Part I. DIGITAL CLASSROOMS PLAN - OVERVIEW I.1 Phone: I
Transcript of Part I. DIGITAL CLASSROOMS PLAN - OVERVIEW I.1 Phone: I
1
Part I DIGITAL CLASSROOMS PLAN - OVERVIEW I1 District Team Profile
TitleRole Name Email Phone Assessment Amy Combs amycombslcsborg 850-643-2275 ext 247 Curriculum amp Instruction Gay Lewis gaylewislcsborg 850-643-2275 ext 233 District Leadership Seth Geiger sethgeigerlcsborg 850-643-2275 ext 236 Finance Sheila Hall sheilahalllcsborg 850-643-2275 ext 225 Information Technology Lynn Guthrie lynnguthrielcsborg 850-643-2275 ext 248
I2 Planning Process The District Leadership committee developed guidelines for the development implementation monitoring and evaluation of the Liberty County District 2014-2019 Digital Classroom Technology Plan The committee will also assist in the implementation of the activities described in the objectives The plan consists of a comprehensive program that effectively uses technology to help students meet or exceed the state academic content standards in all core content areas including Language Arts Mathematics Science and Social Studies along with the English Language Development standards Collaboration with the District Advisory Council will be a continuing part of this plan The District Governing Board supports the educational technology goals that provide guidance in addressing the districtrsquos technology needs The plan also provides a clear focus to enhance the districtrsquos curricular program and improve school community technology skills needed to effectively implement the use of technology in the classroom computer labs andor library media centers Technology curricular goals are included in each school sitersquos plan for student achievement Liberty County School District is committed to reaching all learners regardless of their abilities There is a growing population of ELL students along with students with disabilities who require accommodations and modifications and our staff is devoted to utilizing flexible ways to present information such as digital books (using I-Pads) text-to-speech applications and specialized software They also provide students with various ways to express themselves in order to increase active engagement in different settings and situations In addition assistive technology devices are available for students with disabilities to participate communicate and learn more effectively in the classroom The district employs a variety of assistive technology devices to augment supplement and compliment the educational process for students with special needs Child Study Teams identify assistive technology needs on a case-by-case basis On the higher-
2
grade levels students may have access to a collaborative global community of learners using tools such as online learning podcasts wikis etc The Assistive Technology Specialist (LATS) works closely with the teachers of identified students to assure that instructional needs are met These students based on the goals and needs identified in their IEPs receive help from text-to-speech software keyboards for response and other technology tools that allow them to successfully function in the classroom Instructional software programs such as Unique Fountas amp Pinnell Reading Plus and BrainPOP ESL serves these students as well as identified general education students to help them move forward in the accomplishments of the Florida Standards I3 Technology Integration Matrix (TIM) Professional Development should be evaluated based on the level of current technology integration by teachers This will measure the impact and what type of professional development is needed for digital learning In September of this year teachers were given the Technology Uses and Perceptions Survey to help target professional development needs and to get a better understanding of how prepared teachers are to integrate technology Results were reviewed and the TUPS will be administered again at the end of this school year to measure growth and development in the area of technology We currently have eight staff members enrolled in the iTeach Professional Learning online course TIMT-100 Implementation TIM Evaluation Tools through USF These staff include representation from all schools as well as district staff This team will work collaboratively to train administrators and teachers in the use of the Technology Integration Matrix (TIM) The TIM will be used by mentors and administrators to measure the technology integration into the classroom curriculum In addition teachers will complete the TIM as a self-assessment once each semester As professional development needs are determined we will provide access to professional development and training to assist with the integration of technology into instruction provided in the classroom The Master In-service Plan located at PAECorg includes the following components Technology in the ClassroomDigital Curriculum ndash Component Number 3-408-001 or 3-100-002 (Exceptional Student Education) and Technology for Educational Leaders ndash Component Numberrdquo 7-507-005mdash5 Ongoing professional development opportunities will be offered in several modalities including face-to-face workshop study grouplearning community action research and independent study as well as through distance and online learning The use of a District Instructional Technology Coach and Technology Lead Teachers will be incorporated to provide the ongoing support and technology expertise to ensure integration of technology into the classroom These staff will meet with instructional staff on a regular basis share resources model lessons and assist in setting goals District Summer Technology Institutes will be held to build capacity for technology integration
3
I4 Multi-Tiered System of Supports (MTSS) Liberty County uses the problem solvingMTSS method of developing and implementing instruction and interventions based on a three tiered model Our MTSS model integrates core instruction (Tier 1) supplemental instructionintervention (Tier 2) and intensive interventions (Tier 3) This system relies on the data from state and district assessments as well as implementation data on the effectiveness of student specific interventions The district utilizes the MTSS component of Performance Matters to record monitor and disaggregate data of core and intervention programs and uses this data to determine professional development needs and changes to programs used for students Core instruction (Tier 1) requires differentiation of instructional strategies in the classroom Performance Matters is a technology tool utilized to identify students needing support for small-group instruction and targeted instructional delivery This model for Tier 1 requires that sufficient hardware be available in classrooms to allow for small-group use of the technology Therefore this will continue to be a primary area of focus District staff and schools use Focus and Performance Matters to track student achievement data of students who are receiving Tier II and Tier III levels of intervention Ongoing progress monitoring tools such as STAR 360 Fountas amp Pinnell and i-Ready will be used to determine needs in core instruction Review of this data occurs at the classroom school and district level Principals and Assistant Principals support school-wide data review and assist teachers in interpreting data for the creation of ldquoWatch Listsrdquo or Early Warning Systems The problem solving process was used as a guide in the creation of this plan The review of usage data compared to school-wide achievement data coupled with the review of technology infrastructure have provided an overview to guide the district in planning for the placement and implementation of instructional technology Ongoing monitoring and evaluation of the effectiveness of our tools at each Tier will be used to ensure that we meet the needs of all students
4
I5 District Policy
Type of Policy Brief Summary of Policy Web Address Date of Adoption Student data safety security and privacy
FERPA and Student Code of Conduct
LCSB website
July 14 2016
District teacher evaluation components relating to technology
(if applicable)
The Danielson Model has been adopted by the
district and has technology
competencies within each domain
Danielson Model Technology-
Related Competencies
May 2011
BYOD (Bring Your Own Device) Policy
NA NA NA
Policy for refresh of devices (student and
teachers)
NA NA NA
AcceptableResponsible Use policy (student
teachers admin)
The policies procedures and information within this document apply to all technology used in
Liberty County Schools
Acceptable Use Policy on LCSB
website
July 14 2016
Master Inservice Plan (MIP) technology
components
Guidelines and protocols for professional learning
and digital requirements expectations
PAEC MIP
September 13
2016
OtherOpen Response Technology Disaster Recovery Plan
TDRP June 7 2016
5
Part II DIGITAL CLASSROOMS PLAN ndashSTRATEGY STEP 1 ndash Needs Analysis
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A Student Performance Outcomes - Needs Analysis
An analysis of 2015-16 AMO data shows that there is a significant gap between African American students ELL and students with disabilities compared to White and economically disadvantaged students
Subgroup ELA Math African American 31 37 Hispanic 34 44 White 50 56 ELL 17 33 SWD 11 24 Economically Disadvantaged 39 46
Student Performance Outcomes (Required)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA1 ELA Student Achievement 49 52 062019 IIA2 Math Student Achievement 49 52 062019 IIA35 Science Student Achievement ndash 5th 61 64 062019 IIA38 Science Student Achievement ndash 8th 61 64 062019 IIA4 Science Student Achievement ndash Biology 57 60 062019 IIA5 ELA Learning Gains 47 50 062019 IIA6 Math Learning Gains 49 52 062019 IIA7 ELA Learning Gains of the Low 25 44 47 062019 IIA8 Math Learning Gains of the Low 25 45 48 062019 IIA9 Overall 4-year Graduation Rate 78 81 062019 IIA10 Acceleration Success Rate 68 71 062019 Student Performance Outcomes (District Provided)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA11 (D) SWD ELA Student Achievement 11 15 062019 IIA12 (D) SWD Math Student Achievement 24 27 062019
6
B Digital Learning and Technology Infrastructure - Needs Analysis
As a district we are planning on having a 11 ratio for student instructional mobile computers Our current ratio is 31 with a gap to be addressed of 21
B Infrastructure Needs Analysis (Required) Baseline from
2014 Actual from Spring 2016
Target For 2016-2017
School Year
Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB1 Student to Computer Device Ratio 101 21 11 072018 11 IIB2 Count of student instructional
desktop computers meeting specifications
518 610 653 072018 40
IIB3 Count of student instructional mobile computers (laptops) meeting specifications
93 159 1200 072018 948
IIB4 Count of student web-thin client computers meeting specifications
0 296 296 NA NA
IIB5 Count of student large screen tablets meeting specifications
0 0 0 NA NA
IIB6 Percent of schools meeting recommended bandwidth standard
100 100 100 Ongoing 0
IIB7 Percent of wireless classrooms (80211n or higher)
65 65 100 072019 35
IIB8 District completion and submission of security assessment
NA NA Y NA NA
IIB9 District support of browsers in the last two versions
Y Y Y Ongoing No gap
7
Our district is in the process of upgrading all computers to Windows 10 We have one model of document camera (25) that is not compatible with Windows 10 thus making our gap to be addressed 31 The district has invested in research-based software and hardware to address student learning needs Due to an inequity in access to hardware across the district some students have limited access to digital tools to positively impact their learning In addition the district struggles with adequate funding to maintain a systematic refresh of student devices as well as the core infrastructure needs for switches WAPs and technical services to maintain the backbone of the network Districts will complete the security assessment provided by the FDOE However under s 11907(1) this risk assessment is confidential and exempt from public records
