PARTICIPANT BUILD PACK 1 PROCESS FLOW DIAGRAMS VER 3.3 TABLE OF TRANSACTIONS VER 3.2 PREPARED BY: MARKET DEVELOPMENT DOCUMENT REF: 305196 VERSION: 3.4 DATE: 01 JULY 2014 FINAL :

Transcript of Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 -...

Page 1: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1

PROCESS FLOW DIAGRAMS VER 3.3

TABLE OF TRANSACTIONS VER 3.2

PREPARED BY: MARKET DEVELOPMENT

DOCUMENT REF: 305196

VERSION: 3.4

DATE: 01 JULY 2014

FINAL :

Page 2: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 2 of 51

Document Approval and Acceptance

AEMO Approval This document has been prepared by:

NAME: DANNY MCGOWAN

Position: Principal Regulatory Analyst

Signature: Date:

This document has been reviewed and conforms with the authorised changes to the Gas Interface Protocol:

NAME: PETER ALBERTS

Position: Senior Manager, Gas Retail Market Development

Signature: Date:

This document has been reviewed and conforms to AEMO’s regulatory obligations:

NAME: TERRY GRIMWADE

Position: Executive General Manager, Market Development

Signature: Date:

Page 3: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 3 of 51

Version History

VERSION. DATE AUTHOR(S) CHANGES AND COMMENTS

3.0 01/07/10 S. Monaco Ensure document complies with AEMO standard.

Replace references to MSOR with relevant NGR & RMP references.

Update terminology to correspond with current usage and definitions.

Update acronyms to the current vernacular.

Update images

Add References to Predecessors

Diagram 2.0 – Remove process flows 2.18, 2.19 and 2.21 which related to an aseXML transaction interface between RB and DB for confirming current FRO. This aseXML transaction does not exist.

Diagram 2.0 – Process flow 2.12 to 2.27 which relates to an aseXML transaction called Meterdatahistory, which is not operational in aseXML. It is however operational as an email.

Diagram 4.0 – Remove the information bubble that made reference to reviewing Meter Route schedule being considered as an aseXML. This transaction continues to be made available via email.

Diagram 5.4 – Remove the information bubble that made reference to reviewing Meter Time Expired notice being considered as an aseXML. This transaction continues to be made available via email.

Diagram 13.1, 13.2A, 13.3 and 13.7 – yellow change marks as agreed in IN003/09 (CR96 – Minor RoLR Documentation Changes) have been included. A copy of the IN003/09 GMI is available from [email protected]

3.1 30/07/12 S. Macri IN011/12 (NECF Changes)

Changes for Customer Classification

3.2 01/02/13 J. Luu IN029/12 Pilot Program BAU Process

3.3 01/01/14 D. McGowan IN004/12 – Redundant Provision and minor GIP and Spec Pack changes

3.4 01/07/14 D. McGowan IN017/13 – Gas Road Map. Service Orders Review. Remove diagrams 5.1 to 5.5, 99.3 and 99.4 and add new Process Flows diagrams 100 to 107

Page 4: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 4 of 51

Executive Summary

The Table of Transactions version 3.0 contains: Table of Transactions, Table of Elements, List of Job Enquiry Codes, Address Elements and MIRN and Meter states. Note: The Table of Transactions is a separate document and is not included in the electronic version of this document.

References to Predecessors

To reflect the governance changes implemented on 1 July 2009, this document has been amended to

remove references to the Victorian Energy Networks Corporation (VENCorp) and replace such references

with Australian Energy Market Operator (AEMO). Where any content inadvertently refers to VENCorp it

should be read as referring to AEMO.

It should be noted that participant ID “VENCORP” remains as the participant ID for AEMO as the gas market

operator in Victoria and Queensland.

Page 5: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 5 of 51

Contents

1 Process Flow Diagrams ................................................................................... 7

1.1 DIAGRAM 1.0 – SPECIAL METER READS ............................................................... 2

1.2 DIAGRAM 1.1 – SPECIAL METER READS CANCELLATION ................................... 3

1.3 DIAGRAM 2.0 – BM DATA COLLECTION AND DELIVERY (PAGE 1) ...................... 4

1.4 DIAGRAM 2.0 – BM DATA COLLECTION AND DELIVERY (PAGE 2) ...................... 5

1.5 DIAGRAM 2.7 – BASIC METER CUSTOMISATION BILL ESTIMATION ................... 6

1.6 DIAGRAM 4.0 – BASIC METER ROUTE AND SITE INFORMATION ........................ 7

1.7 DIAGRAM 4.1 – BASIC METER ROUTE AND SITE INFORMATION ........................ 8

1.8 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 1) ................................................ 9

1.9 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 2) .............................................. 10

1.10 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 3) .............................................. 11

1.11 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 4) .............................................. 12

1.12 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 5) .............................................. 12

1.13 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 6) .............................................. 14

14

1.14 DIAGRAM 9.1 – BM DAILY CONSUMPTION ESTIMATION .................................... 15

1.15 DIAGRAM 10.0 – DATA CHANGE ........................................................................... 16

1.16 DIAGRAM 11.0 – BASIC METER PROFILER (BMP) ............................................... 17

1.17 DIAGRAM 12.0 – MIRN REQUEST ......................................................................... 18

1.18 DIAGRAM 13.0 – CUSTOMER REQUEST TO RETAILER ...................................... 19

2 RETAILER OF LAST RESORT PROCESS FLOWS .......................................20

2.1 DIAGRAM 13.1 – PRE-ROLR EVENT – MONTHLY TRANSFER OF CUSTOMER DATA TO AEMO ................................................................................................................ 20

2.2 DIAGRAM 13.2 – CATS PROCESSING – CANCELLED AND ACCELERATED CUSTOMER TRANSFERS ...................................................................................... 21

2.3 DIAGRAM 13.2A – CATS PROCESSING – ACCELERATED CUSTOMER TRANSFERS (‘MOVE INS’) ............................................................................................................ 22

2.4 DIAGRAM 13.3 – NON-CATS / CUSTOMER DATA EXCHANGE AND DATA GENERATION ......................................................................................................... 23

