT PROJECTS

    DART received funding to replace some vehicles and expand its fleet, identified in the

    previous PTP, although limited funding and/or delays in project timelines have prohibited the

    purchase of all vehicles. HIRTA, however, did not receive funding for its replacement and

    expansion vehicles. Table 3.3 summarizes the status of vehicles programmed for purchase in FY

    2010.

    DART received funding through the Iowa DOTs Infrastructure Grant program to implement

    its Environmental/Energy Use System for its facility. Funding for several ongoing equipment and

    facility improvement projects such as preventative maintenance, facility engineering/design,

    deteriorating concrete, facility repairs, safety and security, shop equipment, computer hardware and

    software, and transit enhancements are pending grant approval. DART did not receive funding for

    several larger-scale projects, including the multimodal transit hub facility, bus-rapid transit projects, a

    downtown Des Moines tram system, and a new park-and-ride facility.

    HIRTA continues efforts to develop transit storage facilities in two of its counties. In June

    2009, the CIRTPA completed the Warren County Transit Storage Facility Feasibility Study for

    HIRTA. This study evaluated the potential for locating a transit storage facility in the Indianola area,

    and recommended working with the Warren County Engineering Department to develop a joint-use

    facility on Warren County-owned property. In December 2009, HIRTA began discussions with the

    City of Ames to develop a Story County transit storage facility. The CIRTPA previously studied the

    feasibility of a Story County facility in 2007. HIRTAs efforts to develop transit storage facilities in

    both Story and Warren Counties are ongoing.

    Table 3.4 summarizes the status of facility and equipment projects programmed for FY 2010.

    16

  • 7/28/2019 Passenger Transportation Plan 2011

    17/33

  • 7/28/2019 Passenger Transportation Plan 2011

    18/33

    TABLE3

    .2

    Status

    ofOther

    Pro

    jec

    tsRecommen

    de

    dtoHe

    lpTransportation

    Coord

    ina

    tion

    Agency

    Project

    Funded

    Implemented

    Impact

    TAG

    2nd MobilityMatters

    Workshop

    Yeswithlocalfunds

    Yes

    October2009

    Allowed

    the

    TAG

    to

    educatest

    akeholders

    about

    transportationfundingandmobilitymanagement,andto

    continue

    addressing

    needs

    related

    to

    employment

    transportationandmedicaltransportation

    .

    Unknown

    ExpandedNightService

    No

    No

    Servicenotimplemented.

    DARTand

    theCICIL

    AdditionalBusTraining

    YesAmericanPublicTransit

    AssociationGrant

    YesMay-June,2009

    DA

    RTandtheCentralIowaCenterforI

    ndependentLiving

    (CICIL)hostedtrainingabouthowtoridethebus.Asa

    result,morepeoplehavebecomefamiliarwith

    and

    comfortableusingpublictransportation.

    TAG

    RecoveryPro

    gramfor

    Unemployed

    Persons

    No

    No

    Pro

    gramnotimplemented.

    TAG

    CoordinatedMedical

    Appointments

    No

    No

    Pro

    gramnotimplemented.

    TAG/MPO

    Accessibility

    Audit

    MPOpurchasedPictometry

    technology,whichwilla

    ssist

    inaudit

    Pictometrytechnology

    willarriveSpring

    2010

    Au

    ditnotyetconducted.

    TAG

    AdditionalBusShelters

    No

    No

    Ad

    ditionalsheltersnotprovided.

    TAG

    MobilityManagement

    Service

    No

    No

    Servicenotimplemented.

    MPO/

    DART/

    HIRTA/

    CyRide

    TransitService

    BetweenAmesandDes

    Moines

    Nofundingforafeasibility

    studywasdelayeduntil

    PassengerTransportatio

    n

    FundingStudycompletion

    Partial-Executive

    Expressprovidestrips

    totheDesMoines

    InternationalAirport

    Executive

    Express

    service

    helpsm

    eetsome

    needs,

    spe

    cificallythoserequiringtransportationtotheDes

    Mo

    inesInternationalAirport.Moregeneralservicealong

    the

    corridorisstillneeded.