B Infrastructure Needs Analysis (District Provided)
Baseline Actual from Spring 2016
Target Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB10 (D)
Classrooms with mounted LCD projectors 87 112 132 062018 20
IIB11 (D)
Classrooms with document cameras 74 99 15 062017 6
IIB12 (D)
Classrooms with interactive whiteboards 40 40 100 062019 60
IIB13 (D)
Schools with access to FTP scanners used for online assessment component
2 2 3 062017 1
8
C Professional Development
Professional development needs include increasing instructional capabilities for developing delivering evaluating and maintaining digital instructional materials All training components aligned with Master In-Service Plan requirements including School leadership ldquolook-forsrdquo on quality digital learning processes in the classroom educator capacity to use available technology instructional lesson planning using digital resources and student digital learning practices These Master In-service Plan components can be located on PAECrsquos website at httpmypaecorgsearchdefaultaspxq=master+in-service+planamptype=082033-35082033-117|-182117-124 Liberty County School District will hire an Instructional Technology Coach with funds allocated through the LCSD Digital Classroom Plan The Instructional Technology Coach will be classified as a Teacher on Special Assignment and earn a salary according to LCSD approved salary schedule as a 12 month 7-hour teacher employee Technology Lead Teachers will be selected from each of the K-8 schools and the high school The Technology Lead Teachers will work collaboratively with the District Tech Team In addition LCSD will provide instructional staff with opportunities and training to effectively incorporate technology into the curriculum There is also a need for the development of assessments in our LIIS Performance Matters andor other management systems to align curriculum with the Florida Standards with an emphasis on developing cross-curricular content that integrates the use of technology
C Professional Development Needs Analysis (Required)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC1 Average teacher technology integration via the TIM (based on peer andor administrator observations andor evaluations)
Entry 41 Adoption29 Adaption19 Infusion5 Transform6
Entry 10 Adoption10 Adaption10 Infusion60 Transform10
062020
IIC2 Percentage of total evaluated teacher lessons plans at each level of the TIM
Entry 0 Adoption0 Adaption0 Infusion0 Transform0
Entry 10 Adoption10 Adaption30 Infusion40 Transform10
062020
9
D Digital Tools
Digital Tools Baseline Target BrainPOP ESL Partially Implemented Ongoing implementation ConnectED McGraw Hill Partially implemented Ongoing implementation CPALMS Partially implemented Ongoing implementation Discovery Education Fully implemented Continue to support classrooms Edgenuity Fully implemented Continue to support classrooms Focus Fully Implemented Continue to support classrooms Fountas amp Pinnell (LLI) Partially implemented Ongoing implementation GMetrix Fully implemented Continue to support classrooms i-Ready Partially Implemented Ongoing implementation IXL Partially implemented Ongoing implementation Math Nation Fully implemented Continue to support classrooms MicroType Fully implemented Continue to support classrooms Performance MattersUnify Partially implemented Ongoing implementation Reading Plus Fully implemented Continue to support classrooms Renaissance Place (AR 360 STAR Reading amp Math 360)
Fully implemented Continue to support classrooms
Springboard Fully implemented Continue to support classrooms Study Island Partially Implemented Ongoing implementation
Think Central (Math amp Science K-8 Digital Content)
Fully implemented Continue to support classrooms
Unique Partially implemented Ongoing implementation Write Score Partially implemented Ongoing implementation
C Professional Development Needs Analysis (District Provided)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC3 (D) Increase the level of technology integration in all subject areas to promote higher level thinking skills for all students
Entry 41
50 decrease in Entry
Level
062018
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
2
grade levels students may have access to a collaborative global community of learners using tools such as online learning podcasts wikis etc The Assistive Technology Specialist (LATS) works closely with the teachers of identified students to assure that instructional needs are met These students based on the goals and needs identified in their IEPs receive help from text-to-speech software keyboards for response and other technology tools that allow them to successfully function in the classroom Instructional software programs such as Unique Fountas amp Pinnell Reading Plus and BrainPOP ESL serves these students as well as identified general education students to help them move forward in the accomplishments of the Florida Standards I3 Technology Integration Matrix (TIM) Professional Development should be evaluated based on the level of current technology integration by teachers This will measure the impact and what type of professional development is needed for digital learning In September of this year teachers were given the Technology Uses and Perceptions Survey to help target professional development needs and to get a better understanding of how prepared teachers are to integrate technology Results were reviewed and the TUPS will be administered again at the end of this school year to measure growth and development in the area of technology We currently have eight staff members enrolled in the iTeach Professional Learning online course TIMT-100 Implementation TIM Evaluation Tools through USF These staff include representation from all schools as well as district staff This team will work collaboratively to train administrators and teachers in the use of the Technology Integration Matrix (TIM) The TIM will be used by mentors and administrators to measure the technology integration into the classroom curriculum In addition teachers will complete the TIM as a self-assessment once each semester As professional development needs are determined we will provide access to professional development and training to assist with the integration of technology into instruction provided in the classroom The Master In-service Plan located at PAECorg includes the following components Technology in the ClassroomDigital Curriculum ndash Component Number 3-408-001 or 3-100-002 (Exceptional Student Education) and Technology for Educational Leaders ndash Component Numberrdquo 7-507-005mdash5 Ongoing professional development opportunities will be offered in several modalities including face-to-face workshop study grouplearning community action research and independent study as well as through distance and online learning The use of a District Instructional Technology Coach and Technology Lead Teachers will be incorporated to provide the ongoing support and technology expertise to ensure integration of technology into the classroom These staff will meet with instructional staff on a regular basis share resources model lessons and assist in setting goals District Summer Technology Institutes will be held to build capacity for technology integration
3
I4 Multi-Tiered System of Supports (MTSS) Liberty County uses the problem solvingMTSS method of developing and implementing instruction and interventions based on a three tiered model Our MTSS model integrates core instruction (Tier 1) supplemental instructionintervention (Tier 2) and intensive interventions (Tier 3) This system relies on the data from state and district assessments as well as implementation data on the effectiveness of student specific interventions The district utilizes the MTSS component of Performance Matters to record monitor and disaggregate data of core and intervention programs and uses this data to determine professional development needs and changes to programs used for students Core instruction (Tier 1) requires differentiation of instructional strategies in the classroom Performance Matters is a technology tool utilized to identify students needing support for small-group instruction and targeted instructional delivery This model for Tier 1 requires that sufficient hardware be available in classrooms to allow for small-group use of the technology Therefore this will continue to be a primary area of focus District staff and schools use Focus and Performance Matters to track student achievement data of students who are receiving Tier II and Tier III levels of intervention Ongoing progress monitoring tools such as STAR 360 Fountas amp Pinnell and i-Ready will be used to determine needs in core instruction Review of this data occurs at the classroom school and district level Principals and Assistant Principals support school-wide data review and assist teachers in interpreting data for the creation of ldquoWatch Listsrdquo or Early Warning Systems The problem solving process was used as a guide in the creation of this plan The review of usage data compared to school-wide achievement data coupled with the review of technology infrastructure have provided an overview to guide the district in planning for the placement and implementation of instructional technology Ongoing monitoring and evaluation of the effectiveness of our tools at each Tier will be used to ensure that we meet the needs of all students
4
I5 District Policy
Type of Policy Brief Summary of Policy Web Address Date of Adoption Student data safety security and privacy
FERPA and Student Code of Conduct
LCSB website
July 14 2016
District teacher evaluation components relating to technology
(if applicable)
The Danielson Model has been adopted by the
district and has technology
competencies within each domain
Danielson Model Technology-
Related Competencies
May 2011
BYOD (Bring Your Own Device) Policy
NA NA NA
Policy for refresh of devices (student and
teachers)
NA NA NA
AcceptableResponsible Use policy (student
teachers admin)
The policies procedures and information within this document apply to all technology used in
Liberty County Schools
Acceptable Use Policy on LCSB
website
July 14 2016
Master Inservice Plan (MIP) technology
components
Guidelines and protocols for professional learning
and digital requirements expectations
PAEC MIP
September 13
2016
OtherOpen Response Technology Disaster Recovery Plan
TDRP June 7 2016
5
Part II DIGITAL CLASSROOMS PLAN ndashSTRATEGY STEP 1 ndash Needs Analysis
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A Student Performance Outcomes - Needs Analysis
An analysis of 2015-16 AMO data shows that there is a significant gap between African American students ELL and students with disabilities compared to White and economically disadvantaged students
Subgroup ELA Math African American 31 37 Hispanic 34 44 White 50 56 ELL 17 33 SWD 11 24 Economically Disadvantaged 39 46
Student Performance Outcomes (Required)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA1 ELA Student Achievement 49 52 062019 IIA2 Math Student Achievement 49 52 062019 IIA35 Science Student Achievement ndash 5th 61 64 062019 IIA38 Science Student Achievement ndash 8th 61 64 062019 IIA4 Science Student Achievement ndash Biology 57 60 062019 IIA5 ELA Learning Gains 47 50 062019 IIA6 Math Learning Gains 49 52 062019 IIA7 ELA Learning Gains of the Low 25 44 47 062019 IIA8 Math Learning Gains of the Low 25 45 48 062019 IIA9 Overall 4-year Graduation Rate 78 81 062019 IIA10 Acceleration Success Rate 68 71 062019 Student Performance Outcomes (District Provided)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA11 (D) SWD ELA Student Achievement 11 15 062019 IIA12 (D) SWD Math Student Achievement 24 27 062019
