2 ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION M/s SHAW ARCHITECTS +919898213973 [email protected] PART –A & B TECHNICAL & PRICE BID TENDER DOCUMENTS FOR AIR CONDITIONING WORK FOR BAJUWA BRANCH (NEW PREMISES), VADODARA. 1 TENDER ISSUED TO M/S………………………………………………………………………… ……………………………………………………………………..………… ………………………………………………………………………………… ………………………………………………………. 2 TENDER COST Rs. 30000 (Three Hundred Only) 3 EMD COST Rs. 6,00000 (Six Thousand Only) 4 PROJECT ARCHITECTS M/S SHAW ARCHITECTS, SF218, SAMANVAY SILICON, OPP. KALYAN HOTEL, NR. DAIRY DEN CIRCLE, SAYAJIGUNJ, VADODARA 390005, GUJARAT. 5 ARCHITECT’S CONTACT DETAIL MOBILE NO. : +919898213973 EMAIL I.D. : [email protected] 1/16

Transcript of PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement...

Page 1: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

       

2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION  

M/s SHAW ARCHITECTS                                        +91‐9898213973      [email protected] 

  

PART –A & B  TECHNICAL & PRICE BID TENDER DOCUMENTS 

 FOR 

 AIR CONDITIONING WORK 

FOR BAJUWA BRANCH (NEW PREMISES), VADODARA.  

     

1  TENDER ISSUED TO   M/S………………………………………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………………………………………. 

2  TENDER COST  Rs. 300‐00 (Three Hundred Only) 

3  EMD COST  Rs. 6,000‐00 (Six Thousand Only) 

4  PROJECT ARCHITECTS  M/S  SHAW  ARCHITECTS,  SF‐218,  SAMANVAY SILICON,  OPP.  KALYAN  HOTEL,  NR.  DAIRY  DEN CIRCLE,  SAYAJIGUNJ,  VADODARA  –  390005, GUJARAT. 

5  ARCHITECT’S CONTACT DETAIL  MOBILE NO. : +91‐9898213973 E‐MAIL I.D. : [email protected] 

                       

            

1/16

Page 2: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

NOTICE INVITING TENDER (NIT)  UBI Invites sealed tenders under two cover systems from the AIR CONDITIONING WORK contractors on Bank’s approved panel under appropriate category in the circle of Vadodara Region only for the work mentioned below. Details of the tender are as under: 

1  Name of work  AIR CONDITIONING WORKS AT BAJUWA BRANCH (New Premises), VADODARA. 

2  Date of Issue of tender documents  22‐04‐2019 at 2:00 p.m.  

3  Last date of  tender collection  13‐05‐2019 by 11:00 am. 

4  Tender close  / Submission date  13‐05‐2019 by 1:00 pm. 

5  Date & Time of opening of tender  13‐05‐2019 at 3:30 pm. 

6  Place of submission of bids    Regional Head, Union Bank of India, 2nd floor,    Regional office, Opp. Faculty of Commerce, Sayajigunj, Vadodara. ‐390 005 

7  Date of commencement  2 days from issue of work order. 

8  Date of completion of work  45 days from issue of work order. 

9  Period for settlement of final bill  30  days  from  date  of  issue  of  completion certificate by the Architect. 

10  Total Security Deposit (TSD)  TSD shall be 5% of contract value which will be deducted from the final bill of the contractor by way of  retention amount. TSD will be  refunded to  the  contractor  on  successful  completion  of defect liability period. 

11  Earnest money deposit  Rs.  6,000/‐  by way  of Demand Draft/  Banker’s Cheque/  Personal  Cheque  of  the  firm’s  UBI account  payable  to  “Union  Bank  of  India, VADODARA. Technical bid with personal cheque of any other bank except UBI shall be rejected & their  price  bid  shall  not  be  opened.  EMD  of successful  contractor  shall  be  refunded  on completion of the work. 

12  Release of Retention Money/ Earnest money 

The Earnest money deposited shall not carry any interest  and  will  be  refunded  to  unsuccessful tenderers  after  allocation  of  work  order.  The Earnest  money  of  successful  tenderer  will  be release  after  completion  of  work  and certification  of  final  bill.  Retention  &  Security money after 14 days from defect liability period. 