    Source:

    TAG

    TABLE3

    .3

    Status

    ofPro

    jec

    tsRecommen

    ded

    toMee

    tFlee

    tNee

    ds

    Agency

    Project

    Funded

    Implemented

    Impact

    DART

    Purchase54vehicles

    forreplacementor

    expansion

    FTASection5307,5309

    ,5310;

    STP;CMAQ

    Willpurchase41ofthe

    54vehicles

    programmedforFY

    2010

    AllowsDARTtomaintainafleet

    ofvehicleswith

    adequatemileageandusefullife,andallowsDARTto

    expandserviceswithnewvehicles.

    HIRTA

    Purchase19vehicles

    forreplacementor

    expansion

    No

    Novehiclespurchased

    HIRTAmustcontinuetousecurrentvehiclesandis

    unabletoexpandsomeservicesdue

    toaninsufficient

    supplyofvehicles.

    Source:

    DesMoinesAreaMPO,DART,andHIRTA

    18

  • 7/28/2019 Passenger Transportation Plan 2011

    19/33

    TABLE3

    .4

    Status

    ofPro

    jec

    tsRecommen

    ded

    toMee

    tFac

    ilityan

    dEqu

    ipmen

    tNee

    ds

    Agency

    Project

    Funded

    Implemented

    Impact

    DART

    Environmental/EnergyUseSystem

    UpgradeforFacility

    Yes

    Infrastructure

    Grant

    Within9

    months

    AllowsDARTtomakeupgradestoitsfacilitytoimproveenergy

    efficiency.

    DART

    Routineequipment/facilityprojects

    (preventative

    maintenance,facility

    engineering/d

    esign,deteriorating

    concreterepa

    ir,facilityrepairs,safety

    andsecurity,

    shopequipment,

    computerequ

    ipment,andtransit

    enhancements)

    PendingG

    rant

    Approval

    PendingGrant

    Approval

    AllowsDARTtomaintainoperationsatitsfacility.

    DART

    MultimodalT

    ransitHubConstruction

    No

    No

    Notimplem

    ented.

    DART

    BusRapidTr

    ansit(BRT)

    Engineering/Design

    No

    No

    Notimplem

    ented.

    DART

    CustomerFacilitiesonUniversity

    AvenueBRT

    Line

    No

    No

    NotImplem

    ented.

    DART

    DowntownD

    esMoinesTram

    No

    No

    NotImplem

    ented.

    DART

    WesternSuburbsPark-and-Ride

    No

    No

    NotImplem

    ented.

    DART

    GreenRoofR

    eplacementatDART

    Facility

    No

    No

    NotImplem

    ented.

    HIRTA

    StoryCounty

    StorageFacility

    No

    Ongoing

    (Land

    Negotiations

    Underway)

    Coordinatio

    nwiththeCityofAmesforlandacquisitionisongoing.

    HIRTA

    WarrenCoun

    tyStorageFacility

    No

    Ongoing

    (Feasibility

    Study

    Completed)

    Feasibilitystudycompleted.

    CoordinationwithWarrenCounty

    ongoing.

    Source:

    DesMoinesAreaMPO,DART,andHIRTA

    19

  • 7/28/2019 Passenger Transportation Plan 2011

    20/33

    THIS PAGE LEFT BLANK INTENTIONALLY

    20

  • 7/28/2019 Passenger Transportation Plan 2011

    21/33

    4 R ec ent De velopmentsThis chapter discusses developments since the FY 2010-2013 PTPs adoption that could have

    an impact on the FY 2010-2013 PTPs prioritized list of transportation needs and/or the FY

    2010-2013 PTPs program of recommended projects.

    4.1 HORIZON YEAR 2035 METROPOLITAN TRANSPORTATION PLAN

    In September 2009, the Des Moines Area MPO adopted the HY 2035 MTP. Chapter 2 of

    this FY 2011 PTP update discusses the outcomes of the HY 2035 MTPs public input strategies. In

    addition to this public input, the HY 2035 MTP includes goals and objectives, as well as passenger

    transportation strategies, which should be included in the PTP.