6
B Digital Learning and Technology Infrastructure - Needs Analysis
As a district we are planning on having a 11 ratio for student instructional mobile computers Our current ratio is 31 with a gap to be addressed of 21
B Infrastructure Needs Analysis (Required) Baseline from
2014 Actual from Spring 2016
Target For 2016-2017
School Year
Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB1 Student to Computer Device Ratio 101 21 11 072018 11 IIB2 Count of student instructional
desktop computers meeting specifications
518 610 653 072018 40
IIB3 Count of student instructional mobile computers (laptops) meeting specifications
93 159 1200 072018 948
IIB4 Count of student web-thin client computers meeting specifications
0 296 296 NA NA
IIB5 Count of student large screen tablets meeting specifications
0 0 0 NA NA
IIB6 Percent of schools meeting recommended bandwidth standard
100 100 100 Ongoing 0
IIB7 Percent of wireless classrooms (80211n or higher)
65 65 100 072019 35
IIB8 District completion and submission of security assessment
NA NA Y NA NA
IIB9 District support of browsers in the last two versions
Y Y Y Ongoing No gap
7
Our district is in the process of upgrading all computers to Windows 10 We have one model of document camera (25) that is not compatible with Windows 10 thus making our gap to be addressed 31 The district has invested in research-based software and hardware to address student learning needs Due to an inequity in access to hardware across the district some students have limited access to digital tools to positively impact their learning In addition the district struggles with adequate funding to maintain a systematic refresh of student devices as well as the core infrastructure needs for switches WAPs and technical services to maintain the backbone of the network Districts will complete the security assessment provided by the FDOE However under s 11907(1) this risk assessment is confidential and exempt from public records
B Infrastructure Needs Analysis (District Provided)
Baseline Actual from Spring 2016
Target Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB10 (D)
Classrooms with mounted LCD projectors 87 112 132 062018 20
IIB11 (D)
Classrooms with document cameras 74 99 15 062017 6
IIB12 (D)
Classrooms with interactive whiteboards 40 40 100 062019 60
IIB13 (D)
Schools with access to FTP scanners used for online assessment component
2 2 3 062017 1
8
C Professional Development
Professional development needs include increasing instructional capabilities for developing delivering evaluating and maintaining digital instructional materials All training components aligned with Master In-Service Plan requirements including School leadership ldquolook-forsrdquo on quality digital learning processes in the classroom educator capacity to use available technology instructional lesson planning using digital resources and student digital learning practices These Master In-service Plan components can be located on PAECrsquos website at httpmypaecorgsearchdefaultaspxq=master+in-service+planamptype=082033-35082033-117|-182117-124 Liberty County School District will hire an Instructional Technology Coach with funds allocated through the LCSD Digital Classroom Plan The Instructional Technology Coach will be classified as a Teacher on Special Assignment and earn a salary according to LCSD approved salary schedule as a 12 month 7-hour teacher employee Technology Lead Teachers will be selected from each of the K-8 schools and the high school The Technology Lead Teachers will work collaboratively with the District Tech Team In addition LCSD will provide instructional staff with opportunities and training to effectively incorporate technology into the curriculum There is also a need for the development of assessments in our LIIS Performance Matters andor other management systems to align curriculum with the Florida Standards with an emphasis on developing cross-curricular content that integrates the use of technology
C Professional Development Needs Analysis (Required)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC1 Average teacher technology integration via the TIM (based on peer andor administrator observations andor evaluations)
Entry 41 Adoption29 Adaption19 Infusion5 Transform6
Entry 10 Adoption10 Adaption10 Infusion60 Transform10
062020
IIC2 Percentage of total evaluated teacher lessons plans at each level of the TIM
Entry 0 Adoption0 Adaption0 Infusion0 Transform0
Entry 10 Adoption10 Adaption30 Infusion40 Transform10
062020
9
D Digital Tools
Digital Tools Baseline Target BrainPOP ESL Partially Implemented Ongoing implementation ConnectED McGraw Hill Partially implemented Ongoing implementation CPALMS Partially implemented Ongoing implementation Discovery Education Fully implemented Continue to support classrooms Edgenuity Fully implemented Continue to support classrooms Focus Fully Implemented Continue to support classrooms Fountas amp Pinnell (LLI) Partially implemented Ongoing implementation GMetrix Fully implemented Continue to support classrooms i-Ready Partially Implemented Ongoing implementation IXL Partially implemented Ongoing implementation Math Nation Fully implemented Continue to support classrooms MicroType Fully implemented Continue to support classrooms Performance MattersUnify Partially implemented Ongoing implementation Reading Plus Fully implemented Continue to support classrooms Renaissance Place (AR 360 STAR Reading amp Math 360)
Fully implemented Continue to support classrooms
Springboard Fully implemented Continue to support classrooms Study Island Partially Implemented Ongoing implementation
Think Central (Math amp Science K-8 Digital Content)
Fully implemented Continue to support classrooms
Unique Partially implemented Ongoing implementation Write Score Partially implemented Ongoing implementation
C Professional Development Needs Analysis (District Provided)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC3 (D) Increase the level of technology integration in all subject areas to promote higher level thinking skills for all students
Entry 41
50 decrease in Entry
Level
062018
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
3
I4 Multi-Tiered System of Supports (MTSS) Liberty County uses the problem solvingMTSS method of developing and implementing instruction and interventions based on a three tiered model Our MTSS model integrates core instruction (Tier 1) supplemental instructionintervention (Tier 2) and intensive interventions (Tier 3) This system relies on the data from state and district assessments as well as implementation data on the effectiveness of student specific interventions The district utilizes the MTSS component of Performance Matters to record monitor and disaggregate data of core and intervention programs and uses this data to determine professional development needs and changes to programs used for students Core instruction (Tier 1) requires differentiation of instructional strategies in the classroom Performance Matters is a technology tool utilized to identify students needing support for small-group instruction and targeted instructional delivery This model for Tier 1 requires that sufficient hardware be available in classrooms to allow for small-group use of the technology Therefore this will continue to be a primary area of focus District staff and schools use Focus and Performance Matters to track student achievement data of students who are receiving Tier II and Tier III levels of intervention Ongoing progress monitoring tools such as STAR 360 Fountas amp Pinnell and i-Ready will be used to determine needs in core instruction Review of this data occurs at the classroom school and district level Principals and Assistant Principals support school-wide data review and assist teachers in interpreting data for the creation of ldquoWatch Listsrdquo or Early Warning Systems The problem solving process was used as a guide in the creation of this plan The review of usage data compared to school-wide achievement data coupled with the review of technology infrastructure have provided an overview to guide the district in planning for the placement and implementation of instructional technology Ongoing monitoring and evaluation of the effectiveness of our tools at each Tier will be used to ensure that we meet the needs of all students
4
I5 District Policy
Type of Policy Brief Summary of Policy Web Address Date of Adoption Student data safety security and privacy
FERPA and Student Code of Conduct
LCSB website
July 14 2016
District teacher evaluation components relating to technology
(if applicable)
The Danielson Model has been adopted by the
district and has technology
competencies within each domain
Danielson Model Technology-
Related Competencies
May 2011
BYOD (Bring Your Own Device) Policy
NA NA NA
Policy for refresh of devices (student and
teachers)
NA NA NA
AcceptableResponsible Use policy (student
teachers admin)
The policies procedures and information within this document apply to all technology used in
Liberty County Schools
Acceptable Use Policy on LCSB
website
July 14 2016
Master Inservice Plan (MIP) technology
components
Guidelines and protocols for professional learning
and digital requirements expectations
PAEC MIP
September 13
2016
OtherOpen Response Technology Disaster Recovery Plan
TDRP June 7 2016
5
Part II DIGITAL CLASSROOMS PLAN ndashSTRATEGY STEP 1 ndash Needs Analysis
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A Student Performance Outcomes - Needs Analysis
An analysis of 2015-16 AMO data shows that there is a significant gap between African American students ELL and students with disabilities compared to White and economically disadvantaged students
Subgroup ELA Math African American 31 37 Hispanic 34 44 White 50 56 ELL 17 33 SWD 11 24 Economically Disadvantaged 39 46
Student Performance Outcomes (Required)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA1 ELA Student Achievement 49 52 062019 IIA2 Math Student Achievement 49 52 062019 IIA35 Science Student Achievement ndash 5th 61 64 062019 IIA38 Science Student Achievement ndash 8th 61 64 062019 IIA4 Science Student Achievement ndash Biology 57 60 062019 IIA5 ELA Learning Gains 47 50 062019 IIA6 Math Learning Gains 49 52 062019 IIA7 ELA Learning Gains of the Low 25 44 47 062019 IIA8 Math Learning Gains of the Low 25 45 48 062019 IIA9 Overall 4-year Graduation Rate 78 81 062019 IIA10 Acceleration Success Rate 68 71 062019 Student Performance Outcomes (District Provided)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA11 (D) SWD ELA Student Achievement 11 15 062019 IIA12 (D) SWD Math Student Achievement 24 27 062019
6
B Digital Learning and Technology Infrastructure - Needs Analysis
As a district we are planning on having a 11 ratio for student instructional mobile computers Our current ratio is 31 with a gap to be addressed of 21
B Infrastructure Needs Analysis (Required) Baseline from
2014 Actual from Spring 2016
Target For 2016-2017
School Year
Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB1 Student to Computer Device Ratio 101 21 11 072018 11 IIB2 Count of student instructional
desktop computers meeting specifications
518 610 653 072018 40
IIB3 Count of student instructional mobile computers (laptops) meeting specifications
93 159 1200 072018 948
IIB4 Count of student web-thin client computers meeting specifications
0 296 296 NA NA
IIB5 Count of student large screen tablets meeting specifications
0 0 0 NA NA
IIB6 Percent of schools meeting recommended bandwidth standard
100 100 100 Ongoing 0
IIB7 Percent of wireless classrooms (80211n or higher)
65 65 100 072019 35
IIB8 District completion and submission of security assessment
NA NA Y NA NA
IIB9 District support of browsers in the last two versions