13  Liquidated damages for non completion of work within the date of completion 

0.5%  per  week  subject  to maximum  of  5%  of contract value inclusive of Sundays and Holidays. 

14  Defect liability period  12  months  from  the  date  of  completion certificate issued by the Bank Architect. 

15  Cost of tender document  Rs. 300/‐ Only D.D. Or UBI Cheque  (in  favor of Union Bank of  India payable at Vadodara). Non Refundable. 

2/16

Page 3: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

16  Interested  bidder may  obtain  further  information  from  the office of  consultant  / Bank Architect. 

17  Bank  reserves  the  right  to  reject wholly or part of  any or  all  tenders  received without Assigning any reason whatsoever, Also Bank reserves the right to split the work and place the order to more than one party. 

18  ANY FREAK RATE OF INDIVIDUAL ITEM ON HIGHER SIDE ARE LIABLE FOR NEGOTIATION 

19  Any  Contractor  which  is  empanelled  in  more  than  one  category  (i.e, Furniture/Electrical/Air  Conditioning)  can  compete  only  in  one  category.  If  applied  for more  than one category,  then any one  tender will be accepted by Bank and others are subjected to rejection.   

20  Rates quoted & agreed by the tenderer shall remain firm throughout the contract period (Including authorized extension). Rates quoted shall be inclusive of all taxes, duties, levies, royalties & other incidental / other Industrial charges etc. However GST Tax shall be paid by the bank extra as applicable to work contract tax as per actual. 

21  Running bills each not more than 70% of contract value on completion of 90% of work OR as stage guided by Architects  shall be paid. Final Bill will be paid against the final payment certificate on submission detailed final bills submitted by the contractor to the Architect on successful Completion of the work. 

 Office of Architect means :   M/s SHAW ARCHITECTS,  SF‐218, SAMANVAY SILICON, OPP. KALYAN HOTEL, NR. DAIRY DEN CIRCLE,  SAYAJIGANJ, VADODARA‐390005. M: +91‐9898213973  i) In case the date of opening of tender is declared a holiday, the tenders will be opened on the   next working day at the same place & time. 

ii) Please  read  tender  documents  for  details  on  content  of  this  NIT.  Tenderers  are requested to go   through the additional conditions with due care as the same are stipulated particularly for this   project. 

iii) Rates  quoted  by  the  tenderers  in  variance  with  the  NIT  provision  are  liable  to  be rejected. 

iv) Clarification,  if  any,  regarding  the  content  of  these  documents  &  this  work  can  be obtained from  the Architect before filling  in the tenders. All bidders are supposed to visit the site, understand   the conditions and seek clarifications from the Bank & the Architect. 

UBI has right to accept/ reject any/ all tenders without assigning any reasons. (For and on behalf of Union Bank of India)    Regional Head           Union Bank of India, 2nd floor, Regional office, Opp. Faculty of Commerce, Sayajigunj, Vadodara. ‐390 005            DATE : 22‐04‐2019  

3/16

Page 4: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

SPECIAL TERMS AND CONDITIONS 

1  Limit of variation  100% without any change in price if work is done within six months of the contract and with prior consent of Architect / Consultant. 

2  Additional items  For  items where  unit  rates  are  not  available  , contractor  shall  provide  proper  cost  break‐up and  proceed  only  after  approval/consent.  Any sample  to be made  for approval shall be at  the Contractor’s cost. 

3  Validity of tender  Three month after the opening of the tender. 

4  Rules/ Regulations  The contractor  shall have  their  responsibility of complying  with  the  local  shops/establishments Act  and  other  labor/ minimum wages  Act  and shall  keep  all  such  records/  accounts  on payment  of  wages  /  attendance  as  deemed necessary. 

5  Arbitration  As per the standard arbitration clause under the jurisdiction of Vadodara. 

6  Organization  The  contractor  shall  employ  competent  / qualified  supervisor  /Engineer‐in‐charge  who shall be responsible for the day to day work and coordinate  as  necessary  with  the  Architect’s supervisor.  Any  workman  found  guilty  of misconduct/theft shall remove from the site. 

