2

• Project data & partners• Objectives & strategies• Work plan implementation• Main planned activities • Conclusions

Outline

EUMEDGRID-Support Project Data

• Support Action co-funded by European Commission under: Capacities specific program - Research Infrastructures - FP7-INFRASTRUCTURES-2009-1

• Project ID 246589• Duration: 24 months• Start: 1st January 2010

– – We are now at Project Month 18

• Budget (EU contribution): 740 k€ • Budget (Total): 867 k€• Coordinating Person: Federico Ruggieri / INFN Roma Tre

EUMEDGRID-Support Project Partners

CERIST

CYNET

EUN

J UNET

University of MaltaCNRST

IUGAZA

HIAST

CCK

TÜBİTAK,ULAKBIM

INFN, GARR,COMETA

CNRS-IDGHealthGrid

TRUST-IT

[ Partners & Third Parties]

14 Partners + 2 Third Parties from 13 Countries

Objectives & Strategic Lines

• Support the consolidation and expansion of the EUMEDGRID Infrastructure with a special emphasis on sustainability

• High Level Policy Dissemination• Create a Two Level network of Competence Centres• Widen the existing human network involving new user

communities• Closely cooperate with other projects and initiatives

relevant for the Mediterranean

The EUMEDGRID e-Infrastructure25 EUMEDGRID sites have been deployed in 13 countries,

giving a total of 1800 connected Servers and about 84 TBs of storage capacity

PALESTINE

Current EUMEDGRID-Support infrastructure

in progress

currently operational site / included in top BD-II

15 sites (10 operational today)in 11 countries

CERIST

CNRST

CCK

RomaTre

GARR GRNET

UoM

COMETA

TUBITAKULAKBIM

CYNET

HIAST

EUN JUNET

ERI

IUGAZA

ProjectMonth

0 6 12 18 243 9 15 21

D1.1: First Progress Report

M1.2 First projectReview

D4.2: EumedGird-SupportBooklet for StakeHoldersand policy makers

D4.1b: Proposed Regional and National organ. models for sustainability

D4.3: Report for stakeholders andPolicy makers on the impact of theEUMEDGRID-Support project

D2.1a: Web Portalstatic version

D3.2: Final plan for sustainability of a two tiers competence centre in the Mediterr.

M1.1 ProjectKick off meeting

M2.1 ProjectWeb site ready

M1

MM8

M4.2: second High PolicyWorkshop

M4.1: First high policy workshop

M14

M2.2: EUMEDGRID-support Booklet published

D3.1: Sustainability plan for a 2 tiers competence centre in the Mediterranean

D2.1b: Web Portal fully operational

D2.2a: CommunicationStrategy and Dissemination plan

D2.3a: Results reportson requirements & challenges on the first workshop

D2.4a: Statistical database analysis of new communities

D4.1a: State of the art of e-Infrastructures in the Mediterranean region

D2.3b: Results reports on req. & challenges on WS2

D2.4b: Statistical database analysisof new communities

D1.2: Final Progress Report

D2.2c: Updated Comm.&Diss.plan

M3.1: Second Level Competence Centre operational

M13

M24

M1.3 Second Project Review

M6

M7

M19

M18

M19

M22

M24

D2.2b: Updated CommunicationStrategy and Dissemination plan

D2.2d: Updated Comm.&Diss.planM24M12

M12

M7

Deliverables and Milestones

Implementation

• WP1 Project Management• WP2 Communication and Dissemination• WP3 Applications and Users Support• WP4 e-Infrastructure sustainability and

support

Country-level tasks

NGI

MonitoringMonitoring

AccountingAccounting

M/W M/W Repo.Repo.

Cert. Auth.Cert. Auth.

VOMSVOMS

11stst Level Leveluser supp.user supp.

DataDataCatalogsCatalogs

Info. Syst.Info. Syst.

L&BL&BWMSWMS

EUMEDGRID-Support project level tasks

MED

M/W releaseM/W release

MonitoringMonitoring

AccountingAccounting

Catch-all CACatch-all CA

Global VOMSGlobal VOMS

22ndnd Level Leveluser supp.user supp.

Gen. Info. Gen. Info. SystemSystem

Knowledge repo.Knowledge repo.

High levelHigh levelGrid servicesGrid services

Application lifecycle

– Formal agreements/Memorandum of Understanding are to state explicitly what the interested party needs from the project and what they will offer in return

– Facilitates the relationships between those projects and EUMEDGRID activities

– Extends technical work leveraging similar or complementary working carried out by other projects

– Help projects interact and share their experiences– Multiplies promotional activities

Community Engagement

Strategic Projects

www.eumedgrid.eu

• Serve as a point of contact for projects which are collaborating or wish to collaborate with the project and establish formal collaboration agreements

EUMEDGRID-Support Website and contacts

www.eumedgrid.eu

www.eumedgrid.eu

Conclusions

• EUMEDGRID-Support is officially started on 1 January 2010 – Brand new Web Site: ww.eumedgrid.eu– Launch Event in Cairo 26 January 2010.

• It builds on the results of EUMEDGRID– Resuming its pilot infrastructure

• We already started – Good progress over the last 2 months ! – Basing on its exploited human network

• Will focus on e-Science in– Sustainability– High Level Policy Dissemination– Education and Training for long term support– Promoting best practices, sharing experience– Liaising EU and the Mediterranean scientists, Projects, User Communities