Y Y Y Ongoing No gap
7
Our district is in the process of upgrading all computers to Windows 10 We have one model of document camera (25) that is not compatible with Windows 10 thus making our gap to be addressed 31 The district has invested in research-based software and hardware to address student learning needs Due to an inequity in access to hardware across the district some students have limited access to digital tools to positively impact their learning In addition the district struggles with adequate funding to maintain a systematic refresh of student devices as well as the core infrastructure needs for switches WAPs and technical services to maintain the backbone of the network Districts will complete the security assessment provided by the FDOE However under s 11907(1) this risk assessment is confidential and exempt from public records
B Infrastructure Needs Analysis (District Provided)
Baseline Actual from Spring 2016
Target Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB10 (D)
Classrooms with mounted LCD projectors 87 112 132 062018 20
IIB11 (D)
Classrooms with document cameras 74 99 15 062017 6
IIB12 (D)
Classrooms with interactive whiteboards 40 40 100 062019 60
IIB13 (D)
Schools with access to FTP scanners used for online assessment component
2 2 3 062017 1
8
C Professional Development
Professional development needs include increasing instructional capabilities for developing delivering evaluating and maintaining digital instructional materials All training components aligned with Master In-Service Plan requirements including School leadership ldquolook-forsrdquo on quality digital learning processes in the classroom educator capacity to use available technology instructional lesson planning using digital resources and student digital learning practices These Master In-service Plan components can be located on PAECrsquos website at httpmypaecorgsearchdefaultaspxq=master+in-service+planamptype=082033-35082033-117|-182117-124 Liberty County School District will hire an Instructional Technology Coach with funds allocated through the LCSD Digital Classroom Plan The Instructional Technology Coach will be classified as a Teacher on Special Assignment and earn a salary according to LCSD approved salary schedule as a 12 month 7-hour teacher employee Technology Lead Teachers will be selected from each of the K-8 schools and the high school The Technology Lead Teachers will work collaboratively with the District Tech Team In addition LCSD will provide instructional staff with opportunities and training to effectively incorporate technology into the curriculum There is also a need for the development of assessments in our LIIS Performance Matters andor other management systems to align curriculum with the Florida Standards with an emphasis on developing cross-curricular content that integrates the use of technology
C Professional Development Needs Analysis (Required)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC1 Average teacher technology integration via the TIM (based on peer andor administrator observations andor evaluations)
Entry 41 Adoption29 Adaption19 Infusion5 Transform6
Entry 10 Adoption10 Adaption10 Infusion60 Transform10
062020
IIC2 Percentage of total evaluated teacher lessons plans at each level of the TIM
Entry 0 Adoption0 Adaption0 Infusion0 Transform0
Entry 10 Adoption10 Adaption30 Infusion40 Transform10
062020
9
D Digital Tools
Digital Tools Baseline Target BrainPOP ESL Partially Implemented Ongoing implementation ConnectED McGraw Hill Partially implemented Ongoing implementation CPALMS Partially implemented Ongoing implementation Discovery Education Fully implemented Continue to support classrooms Edgenuity Fully implemented Continue to support classrooms Focus Fully Implemented Continue to support classrooms Fountas amp Pinnell (LLI) Partially implemented Ongoing implementation GMetrix Fully implemented Continue to support classrooms i-Ready Partially Implemented Ongoing implementation IXL Partially implemented Ongoing implementation Math Nation Fully implemented Continue to support classrooms MicroType Fully implemented Continue to support classrooms Performance MattersUnify Partially implemented Ongoing implementation Reading Plus Fully implemented Continue to support classrooms Renaissance Place (AR 360 STAR Reading amp Math 360)
Fully implemented Continue to support classrooms
Springboard Fully implemented Continue to support classrooms Study Island Partially Implemented Ongoing implementation
Think Central (Math amp Science K-8 Digital Content)
Fully implemented Continue to support classrooms
Unique Partially implemented Ongoing implementation Write Score Partially implemented Ongoing implementation
C Professional Development Needs Analysis (District Provided)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC3 (D) Increase the level of technology integration in all subject areas to promote higher level thinking skills for all students
Entry 41
50 decrease in Entry
Level
062018
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
4
I5 District Policy
Type of Policy Brief Summary of Policy Web Address Date of Adoption Student data safety security and privacy
FERPA and Student Code of Conduct
LCSB website
July 14 2016
District teacher evaluation components relating to technology
(if applicable)
The Danielson Model has been adopted by the
district and has technology
competencies within each domain
Danielson Model Technology-
Related Competencies
May 2011
BYOD (Bring Your Own Device) Policy
NA NA NA
Policy for refresh of devices (student and
teachers)
NA NA NA
AcceptableResponsible Use policy (student
teachers admin)
The policies procedures and information within this document apply to all technology used in
Liberty County Schools
Acceptable Use Policy on LCSB
website
July 14 2016
Master Inservice Plan (MIP) technology
components
Guidelines and protocols for professional learning
and digital requirements expectations
PAEC MIP
September 13
2016
OtherOpen Response Technology Disaster Recovery Plan
TDRP June 7 2016
5
Part II DIGITAL CLASSROOMS PLAN ndashSTRATEGY STEP 1 ndash Needs Analysis
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A Student Performance Outcomes - Needs Analysis
An analysis of 2015-16 AMO data shows that there is a significant gap between African American students ELL and students with disabilities compared to White and economically disadvantaged students
Subgroup ELA Math African American 31 37 Hispanic 34 44 White 50 56 ELL 17 33 SWD 11 24 Economically Disadvantaged 39 46
Student Performance Outcomes (Required)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA1 ELA Student Achievement 49 52 062019 IIA2 Math Student Achievement 49 52 062019 IIA35 Science Student Achievement ndash 5th 61 64 062019 IIA38 Science Student Achievement ndash 8th 61 64 062019 IIA4 Science Student Achievement ndash Biology 57 60 062019 IIA5 ELA Learning Gains 47 50 062019 IIA6 Math Learning Gains 49 52 062019 IIA7 ELA Learning Gains of the Low 25 44 47 062019 IIA8 Math Learning Gains of the Low 25 45 48 062019 IIA9 Overall 4-year Graduation Rate 78 81 062019 IIA10 Acceleration Success Rate 68 71 062019 Student Performance Outcomes (District Provided)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA11 (D) SWD ELA Student Achievement 11 15 062019 IIA12 (D) SWD Math Student Achievement 24 27 062019
6
B Digital Learning and Technology Infrastructure - Needs Analysis
As a district we are planning on having a 11 ratio for student instructional mobile computers Our current ratio is 31 with a gap to be addressed of 21
B Infrastructure Needs Analysis (Required) Baseline from
2014 Actual from Spring 2016
Target For 2016-2017
School Year
Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB1 Student to Computer Device Ratio 101 21 11 072018 11 IIB2 Count of student instructional
desktop computers meeting specifications
518 610 653 072018 40
IIB3 Count of student instructional mobile computers (laptops) meeting specifications
93 159 1200 072018 948
IIB4 Count of student web-thin client computers meeting specifications
0 296 296 NA NA
IIB5 Count of student large screen tablets meeting specifications
0 0 0 NA NA
IIB6 Percent of schools meeting recommended bandwidth standard
100 100 100 Ongoing 0
IIB7 Percent of wireless classrooms (80211n or higher)
65 65 100 072019 35
IIB8 District completion and submission of security assessment
NA NA Y NA NA
IIB9 District support of browsers in the last two versions
Y Y Y Ongoing No gap
7
Our district is in the process of upgrading all computers to Windows 10 We have one model of document camera (25) that is not compatible with Windows 10 thus making our gap to be addressed 31 The district has invested in research-based software and hardware to address student learning needs Due to an inequity in access to hardware across the district some students have limited access to digital tools to positively impact their learning In addition the district struggles with adequate funding to maintain a systematic refresh of student devices as well as the core infrastructure needs for switches WAPs and technical services to maintain the backbone of the network Districts will complete the security assessment provided by the FDOE However under s 11907(1) this risk assessment is confidential and exempt from public records
B Infrastructure Needs Analysis (District Provided)
Baseline Actual from Spring 2016
Target Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB10 (D)
Classrooms with mounted LCD projectors 87 112 132 062018 20
IIB11 (D)
Classrooms with document cameras 74 99 15 062017 6
IIB12 (D)
Classrooms with interactive whiteboards 40 40 100 062019 60
IIB13 (D)
Schools with access to FTP scanners used for online assessment component
2 2 3 062017 1
8
C Professional Development
Professional development needs include increasing instructional capabilities for developing delivering evaluating and maintaining digital instructional materials All training components aligned with Master In-Service Plan requirements including School leadership ldquolook-forsrdquo on quality digital learning processes in the classroom educator capacity to use available technology instructional lesson planning using digital resources and student digital learning practices These Master In-service Plan components can be located on PAECrsquos website at httpmypaecorgsearchdefaultaspxq=master+in-service+planamptype=082033-35082033-117|-182117-124 Liberty County School District will hire an Instructional Technology Coach with funds allocated through the LCSD Digital Classroom Plan The Instructional Technology Coach will be classified as a Teacher on Special Assignment and earn a salary according to LCSD approved salary schedule as a 12 month 7-hour teacher employee Technology Lead Teachers will be selected from each of the K-8 schools and the high school The Technology Lead Teachers will work collaboratively with the District Tech Team In addition LCSD will provide instructional staff with opportunities and training to effectively incorporate technology into the curriculum There is also a need for the development of assessments in our LIIS Performance Matters andor other management systems to align curriculum with the Florida Standards with an emphasis on developing cross-curricular content that integrates the use of technology
C Professional Development Needs Analysis (Required)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC1 Average teacher technology integration via the TIM (based on peer andor administrator observations andor evaluations)
Entry 41 Adoption29 Adaption19 Infusion5 Transform6
Entry 10 Adoption10 Adaption10 Infusion60 Transform10
062020
IIC2 Percentage of total evaluated teacher lessons plans at each level of the TIM
Entry 0 Adoption0 Adaption0 Infusion0 Transform0
Entry 10 Adoption10 Adaption30 Infusion40 Transform10