7  Damage to property  Any  damage  to  the Bank’s property during  the work  period  will  be  recovered  from  the contractor  as  per  the  valuation  submitted  by Architect. 

8  Deduction  Tax at source as per Act. 

9  Terms of payment  Final Payment after completion of Project. 

10  Billing Procedure  All measurements shall be recorded in Duplicate on  standard  measurement  sheets  Prepared jointly  by  the  Architect’s  Site  Engineer  &  the Contractor’s  Representatives  duly  signed  by them. All Bills shall be submitted along with this Checked Measurement sheets. 

11  Time schedule of work  The  Contractor  must  submit  before  the Commencement  of  work,  a  Bar  chart  showing the  date  of  commencement  &  the  date  of completion of each  item of Work as mentioned in  the Schedule of Quantities within  the  tender completion time frame. 

12  Release of TSD  100% after the Defect  liability period. Retention money will not bear any interest. 

13  General  The  rates  should  be  quoted  considering necessary  Scaffolding &  staging work,  Removal of  debris  as  &  when  necessary,  In  view  of 

4/16

Page 5: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

restriction of Local concern Authority & all type of Lab test. 

14  Site Location  The  aforesaid  work  needs  to  carry  out  at BAJUWA,  Vadodara  located  at  10  km  from Vadodara Railway Station. 

                                           

5/16

Page 6: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

          FORM OF TENDER  (On the Letterhead of Tenderer) 

........................................................  

........................................................  .........................................................  Dear Sirs Ref: ...........................................................  ............................................................  ............................................................  1)  I/We  refer  to  the  tender  notice  issued  by  your  Consultant  M/s.Shaw  Architects,  SF‐218, Samanvay  Silicon,  Nr.  Dairy  Den  Circle,  Sayajiganj,  Vadodara    on  your  behalf  for  the .........................................................................in connection with the above.  2) I/We do hereby offer to perform provide execute complete and maintain the works in conformity Bill  of  Quantities  for  the  sum  of RS......................................(Rupees...............................................................)  only  at  the  respective rates quoted in the bill of quantities.  3)  I/We have  satisfied myself/ourselves as  to  the  site  conditions, examined  the drawings and all aspects  of  the  tender  conditions  subject  to  above,  I/We  do hereby  agree  should  this  tender be accepted in whole of part off:  4) Abide by and fulfill all the terms and provisions of the said conditions annexed hereto: 5) Complete the works within 45 days stipulated  in two or three shifts  if considered necessary by the Consultants at no extra cost to the Owner.  6)  I/We  have  deposited  the  earnest money  of  RS..............................................................which we note will not bear any interest and is liable to forfeiture,  i) If the offer is withdrawn within the validity period of acceptance. Or,  ii) If the contract is not executed with 2 days from award of contract. Or,  iii) The acceptance of this tender shall constitute a binding of contract and any failure as mentioned in Clause.4 shall constitute a breach of contract by us and the tender accepting authority shall be entitled to have the work executed at our risk and cost and to claim extra cost/expenditure incurred by them from us.  7. Unless and until a  formal agreement  is prepared and executed  this  tender  together with your written acceptance thereof shall constitute as a binding contract.  8. I/We understand that you are not bound to accept the lowest any tender received.  9.  I/We have  independently considered the amount of  liquidated damages  in the Appendix to the General conditions of the Contract and agree that it represents fair estimate of the loss likely to be suffered by you in the event of the works not being completed in time.  10. Our Bankers are:‐  I)  II)  The names of Partners/Directors of the firm Authorized to sign   Yours faithfully,    Name of person having power of Attorney to sign the contract.  (Certified true copy of the Power of attorney should be attached.)  Signature of the Contractor with Seal  

6/16

Page 7: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

GENERAL RULES AND GUIDANCE FOR THE TENDERERS:   