    Goals and Objectives

    The HY 2035 MTP includes five goals, and each goal includes a number of objectives. The

    goals and objectives relating to passenger transportation are as follows:

    Goal 1: Maintain and improve the regional transportation system:

    o Objective 1.2: Improve transit system services and facilities:

    Maintain quality of benches and shelters; Reduce the average bus fleet age to six years; and, Preserve bus routes that meet a minimum performance

    standard;

    Goal 2: Improve the accessibility, connectivity, and mobility of the transportationsystem, for people and freight, for all modes of transportation in and through theregion:

    o Objective 2.2: Improve the transit facilities infrastructure:

    Increase the number of park-and-ride spaces if lotsexceed 80 percent of lot capacity during peak hours;

    Provide a sheltered transit stop for every service mileof fixed-route and shuttle-route service;

    Require that all new transit vehicles purchased includebicycle carrying capacity; and,

    Reduce the number of bus stops withoutpaved/marked platforms by 50 percent;

    21

  • 7/28/2019 Passenger Transportation Plan 2011

    22/33

    o Objective 2.3: Improve existing transit system operations:

    Increase the hours of operation of downtown shuttleservice to add weekend and night service;

    Increase the hours of operation on fixed-route serviceand offer night and late night service in areas thatcurrently do not have service;

    Maintain seven day per week service; Provide holiday service on fixed-route and paratransit

    services; Provide thirty-minute mid-day and fifteen-mintute

    peak-hour headways on fixed-route bus service withgreater than 22 passengers per revenue hour; and,

    Provide fifteen-minute peak hours headways onexpress-route bus service with greater than 25passengers per revenue hour;

    o Objective 2.5: Improve the connection of multiple modes oftransportation:

    Secure or build four regional park-and-ride facilitiesfor express-route bus service;

    Build four new community transit transfer centerswithin the Greater Des Moines metropolitan area;

    Implement a Downtown Des Moines Regional TransitHub facility for future Des Moines Amtrak servicethat is integrated with existing or planned transitservice, intercity buses, and airport shuttles;

    Provide opportunities for bicycle racks and/or lockersat transit facilities;

    Provide opportunities for covered bike racks and/orlockers for every service mile of fixed-route andshuttle-route transit service; and,

    Increase the proportion of multimodal access pointsthat are Americans with Disabilities Act (ADA)compliant;

    o Objective 2.8: Increase the accessibility of population centers,employment centers, and other services with multiple modes oftransportation;

    o Objective 2.9: Improve the connectivity to regions beyond thegreater Des Moines metropolitan area:

    Connect the greater Des Moines metropolitan area to aregional passenger rail network;

    Increase the number of intercity bus trips departingDes Moines; and,

    22

  • 7/28/2019 Passenger Transportation Plan 2011

    23/33

    Continue coordination of public and private passengertransportation services inside and outside the region;

    Goal 3: Maintain quality performance of the regional transportation system throughefficient congestion management and operations techniques:

    o Objective 3.1: Maintain acceptable levels of travel on the street andhighway system:

    Promote the use of alternative modes oftransportation;

    Reduce single occupant vehicles by 10 percent over2008 levels on the freeway system during peak-hours;and,

    Maintain existing commute times;

    o Objective 3.3: Improve existing transit system performance:

    Decrease transfer times for transit service; Implement intelligent transportation systems solutions,

    including automatic vehicle location and variablemessage sign technology, to provide customers withreal-time transit travel information;

    Triple transit ridership from 2008 levels; Double transit mode share during peak-hours; and, Double rideshare mode share during peak-hours;

    Goal 4: Improve the safety and security of the regional transportation system for allusers:

    o Objective 4.5: Provide security features on bicycle, pedestrian,transit, and parking facilities, and at multimodal crossings; and,

    o Objective 4.6: Provide safety features on bicycle, pedestrian, transit,and parking facilities, and at multimodal crossings;

    Goal 5: Preserve, protect, and enhance the natural and human environment.

    Projects and Strategies

    In addition to the projects included in the FY 2010-2013 PTP, the HY 2035 MTP includes

    passenger transportation projects and strategies to help meet the HY 2035 MTPs goals andobjectives. Table 4.1 summarizes projects identified for implementation between HY 2011 and HY

    2015. Note, however, that the HY 2035 MTP refers to the projects in Table 4.1 as illustrative

    because they would require funding beyond levels DART traditionally receives.