062020
9
D Digital Tools
Digital Tools Baseline Target BrainPOP ESL Partially Implemented Ongoing implementation ConnectED McGraw Hill Partially implemented Ongoing implementation CPALMS Partially implemented Ongoing implementation Discovery Education Fully implemented Continue to support classrooms Edgenuity Fully implemented Continue to support classrooms Focus Fully Implemented Continue to support classrooms Fountas amp Pinnell (LLI) Partially implemented Ongoing implementation GMetrix Fully implemented Continue to support classrooms i-Ready Partially Implemented Ongoing implementation IXL Partially implemented Ongoing implementation Math Nation Fully implemented Continue to support classrooms MicroType Fully implemented Continue to support classrooms Performance MattersUnify Partially implemented Ongoing implementation Reading Plus Fully implemented Continue to support classrooms Renaissance Place (AR 360 STAR Reading amp Math 360)
Fully implemented Continue to support classrooms
Springboard Fully implemented Continue to support classrooms Study Island Partially Implemented Ongoing implementation
Think Central (Math amp Science K-8 Digital Content)
Fully implemented Continue to support classrooms
Unique Partially implemented Ongoing implementation Write Score Partially implemented Ongoing implementation
C Professional Development Needs Analysis (District Provided)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC3 (D) Increase the level of technology integration in all subject areas to promote higher level thinking skills for all students
Entry 41
50 decrease in Entry
Level
062018
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
5
Part II DIGITAL CLASSROOMS PLAN ndashSTRATEGY STEP 1 ndash Needs Analysis
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A Student Performance Outcomes - Needs Analysis
An analysis of 2015-16 AMO data shows that there is a significant gap between African American students ELL and students with disabilities compared to White and economically disadvantaged students
Subgroup ELA Math African American 31 37 Hispanic 34 44 White 50 56 ELL 17 33 SWD 11 24 Economically Disadvantaged 39 46
Student Performance Outcomes (Required)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA1 ELA Student Achievement 49 52 062019 IIA2 Math Student Achievement 49 52 062019 IIA35 Science Student Achievement ndash 5th 61 64 062019 IIA38 Science Student Achievement ndash 8th 61 64 062019 IIA4 Science Student Achievement ndash Biology 57 60 062019 IIA5 ELA Learning Gains 47 50 062019 IIA6 Math Learning Gains 49 52 062019 IIA7 ELA Learning Gains of the Low 25 44 47 062019 IIA8 Math Learning Gains of the Low 25 45 48 062019 IIA9 Overall 4-year Graduation Rate 78 81 062019 IIA10 Acceleration Success Rate 68 71 062019 Student Performance Outcomes (District Provided)
Baseline Target
Date for Target to be Achieved
(MoYear) IIA11 (D) SWD ELA Student Achievement 11 15 062019 IIA12 (D) SWD Math Student Achievement 24 27 062019
6
B Digital Learning and Technology Infrastructure - Needs Analysis
As a district we are planning on having a 11 ratio for student instructional mobile computers Our current ratio is 31 with a gap to be addressed of 21
B Infrastructure Needs Analysis (Required) Baseline from
2014 Actual from Spring 2016
Target For 2016-2017
School Year
Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB1 Student to Computer Device Ratio 101 21 11 072018 11 IIB2 Count of student instructional
desktop computers meeting specifications
518 610 653 072018 40
IIB3 Count of student instructional mobile computers (laptops) meeting specifications
93 159 1200 072018 948
IIB4 Count of student web-thin client computers meeting specifications
0 296 296 NA NA
IIB5 Count of student large screen tablets meeting specifications
0 0 0 NA NA
IIB6 Percent of schools meeting recommended bandwidth standard
100 100 100 Ongoing 0
IIB7 Percent of wireless classrooms (80211n or higher)
65 65 100 072019 35
IIB8 District completion and submission of security assessment
NA NA Y NA NA
IIB9 District support of browsers in the last two versions
Y Y Y Ongoing No gap
7
Our district is in the process of upgrading all computers to Windows 10 We have one model of document camera (25) that is not compatible with Windows 10 thus making our gap to be addressed 31 The district has invested in research-based software and hardware to address student learning needs Due to an inequity in access to hardware across the district some students have limited access to digital tools to positively impact their learning In addition the district struggles with adequate funding to maintain a systematic refresh of student devices as well as the core infrastructure needs for switches WAPs and technical services to maintain the backbone of the network Districts will complete the security assessment provided by the FDOE However under s 11907(1) this risk assessment is confidential and exempt from public records
B Infrastructure Needs Analysis (District Provided)
Baseline Actual from Spring 2016
Target Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB10 (D)
Classrooms with mounted LCD projectors 87 112 132 062018 20
IIB11 (D)
Classrooms with document cameras 74 99 15 062017 6
IIB12 (D)
Classrooms with interactive whiteboards 40 40 100 062019 60
IIB13 (D)
Schools with access to FTP scanners used for online assessment component
2 2 3 062017 1
8
C Professional Development
Professional development needs include increasing instructional capabilities for developing delivering evaluating and maintaining digital instructional materials All training components aligned with Master In-Service Plan requirements including School leadership ldquolook-forsrdquo on quality digital learning processes in the classroom educator capacity to use available technology instructional lesson planning using digital resources and student digital learning practices These Master In-service Plan components can be located on PAECrsquos website at httpmypaecorgsearchdefaultaspxq=master+in-service+planamptype=082033-35082033-117|-182117-124 Liberty County School District will hire an Instructional Technology Coach with funds allocated through the LCSD Digital Classroom Plan The Instructional Technology Coach will be classified as a Teacher on Special Assignment and earn a salary according to LCSD approved salary schedule as a 12 month 7-hour teacher employee Technology Lead Teachers will be selected from each of the K-8 schools and the high school The Technology Lead Teachers will work collaboratively with the District Tech Team In addition LCSD will provide instructional staff with opportunities and training to effectively incorporate technology into the curriculum There is also a need for the development of assessments in our LIIS Performance Matters andor other management systems to align curriculum with the Florida Standards with an emphasis on developing cross-curricular content that integrates the use of technology
C Professional Development Needs Analysis (Required)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC1 Average teacher technology integration via the TIM (based on peer andor administrator observations andor evaluations)
Entry 41 Adoption29 Adaption19 Infusion5 Transform6
Entry 10 Adoption10 Adaption10 Infusion60 Transform10
062020
IIC2 Percentage of total evaluated teacher lessons plans at each level of the TIM
Entry 0 Adoption0 Adaption0 Infusion0 Transform0
Entry 10 Adoption10 Adaption30 Infusion40 Transform10
062020
9
D Digital Tools
Digital Tools Baseline Target BrainPOP ESL Partially Implemented Ongoing implementation ConnectED McGraw Hill Partially implemented Ongoing implementation CPALMS Partially implemented Ongoing implementation Discovery Education Fully implemented Continue to support classrooms Edgenuity Fully implemented Continue to support classrooms Focus Fully Implemented Continue to support classrooms Fountas amp Pinnell (LLI) Partially implemented Ongoing implementation GMetrix Fully implemented Continue to support classrooms i-Ready Partially Implemented Ongoing implementation IXL Partially implemented Ongoing implementation Math Nation Fully implemented Continue to support classrooms MicroType Fully implemented Continue to support classrooms Performance MattersUnify Partially implemented Ongoing implementation Reading Plus Fully implemented Continue to support classrooms Renaissance Place (AR 360 STAR Reading amp Math 360)
Fully implemented Continue to support classrooms
Springboard Fully implemented Continue to support classrooms Study Island Partially Implemented Ongoing implementation
Think Central (Math amp Science K-8 Digital Content)
Fully implemented Continue to support classrooms
Unique Partially implemented Ongoing implementation Write Score Partially implemented Ongoing implementation
C Professional Development Needs Analysis (District Provided)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC3 (D) Increase the level of technology integration in all subject areas to promote higher level thinking skills for all students
Entry 41
50 decrease in Entry
Level
062018
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
6
B Digital Learning and Technology Infrastructure - Needs Analysis
As a district we are planning on having a 11 ratio for student instructional mobile computers Our current ratio is 31 with a gap to be addressed of 21
B Infrastructure Needs Analysis (Required) Baseline from
2014 Actual from Spring 2016
Target For 2016-2017
School Year
Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB1 Student to Computer Device Ratio 101 21 11 072018 11 IIB2 Count of student instructional
desktop computers meeting specifications
518 610 653 072018 40
IIB3 Count of student instructional mobile computers (laptops) meeting specifications
93 159 1200 072018 948
IIB4 Count of student web-thin client computers meeting specifications
0 296 296 NA NA
IIB5 Count of student large screen tablets meeting specifications
0 0 0 NA NA
IIB6 Percent of schools meeting recommended bandwidth standard
100 100 100 Ongoing 0
IIB7 Percent of wireless classrooms (80211n or higher)
65 65 100 072019 35
IIB8 District completion and submission of security assessment
NA NA Y NA NA
IIB9 District support of browsers in the last two versions
Y Y Y Ongoing No gap
7
Our district is in the process of upgrading all computers to Windows 10 We have one model of document camera (25) that is not compatible with Windows 10 thus making our gap to be addressed 31 The district has invested in research-based software and hardware to address student learning needs Due to an inequity in access to hardware across the district some students have limited access to digital tools to positively impact their learning In addition the district struggles with adequate funding to maintain a systematic refresh of student devices as well as the core infrastructure needs for switches WAPs and technical services to maintain the backbone of the network Districts will complete the security assessment provided by the FDOE However under s 11907(1) this risk assessment is confidential and exempt from public records
B Infrastructure Needs Analysis (District Provided)
Baseline Actual from Spring 2016
Target Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB10 (D)
Classrooms with mounted LCD projectors 87 112 132 062018 20
IIB11 (D)
Classrooms with document cameras 74 99 15 062017 6
IIB12 (D)
Classrooms with interactive whiteboards 40 40 100 062019 60
IIB13 (D)
Schools with access to FTP scanners used for online assessment component
2 2 3 062017 1
8
C Professional Development