2.5 DIAGRAM 13.4 – FRB GENERATED CUSTOMER LISTS FOR ROLR ................... 24

2.6 DIAGRAM 13.5 – WHOLESALE PROCESS ............................................................ 25

2.7 DIAGRAM 13.6 – ROLR COMMUNICATIONS ......................................................... 26

2.8 DIAGRAM 13.7 – PROVISION OF ESTIMATE TRANSFER READS AND SUBSEQUENT ADJUSTMENT ......................................................................................................... 27

2.9 DIAGRAM 13.8 – SERVICE ORDERS IN FLIGHT ................................................... 28

3 PROCESS FLOW DIAGRAMS .......................................................................29

3.1 DIAGRAM 99.1 – MAINS RENEWAL ....................................................................... 29

Page 6: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 6 of 51

3.2 DIAGRAM 99.2 – NETWORK BILLING .................................................................... 30

3.3 DIAGRAM 99.4 – MIRN STANDING DATA UPDATE ............................................... 31

3.4 DIAGRAM 99.5 – METERED SUPPLY POINT COUNT UPDATE ............................ 32

4 CUSTOMER CLASSIFICATION .....................................................................33

4.1 DIAGRAM 99.6 – METER FIX .................................................................................. 33

4.2 DIAGRAM 99.7 – TRANSFER (IN SITU / MOVE – IN) ............................................. 34

4.3 DIAGRAM 99.8 – MOVE IN (NO CHANGE IN RETAILER) ...................................... 35

4.4 DIAGRAM 99.9 – CUSTOMER REQUEST TO RETAILER ...................................... 36

5 SERVICE ORDER PROCESS FLOWS ..........................................................37

5.1 The drawing conventions used for these diagrams: .................................................. 37

5.2 Diagram 100: Service Orders General (Simplified) ................................................... 38

5.3 Diagram 101: Retailer Initiated Service Orders Cancellation .................................... 39

5.4 Diagram 102: Distributor Initiated Service Orders ..................................................... 40

5.5 Diagram 103: Shipper Process ................................................................................. 41

5.6 Diagram 104: Meter Fix Request .............................................................................. 42

5.7 Diagram 105: Upgrade from Basic to Interval Meter ................................................. 43

5.8 Diagram 106 : Downgrade from Interval to Basic Meter For tariff D .......................... 44

5.9 Diagram 107: Service Order Transaction Table ........................................................ 45

Page 7: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 7 of 51

1 Process Flow Diagrams

1. These flow charts were developed as a working aid to development of the Retail Market Procedures

(Victoria) and the Participant Build Packs for the purpose of identifying the necessary transactions

between Retailers, Distributors and AEMO. Whilst reasonable effort has been made to ensure that

these flow charts are updated and consistent with the Retail Market Procedures (Victoria) and the

Participant Build Packs, there may be differences between the flow charts and the Retail Market

Procedures (Victoria) and the Participant Build Packs. Where there is a difference, the Retail Market

Procedures (Victoria) and the Participant Build Packs take precedence.

2. The process steps within individual business are indicative only and do not necessarily identify all

required process steps nor do they mandate the use of a particular process.

3. The drawing conventions used for these diagrams are as follows:

a. Multiple flow arrows exiting from a process step indicate two or more independent process flows

that occur following the step. If a flow is conditional, that condition will be noted on the flow

arrow.

b. Alternative flows are indicated by a decision box containing a question. Conditions based on

answers to the question on the flows exiting these boxes will be noted on the flow arrows.

c. A “fork” synch bar indicates two unconditional parallel processes that will rejoin at some point

with a “join” synch bar. A join indicates that all processes must be completed before moving on.

4. Flow arrows that cross “swim lanes” to connect to a start or end identifier are used to ease diagram

production and do not indicate a B2B transaction.

Page 8: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 2 of 51

1.1 DIAGRAM 1.0 – SPECIAL METER READS

Customer

Retail Business

(New or Existing FRO)

AEMO

Distribution

Business

BMDM

MBMR

1.1 Requests

special read

1.2 Requires special

read

1.11 Close Special

Read Request and

adv ise RB

1.3 Nominate date and

generate special read

request 1.17 Will l Retailer

carry out special

read?

1.8 Issues request to

contractor for debt

collection or

disconnection

1.4 Log request and

forward to Meter Reading

Contractor

1.18 Attend site:

Access available

1.10 Record reason for no

access and adv ise DB1.5 Record reading and if

requested disconnect

1.6 Perform basic

high/low v alidation 1.7 Send read data to

BMDM

1.19 Was meter

disconnected?

1.9.1 Update MIRN and Meter

Data database with

disconnection status

1.14 Send New FRO

Meter index, date and

site data

1.15 Transfer Request?

1.9 If debt un paid

disconnect and read

meter. Forward meter

read and disconnection

flag to DB

1.13 Update New

FRO CIS

10.0 Data Change - 10.4

[No]

1.16 Receiv e Transfer

Completion

Notification

6.0 Customer Transfer

Page 4 - 6.4.12

1.20 Return Work

Order Number

1.21 Log Work Order

Number

6.0 Customer Transfer -

6.1.19

2.0 Basic Meter Data

Collection and Delivery -

2.6

1.20 Was it Special

Final Read ?

1.21 Perform Estimation

SpecialReadRequest

«aseXML»

[Yes]

[No]

[Yes]

[No]

AccountCreationNotification

«aseXML»

[Yes]

SpecialReadResponse

«aseXML»

[Yes]

[Yes][No]

MeterReadInputNotification

«aseXML»

SpecialReadResponse

«aseXML»

CATSNotification

«aseXML»

Page 9: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 3 of 51

1.2 DIAGRAM 1.1 – SPECIAL METER READS CANCELLATION

1.22 Special Read

no longer required

Nominate

date and

generate

Special

Read

Request

1.23 Raise Special

Read Cancellation

request

1.24 Log Special

Read Cancellation

Close

Special

Read

Request

and

adv ise RB

Distributor

Retailer

SpecialReadRequest

«aseXML»

Page 10: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 4 of 51

1.3 DIAGRAM 2.0 – BM DATA COLLECTION AND DELIVERY (PAGE 1)

2.2 Load reading route

schedules into PDEs

2.17 Card Read

2.16 Call Centre

Read

2.3 Follow route schedule

and key reads into PDEs

2.4 Perform basic

high/low v alidation,

update site info as

required

2.1 Download reading

route schedule and

v lidation parameters to

meter reading contractor

2.5 Upload read data

2.8 Subtract prev ious

index read from current

index read

Retail

Business

Customer

2.1a Calculate v alidation

parameters

A (to page 2)

AEMO

Distribution

Business

BMDM

MBMR

4.0 Basic Meter Route and Site

Information - 4.2

5.1 Basic Meter Fix -

5.1.12

1.0 Special Meter

Reads - 1.9.1, 1.19 &

1.21

2.7 Obtain estimated index

data as required via

process 2.7 Basic Meter

Customer Bill Estimation

2.6 Store and v alidate data

Page 1

1.0 Special Meter Reads -

1.15

5.5 Basic Meter

Removal - 5.5.11 &

5.5.13 99.3 Service

Orders - 99.3.9

2.30 Able to

read meter?