    23

  • 7/28/2019 Passenger Transportation Plan 2011

    24/33

    TABLE 4.1 HY 2035 MTP Illustrative Passenger Transportation Projects:HY 2011-2015

    DescriptionCapital Cost

    ($000s)Operating Cost

    ($000s)Total Cost

    ($000s)

    Replace 45 buses to maintain 6 year fleet age $24,400 $0 $24,400

    Construct a multimodal transit hub downtown $22,810 $1,820 $24,630

    Implement BRT on University Avenue $12,170 $2,190 $14,360Implement BRT to Ankeny $9,730 $970 $10,700

    Implement a tram in downtown Des Moines $121,670 $14,600 $136,270Upgrade fare collection system $3,040 $0 $3,040Increase park-and-ride space $490 $60 $550

    Install one shelter per mile of service $50 $150 $200

    Increase downtown shuttle evening hours $0 $50 $0Increase transit evening hours $0 $1,220 $1,220

    Implement holiday service $0 $40 $40

    Increase fixed route frequency $2,430 $1,220 $3,650Increase express route frequency $2,430 $910 $3,340

    Construct 4 new park-and-ride facilities $18,250 $60 $18,310Amtrak facilities connection to transit hub $3,650 $0 $3,650

    Intelligent Transportation Systems Signage $5,470 $460 $5,930Eliminate stormwater pond by DART facility $4,870 $0 $4,870Construct new paratransit facility $9,730 $0 $9,730Rehabilitate existing DART facility $12,170 $0 $12,170

    Total $253,360 $23,750 $277,110

    Source: Des Moines Area MPO HY 2035 MTP

    The HY 2035 MTP contains additional strategies to support passenger transportation efforts,

    including:

    Encouragement of multimodal coordination;

    Promotion of transit-supportive land development;

    Continued public outreach/marketing for passenger transportation;

    Continued public transportation/human service coordination; and,

    Support of additional service, including passenger rail, intercity bus service, and rapidtransit service.

    4.2 IOWA MOBILITY MANAGER FUNDING

    In 2009, the Iowa DOT announced it would set aside $300,000 in unused New Freedom

    funds for public transit agencies, or subcontracting agencies, to hire mobility managers. Themobility manager funding requires an application to the Iowa DOT and is available for up to two

    years, with a 20 percent local match the first year and a 50 percent local match the second year.

    Mobility managers have become more prevalent around the country in recent years, serving as staff

    resources to help public transportation providers, human service agencies, and transportation users

    coordinate transportation services.

    24

  • 7/28/2019 Passenger Transportation Plan 2011

    25/33

    4.3 ECONOMIC STIMULUS FUNDING

    In February 2009, President Obama signed an economic stimulus bill, known as the

    American Recovery and Reinvestment Act(ARRA). ARRA provided additional federal funding to

    DART and HIRTA beyond traditional levels. DART used ARRA funding to purchase expansion

    vehicles and implement several facility and equipment projects, while HIRTA utlized ARRA funding

    exclusively for vehicle purchases. In December 2009, the U.S. House of Representatives took steps

    toward a second stimulus bill by passing theJobs for Main Streetbill. A second stimulus bill is not

    yet finalized, but, should it pass, the Iowa DOT and local public transit agencies could expect

    additional funding for fleet, facility, equipment, and other passenger transportation-related projects.

    4.4 IOWA PASSENGER TRANSPORTATION FUNDING STUDY

    In December 2009, the Iowa DOT presented the Iowa Passenger Transportation Funding

    Study9 to the Iowa General Assembly. The Iowa General Assembly requested the Iowa DOT

    conduct this study to review the sufficiency of current revenues to meet future passenger

    transportation needs, identify passenger transportation improvements needed to meet state energy

    independence goals, and assess the ability of passenger transportation to meet the mobility needs of

    Iowas growing senior population. The study examined funding and service needs for baseline

    service demand (i.e., demand of transit-depended populations such as seniors) and for choice service

    demand (i.e., people who have other transportation options but would use passenger transportation

    for energy efficiency and environmental reasons).

    The study found the need for an additional 13.8 million trips per year to meet baseline

    demand, at an estimated cost of $125 million per year. The study also concluded an additional 24.3

    million trips per year are needed to meet choice-rider demand, at an estimated cost of $350 million

    per year. Service improvements identified in the study to address these service gaps include:

    Reduce fixed-route frequency to 30 minutes for baseline demand and 15 minutes forchoice demand;

    Increase regional public transit agency trips by 90 percent annually to address bothbaseline and choice demand;

    Extend weekday fixed-route service to 11:00 pm in large urban areas to addressbaseline demand and in both large and small urban areas to address choice demand;

    Provide Sunday service in cities of 50,000 or more to address choice demand;

    Lower the average fleet age from six to four years;

    Increase public transportation and human service agency coordination; and,

    For choice demand, provide disincentives to driving automobiles, such as increasedparking rates in targeted areas, reduced parking supply in targeted areas, and deferredroadway improvements in favor of transit capacity improvements in congested areas.