Professional development needs include increasing instructional capabilities for developing delivering evaluating and maintaining digital instructional materials All training components aligned with Master In-Service Plan requirements including School leadership ldquolook-forsrdquo on quality digital learning processes in the classroom educator capacity to use available technology instructional lesson planning using digital resources and student digital learning practices These Master In-service Plan components can be located on PAECrsquos website at httpmypaecorgsearchdefaultaspxq=master+in-service+planamptype=082033-35082033-117|-182117-124 Liberty County School District will hire an Instructional Technology Coach with funds allocated through the LCSD Digital Classroom Plan The Instructional Technology Coach will be classified as a Teacher on Special Assignment and earn a salary according to LCSD approved salary schedule as a 12 month 7-hour teacher employee Technology Lead Teachers will be selected from each of the K-8 schools and the high school The Technology Lead Teachers will work collaboratively with the District Tech Team In addition LCSD will provide instructional staff with opportunities and training to effectively incorporate technology into the curriculum There is also a need for the development of assessments in our LIIS Performance Matters andor other management systems to align curriculum with the Florida Standards with an emphasis on developing cross-curricular content that integrates the use of technology
C Professional Development Needs Analysis (Required)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC1 Average teacher technology integration via the TIM (based on peer andor administrator observations andor evaluations)
Entry 41 Adoption29 Adaption19 Infusion5 Transform6
Entry 10 Adoption10 Adaption10 Infusion60 Transform10
062020
IIC2 Percentage of total evaluated teacher lessons plans at each level of the TIM
Entry 0 Adoption0 Adaption0 Infusion0 Transform0
Entry 10 Adoption10 Adaption30 Infusion40 Transform10
062020
9
D Digital Tools
Digital Tools Baseline Target BrainPOP ESL Partially Implemented Ongoing implementation ConnectED McGraw Hill Partially implemented Ongoing implementation CPALMS Partially implemented Ongoing implementation Discovery Education Fully implemented Continue to support classrooms Edgenuity Fully implemented Continue to support classrooms Focus Fully Implemented Continue to support classrooms Fountas amp Pinnell (LLI) Partially implemented Ongoing implementation GMetrix Fully implemented Continue to support classrooms i-Ready Partially Implemented Ongoing implementation IXL Partially implemented Ongoing implementation Math Nation Fully implemented Continue to support classrooms MicroType Fully implemented Continue to support classrooms Performance MattersUnify Partially implemented Ongoing implementation Reading Plus Fully implemented Continue to support classrooms Renaissance Place (AR 360 STAR Reading amp Math 360)
Fully implemented Continue to support classrooms
Springboard Fully implemented Continue to support classrooms Study Island Partially Implemented Ongoing implementation
Think Central (Math amp Science K-8 Digital Content)
Fully implemented Continue to support classrooms
Unique Partially implemented Ongoing implementation Write Score Partially implemented Ongoing implementation
C Professional Development Needs Analysis (District Provided)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC3 (D) Increase the level of technology integration in all subject areas to promote higher level thinking skills for all students
Entry 41
50 decrease in Entry
Level
062018
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
7
Our district is in the process of upgrading all computers to Windows 10 We have one model of document camera (25) that is not compatible with Windows 10 thus making our gap to be addressed 31 The district has invested in research-based software and hardware to address student learning needs Due to an inequity in access to hardware across the district some students have limited access to digital tools to positively impact their learning In addition the district struggles with adequate funding to maintain a systematic refresh of student devices as well as the core infrastructure needs for switches WAPs and technical services to maintain the backbone of the network Districts will complete the security assessment provided by the FDOE However under s 11907(1) this risk assessment is confidential and exempt from public records
B Infrastructure Needs Analysis (District Provided)
Baseline Actual from Spring 2016
Target Date for Target to be Achieved
(MoYear)
Gap to be addressed
(Actual minus Target) IIB10 (D)
Classrooms with mounted LCD projectors 87 112 132 062018 20
IIB11 (D)
Classrooms with document cameras 74 99 15 062017 6
IIB12 (D)
Classrooms with interactive whiteboards 40 40 100 062019 60
IIB13 (D)
Schools with access to FTP scanners used for online assessment component
2 2 3 062017 1
8
C Professional Development
Professional development needs include increasing instructional capabilities for developing delivering evaluating and maintaining digital instructional materials All training components aligned with Master In-Service Plan requirements including School leadership ldquolook-forsrdquo on quality digital learning processes in the classroom educator capacity to use available technology instructional lesson planning using digital resources and student digital learning practices These Master In-service Plan components can be located on PAECrsquos website at httpmypaecorgsearchdefaultaspxq=master+in-service+planamptype=082033-35082033-117|-182117-124 Liberty County School District will hire an Instructional Technology Coach with funds allocated through the LCSD Digital Classroom Plan The Instructional Technology Coach will be classified as a Teacher on Special Assignment and earn a salary according to LCSD approved salary schedule as a 12 month 7-hour teacher employee Technology Lead Teachers will be selected from each of the K-8 schools and the high school The Technology Lead Teachers will work collaboratively with the District Tech Team In addition LCSD will provide instructional staff with opportunities and training to effectively incorporate technology into the curriculum There is also a need for the development of assessments in our LIIS Performance Matters andor other management systems to align curriculum with the Florida Standards with an emphasis on developing cross-curricular content that integrates the use of technology
C Professional Development Needs Analysis (Required)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC1 Average teacher technology integration via the TIM (based on peer andor administrator observations andor evaluations)
Entry 41 Adoption29 Adaption19 Infusion5 Transform6
Entry 10 Adoption10 Adaption10 Infusion60 Transform10
062020
IIC2 Percentage of total evaluated teacher lessons plans at each level of the TIM
Entry 0 Adoption0 Adaption0 Infusion0 Transform0
Entry 10 Adoption10 Adaption30 Infusion40 Transform10
062020
9
D Digital Tools
Digital Tools Baseline Target BrainPOP ESL Partially Implemented Ongoing implementation ConnectED McGraw Hill Partially implemented Ongoing implementation CPALMS Partially implemented Ongoing implementation Discovery Education Fully implemented Continue to support classrooms Edgenuity Fully implemented Continue to support classrooms Focus Fully Implemented Continue to support classrooms Fountas amp Pinnell (LLI) Partially implemented Ongoing implementation GMetrix Fully implemented Continue to support classrooms i-Ready Partially Implemented Ongoing implementation IXL Partially implemented Ongoing implementation Math Nation Fully implemented Continue to support classrooms MicroType Fully implemented Continue to support classrooms Performance MattersUnify Partially implemented Ongoing implementation Reading Plus Fully implemented Continue to support classrooms Renaissance Place (AR 360 STAR Reading amp Math 360)
Fully implemented Continue to support classrooms
Springboard Fully implemented Continue to support classrooms Study Island Partially Implemented Ongoing implementation
Think Central (Math amp Science K-8 Digital Content)
Fully implemented Continue to support classrooms
Unique Partially implemented Ongoing implementation Write Score Partially implemented Ongoing implementation
C Professional Development Needs Analysis (District Provided)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC3 (D) Increase the level of technology integration in all subject areas to promote higher level thinking skills for all students
Entry 41
50 decrease in Entry
Level
062018
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
8
C Professional Development
Professional development needs include increasing instructional capabilities for developing delivering evaluating and maintaining digital instructional materials All training components aligned with Master In-Service Plan requirements including School leadership ldquolook-forsrdquo on quality digital learning processes in the classroom educator capacity to use available technology instructional lesson planning using digital resources and student digital learning practices These Master In-service Plan components can be located on PAECrsquos website at httpmypaecorgsearchdefaultaspxq=master+in-service+planamptype=082033-35082033-117|-182117-124 Liberty County School District will hire an Instructional Technology Coach with funds allocated through the LCSD Digital Classroom Plan The Instructional Technology Coach will be classified as a Teacher on Special Assignment and earn a salary according to LCSD approved salary schedule as a 12 month 7-hour teacher employee Technology Lead Teachers will be selected from each of the K-8 schools and the high school The Technology Lead Teachers will work collaboratively with the District Tech Team In addition LCSD will provide instructional staff with opportunities and training to effectively incorporate technology into the curriculum There is also a need for the development of assessments in our LIIS Performance Matters andor other management systems to align curriculum with the Florida Standards with an emphasis on developing cross-curricular content that integrates the use of technology
C Professional Development Needs Analysis (Required)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC1 Average teacher technology integration via the TIM (based on peer andor administrator observations andor evaluations)
Entry 41 Adoption29 Adaption19 Infusion5 Transform6
Entry 10 Adoption10 Adaption10 Infusion60 Transform10
062020
IIC2 Percentage of total evaluated teacher lessons plans at each level of the TIM
Entry 0 Adoption0 Adaption0 Infusion0 Transform0
Entry 10 Adoption10 Adaption30 Infusion40 Transform10
062020
9
D Digital Tools
Digital Tools Baseline Target BrainPOP ESL Partially Implemented Ongoing implementation ConnectED McGraw Hill Partially implemented Ongoing implementation CPALMS Partially implemented Ongoing implementation Discovery Education Fully implemented Continue to support classrooms Edgenuity Fully implemented Continue to support classrooms Focus Fully Implemented Continue to support classrooms Fountas amp Pinnell (LLI) Partially implemented Ongoing implementation GMetrix Fully implemented Continue to support classrooms i-Ready Partially Implemented Ongoing implementation IXL Partially implemented Ongoing implementation Math Nation Fully implemented Continue to support classrooms MicroType Fully implemented Continue to support classrooms Performance MattersUnify Partially implemented Ongoing implementation Reading Plus Fully implemented Continue to support classrooms Renaissance Place (AR 360 STAR Reading amp Math 360)
Fully implemented Continue to support classrooms
Springboard Fully implemented Continue to support classrooms Study Island Partially Implemented Ongoing implementation
Think Central (Math amp Science K-8 Digital Content)
Fully implemented Continue to support classrooms
Unique Partially implemented Ongoing implementation Write Score Partially implemented Ongoing implementation