2.31 Leav e card

5.2 Basic Meter

Change - 5.2.9

5.3 Basic Meter

Upgrade to

Interval - 5.3.10

«Phone»

«Mail» MeterReadInputNotification

«aseXML»

[Yes][No]

Page 11: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 5 of 51

1.4 DIAGRAM 2.0 – BM DATA COLLECTION AND DELIVERY (PAGE 2)

2.9 Conv ert imp to

metric

2.10 Apply PCF

2.12 Prov ide Energy and/or flow data and or index readings

2.15 Calculate

bill/DUoS

2.13 Bill end

customers

Metric Data ?

2.11 Apply

av erage heating

v alue

2.22 Process Energy

Data Response

11.0 Basic Meter Profiler

(BMP) - 11.1

10.0 Data Change - 10.59.1 BM Daily Consumption

Estimation

A (from page 1)

2.23 Sav e

energy data

2.24 Process

energy data

2.25 Return

Meter Data

Response

2.26 Request

Energy History

2.27 Sav e

Energy History

data

Retail

Business

Customer

AEMO

Distribution

Business

BMDM

MBMR

Page 2

2.28 Identify any

missing energy

data

2.29 Request

missing energy

data

11.0 Basic Meter

Profiler (BMP) - 11.15

MeterDataMissingNotification

«aseXML (CSV)»

MeterDataMissingNotification

«aseXML»MeterDataNotification (2nd tier)

«aseXML (CSV)»

MeterDataNotification

«aseXML (CSV)»MeterDataHistoryResponse

«E-mail

(CSV)»

[No]

[Yes]

MeterDataResponse

«aseXML»

MeterDataResponse

«aseXML»Request Gas History Data

«fax or e-mail»

Page 12: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 6 of 51

1.5 DIAGRAM 2.7 – BASIC METER CUSTOMISATION BILL ESTIMATION

MBMR

BMDM

Distribution

Business

AEMO

Customer

Retail

Business

2.7.4 Prov ide

Customer

Characterisation

2.7.5 Prov ide EDD2.7.6 Prov ide av e. daily

flow. weighted Heating

Values

consumption

history >1yr?

2.7.1 Determine av e

BL & av e TSF from

Customer

Characterisation 2.7.2 Estimate Daily

Consumed Energy using

BL & TSF

2.7.3 Conv ert

Estimated Consumed

Energy to flow

2.0 Basic Meter Data

Collection and Delivery

- 2.62.0 Basic Meter

Data Collection

and Delivery - 2.8

AmendMeterRouteDetails

«aseXML (CSV)»

«MIBB»«MIBB»

[No]

[Yes]

Page 13: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 7 of 51

1.6 DIAGRAM 4.0 – BASIC METER ROUTE AND SITE INFORMATION

MBMR

BMDM

Distribution

Business

AEMO

Customer

Retail

Business

3.1(a) Customer Requests

changes to address information

(eg - Lot number to Hse Number)3.1(b) Customer Requests

changes to site Information (eg -

Access to Meter)

4.3 Consultation on

Route/Route Changes

3.2(a) Retailer records and

issues request to update

address information

3.2(b) Retailer records and

issues request to update Site

Information

3.4 Update Meter Data

Database

3.3 Receiv es and acknowledges change to Site Information

4.1 Analyse and

optimise routes4.2 Update/Create route

schedules based on

outputs

3.5 Meter Reading Serv ice

Prov ider requests changes to

site Information (eg - Access to

Meter, Address details)

5.1 Basic Meter Fix -

5.1.12

4.4 Record route

changes

4.5 Record annual

meter read schedule

5.3 Basic Meter Upgrade

to Interval - 5.3.10

2.0 Basic Meter Data

Collection and Delivery - 2.1

«Phone, fax, e-mail»

AmendMeterRouteDetails

«aseXML»

AmendMeterRouteDetails

«aseXML»

AmendMeterRouteDetails

«E-mail (CSV)»

Annual meter read schedule

«E-mail (CSV), web»

Page 14: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 8 of 51

1.7 DIAGRAM 4.1 – BASIC METER ROUTE AND SITE INFORMATION

Distribution

Business

Customer

Retail

Business

3.1c Customer

request change to

contact details

3.1d Customer request

mov e in and prov ides

contact Details

3.2c Retailer

records details

and issues request

to update contact

details

3.3 Reciev es and

acknowledges change

to customer contact

details

3.6 Update Customer

contact Database

«<aseXMLCSV>»

AmendCustomerDetails

Page 15: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 9 of 51

1.8 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 1)

6.1.13 Prov ide

Implicit Informed

Consent

6.1.1 Submit Transfer

Request to CATS

6.1.6 Initiate

Transfer

Transaction

6.1.7 Request

Standing Data

6.1.9 Notify Affected

Parties

6.1.8 Deliv er

Standing Data

6.1.12 Put on Notice to

Deliv er Energy for This

Site in the Allowable

Period

6.1.10 Receiv e

Notice of Transfer

6.1.11 Receiv e

Notice of Transfer

Customer

AEMO

Current FRO

TPO

Distributor

6.1.17 Receiv e

Standing Data

6.1.18 Process

Response to Standing

Data

6.1.5 Notify New

Retailer

6.1.16 Process Response to

Transfer Request

End Process

A (to page 2)

Page 1

1.0 Special Meter Reads - 1.2

New FRO

12.0 MIRN

Request

End Process

I (to page 4)

6.1.19 Is it re

Retrospective Transfer

& no reading for that

date?