2.1. Tenderers are expected to visit the site before quoting the rates and should satisfy themselves as to the nature and conditions of work and facilities available etc.  2.2. The Tenderers are required to examine the enclosed Tender form and conditions mentioned in the Tender.  2.3. The Tenderer should quote the rates  in  figures. The amount  for each  item should be worked out and  the  requisite  totals  shall be given. The  total amount shall be written both  in  figures and words.  2.4. The rates quoted in this Tender shall be for measured finished works and shall be inclusive of all charges such as cost of materials, transportation, freight charges, Income Tax, Works Contract Tax and  any  other  form  of  levies  etc,  complete  but  excluding  GST.  GST  chargeable  is  to  be  shown separately for the 100% portion of the work.  2.5. GST payable by the Bank has to be shown separately in the Tender/Bill.  2.6. The work is to be completed within the stipulated time from the date of issue of Work Order.  2.7. Extreme care  is to be taken by the Contractor at the time of earth work excavation, removing the existing interlocks, cutting the Tar Road, opening the top RCC Covers of the existing cable duct so that existing U.G Cables or any other service/utility lines does not get damaged during the earth work excavation or at  the  time of  laying of U.G Cable.  If any  items are damage during  the earth work  excavation,  laying  of  new  U.G  Cable,  damaged  item  has  to  be  repaired/replaced  by  the Contractor at his own cost.  2.8.  The  successful  Tenderer  shall  give  all  necessary  personal  attention  to  the work  during  the progress of work, and also until the expiry date of “Defects Liability Period” which is One Year after issue of completion Certificate by the Consultant.  2.9.  The  Bank  reserves  the  right  to  reject  any  portion  of  work  or  materials  which  is  found unsatisfactory and not up to the standard.  2.10.  Bank  has  the  right  to  scrutinize  and  correct  arithmetical/  calculation  mistakes  in  the participating Tenders  and  suitably  correct  the arithmetical  /calculation mistakes and wrong  total amounts to decide on the lowest Bidder. Mere opening of the Tender will not be considered as final results.  2.11. Bidders shall be quote rates in prescribed Price Bid Format provided in tender and quoting in any  other  form will  be  rejected. All  rates  shall be quoted  item wise basis. Any modifications  to provided Price Bid Format in terms of technical specifications, unit quantities or quoting discount by lump sum discount percentages / amount in price bid will lead to complete rejection of the bid.  2.12.  If  there  is any discrepancy/error  in  the hard copy of  the Tender Document and  the Tender Document available on Bank web site, Bank web site version will be the final version. 2.13. A retention amount of 10% will be retained from each running bill and final bill and shall be paid to the successful Tenderer after the defects liability period on certification of the Consultant.  2.14. Tax deductions, if applicable as per statutory regulations will be done on every payment and will be deposited with the Tax Department on behalf of the Contractors and the certificates of tax deduction will be issued to the respective Contactors.  2.15. Tax deduction at source (T.D.S) as per statutory regulations at the rate applicable at the time of  billing will  be  done  from  payments  to  Contractors  and  the  same will  be  paid  to  Income  Tax Department and certificates of TDS will be issued to the Contractors.  2.16.  All  taxes  such  as  Income  Tax,  Entry  Tax, Octroi, Works  Contract  Tax  or  any  other  Tax  on materials/service  in respect of this Contract shall be payable by the Contractors and the Bank will not entertain any claim in this matter. 