    9 http://www.iatransit.com/regulations/coordination/final_funding_study_report_12-15-09.pdf

    25

  • 7/28/2019 Passenger Transportation Plan 2011

    26/33

    The Iowa Passenger Transportation Funding Study also examined potential demand on

    numerous intercity corridors, several of which are in central Iowa. Table 4.2 summarizes the

    intercity corridors included in theIowa Passenger Transportation Funding Study.

    TABLE 4.2 Central Iowa Interci tyCorridors Included in the Iowa PassengerTransportation Funding Study

    CorridorEstimated Daily Public

    Transportation Trips

    Boone-Ames 625

    Des Moines-Indianola 1,050

    Des Moines-Adel 900

    Des Moines-Ames 790

    Des Moines-Perry 450

    Des Moines-Winterset 400

    Nevada-Ames 780

    Pella-Knoxville 400Perry-Adel 250

    Pella-Oskaloosa 350

    Source: Iowa Passenger Transportation Funding Study

    4.5 DART FY 2011 BUDGET SHORTFALL

    In fall 2009, DART estimated a FY 2011 budget shortfall of approximately $2.3 million

    due to effects from the national economic downturn. Since those initial projections, DART

    staff made up all but $800,000 of the budget shortfall by instituting unpaid time off and wage

    freezes among administrative staff. Another $250,000 in savings was realized by the two unions

    representing DARTs drivers and mechanics voting to accept a wage freeze.

    DART is adjusting bus route schedules and increasing fares to make up the remaining

    $550,000 budget shortfall for the FY 2011. The changes are outlined in Table 4.3 and went into

    effect April 25, 2010. In addition to these changes, DART increased the standard bus fare from

    $1.50 to $1.75.

    26

  • 7/28/2019 Passenger Transportation Plan 2011

    27/33

    TABLE 4.3 DART Service Adjustments to Address Budget Shortfall

    Route Adjustment(s)

    #1 WDM/Fairgrounds

    Service to Valley West Mall will no longer be offered (served by Route#3)

    Midday and weekend service will operate every 60 minutes

    Peak service will operate every 30 minutes

    The current Route 1 will be split into two different services:o The east side (Fairgrounds) portion of the Route #1 will remain

    Route #1o The west side (Ingersoll/West Des Moines) portion of the Route

    will be incorporated into the Route #11

    The new Route #1 on the east side of Des Moines will be extended toPleasant Hill on weekdays and replace Route #10

    Route #1 Fairgrounds will now be called Fairgrounds to E. 42nd &Hubbell or Fairgrounds to Pleasant Hill

    Saturday service will begin later and end earlier (Same as SundayService)

    #3 University/Highland &Oak Park

    Service will operate every 15 minutes during the peak and midday on thewestbound portion of the service

    Service to Valley West Mall on Saturdays and Sundays will operateevery 30 minutes instead of the current every 60 minutes

    Saturday service will begin later and end earlier (Same as SundayService)

    #4 Urbandale/E. 14th Service will operate every 30 minutes during the peak

    Saturday service will begin later and end earlier (Same as SundayService)

    #5 Clark/E. 6th & E. 9th Service will operate every 60 minutes during the peak

    Saturday service will begin later and end earlier (Same as SundayService)

    #6 W.9th-Douglas/Indianola-Lacona

    Minor schedule time adjustments on weekdays

    Saturday service will begin later and end earlier (Same as Sunday

    Service)

    #7 Ft. Des Moines/Hubbell Minor schedule time adjustments on weekdays

    Saturday service will begin later and end earlier (Same as SundayService)

    #8 SW 14th-Havens/S. Union Reduce to 60 minute service all day on weekdays (does not operate on

    weekends)

    Service will no longer pull into the Des Moines International Airport

    #10 Pleasant Hill

    Will be replaced by Route #1 so that no transfer will be required to getto Downtown Des Moines

    Trip times to/from Pleasant Hill will remain similar to the current Route#10

    Route #1 Fairgrounds will now be called Fairgrounds to E. 42nd &Hubbell or Fairgrounds to Pleasant Hill

    #11 Jordan Creek

    The west side (Ingersoll/West Des Moines) portion of the Route #1 willbe incorporated into the Route #11

    Service will extend from Downtown Des Moines to Jordan Creek

    New route name will be Ingersoll/West Des Moines to Valley Junctionor Jordan Creek