6.6.1 Receiv e

Problem Notice

6.1.20 Generate

Problem Notice

NACK

Further processing as per

problem notice handling,

refer to Page 6

6.1.21 Is it

move-in transfer ?

B (to page 3)

D (to page 4)[No]

[Yes]

[If Special Read is required]

CATSChangeRequest

«aseXML»

CATSChangeResponse

«aseXML»

CATSChangeResponse

«aseXML»

CATSDataRequest

«aseXML»

CATSNotification

«aseXML»

«manual process»

CATSNotification

«aseXML»

CATSChangeRequest

«aseXML»

[No]

NACK [Yes]

«aseXML»

CATSChangeAlert

«aseXML»

Page 16: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 10 of 51

1.9 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 2)

6.2.2 Enter

Objection in CATS

6.2.3 Validate

Objection

6.2.5 Notify

Objecting Party6.2.6 Register

Objection

Customer

New FRO

AEMO

Current FRO

TPO

Distributor

6.2.7 Process

Objection

Response

A (from page 1)

C (to page 3)

6.3.1 Notify

Affected

Participants

6.3.2 Consider

Valid Objection

6.3.5 Receiv e

Notice of

Objection

6.2.1 Object ?

B (to page 3)

G (to page 3)

Page 2

[No]

[Yes]

CATSObjectionResponse

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSObjectionRequest

«aseXML»

Page 17: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 11 of 51

1.10 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 3)

6.3.19 Receiv e

Notice of Objection

Withdrawal6.3.10 Liase/Notify

with Customer

6.3.12 Receiv e

Cancelled Txf

Notice

6.3.8 Clear

Objection

6.3.11 Monitor

Objection Period

6.3.9 Any Objections?6.3.13 Cancel

Transfer Request

End Process

End Process

6.3.14 Receiv e

Cancelled Txf

Notice

6.3.15 Receiv e

Cancelled Txf

Notice6.3.20 Receiv e

Notice of Objection

Withdrawal

6.3.18 Receiv e

Notice of Objection

Withdrawal

6.3.17 Remov e from

the Transfer Queue to

Deliv er Energy

6.3.16 Receiv e

Cancelled Txf

Notice

Customer

New FRO

AEMO

Current FRO

TPO

Distributor

C (from page 2)

6.3.7 Resolv e

ObjectionD (to page 4)

B (from page 2)

G (from page 2)

6.3.21 Receiv e

Notice of

Objection

Withdrawal

Page 3

H (from page 5)

6.3.22 Send

Cancelled Txf

Notice

6.3.23 Send

Notice of

Objection

Withdrawal CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»CATSNotification

«aseXML»

CATSNotification

«aseXML»

[objection period expired]

CATSObjectionWithdrawal

«aseXML»

[Yes]

[No]

Page 18: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 12 of 51

1.11 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 4)

1.12

6.4.14 Receiv e

Status Update

6.4.1 Set Transfer

Status to Pending

6.4.16 Receiv e

Status Update

6.4.15 Receiv e

Status Update

6.4.2 Wait For

Final Read Data

6.4.3 Load Actual

Meter Read Data6.4.5 Is Read an Actual Read?

6.4.6 Is Read

Date OK for

Transfer?

6.4.9 Update CIS

End Process

End Process

End Process

End Process

End Process

6.4.7 Update

Status to

Completed

6.4.8 Notify

Affected

Participants

6.4.10 Issue

Final Bill

6.4.11 Update

DUoS/TUoS Billing

6.4.12 Update

Data Access

Controls

6.4.13 Update

Meter Register

Customer

New FRO

AEMO

Current FRO

TPO

Distributor

D (from page 3)

E (from page 5)

F (to page 5)

Page 4

6.4.17 Has

Standing Data

been provided ?

6.4.17 Send Status

Change Notice

1.0 Special

Meter Reads -

1.16

11.0 Basic Meter

Profiler (BMP) - 11.21

I (from page 1)

[No]

[Yes]

[No]

[Yes][Yes]

[Yes]

[No]

[No]

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

D (from page 1 and 3)

Page 19: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 13 of 51

DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 5)

6.5.1 Exception

Processing

6.5.4 New

Transfer Date

or Cancel?

6.5.17 Receiv e

Transfer

Cancellation

Notice

End Process

End Process

End Process

6.5.2 Notify Late

Meter Read 6.5.6 Set Transfer

Status to Cancelled

6.5.7 Notify Affected

Participants

6.5.8 Update

Status with new

Transfer Date

6.5.10 Notify

Affected

Participants

6.5.19 Receiv e

Transfer

Cancellation

Notice

6.5.18 Receiv e

Transfer

Cancellation

Notice

6.5.11 Receiv e

Notice

6.5.12 Receiv e

Notice

6.5.3 Notify New

Retailer Of final

Read Failure

Customer

New FRO

AEMO

Current FRO

TPO

Distributor

F (from page 4)

6.5.15 Receiv e

Notice of Read

Failure

6.5.16 Receiv e

Notice of Read

Failure

E (to page 4)

CATSChangeWithdrawal

Page 5

6.5.14 Has

read fail notice

been issued ?

H (to page 3)

CATSChangeRequest

6.5.20 Process

Response

AEMOwill automatically cancel the Transfer Request

if a New Transfer Date or a Cancellation is not

received within 10 business days.

6.5.21 Is it re

Retrospective

Transfer

H (to page 3)

[Cancel]

«aseXML»

[New transfer date]

«aseXML»

CATSDataRequest

«aseXML»

CATSDataRequest

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSNotification

«aseXML»

CATSChangeResponse

«aseXML»

CATSDataRequest

«aseXML»

[No]

[Yes]

[No]

[Yes]

Page 20: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 14 of 51

1.13 DIAGRAM 6.0 – CUSTOMER TRANSFER (PAGE 6)

6.6.1 Receiv e

Problem Notice

6.6.2 Pass Problem

Notice to New

Retailer

6.6.5 Generate

Problem Notice

6.6.3 Generate

Problem Notice

Customer

New FRO

AEMO

Current FRO

TPO

Distributor

Page 6

6.6.4 Generate

Problem Notice

CATSChangeAlert

«aseXML»

CATSChangeAlert

«aseXML»

«manual process»

CATSChangeAlert

«aseXML»

Page 21: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 15 of 51

1.14 DIAGRAM 9.1 – BM DAILY CONSUMPTION ESTIMATION

Customer

Retail Business

AEMO

Distribution

Business

BMDM

MBMR

11.0 Basic Meter Profiler (BMP)9.1.1 Consumed

Energy Available ?

