PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · •...

19
Corporate Presentation PASE PSC January 2010

Transcript of PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · •...

Page 1: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Corporate Presentation

PASE PSCJanuary 2010

Page 2: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Important Notice• The information in this document is in summary form and should not be relied upon as a complete and

accurate representation of any matters that a potential investor should consider in evaluating Triangle Energy (Global) Ltd. While management has taken every effort to ensure the accuracy of the material in the presentation, the presentation is provided for information purposes only, Triangle Energy (Global) Ltd, its officers and management exclude and disclaim any liability in respect of anything done in reliance on the presentation.

• The presentation may contain forward looking statements that are subject to risk factors associated with the oil and gas business, many of which are beyond the control of Triangle Energy (Global) Ltd. It is believed that the expectations reflected in those statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially from those expressed or implied in such statements. No assurance or guarantee, is or should be taken to be, given in relation to the future business or performance or results of Triangle Energy (Global) Ltd or the likelihood that the assumptions, estimates or outcomes will be achieved.

• The material provided to you does not constitute an invitation, solicitation, recommendation or an offer to purchase or subscribe for securities.

Page 3: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Corporate Overview• Triangle Energy (Global) Limited (ASX:TEG)• Purchased 100% working interest in Pase PSC

from Mobil effective 1 June 2009• Operated through wholly owned subsidiary

Triangle Pase Inc (TPI), JV with Government of Indonesia (GOI)

• New Jakarta management from 1 Jan 2010• Current focus on PSC renewal• Field focus on increasing gas production

Page 4: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Pase PSC – Summary• Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2.• After relinquishments in 1984, 1986 and 1987, the contract area is currently about 922 km2

and all work commitments have been fulfilled.• Principal PSC terms:

– February 11, 2011 expiry (currently seeking 20 year renewal)– Production split (Excellent older terms)

– First Trance Petroleum (FTP) 20% (splitable)

• Approximately 1000 km 2D seismic was acquired in early 80’s. In early 1990, an extra 172 km 2D survey was shot in Pase area. Extensive digital data basing & seismic reprocessing has been carried out until early 2001 – with no more seismic activity since.

• A total 11 wells (not including sidetracking) have been drilled– 3 wildcat wells A1, B1, C1.– 8 delineation/development wells

• 2 wells A5+A6 presently flowing gas at 9.8 MMCFD => Cash Flow• 2 wells A8 and A1 planned for 1st Quarter 2010.

Oil Gas

Contractor 34.0909% 68.1818%

GOI 65.9091% 31.8182%

Page 5: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Pase Gas Field – Productionshowing increase as A5 brought back on stream & added to A6

Nearly DOUBLING gas production

-

500

1,000

1,500

2,000

2,500

0100020003000400050006000700080009000

10000

1-Ja

n

8-Ja

n

15-Ja

n

22-Ja

n

29-Ja

n

Wat

er R

ate

(BBL

S/D)

Gas

Rat

e (M

CFD)

Monthly Pase Field Production

Gas Production

Water Production

A5+A6

-500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000

0100020003000400050006000700080009000

10000

1-Ju

l

1-Au

g

1-Se

p

1-O

ct

1-N

ov

1-De

c

1-Ja

n

Wat

er R

ate

(BBL

S/D)

Gas

Rat

e (M

CFD)

Year-to-Date Pase Field Production

Gas Production Water Production

A6+A5

Page 6: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Aceh Production Operations

Aceh Production Operations

POINT-A

CL-II

S.LHOK SUKON-B1 CLUSTER PASE

12" GAS PIPELINE

SOUTH LHOK SUKON-ASOUTH LHOK SUKON-D2

30" GASPIPELINE

MALACCA STRAIT

CL-I

LHOKSEUMAWE

30" SUBSEA GASPIPELINE 100 km

ASEANACEH FERTILIZER

(AAF) HUMPUSSAROMATIC

ARUN LNGPLANT

AAF HOUSINGAREA

PT. PIMHOUSING AREA

PT. KERTASKRAFT ACEH

PT. ARUNHOUSING

AREABUKIT INDAH

HOUSING

LANDING

P.T. PUPUKISKANDAR MUDA

(PIM)