C Professional Development Needs Analysis (District Provided)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC3 (D) Increase the level of technology integration in all subject areas to promote higher level thinking skills for all students
Entry 41
50 decrease in Entry
Level
062018
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
9
D Digital Tools
Digital Tools Baseline Target BrainPOP ESL Partially Implemented Ongoing implementation ConnectED McGraw Hill Partially implemented Ongoing implementation CPALMS Partially implemented Ongoing implementation Discovery Education Fully implemented Continue to support classrooms Edgenuity Fully implemented Continue to support classrooms Focus Fully Implemented Continue to support classrooms Fountas amp Pinnell (LLI) Partially implemented Ongoing implementation GMetrix Fully implemented Continue to support classrooms i-Ready Partially Implemented Ongoing implementation IXL Partially implemented Ongoing implementation Math Nation Fully implemented Continue to support classrooms MicroType Fully implemented Continue to support classrooms Performance MattersUnify Partially implemented Ongoing implementation Reading Plus Fully implemented Continue to support classrooms Renaissance Place (AR 360 STAR Reading amp Math 360)
Fully implemented Continue to support classrooms
Springboard Fully implemented Continue to support classrooms Study Island Partially Implemented Ongoing implementation
Think Central (Math amp Science K-8 Digital Content)
Fully implemented Continue to support classrooms
Unique Partially implemented Ongoing implementation Write Score Partially implemented Ongoing implementation
C Professional Development Needs Analysis (District Provided)
Baseline (established in
2016) Target
Date for Target to
be Achieved (MoYear)
IIC3 (D) Increase the level of technology integration in all subject areas to promote higher level thinking skills for all students
Entry 41
50 decrease in Entry
Level
062018
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
10
E Digital Tools Needs Analysis Students (Required)
Access Utilization
Baseline of students with access to this type
of tool
Target of students
with access to this type of tool by 2017-2018
Baseline of students
who use this type of tool on a regular
basis
Target of students
who use this type of tool on a regular
basis by 2017-2018
IID1 (S) A system that supports student access to online assessments and personal results
80 100 40 60
IID2 (S) A system that houses documents videos and information for students to access
10 60 10 50
IID3 (S) A system that supports student access to individualized instruction
70 100 60 100
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
11
D Digital Tools Needs Analysis Teachers (Required)
Access Utilization
Baseline of teachers with access to this type
of tool
Target of teachers
with access to this type of tool by 2017-2018
Baseline of teachers
who use this type of tool on a regular
basis
Target of teachers who use
this type of tool on a regular basis by
2017-2018 IID1 (T) A system that supports the
assessment lifecycle from item creation to assessment authoring and administration and scoring
100 100 20 40
IID2 (T) A system that houses documents videos and information for teachers to access
35 100 15 40
IID3 (T) A system that provides teachers with the ability to individualize instruction
100 100 70 100
IID4 (T) A system that provides the ability to create instructional materials andor resources and lesson plans
100 100 70 90
IID5 (T) A system that includes district staff information combined with the ability to create and manage professional development offerings and plans
100 100 100 100
IID6 (T) A system that includes comprehensive student information that is used to inform instructional decisions in the classroom for analysis and for communicating to students and parents about classroom activities and progress
100 100 80 90
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
12
D Digital Tools Needs Analysis Parents (Required)
Access Utilization
Baseline of parents with access to this type of tool
Target of parents with access to this type of tool
by 2017-2018
Baseline of parents who use this type of tool on a
regular basis
Target of parents who use this type of tool on a
regular basis by 2017-
2018 IID1 (P)
A system that includes comprehensive student information to inform parents about instructional decisions classroom activities and student progress
100 100 NA NA
D Digital Tools Needs Analysis Instructional Materials (Required)
Baseline established in
2016 Target
by 2017-2018 IID1 (IM) Percentage of instructional materials purchased and
utilized in digital format (purchases for 2016-17) 70 80
IID2 (IM) Percentage of total instructional materials implemented and utilized that are digital format (includes purchases from prior years)
80 85
IID3 (IM) Percentage of instructional materials integrated into the district Digital Tools System
70 80
IID4 (IM) Percentage of the materials in answer IID2 above that are accessible and utilized by teachers
80 90
IID5 (IM) Percentage of the materials in answer IID2 that are accessible and utilized by students
80 90
IID6 (IM) Percentage of parents that have access via an LIIS to their studentsrsquo instructional materials [s 1006283(2)(b)11 FS]
0 0
D Digital Tools Needs Analysis Instructional Materials (District Provided)
Baseline established in
2016 Target
by 2017-2018 IID7 (IM) Single Sign On platform for student and teacher
use 75 100
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
13
E Online Assessments
A review of district available technology indicate that increasing the amount of workstations available and mobile labs will help facilitate this identified issue and decrease the amount of lost instructional time due to scheduling conflicts with testing The following plan will address this need
D Online Assessments Needs Analysis (Required) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE1 (D) Computersdevices available for statewide FSAEOC computer-based assessments
491 900 2018
IIE2 (D) Percent of schools reducing the amount of scheduled time required to complete statewide FSAEOC computer-based assessments
100 100 Ongoing
D Online Assessments Needs Analysis (District Provided) Baseline
established in 2016 Target
Date Target to be
Achieved (MoYear)
IIE3 (D) IIE4 (D) IIE5 (D)
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
14
STEP 2 ndash Goal Setting Mathematics Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and special education assessments Objective Students will use technology to enhance their learning of mathematics content towards mastery of the Florida mathematics standards Objective Students will acquire skills and knowledge to utilize a variety of technological math tools Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
English Language Arts (ELA) Goal By May 2018 90 of students in grades 3-11 will demonstrate a 3 growth towards proficiency on the Florida Standards as measured by the state assessment and designated special education assessments Objective Students will use technology to enhance their learning of ELA content towards mastery of the Florida ELA standards Objective Students will use educational software that supports the Florida ELA standards and specifically analytical thinking and problem solving with relevant real-world applications Objective Students will learn keyboarding and word processing skills as dictated by the Florida Standards Objective Students will utilize a variety of presentation software to organize and present their work Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
15
Science Goal By May 2018 90 of students in grade 5 and 8 will demonstrate a 3 growth towards proficiency in the science standards as measured by the Florida Science Assessment Objective Students will utilize technology resources to enhance their learning of science content towards mastery of the next generation science standards Objective Students will learn to use the internet as a resource to enhance their understanding of science concepts while working in a collaborative classroom environment Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Identify software and Internet resources to be used bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify and schedule professional development
History Goal Integrate History content standards into day-to-day teaching and learning of ELA and Mathematics Florida content standards as they apply to include an essential use of technology Objective Students will learn to appropriately use the Internet as a resource for research and to enhance their understanding of Florida specific standards for history and social sciences Objective Utilize technology resources that are part of the adopted textbook to enhance learning of Florida specific standards for history and social sciences Objective Students will utilize multimedia such as scanners digital still and video cameras to enhance their presentation skills Strategy
bull Development of a plan to ensure access to technology to support objectives in priority order
bull Annually survey staff to identify strengths and weaknesses of implementation bull Review assessment data to determine strengths needs and trends bull Ongoing review of the need for additional professional development hardware and
software bull Purchase andor maintain needed software bull Identify software and Internet resources to be used bull Identify and schedule professional development
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
16
Technology Integration Goal Improve technology integration into the classroom instruction and professional development to increase the achievement of our students while supporting teachers in the delivery of instruction and the monitoring of student learning Objective Implement model classroom plan that provides fair and equitable access to technology tools for all students and teachers across the district Objective Increase the number of devices that can be utilized to support progress monitoring and the delivery of online assessments throughout the year Objective Implement a district wide Single Sign On System to provide ease of transfer between applications for students and teachers Strategy
bull Work with various vendors and technical support providers as necessary to install the technical infrastructure that will support the requirements for model classrooms and devices (Wiring hardware bandwidth WAPs etc)
bull Acquisition of laptops docking stations projectors mounts document cameras interactive touch display units and 3D printers to bring classrooms in line with model classroom specifications
bull Acquisition of additional devices and furniture necessary to serve as student workstations
bull Teacher training and professional development on new environment and devices for students and staff on their use to increase and enhance student learning and engagement
Infrastructure Goal The district will establish and maintain the technology infrastructure necessary for students and educators to access electronic information and support the districtrsquos instructional and administrative goals Objective The district will support and maintain LANsWANs for both hardware and software Objective The district will supply sufficient bandwidth to support current and future district technology needs Objective The district will support ldquomanaged wirelessrdquo access throughout the district Objective The district will purchase and deploy computers laptops and peripheral devices for staff and student use Strategy
bull Acquire and maintain switches firewalls web filters wireless access points and other network hardware as needed
bull Obtain technical support to assist with network design of VLANS to reduce collision domains as needed