9.1.2 Estimate Daily

Consumed Energy using

BL & TSF

9.1.3 Prov ide BL & TSF

11.0 Basic Meter Profiler

(BMP)

See also diagram 11.0 BMP

(11.16 -> 11.17)

This diagram is for AEMO internal use only.

Not to be used for participant design

[No]

[Yes]

NMIStandingDataUpdateNotification

«aseXML»

Page 22: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 16 of 51

1.15 DIAGRAM 10.0 – DATA CHANGE

Retail

Business

Customer

AEMO

Distribution

Business

BMDM

MBMR

10.1 Customer

complaint re bill

10.2 Consider

complaint - data

problem?

10.3 Request data quality confirmation and

prov ide clarifiying Information (where

applicable)

10.6 Manage customer /

complaint

10.4 Initiate Special

Read

10.8 Alternative

re-estimate or special

read required?

10.7 Carry out

alternativ e

re-estimation

10.5 Inform RB of

re-estimation or special

read result

1.0 Special Meter Reads -

1.4

2.0 Basic Meter Data

Collection and

Delivery - 2.12

[Yes] [No]

MeterDataVerifyRequest

«aseXML»

[Special Read] [Alternative re-estimate]

[If new energy data is to be

supplied]

MeterDataVerifyResponse

«aseXML»

Page 23: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 17 of 51

1.16 DIAGRAM 11.0 – BASIC METER PROFILER (BMP)

Retail

Business

Customer

AEMO

Distribution

Business

BMDM

MBMR

11.11 Calculate EDD

Values

11.12 Generate

v alues/site without

reading

11.5 Aggregate

Energy Readings by

RB by DB

11.6 Apply Profile to

Aggregated Energy

11.4 Apply UAFG

Benchmark

11.7 Profile

Preparation (PPS)

11.8 Settlements

Process

11.9 MIBB

11.17 Update Meter

Register with BL and

TSF

11.21 Meter Data

Store

Meter Data Store

11.16 Deliv er BL and

TSF by Site

11.14 Monitor Energy

Data

11.15 Request

Missing Energy Data

11.2 Are all

MIRNs present ?

11.18 Send Response

to BL and TSF by Site

Update

11.20 Process Response

to BL and TSF by Site

Update

11.1 Validate Data

6.0 Customer

Transfer - 6.4.3

2.0 Basic Meter Data

Collection and Delivery

- 2.12

2.0 Basic Meter Data

Collection and Delivery

- 2.22

MeterDataResponse

«aseXML»

NMIStandingDataUpdateResponse

«aseXML»

MeterDataNotification (2nd tier)

«aseXML»

NMIStandingDataUpdateNotification

«aseXML»

[No]

[Yes]

MeterDataMissingNotification

«aseXML»

Page 24: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 18 of 51

1.17 DIAGRAM 12.0 – MIRN REQUEST

Retail

Business

Customer

AEMO

Distribution

Business

BMDM

MBMR

12.2 Prov ide Explicit

Informed Consent,

MIRN or Address

12.12 Contact DB

for Details

12.13 Manage Query

on Failed Searches

12.9 Can RB resolve?

12.3 Initiate MIRN

Discov ery Transaction

12.5 Single match on

Address/MIRN?

12.6 Prov ide MIRN Data12.7 Prov ide Additional

MIRN Data

12.8 Use Data

NMIDiscoveryRequest/

NMIStandingDataRequest

12.14 Return error

NMIDiscoveryResponse/

NMIStandingDataResponse

MIDiscoveryResponse/

NMIStandingDataResponseNMIDiscoveryResponse/

NMIStandingDataResponse

«Phone, fax, e-mail»

[No][Yes]

«aseXML»

[Yes][No] [If additional data to be supplied]

«aseXML» «aseXML»«aseXML»

Page 25: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 19 of 51

1.18 DIAGRAM 13.0 – CUSTOMER REQUEST TO RETAILER

Identifying a Gas Customer’s Current Retailer (Meter and/or up stand removed)

Business Day 1 Day 3 Day 8

Ret

aile

r

(Not

FR

O)

Ret

aile

r

(Not

FR

O)

AE

MO

AE

MO

FRO

FRO

Dis

tribu

tor

Dis

tribu

tor

Cus

tom

erC

usto

mer 1. Customer calls

a RB who is not

the FRO to

arrange SO.

2. Receives call from

customer. Advises

customer they are not the

RB for that address.

Take customer's details.

No SO details are taken.

3. RB B2B Contact

(Primary/Secondary)

send AEMO

Helpdesk email for

“Identify FRO”.

4. Helpdesk logs

call and searches

meter register for

current FRO.

5. AEMO Pass

customer details to

FRO and closes call.

6. FRO contact

customer and

collects SO

details.

7. Customer

happy.

End.

8. Organise

Service Order (if

required).

9. Receive Service

order request and

complete.