ROADPIPELINE

A-13 LHOK SUKON

PANTON LABU

SIMPANG ULIM

MALIKUSSALEHAIRPORT

·PASE - B

NSO ONSHORE FACILITIES

B. CAMP

CL-IIICL-IV

NSO-A

PIPELINES42” SEP. GAS20” INACTIVE16” RESIDUE GAS TO NAT. PROJECTS16” POINT ‘B’ FUEL GAS10” CONDENSATE

SOUTH LHOK SUKON-D

SLS - D8

Page 7: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

7

Overview - Aceh Production Operations (APO)

MALACCA STRAIT

LHOKSEUMAWE

’D’’A’

ARUNFACILITIES

SLS B

PASE B

PASE A

ARUNLNG PLANT &

NSO-ONSHOREFACILITIES

SLS FACILITIES

PASE

GAS/CONDENSATE PIPELINE

Cl-ICl-II

Point A

Cl-III

Cl-IV

KKAPAPER MILL

NSO ‘A’ PLATFORMStart Production in 1999

ARUN FIELD CLUSTERSStart Production in 1977

SLS & PASE FIELDS AREAStart Production in 1996

SUMATRA

PIMFertilizer Plant

Page 8: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Pase A & B Gas Fields – showing well locations

Page 9: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After
Page 10: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Pase-A Field A5 & A6 wells

Page 11: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

North Sumatra Area

Page 12: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Pase PSC Location Map

Total Current Area: 922 km2

Pase II (315 km2)

Pase I (607 km2)

Page 13: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After
Page 14: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Pase PSC Location Map & Wells

Pase 2 areaUnchanged

Pase 1 area- Relinquished acreage on south sideIn difficult steeply dipping beds in mountains

Page 15: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Pase PSC – Overview Facilities –Gas Fields - Block Boundaries

Page 16: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Pase PSC – Exploration History• Pase A field discovered 1983 by drilling Pase-A1 well and first production commenced

January 1998• Pase B discovered after drilling Pase-A9 in1999 and put on production on 2002• Latest 3D geomodelling study done by ExxonMobil suggested an estimation GIIP of Pase

fields of about 590 BCF (496 BCF for Pase A and 96 BCF for Pase B).• Current cumulative production is about 183 BCF and mostly (82%) coming from fractured

reservoir.• Current Pase field production +/- 9.5 MMCFD from 2 wells (A5 & A6) and likely to be matrix

and/or attic gas. • The block remains prospective as existing gas wells can be put back online to supply the gas

to SLS/Arun facility. • Additionally some undrilled structures within Pase field will be attractive to delineate to add

more gas reserves. • Also enormous exploration potential available within this block, identified leads are also

technically assessable to 2D & 3D to justify drillable prospects.• Mobil did not drill small prospects. • Many smaller and shallower oil plays totally ignored!!

Page 17: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Pase PSC – Drilling History• 3 wildcats drilled by Mobil

1983 Pase-A1 Gas discovery well - Developed & Onstream 1998

1987 Pase-B1 P&A (oilshows in Keutapang ignored)1988 Pase-C1 P&A (1023’ gas column in tight Peuta LS)

• 8 delineation/development wells by Mobil

• New Operator Triangle Pase Inc. - June 2009Rehabilitate Pase Gas Field – A6 back on line July 20092 wells presently flowing Jan 2010 A6+A5 at 9.5MMCFD3rd & 4th wells Pase-A8 and Pase-A1 on line 1st quarter 2010

Page 18: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After
Page 19: PASE PSC - Triangle Energytriangleenergy.com.au/wp-content/uploads/2016/11/Pase-2010_01.pdf · • Pase PSC awarded to Mobil on February 12, 1981 covered about 2,305 km2. • After

Contact UsPerth

Triangle Energy (Global) LtdUnit 7 589 Stirling HwyCottesloe WA 6011Australia

T: + 61 (0) 8 9284 7288F: +61 (0) 2 9250 1838

Executive ChairmanE: [email protected]

Jakarta

Triangle Pase IncPlaza Bumidaya, Floor 18Jl Imam Bonjol No. 61Jakarta Pusat 10310Indonesia

T: + 62 21 3193 1761F: + 62 21 230 1523

Country Manager – IndonesiaE: [email protected]