7/16

Page 8: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

 2.17. An amount of Rs.0.5% per week subject to the maximum ceiling of 5 % of the Tender Amount will be deducted from the bills of contractor as liquidated damages for the delay in completing the work within the scheduled time at the discretion of the bank.  2.18.  No  additional  clauses,  conditions,  alterations  in  specifications  by  the  Tenderer  will  be accepted.  2.19. Successful Contractor should obtain all necessary  labor  licenses  from  relevant State/Central Government Agencies at his own cost and comply with the Contract Labor (Regulation & Abolition) Act 1970 with up to date amendments.  2.20. The Tenderer are advised  to  inspect and examine  the  site and  its  surroundings and  satisfy themselves before submitting their Tenders as to the nature of the site and dimensions, the means of  access  to  the  site,  availability  of materials  and  obtain  all  necessary  information’s  as  to  risks, contingencies and other circumstances which may influence or affect their tender.  2.21. A Tenderer shall be deemed to have full knowledge of the site whether he  inspects  it or not and  no  extra  charges  consequent  on  any  misunderstanding  or  otherwise  shall  be  allowed. Submission of a Tender by a Tenderer  implies  that he has  read  this notice and all other Tender/ contract documents and has made himself aware of the scope and specifications of the work to be done and local conditions and other factors bearing on the execution of the work.  2.22. The entire work  is to be completed  in all respects within the stipulated period stated  in the Notice  Inviting  the  Tender.  If  in  the opinion of  the  Employer/ Bank  the works were delayed  for reasons beyond control of  the contractor,  the Bank may grant a  fair and reasonable extension of time  for  completion  of  the  contract  works.  If  the  work  is  not  completed  within  the  original stipulated time period and authorized extension of time (if granted by the Bank), the provision of liquidated damages will become applicable. However,  the contract  shall  remain  in  force even  for the period beyond the due date of completion irrespective whether the extension is granted or not. 2.23. It will be obligatory on the part of the Tenderer to Tender and sign the Tendered documents for all the component parts.  2.24. No alterations or additions are to be made by the Tenderer in the Tender document. Violation of this instruction will attract rejection of the Tender at the discretion of the Bank.  2.25. The Tenderer is required to check the all the pages and should find missing or in duplicate, or the  figure  or writing  indistinct, he must  inform  the Consultant/ Bank  immediately  and have  the same rectified by the Bank before the scheduled date of opening. Should the Tenderer be in doubt about  the precise meaning of any  item or any provision or  if he wants any clarification, he must inform  the  Consultant/Bank  in  advance  before  the  scheduled  date  of  opening. No  claim will  be allowed in respect of errors in the Tender due to any mistake in the Schedule of Quantities, which should have been, but was not rectified in the manner described above.  2.26. The Employer  shall have powers  to order additional  /non‐tendered  items or  to modify  the Tendered items, to vary the quantities of Tendered items and not to execute certain items. The rate or price of all such additional items/non‐Tendered/modified items will be worked out on the basis of rates quoted for similar  items  in the Contract wherever existing or on engineering rate analysis based on prevalent fair price of labour, material and other components as required.  2.27.  The  Tender  rates  shall  hold  good  for  any  increase  or  decrease  in  the  quantities.  Tender schedule  quantities  are  estimated  quantities  only  and  actual  quantities  depend  on  the  site conditions prevailing at the time of execution of works and work shall be carried out accordingly. Quantities  given  in  the  bill  of  quantities  of  the  Tender  schedule  are  approximate  and  actual quantities are  to be decided on  the basis of site condition at  the  time of execution of work. Any claim by the Contractor will not the entertained by the Bank for deletion of any item of the Tender Schedule or  for  variation  in  the quantities of any  item actually used at  the  time of execution of works and as given in the Tender schedule of quantities.  

8/16

Page 9: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

2.28. Tenderer should ensure that their Tenders are submitted before the date and time specified above.  Bank  will  not  be  responsible  for  any  delay  in  submission  of  Tender  by  the Tenderer/Post/Courier Service etc. It is the responsibility of the Tenderer to ensure that Tenders are submitted at the Bank with the competent authority before the specified time and date.  