    Service will operate every 30 minutes to Valley Junction and every 60minutes to Jordan Creek during the peak. Midday service will operateevery 60 minutes to Jordan Creek. Saturday and Sundays will be 60minute service to Jordan Creek

    27

  • 7/28/2019 Passenger Transportation Plan 2011

    28/33

  • 7/28/2019 Passenger Transportation Plan 2011

    29/33

    TABLE 4.4 Prior itized Passenger Transportation NeedsRank Need

    1 Need to maintain and expand existing services;

    2Need for more marketing/education of transportation information and for making information easier toaccess;

    3 Need to get more low-income persons access to jobs at the hours they need them;4 Need for more hours of service on weekends and weeknights;5

    Need for trips to essential services, particularly trips to medical appointments in Des Moines andIowa City;

    6 Need for more training on how to use the bus system;7 Need to better service multi-purpose trips;8

    Need to increase the accessibility of transit, i.e., ensuring sidewalks to bus stops are in goodcondition;

    9 Need for local governments to include transit more in the planning and development process;10 Need to continue to study rapid transit alternatives; and,11 Need to make passenger transportation more affordable.

    Source: TAG

    29

  • 7/28/2019 Passenger Transportation Plan 2011

    30/33

    THIS PAGE LEFT BLANK INTENTIONALLY

    30

  • 7/28/2019 Passenger Transportation Plan 2011

    31/33

    5 R ecommended P rojects Chapter 5 includes passenger transportation projects recommended by the TAG for

    implementation between FY 2011-2014. The projects recommended are categorized into two tables:

    Table 5.1 includes projects recommended for FTA or Iowa DOT funding during the next four fiscal

    years, while Table 5.2 includes projects that will seek other funding, such as human service funding,

    for implementation. Upon the Des Moines Area MPOs and the CIRTPAs adoption of this FY 2011

    PTP update, this chapter amends and replaces Chapter 6 of the FY 2010-2013 PTP.

    Projects in Table 5.1 will serve as the starting point on which the MPO and the CIRTPA will

    base the transit element of their respective Fiscal Years 2011-2014 Transportation Improvement

    Programs. With the exception of three new projects, the TAG previously recommended all projects

    included in Table 5.1 in the FY 2010-2013 PTP. Chapter 4 of the FY 2010-2013 PTP provides

    additional information about these previously recommended projects and a discussion of how each

    project meets the prioritized list of transportation needs. The three new projects include DARTs

    nitrogen station for tires project, HIRTAs Dallas County Coordination project, and the hiring of a

    mobility manager for central Iowa. A nitrogen station for tires would enable DART to inflate tires

    with nitrogen, which helps tires maintain pressure and improves fuel economy. The Dallas County

    Coordination project is similar to the Boone County Coordination project, providing rural Dallas

    County residents affordable transportation into larger Dallas County communities for medical

    appointments and other services not available in smaller communities. The TAG recommends thehiring of a mobility manager to work with transportation providers and human service agencies full

    time on coordination issues.

    TABLE 5.1 Projects Recommended for FTA or STA Funding, FY 2011-2014

    RecommendingAgency/Provider

    Description Type

    TotalEstimated

    Cost($000s)

    EstimatedYear

    RecommendedFunding Source

    DART Ongoing Operations Operation 7,540 2011-2014 STA/5310/5311

    DARTFleet Replacement (approximately 74 vehiclesexceeding useful life)

    Capital 14,146 2011-2014 5307/5309/STP

    DARTFleet Replacement/Expansion (Purchase 78 vehicles to maintain and expand theRideShare program)

    Capital 2,326 2011-2014 CMAQ/5307

    DART

    Fleet Expansion(Purchase 10 buses for expanding service to WestDes Moines, Urbandale, Johnston, Clive, Ankeny,and Altoona)

    Capital 3,636 2011-2012 CMAQ/5309

    DARTLease Payments on 16 Vehicles Purchased in2003

    Capital 457 2011-2014 5307

    31

  • 7/28/2019 Passenger Transportation Plan 2011

    32/33

    TABLE 5.1 Projects Recommended for FTA or STA Funding, FY 2011-2014 (continued)

    RecommendingAgency/Provider

    Description Type

    TotalEstimated

    Cost($000s)

