PAS_99_CQI

21
Integrated Management Framework

Transcript of PAS_99_CQI

Page 1: PAS_99_CQI

Integrated Management Framework

Page 2: PAS_99_CQI

IntroductionWhat is PAS 99Examples of Integrated Management

SystemsAuditing IMSBenefits & BarriersWhat the Certification Bodies don’t mention

Page 3: PAS_99_CQI

What is PAS 99Specification issued by BSI‘Recognised’ by Certification BodiesFramework by which you can manage all

elements of your businessISO 9001ISO 14001OHSAS 18001Sector Standards: ISO/TS 16949, ISO 13485

etcSpecialist Standards: Organic Food, Fair

Trade, Lexel, Sarbanes Oxley

Page 4: PAS_99_CQI

Principles of PAS 99Based on ISO 14001 structurePDCA Cycle to support systematic

managementRisk Based StandardHelps is you really know your processes!

Process identification with inputs & outputs are essential

Page 5: PAS_99_CQI

Structure of PAS 996 common requirements:

Policy Planning Implementation & Operation Performance Assessment Improvement Management Review

Page 6: PAS_99_CQI

The Specification

Page 7: PAS_99_CQI

Practical Examples of Key Areas

Page 8: PAS_99_CQI

Risk Based Approach4.3.1 Evaluation of Aspects & Impacts : evaluate the

significant business issues & the associated risk

Quality: Preventive Action? Automotive: FMEA Food: HACCP Medical Devices: Product Risk Assessment Environmental: Aspects & Impacts OH&S: Risk Assessment, HAZOP Corporate Governance: Corporate Risk

Goal: Establish a common frame work to identify, evaluate

and control business risks of any type.

Page 9: PAS_99_CQI

Legal & Other Requirements4.3.2 Identification of legal & other requirements

Environmental: licences, waste, water, WEE etc OH&S: HASAW, Manual Handling, PUWER, Consultation Human Resource: Working time directive, equality, disability

etc Data Protection: Do you hold customer information? Products: CE Marking, design requirements Import/Export: Legal requirements, product specifics Software: Are you licensed correctly? Corporate Governance: New companies act & director liability

Goal: Legal compliance (and keep the Managing Director out

of court).

Page 10: PAS_99_CQI

Achieving Compliance

Plan:•Identify requirements•Review arrangements•Identify gaps•Set objectives

Do:•Implement & communicate•Set responsibilities•Write procedures•Establish controls•Training

Act:•Corrective action•Preventive action•Management Review

Check:•Monitor compliance•Audit & Inspection•Sample & measure•Report non conformities

Plan:•Identify requirements•Review arrangements•Identify gaps•Set objectives

Do:•Implement & communicate•Set responsibilities•Write procedures•Establish controls•Training

Act:•Corrective action•Preventive action•Management Review

Check:•Monitor compliance•Audit & Inspection•Sample & measure•Report non conformities

Page 11: PAS_99_CQI

System Linkages

Page 12: PAS_99_CQI

Documenting Working Procedures4.4.1 Operational Control - for example machine maintenance:

OH&S: Wear your PPE, Use the permit to work, isolate the machine

Product: Ensure machine is cleaned, set up for quality critical to quality parameters

Environmental: Don’t throw the oil down the drain etc.

Goal: One stop shop document for each process and task.

Page 13: PAS_99_CQI

Core Systems4.4.3: Documentation requirements, 4.5.4:

Handling non conformities, 4.6.2: Corrective & preventive action

Control of documents & data Control of records Control of non conformities CAPA

Goal: Common procedures for these systems and clear priority on CAPA for the business as a whole

Page 14: PAS_99_CQI

Management Responsibilities4.2: Policy, 4.3.4: Objectives, 4.7 Management

Review

One policy Common (non conflicting) objectives One Management Review of the business

Goal: Common vision, goals and priorities for the business as a whole

Page 15: PAS_99_CQI

IMS Audit4.5.2: Internal Audit

Saves time Must focus on processes (not system elements) Use auditors & specialists to achieve competency Carefully define the scope of the audit & criteria

Goal: Common vision, goals and priorities for the business as a whole

Page 16: PAS_99_CQI

A Turtle Process Map

InputsWhat should we receive?

OutputsWhat should we deliver?

Process

How?InstructionsProcedures

Methods

How Many?

PerformanceIndicators

With What?

EquipmentInfrastructure

With Whom?Training

KnowledgeSkill

Page 17: PAS_99_CQI

Some Barriers to IntegrationPerception:

Can a good Environmental/Quality/H&S Manager cut it running an IMS?

Fear: Is this a cleaver way to ‘right size’ the organisation?

Too Hard: Sound fantastic Mike but…

Lack of Control: Nice try Mike but I’ve just spent the last 5 years

trying to get everyone to follow the Q/E/H&S procedures – we need to maintain the focus not dilute it!

Page 18: PAS_99_CQI

Implementing an IMSWrite a policy for the IMSDefine the system – write a well structured

manual to act as your ‘instruction book’Make sure you have well developed process

understandingInstall common system elements

Page 19: PAS_99_CQI

Benefits of an IMSEncourages risk management across the

businessGives a competitive edge – more holistic

approach to business managementStakeholder satisfaction – systemic approach

to risk, governance across the businessCommon goals across the business

You should not integrate to save a few £££ on Certifications costs!

Page 20: PAS_99_CQI

What the Certification Bodies didn’t tell you!Still need to be certified 3 times

(i.e. ISO 9001, ISO 14001 & OHSAS 18001)

Probably will not make any kind of cost saving

Not all auditors are multi skilled (you may get 2-3 auditors) – Are all auditors competent to audit your business?

Page 21: PAS_99_CQI

So in conclusionPAS 99 – Simple framework to useGenuinely drives a risk based approach to

managementSimplifies systemsCan lead to internal savings

But…

Translate your systemEnsure common processesEnsure correct competencies are sustained