CONDITIONS OF THE CONTRACT NOTE:  The requirements of these conditions shall be fulfilled by the Tenderer without extra charges, the item rates quoted shall be deemed to have taken these conditions into account.  3.1  If  any  additions  and  alterations  are  found necessary  the  Tenderer will have  to do  the  same within the Tendered rates with the approval of the Bank.  3.2 The Contractor shall employ adequate  labour to complete the work within the scheduled time and shall make his own arrangements for housing materials etc.  3.3 The Contractor shall have to make his own arrangements to house his labour and staff, and for their services.  3.4  All  Tendered  rates  shall  include  for  the  cost  of materials,  labour,  supervision,  tools,  plant, transport, all taxes, contingencies duties, breakages, wastages, sundries, scaffolding etc., complete.  3.5 All instructions regarding the execution of works shall be received from the Bank only. Any other instructions issued directly to the contractor by anyone else shall not be binding on the Contractor.  3.6 The Bank, through the Consultants, shall have the power on omit or cancel; any  item of work without  assigning  any  reason  whatsoever  and  no  claim  for  compensation  for  damage  will  be entertained for such omissions and cancellations.  3.7 The Contractor shall maintain satisfactory progress of work as well as maintain a desired level of workmanship. If in the opinion of the Bank if the progress is unsatisfactory and/or the workmanship is unsatisfactory,  the Bank shall  take possession of  the work with 7 days  to  that effect. The Bank shall  then  complete  the  entire  work  and  rectify  all  the  defects  at  the  Contractors  cost  and consequences.  3.8 The case the Bank  is not satisfied with the quality of materials used by the Contractors, Bank reserves the right to direct the Contractor to procure such supplies from the agencies suggested by the Bank and the Contractor is bound by this instruction for purchase of materials.  3.9  The  Contractor  is  to  be  responsible  for  clearing  any  or  all  dirt,  rubbish,  and  superfluous materials  as  they  accumulate  and  to  leave  the  premises  in  a  clean  and  orderly  condition  on completion. No extra payment shall be made for doing this work.  3.10 Any work which  is not approved by the Bank shall have to be removed within 24 hours from the time of order and shall have to be redone by the Contractor at his own cost and this cost will be borne by the Contractor. 3.11 No deviation whatsoever for any reason will be permitted. However, if any deviation becomes necessary, the same should be brought to the  immediate notice of the Bank and written approval must be obtained for such deviation before proceeding with the execution of work.  3.12 The Bank has got the right to supply any materials required for the work and the cost of the materials so supplied will deducted from the bills of the successful Contractor.  3.13 The Contractor shall be responsible for the safe custody of the materials issued to him by the Bank till they are used for the work. He shall make his own arrangements for the safe custody and proper storage and preservation in sound conditions till the same are actually used in the work.  3.14 For any new  item the rate will be fixed by the Bank as per prevailing fair market rate,  labour and overheads which will be binding on the Contractor.  3.15 The Contractor shall have a competent supervisor on the site all the times.  

9/16

Page 10: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

3.16  In  case  the brand of materials mentioned  in  the Tender  is not available  in  the market,  the alternate materials to be used shall be approved by the Bank.  3.17 The Contractor should strictly adhere to the specifications and make of the materials.  3.18 Any clarification on the specifications or further details needed, the Contractor has to contact the Bank.  3.19 Contractor should ensure the safety of his staff / Technicians/ Labourers working at the work site. He should provide all necessary safety equipment to his personnel working at the site.  3.20 Contractor should obtain necessary Group  Insurance  for his personnel working at the site to provide medical  treatment / compensation etc  to any of his staff/worker  in case of any accident. Bank is not bound to provide any assistance of any form in this matter. 

                                      

10/16

Page 11: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

ACCEPTANCE OF CONTRACTOR FOR LABOUR LAWS  

1. The  successful Tenderer  / Contractor  shall carefully and diligently  implement  the provisions of the Contract Labour Act & Contract Labour Rules.  2. The Bank shall be entitled to deduct from the Contract Consideration, any such amount which the Bank  has  to  pay  in  accordance with  the  Contract  Labour  (Regulation & Abolition) Act  1971  and Workmen's Compensation Act, in the event of the Bank have to disburse compensation / effect any payment under the Contract Labour Acts / Rules.  3. Please note that as per rule 81(1) of Contract Labour (R&A) Rules, 1971, it is mandatory on the part of the Contractor to display the notice containing the following details at prominent place at the work site.  (a) Rates of wages.  (b) Hours of work.  (c) Wage periods.  (d) Dates of payment of wages.  (e) Names & addresses of the Labour Inspectors having jurisdiction &  (f) Date of payment of unpaid wages. The notice  containing  the above details  shall be displayed without fail at the work site.  4.  The  Contractor  shall  not  engage  any  workmen  for  wages,  less  than  the  minimum  wages prescribed under the notification issued by the Central Government.  5. The contractor should follow all  labour  laws/guidelines  laid down by central /state government from time to time.   CERTIFICATE.   I / WE HAVE READ, FULLY UNDERSTOOD THE ABOVE MENTIONED REGULATIONS OF LABOUR LAWS/GUIDELINES AND ACCEPT THE SAME IN TOTO. I ALSO UNDERTAKE TO FOLLOW ALL LABOUR LAWS/GUIDELINES LAID DOWN BY CENTRAL /STATE GOVERNMENT FROM TIME TO TIME & INDEMNIFY THE BANK AUTHORITIES.   