Page 26: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 20 of 51

2 RETAILER OF LAST RESORT PROCESS FLOWS

2.1 DIAGRAM 13.1 – PRE-ROLR EVENT – MONTHLY TRANSFER OF CUSTOMER DATA TO AEMO

Page 27: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 21 of 51

2.2 DIAGRAM 13.2 – CATS PROCESSING – CANCELLED AND ACCELERATED CUSTOMER TRANSFERS

Page 28: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 22 of 51

2.3 DIAGRAM 13.2A – CATS PROCESSING – ACCELERATED CUSTOMER TRANSFERS (‘MOVE INS’)

Page 29: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 23 of 51

2.4 DIAGRAM 13.3 – NON-CATS / CUSTOMER DATA EXCHANGE AND DATA GENERATION

Page 30: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 24 of 51

2.5 DIAGRAM 13.4 – FRB GENERATED CUSTOMER LISTS FOR ROLR

Page 31: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 25 of 51

2.6 DIAGRAM 13.5 – WHOLESALE PROCESS

Page 32: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 26 of 51

2.7 DIAGRAM 13.6 – ROLR COMMUNICATIONS

Page 33: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 27 of 51

2.8 DIAGRAM 13.7 – PROVISION OF ESTIMATE TRANSFER READS AND SUBSEQUENT ADJUSTMENT

Page 34: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 28 of 51

2.9 DIAGRAM 13.8 – SERVICE ORDERS IN FLIGHT

Page 35: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 29 of 51

3 PROCESS FLOW DIAGRAMS

3.1 DIAGRAM 99.1 – MAINS RENEWAL

99.1.1 Identify

maintenance work

requirement

99.1.2 Identify

impacted MIRNs

99.1.3 Notify Retailer

of impacted MIRNs

99.1.4 Record

impacted MIRNs

Distributor

Retailer

99.1.5 Notify impacted

customers as required

FieldWorkNotification

«E-mail (CSV)»

Page 36: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 30 of 51

3.2 DIAGRAM 99.2 – NETWORK BILLING

99.2.1 Collate

Network DUoS

Billng Details data

99.2.2 Record

Network DUoS

Billing Details

data

Distributor

Retailer

99.2.3 Issue a

Dispute

99.2.4 Rev iew

Network DUoS

Billing Details and

Propose a

Resolution

99.2.5 Rev iew

Proposed

Dispute

Resolution

99.2.6 Record

Payment Details

«aseXML (CSV)»

NetworkDUoSBill ingNotification

[disagreement with

bill ing details]

«aseXML (CSV)»

NetworkDUoSBill ingNotification

«aseXML (CSV)»

NetworkDUoSBill ingNotification

«aseXML (CSV)»

NetworkDUoSBill ingNotification

Page 37: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 31 of 51

3.3 DIAGRAM 99.4 – MIRN STANDING DATA UPDATE

99.4.1 Update

MIRN Standing

Data

99.4.2 Notify

Retailer of

change

99.4.3 Update

MIRN Standing

Data

Distributor

Retailer

«e-mail»

Page 38: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 32 of 51

3.4 DIAGRAM 99.5 – METERED SUPPLY POINT COUNT UPDATE

99.5.2 Update Metered

Supply Points Count

99.5.1 Prov iding

Metered Supply Points

Count

AEMO

Distributor

MeteredSupplyPointsCountUpdate

«aseXML»

Page 39: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 33 of 51

4 CUSTOMER CLASSIFICATION

4.1 DIAGRAM 99.6 – METER FIX

Customer Classification

AEM

OR

etai

ler

Dis

trib

uto

r

AGREED - Transfer (Insitu/MoveIn)

Request MIRN Discovery/Standing

Data

Validate request and send MIRN

Discovery Response

Receive MIRN Discovery

Responsse and update system(s)

Raise Transfer Request

Receive transfer and Issue market notifications

Generate Account Creation

Notification

Send Notifiction transfer Complete

Receive Completion and update system

Receive Completion and ACN and

update system(s)

Generate Amend Route/Site Address Details Transaction

Has the primary use of the property changed?

End

No

Yes

Receive Amend Route/Site Address Details transaction

and update system(s)

Receive transaction with Customer Classification

Code

Generate Amend Route/

Site Address Details

Transaction

Where CCC is “BUS” Update

Customer Threshold Code (‘LOW’, ‘MED’,

‘HIGH’

Send update

Page 40: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 34 of 51

4.2 DIAGRAM 99.7 – TRANSFER (IN SITU / MOVE – IN)

Customer Classification

AEM

OR

etai

ler

Dis

trib

uto

r

AGREED - Transfer (Insitu/MoveIn)

Request MIRN Discovery/Standing

Data

Validate request and send MIRN

Discovery Response

Receive MIRN Discovery

Responsse and update system(s)

Raise Transfer Request

Receive transfer and Issue market notifications

Generate Account Creation

Notification

Send Notifiction transfer Complete

Receive Completion and update system

Receive Completion and ACN and

update system(s)

Generate Amend Route/Site Address Details Transaction

Has the primary use of the property changed?

End

No

Yes

Receive Amend Route/Site Address Details transaction

and update system(s)

Receive transaction with Customer Classification

Code

Generate Amend Route/

Site Address Details

Transaction

Where CCC is “BUS” Update

Customer Threshold Code (‘LOW’, ‘MED’,

‘HIGH’

Send update

Page 41: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 35 of 51

4.3 DIAGRAM 99.8 – MOVE IN (NO CHANGE IN RETAILER)

Customer Classification

Ret

aile

rD

istr

ibu

tor

AGREED - Move In (Same Retailer)

Receive Customer request for Move-in on property already

with the Retailer

Generate Amend Route/Site Address Details Transaction

Has the primary use of the property changed?

End

No

Yes

Receive transaction with updated

Customer Classification Code

Generate Amend Route/Site Address Details Transaction

Receive Amend Route/Site Address Details transaction

and update system(s)

Where CCC is “BUS” Update

Customer Threshold Code (‘LOW’, ‘MED’,

‘HIGH’

Send update

Page 42: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 36 of 51

4.4 DIAGRAM 99.9 – CUSTOMER REQUEST TO RETAILER

Customer Classification

Ret

aile

rD

istr

ibu

tor

AGREED - Request from Customer to RB

Receive Customer request

Generate Amend Route/Site Address Details Transaction

Has the primary use of the property changed?