bull Evaluate plan and budget for ongoing replacement and updating of infrastructure hardware and software
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
17
bull Evaluate monitor the districts bandwidth to supply sufficient bandwidth for technology needs
Goal The district will assure CBT readiness with sufficient access to increase efficiency of online testing deployment Objective Expand hardware deployment to include computers to meet demands of online testing Objective Upgrade operating systems andor replace devices that do not meet minimum operating specifications as recommended by FSA Strategy
bull Acquire additional laptops desktops or other equipment and software in order to address testing needs
Goal Provide expanded access to technology for all students Objective Liberty Schools will outline develop implement and utilize model classrooms throughout the district
Objective The district will move towards the implementation of student devices Strategy
bull Prioritize and implement procurement of technology to meet objectives bull Provide Technology Mentor Teachers at each school to strengthen and develop teacher skills to create a digital learning environment of personalized learning
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
18
STEP 3 ndash Strategy Setting Goal Addressed Strategy Measurement Timeline
Highest student achievement
Provide teachers and students with high quality digital content for Math ELA Science and History that is aligned to the Florida Standards
bull Review current inventory and purchase additional instructional materials in digital format
2015 and ongoing
Highest student achievement
Prepare students to enter postsecondary with the skills necessary to succeed
bull Continue to purchase andor update Microsoft Office licenses to allow for increased student opportunity in writing and communication
2016 and ongoing
Highest student achievement
Purchase additional digital devices for 11 student environment
bull Analyze results of TUPS and TIM observations
2015 and ongoing
Highest student achievement
Provide adminteacher training and support for the use of integrated digital tool system to transform instruction
bull Train Instructional Admin Technology Coach and Technology Lead Teachers in the TIM
bull Monitor and provide assistance for implementation of digital curriculum for teachers in their classrooms
2015 and ongoing
Highest student achievement
Create an infrastructure that supports the needs of digital learning and online assessments
bull Bandwidth bull Wireless access for all
classrooms bull Upgrade infrastructure bull Increase devices
2015 and ongoing
Highest student achievement
Provide student and staff training for the use of technology hardware software and applications
bull Monitor the success of students in technology courses
bull Observe teachers in the classroom providing digital instruction
bull Provide PD to staff to support effective technology integration into curriculum
2016 and ongoing
Standards-Based Curriculum and Instruction
Provide digital learning equipment and resources to increase technology alignment to Florida Standards and to build capacity for CBT
bull Monitor infrastructure to make sure of adequacy to provide digital curriculum assessment and online access for learning
2016 and ongoing
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
19
Equitable Access to Support High Student Achievement
Enhance and upgrade infrastructure and hardware purchases to assure equitable access to technology tools and digital content for all teachers and students
bull Purchase and install hardware and software to meet district wide access
bull Purchase and install generator system to provide stability of network
2015 and ongoing
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
20
Part III DIGITAL CLASSROOMS PLAN - ALLOCATION PROPOSAL The DCP and the DCP Allocation must include five key components as required by s 101162(12)(b) FS In this section of the DCP districts will outline specific deliverables that will be implemented in the current year that are funded from the DCP Allocation The five components that are included are
A) Student Performance Outcomes B) Digital Learning and Technology Infrastructure C) Professional Development D) Digital Tools E) Online Assessments
A) Student Performance Outcomes
A Student Performance Outcomes Baseline Target IIIA1 Increase student engagement by increasing
teacher ability to engage students during daily classroom instruction using digital devices This measure will be based on average teacher evaluation rating in respective indicators
Effective Highly Effective
IIIA2 Increase FSA ELA Learning Gains of Lowest 25 44 47 IIIA3 Increase FSA Math Learning Gains of Lowest 25 45 48 IIIA4 Increase FCAT Science Student Achievement 59 62 IIIA5 Increase 4-year Graduation Rate 78 81
B) Digital Learning and Technology Infrastructure
B Infrastructure Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIB1
Purchase additional student devices for use during instruction and assessment (computers and charging carts)
July 2017 $32574700 District Wide
IIB2 IIB3
IIIB2 Purchase and install equipment for model classrooms (short throw projectors mounts document cameras printers and scanner)
July 2017 $1327400 Hosford LCHS WRT
IIB10 (D) IIB11 (D)
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
21
IIIB3 Purchase necessary equipment and technical support to provide a stable reliable and efficient network both wired and wireless (upgrade laptops to wireless AC cards IT infrastructure service hours generator setup for server room fiber installation)
July 2017 $4143400 District
IIB6 IIB7
If additional funding will be spent in this category other than this yearrsquos DCP allocation please briefly describe below how the target gaps will be addressed by other fund sources
B Infrastructure Implementation Brief description of other activities
Other funding source Estimated Amount
Estimated Completion Date
MoYear Upgrade bandwidth district-wide
Local funds and E-Rate 131250000 052017
Evaluation and Success Criteria for B) Digital Learning and Technology Infrastructure
B Infrastructure Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIB1
Assessment of needed devices will be documented
Computer devices will be purchased to meet the 13 devices needed to meet student assessment needs as well as additional devices used for instruction These computers will be configured and placed into identified areas and overseen by LCSB staff along with help from the vendor
IIIB2 Outline necessary elements for model classrooms
Items identified for model classrooms will be purchased installed and functioning properly This will be overseen by LCSB staff meeting deadline
IIIB3 Assessment of infrastructure needs will be documented
Identified upgrades will be purchased installed and functioning properly Vendors and LCSB staff meeting deadline
Additionally if the district intends to use any portion of the DCP allocation for the technology and infrastructure needs area B s 101162(12)(b) FS requires districts to submit a third-party
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
22
evaluation of the results of the districtrsquos technology inventory and infrastructure needs Please describe the process used for the evaluation and submit the evaluation results with the DCP Liberty County School District is using the technology resource survey as its third-party review of inventory and infrastructure Quotes for technology needs are also attached C) Professional Development
C Professional Development Implementation Deliverable Estimated
Completion MoYear
Estimated Cost School District
Gap addressed from Sect II
IIIC1 Hire Instructional Technology Coach
June 2017 $6000000 Liberty IIC3 (D)
IIIC2 Select Technology Lead Teachers from K-8 and high school
June 2017 $1260000 Liberty IIC1 IIC2
IIC3 (D) IIIC3 Select Admin Instructional
Technology Coach Technology Lead Teachers and staff from each school will complete and implement training in the use of TIM
January 2017 No Cost Liberty IIC3 (D)
IIIC4 Utilize Instructional Technology Coach and Technology Lead Teachers to lead training at summer institute
July 2017 $1200000 Liberty IIC3 (D)
IIIC5 Digital Professional Development ndash Select staff will attend FETC and 2017 National User Conference by Performance Matters
June 2017 $896600 Liberty IIC1 IIC2
IIC3 (D)
Evaluation and Success Criteria for C) Professional Development
C Professional Development Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIC1 Professional development activity will be monitored through ePDC registration temporary duty forms sign in sheets
Review of TIM data will show a 5 increase to adoption
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
23
IIIC2 Temporary duty forms sign in sheets substitute payroll PD logs
100 of the Technology Lead Teachers will act as a technology resource for teachers offering at least monthly trainings etc
IIIC3 Minutes or Shared notes Completed plan for summer institute and meeting minutes
IIIC4 Temporary duty forms sign in sheets stipend payroll
Technology Leads will participate in relevant training and assist in delivery at the summer institute
IIIC5 Temporary duty forms sign in sheets payroll
Select teachers will participate in conferences and assist in delivery at the summer institute
D) Digital Tools
Implementation Plan for D) Digital Tools
D Digital Tools Implementation
Deliverable Estimated Completion
MoYear
Estimated Cost School District
Gap addressed
from Sect II IIID1 Performance MattersUnify for
assessment administration and scoring
062018 $1863000 District IID1 (T)
IIID2 Office 365 will be integrated into the digital tools system Microsoft Classroom (along with Edmodo amp Microsoft Office) will be used to house documents videos and information for students to access
062017 $900000 District IID2 (S) IID1 (IM)
IIID3 Integrate additional instructional materials into the digital tools system
062017 $4480000 (supported by Instructional
Materials allocation)
District IID3 (S) IID3 (T)
IIID4 Integrate additional instructional materials into the digital tools system
062017 $1280596 District IID3 (S)
IIID5 Implement BrainPOP BrainPOP Jr amp BrainPOP ESL to K-8 schools to support all students in all subject areas
062017 $407650 District IID2 (S) IID4 (T)
Evaluation and Success Criteria for D) Digital Tools
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment
24
D Digital Tools Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIID1 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID2 Microsoft District License to support standardization of licensing (annually)
100 of teachers will utilize Microsoft Office
IIID3 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
IIID4 Analysis of student performance on state tests
10 decrease in number of students scoring non-proficient
Implementation Plan for E) Online Assessments
Evaluation and Success Criteria for E) Online Assessments
E) Online Assessments
Online Assessment Implementation Deliverable Estimated
Completion Date
Estimated Cost SchoolDistrict
IIIE1 Purchase and installation of devices for assessment
August 2017 No additional cost Included in Infrastructure needs
District W R Tolar Hosford School Liberty County High School
IIIE2 Signed contract to increase bandwidth district-wide to provide stable network for multiple grade levels simultaneous online testing
June 2017 $1562500 for 1st payment and remaining covered with District funds and E-Rate
District W R Tolar Hosford School Liberty County High School
E Online Assessment Evaluation and Success Criteria Deliverable (from above)
Monitoring and Evaluation and Process(es)
Success Criteria
IIIE1 Purchase and installation of devices for assessment
Successfully complete the infrastructure trial for online assessment
IIIE2 Increase in bandwidth district-wide
Successfully complete the infrastructure trial for online assessment