Passenger Trains for South Hampton Roads Hampton Roads Partnership Norfolk, VA Norfolk, VA July 17, 2009 Deborah Butler Executive Vice President – Planning & CIO Norfolk Southern Corporation

description

by Deborah Butler, Executive Vice President, Planning and Chief Information Officer for Norfolk Southern Corp

Transcript of Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Page 1: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Passenger Trains for South Hampton Roads

Hampton Roads Partnership

Norfolk, VANorfolk, VA 

July 17, 2009

Deborah ButlerExecutive Vice President – Planning & CIONorfolk Southern Corporation

Page 2: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Outline

Background and Recent Developments

Norfolk Southern’s Route and RoleNorfolk Southern s Route and Role

What Needs to be Done

N t StNext Steps

Page 3: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Background

2002 – High Speed Rail Feasibility Study

2004 – Richmond/Hampton Roads Passenger Rail Study (Alternatives Analysis‐Scoping Report)Study (Alternatives Analysis‐Scoping Report)

2008 – Hampton Roads MPO Regional Travel Delay Study

Page 4: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09
Page 5: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Recent Developments

American Recovery and Reinvestment Act (ARRA) High Speed Rail Program 

$8 billion now

$5 billion later?

Administered by US DOT

Intense Competition for FundsVirginia ‐ $2 billion+

North Carolina ‐ $4 billion+

40 states (pl s D C ) ha e req ested $102 billion40 states (plus D.C.) have requested $102 billion

Page 6: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Passenger Trains on NS’s Route

Main Freight Route to Hampton Roads

Coal conduit

Keeps trailers and containers off the roadsroads

Where Heartland Corridor BeginsWill complete in 2010Will complete in 2010

Vital to competitiveness of the Port

Page 7: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Doublestack Routes From Hampton Roads

Current Doublestack RoutesHeartland Corridor RouteHeartland Corridor Route

Page 8: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Cowan Tunnel ‐ Before

Page 9: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Cowan Tunnel ‐ During

Page 10: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Cowan Tunnel ‐ After

Page 11: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Passenger Trains on NS’s Route

Can Be Upgraded to Handle Passenger Trains

Eastbound NS traink “ k h ”passing Amtrak “Lake Shore”

and light rail trainat Amtrak station, Cleveland, Ohio,

Page 12: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Intercity Rail Passenger Routes – Norfolk‐RichmondExisting Amtrak Service                           Possible Alternative                  

Richmond Staples Mill

Richmond Main Street

Petersburg

Newport News

Norfolk

Norfolk Southern                CSXT Trackage                     CSXT Peninsula Route                  Bus

Page 13: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

What Needs to be DoneUpgrade NS’s Norfolk‐Petersburg Route

For conventional higher speed (79 mph) trains, not high speed railAdd new capacity for passenger trainsp y p g

Build Stations and Acquire EquipmentUpgrade CSXT’s Richmond‐Petersburg Route

P t f W hi t Ch l tt Hi h S d C idPart of Washington‐Charlotte High Speed CorridorVirginia asking $150 million+ for initial work

Secure FundingFor upgrading infrastructure (generally federal)For ongoing operating costs (generally state)

Page 14: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Norfolk Southern’s Role

Provide Route

Operate Passenger Trains?Operate Passenger Trains?

Cooperate and Advocate…

B t N t B S f F d…But Not Be a Source of Funds

Page 15: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Next Steps

NS is Identifying Improvements Needed to Host Passenger Trains 

RTC StudyRTC StudySpotlights choke pointsHelps determine additional infrastructure needed

Design and cost of improvements to avoid delay 

DRPT Completing Federal DEIS in Next 45‐60 DaysPublic commentsPublic commentsRoute recommendations

Goal: Funds from ARRA Round 2 – Mid‐2010Goal: Funds from ARRA Round 2  Mid 2010

Page 16: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Diagram of Typical RTC ModelRed Lines Suggest Locations Where Additional Infrastructure is Needed

Page 17: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Next Steps

NS is Identifying Improvements Needed to Host Passenger Trains 

RTC StudyRTC StudySpotlights choke pointsHelps determine additional infrastructure needed

Design and cost of improvements to avoid delay 

DRPT Completing Federal DEIS in Next 45‐60 DaysPublic commentsPublic commentsRoute recommendations

Goal: Funds from ARRA Round 2 – Mid‐2010Goal: Funds from ARRA Round 2  Mid 2010

Page 18: Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09

Thank You

Questions?