End

No

Yes

Receive transaction with updated

Customer Classification Code

Generate Amend Route/Site Address Details Transaction

Receive Amend Route/Site Address Details transaction

and update system(s)

Where CCC is “BUS” Update

Customer Threshold Code (‘LOW’, ‘MED’,

‘HIGH’

Send update

Page 43: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 37 of 51

5 SERVICE ORDER PROCESS FLOWS

5.1 The drawing conventions used for these diagrams:

The drawing conventions used for these diagrams are as follows:

N.N ActivityProcess Terminator/

Inter-process LinkDecision

Process Close

On

Page

Ref

Process Start

Decision/Data Transfer Description

Wait

Notes

Parallel

Mode

Association

aseXML Message Description

Page 44: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 38 of 51

5.2 Diagram 100: Service Orders General (Simplified)

SA Process Ref: PF (B2B) REQ5B/MIRN 1

Diagram 100: Service Orders General (Simplified)

AE

MO

Dis

trib

uto

rR

eta

iler

Cu

sto

me

r

ServiceOrderRequest

[actionType=’New’]

<<aseXML>>

#1

<<aseXML>>

#4

YesYes

No

Transaction

Acknowledgment

<<aseXML>>

ServiceOrderResponse

[responseType=’Initial’]

<<aseXML>>

#2

Yes

No

ServiceOrderResponse

[responseType=’Closure’]

<<aseXML>>

#3

YesNoYes

Where rejected, Retailer takes

appropriate action e.g. Initiate

new service order request and

current process ends.Wait for service order

response ‘Closure’

Yes

This process wasn’t reviewed as part of

IN017/13. IN027/13 has been created

to raise awareness that when Meter

Data Delivery process is reviewed

revisit this process flow diagram

No

No

No

19. Action

Notification

11. Has SO

been

Completed?

16. Does SO Type

Require Delivery

of Meter Data?

2. Send Service

Order (SO)

C-K

Go To 102.2

12. Was Additional

or Alternative

Work Completed?

Go To 2.0 Meter

Data Delivery

9. Log Service

Order & Send

Response

6. Receive

Acceptance/

Rejection

1. Request a

Service

18. Send

Notification to

AEMO

8. Receive Service

Order Response

(Initial)

5. Send Validation

Outcome

7. Was Service

Order Accepted?

15. Receive

Service Order

Response

(Closure)Up to 5 BD From

Expected Completion of Step 10

10. Action Service

Order

4. Valid Service

Order Request?

13. Send Service

Order Response

3. Receive Service

Order Request &

Validate

1a. Request a

Service

17. Does SO

Require

Notification to

AEMO?

From 103.15 or

104.6 or 104.8 as

applicable

Up to 5 BD from Expected

Completion of Step 10

#1, 2, 3 & 4 Refer to Diagram 107 for the transactions involved

Go To 105.18 or

106.14 as

applicable

14. Upgrade or

Downgrade?

Yes

No

From 103.14

Go To 105.4 or

106.4 as

applicable

If required by

service requested

Page 45: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 39 of 51

5.3 Diagram 101: Retailer Initiated Service Orders Cancellation

SA Process Ref: PF (B2B) REQ 7

Diagram 101: Retailer Initiated Service Orders CancellationD

istr

ibu

tor

Re

taile

rC

usto

me

r

ServiceOrderRequest

[actionType=’Cancel’]

<<aseXML>>

#1

Yes

No

Transaction

Acknowledgment

<<aseXML>>ServiceOrderResponse

[responseType=Closure]

<<aseXML>>

#3

Yes

2. Send Service

Order (SO)

Cancellation

C-K

1a. Request a

Service order to

be Cancelled

3. Receive Service

Order Cancellation

& Validate

4. Valid Service

Order Cancel

Request?

1. Request a

Service order to

be Cancelled

9. Update System

Data

8. Receive Service

Order Response

12. Send Service

Order Response

6. Receive

Acceptance/

Rejection

5. Send Validation

Outcome

11. Can Initial SO

be Cancelled?

No

Yes

Same day cancellations

must also be phoned through

Where cancellation is

rejected the original SO will

continue to be actioned

No

7. Was SO

Cancellation

Accepted?

Where cancellation is rejected

the original SO will continue to

be actioned

Retailer takes appropriate action

10. Attempt to

Cancel Initial SO

Request

Up to 5 BD from Expected

Completion of Step 10

#1 & 3 Refer to Diagram 107 Table for the transactions involved

Page 46: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 40 of 51

5.4 Diagram 102: Distributor Initiated Service Orders

SA Process Ref: PF (B2B) REQ 6

Diagram 102: Distributor Initiated Service OrdersA

EM

OD

istr

ibu

tor

Re

taile

r

<<aseXML>>

#4

Yes

No

No

ServiceOrderResponse

[responseType=Closure]

<<aseXML>>

#3

Distributor initiated work at

the site requires update to

retailer/AEMO

This includes Time Expired

Meters

8. Action

Notification

3. Receive &

Validate Service

Order Response

(C-K)

2. Send Service

Order Response

(C-K)

4. Update System

Data

#3 & 4 Refer to Diagram 107 Table for the transactions involved

Go To 2.0 Meter

Data Delivery

From 100.12

7. Send

Notification to

AEMO

5. Does SO Require

Notification to AEMO?

6. Does SO Type

Require Delivery of

Meter Data?

1. Complete Field

Work

Yes

This process wasn’t reviewed as part of

IN017/13. IN027/13 has been created

to raise awareness that when Meter

Data Delivery process is reviewed

revisit this process flow diagram

Page 47: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 41 of 51

5.5 Diagram 103: Shipper Process

SA Process Ref: MIRN1.1 Part 2

Diagram 103: Shipper ProcessD

istr

ibu

tor

Re

taile

rC

usto

me

r

Phone

Email

No

Yes

Email

Yes

Email

Phone/Fax/Email

No

Yes

Email/Fax

Email/Fax

If rejected, resolve issues

with customer and resend

Shipper Form (potentially

amended)

The request for work Form is

different for each DB

Tariff V requires response

within 10 business days from

request received otherwise

date agreed by the customer

No

Go To 100.1a

14. Receive

Signed Shipper

Acceptance

11. Advise Customer

of Costs / Conditions

& Send Offer

13. Receive

Signed Agreement

5. Send Validation

Outcome

12. Accept

Cost /

Conditions?

7. Review Field

Requirements

and/or Visit Site

6. Receive

Validation

Outcome

1. Request a

Service

4. Valid

Shipper

Request?

3. Receive &

Validate Shipper

Form

8. Does the

Site Match

Shipper Form?

10. Receive

Shipper Response

9. Complete

Shipper

Evaluation Form &

Send Response

2. Prepare

Shipper Form

Notes: Service Order Enquiry Code

MAP, MFX, MRT, RSR, SCR, UMS,

USR

15.Is SO Required

for the Service by

the Applicable

DB?