    EstimatedYear

    RecommendedFunding Source

    DART Ongoing Equipment/Maintenance Capital 23,000 2011-2014 5307/5309

    DARTAdministration/Maintenance Facility Repair andExpansion

    Capital 1,000 2011-2012 Infrastructure Grant

    DARTOngoing JARC Projects Night and UniversityAvenue Service

    Operation 1,500 2011-2014 JARC

    DART Ongoing/Expanded On Call and Sunday Service Operation 1,000 2011-2014 New Freedom

    DARTDowntown Des Moines Multimodal Transit HubFacility

    Capital 20,000 20115309/InfrastructureGrant

    DART Bus Rapid Transit Design/Engineering Capital 1,750 2011 5309

    DARTNew Bus Rapid Transit Customer Facilities onUniversity Avenue

    Capital 1,500 2011 5309

    DART Western Suburbs Park & Ride Capital 1,250 2011 5309DART Purchase Paratransit Mobile Data Terminals Capital 150 2011 5307/5310

    DART Farebox Replacements Capital 1,750 2012 5309

    DART Western Suburb Express Operating and BusesOperationand Capital

    850 2012 CMAQ

    DART Western Suburb On-Call Operating and BusesOperationand Capital

    315 2012 CMAQ

    DART Increased Service Routes 7 and 11 Operation 1,039 2011-2013 CMAQDART Nitrogen Station for Tires Capital 45 2012 CMAQ

    DART Support Vehicles Capital 484 2012-2014 5307

    HIRTA Ongoing Operations Operation 5,600 2011-2014 STA/5310/5311

    HIRTAFleet Replacement (approximately 40 vehiclesexceeding their useful life)

    Capital 5,941 2011-2014 5309

    HIRTAFleet Expansion Dallas County (purchase 2vehicles to aid in medical transportation trips and

    to expand REM Iowa service)

    Capital 151 2011 5309

    HIRTAFleet Expansion Warren County (purchase avehicle to support services for GenesisDevelopment)

    Capital 73 2011 5309

    HIRTAFleet Expansion Boone County (purchase avehicle to expand services to elderly persons)

    Capital 86 2011 5309

    HIRTA Continue Ames-Iowa City Service Operation 100 2011-2014 New Freedom

    HIRTA Continue Boone-Des Moines Service Operation 131 2011-2014 New Freedom

    HIRTA Rural Dallas County Coordination Operation 67 2011-2012 STA Coordination

    HIRTA Continue Rural Boone County Coordination Operation 10 2011 STA Coordination

    HIRTA Story County Storage Facility Capital Unknown Unknown Unknown

    HIRTA Warren County Storage Facility Capital Unknown Unknown Unknown

    DART/HIRTA/

    CyRide Ames-Des Moines Study Planning 100 2011 STA CoordinationUnknown Mobility Manager Unknown Unknown STA Coordination

    Source: DART, HIRTA, and TAG

    With the exception of one new project, the TAG also previously recommended all projects

    included in Table 5.2 in the FY 2010-2013 PTP. Chapter 4 of the FY 2010-2013 PTP provides

    additional information about these projects and a discussion of how each project meets the prioritized

    32

  • 7/28/2019 Passenger Transportation Plan 2011

    33/33

    list of transportation needs. The new service the TAG recommends is providing medical

    transportation service from Des Moines to the University of Iowa Hospitals and Clinics in Iowa City.

    This service could be provided by either adding a stop in Des Moines to HIRTAs existing

    Ames-Iowa City service or, if that option is not feasible, by beginning a new service.

    TABLE 5.2 Projects Recommended for Other Funding, FY 2011-2014

    RecommendingAgency/Provider

    Description Type

    TotalEstimated

    Cost($000s)

    EstimatedYear

    RecommendedFunding Source

    TAG Mobility Matters Workshop Planning Unknown 2011-2014 Local fundsTAG Night Service Operation Unknown Unknown Unknown

    TAG Bus Training Coordination Unknown Unknown Unknown

    TAGRecovery Program forUnemployed Persons

    Operation Unknown Unknown Unknown

    TAGCoordinated MedicalAppointments

    Coordination Unknown Unknown Unknown

    TAG Accessibility Audit Planning 0 2011 Local

    TAGDes Moines-Iowa CityMedical Transportation

    Operation Unknown 2011-2014 Medicaid

    TAGImplementation of MobilityManagement Action Plan(discussed in Chapter 2)

    Planning Unknown 2011-2014 Unknown