Yes

1a. Request a

Service

1b. Request a

Shipper

Email

From 104.3 or

105.1 or 106.1 as

applicable

From 105.2 or

106.2 as applicable

From 105.3 or

106.3 as

applicable

Go To 104.7 or 105.5

or 106.5 or 100.9 as

applicable

No

Page 48: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 42 of 51

5.6 Diagram 104: Meter Fix Request

SA Process Ref: NA

Diagram 104: Meter Fix RequestR

eta

iler

Cu

sto

me

r

1. Request Meter Fix

as Service & Fitting

Lines Completed

2.Simple Meter

Type

Installation?

4. Request

Customer to

Provide CoC &

PLN

5. Customer

Quotes CoC &

PLN

6. Valid CoC &

PLN?Go To 100.1a

7. Request Customer

to Provide Start Work

Notice No & PLN

8. Customer

Quotes Start Work

Notice No & PLN

Yes

No

No Yes

3.Is a Shipper

form required?No

Go To 103.2Yes From 103.14

Page 49: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 43 of 51

5.7 Diagram 105: Upgrade from Basic to Interval Meter

SA Process Ref: PF (B2B) MR12

Diagram 105: Upgrade from Basic to Interval MeterA

EM

OD

istr

ibu

tor

Re

taile

rC

usto

me

r

GIP 126

Email

No

Yes

Email GIP 126

EmailEmail

GIP 126

Email

Email or

ServiceOrderResponse

Email

7. Prepare & Send

Meter Registration

(MR) Application12. Receive

Notated MR

Application

11. Update Meter Register

to ‘Pending’ Interval

Metering & Send Notated

MR Application

18. Receive

Completion Advice

16. Receive

Notated MIP

Notice

8. Amend &

Resubmit MR

Application

17. Update

System Send

Completion Advice

to Retailer

9. Receive &

Validate MR

Application

14. Complete & Send

Meter Installation

Parameter (MIP)

Notice

5. Confirm Receipt

of Signed

Acceptance

10. MR

Application

Valid?

1. Request

Upgrade to

Interval Meter

From 103.14

15. Update Meter Register

to ‘Active’ Interval

Metering & Send Notated

MIP Notice

Go To 103.2

3. Distributor

identifies need for

Basic to Interval

Meter Upgrade

13. Commission

Interval Meter in

Association with

MDP

6. Install Data

Logger and/or

Comms

4.Confirm Receipt

of Service Order

From 100.9

If required by service

requested

Go To 103.1b

2. Retailer

identifies need for

Basic to Interval

Meter Upgrade

Go To 103.1a

From 100.14

Email

Page 50: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 44 of 51

5.8 Diagram 106 : Downgrade from Interval to Basic Meter For tariff D

SA Process Ref: PF (B2B) MR14

Diagram 106 : Downgrade from Interval to Basic Meter For tariff DA

EM

OD

istr

ibu

tor

Re

taile

rC

usto

me

r

GIP 134

Email

No

Yes

Email

GIP 134

Email

ServiceOrderResponse

Email

9. MIP Valid?

14. Receive SO

Completion Advice

Go To 103.2

2. Retailer

identifies need for

Interval to Basic

Meter Downgrade

11. Receive

Notated MIP

Go To 103.1a

13. Remove Data

Logger and/or

Comms

10. Update Meter Register

to ‘Basic’ Metering & Send

Notated MIP

Go To 103.1b

3. Distributor

identifies need for

Interval to Basic

Meter Downgrade

6. Prepare & Send

Meter Installation

Parameter change

Notice (MIP)

From 100.9

5. Confirm Receipt

of Signed

Acceptance

From 100.14

12. Update

System and set

Meter to ‘Basic’

7. Amend &

Resubmit MIP

From 103.14

8. Receive &

Validate MIP

4. Confirm Receipt

of Service Order

1. Request

Downgrade to a

Basic Meter

Email

Page 51: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 ... · Title: Participant Build Pack 1 - Process Flow Diagrams - v 3.4 (Marked Up) Author: Stef Keywords: Enter Document Ref

PARTICIPANT BUILD PACK 1 - PROCESS FLOW DIAGRAMS

Doc Ref: 305196 ver 3.4 01 JULY 2014 Page 45 of 51

5.9 Diagram 107: Service Order Transaction Table

#1 Service Orders Request C-K #2 Service Order Response C-K (Initial) #3 Service Order Response C-K (Final) #4 Status Change Response

GIP 87 - Meter Fix Request

(JEC = MFX)GIP 87A - Meter Fix Request Response GIP 92 - Meter Fix Completed GIP 94 - Meter Fix Notification

GIP 93 - No Access to Complete Meter

FixGIP 101 - Meter Change Request

(JEC = MCH)

GIP 101A - Meter Change Request

Response

GIP 104 - No Access to Complete Meter

Change

GIP 108 - Meter Change Completed

GIP 125 - Meter Upgrade Completed

GIP 151 - Meter Removal Request

(JEC = MRM)

GIP 151A - Meter Removal Request

Response

GIP 154 - No Access to Complete Meter

Removal

GIP 158 - MIRN Status Update

Notification

GIP 157 - Meter Removal Completed

GIP 310 - Service Connection Request

(JEC = SCR)

GIP 310A - Service Connection Request

ResponseGIP 311 - Service Connection Complete

GIP 312 - Service Disconnection Request

(JEC = SDR)

GIP 312A - Service Disconnection Request

Response

GIP 313 - Service Disconnection

Complete

GIP 158 - MIRN Status Update

NotificationGIP 314 - Service Orders for Priority C-K

(JEC = All JEC's)

GIP 314A - Service Orders for Priority C-K

Response

GIP 315 - Service Orders Completed for

Priority A-KGIP 316 - Relocate Service Request

(JEC = RSR)

GIP 316A - Relocate Service Request

ResponseGIP 317 - Relocate Service Complete

GIP 318 - Upgrade Service Size Request

(JEC = USR)

GIP 318A - Upgrade Service Size Request

Response

GIP 319 - Upgrade Service Size

CompleteGIP 320 - Upgrade Meter Size Request

(JEC = UMS)

GIP 320A - Upgrade Meter Size Request

ResponseGIP 321 - Upgrade Meter Size Complete

JEC = Job Enquiry

Diagram 107: Service Order Transaction Table