      

SIGNATURE OF THE CONTRACTOR                              WITH SEAL & DATE           

11/16

Page 12: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

SAFETY CODES GENERAL SAFETY CODES: 

 1. First aid appliances including adequate supply of sterilized dressing and cotton wool shall be kept in a readily accessible place. 2. An  injured  shall be  taken  to  a Public Hospital without  loss of  time,  in  cases where  the injury necessitates hospitalization. 3. Suitable and  strong scaffolds should be provided  for workman  for all works  that cannot safely be done from the ground. 4. No portable single ladder shall be over 8meters in length. The width between the side rails shall not be  less than 30 cm. clear. And the distance between two adjacent rungs shall not be more than 30 cm When a ladder is used an extra majdoor shall be engaged for holding ladder. 5. The excavated material shall not be placed within 1.5meters of the edge of the trench or half of the depth of trenches whichever is more. All trenches and excavation shall be provided with necessary fencing and lighting.  6. Every opening in the floor of a building or in a working platform be provided with suitable means to prevent the fall of persons or materials by providing suitable fencing or railing whose minimum height shall be one meter. 7. No floor, roof or other part of the structure shall be so overloaded with debris or materials as to render it unsafe. 8. Workers  employed  on mixing  &  handling material  such  as  asphalt,  cement mortar  or concrete & lime mortar shall be provided with protective footwear & rubber hand‐gloves. 9. Those engaged in welding work shall be provided with welder’s protective eye‐shields and gloves. 10. (i)   No paint containing lead or lead products shall be used except in the form of paste and readymade paint.   (ii)  Suitable facemasks should be supplied for use by the workers when the paint    applied in the form of spray or surface having lead paint dry rubbed and    scrapped. 11. Overalls shall be supplied by the contractor to the painters and the adequate facilities shall be provided to enable the working painters to wash during the periods of cessation of works. 12. Hoisting machine and tackle used  in the works,  including their attachments, anchors and supports shall be in perfect condition.  The ropes used  in hoisting or  lowering material or as a means of suspension shall be     of durable quality and adequate strength free from defect. 

             

12/16

Page 13: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

TECHNICAL SPECIFICATIONS (MAKES/MODELS) LIST OF APPROVED MAKES OF MATERIAL 

The following are approved brand makes/manufacture’s makes listed below. In case it is established that material  as  listed  below  is  not  available  in  the market,  approved  equivalent material  and finished off any other specialized brand names/manufacturer’s makes may be used as per approval of  BANK/Architect/Consultant.  Contractor’s  are  instructed  to  submit  the  approved make  list  of items which they are using at site before starting the work.  

 

LIST OF APPROVED MAKES FOR AIR CONDITIONING WORKS 

Sr. No.  

PARTICULAR  MAKE 

1.0  VRF / VRV units  Carrier/Daikin / Mitsubishi / Toshiba / Voltas. 

2.0  Cassette Units  MAKE: Carrier/Daikin / Mitsubishi / Toshiba / Voltas. (Scroll) 

3.0  Conventional Hi wall units / Ductable / Condensing units 

MAKE: Carrier/Daikin / Mitsubishi / Toshiba / Voltas.  (SPLIT – 3 STAR*** RATED 2018 ) 

4.0  Copper Pipe  Mandev / Rajco / Totaline 

5.0  Hard CPVC Pipes  Supreme / Prince /Astral/Finolex 

6.0  G.I. Sheet  Jindal / Llyod Steel / Tata 

7.0  Insulation Material:   

8.0  Nitrile Rubber roll and tube (Class‐O) 

Armacell / K‐Flex / A‐ Flex / Superlon /Aeroflex 

9.0  Electrical:   

10.0  Switch Gear  MK / Siemens / Schneider/Havells 

10.1  Cable   

  1) Armored Cable  Finolex / KEI / RR Kabel/Havells 

  2)Flexible Cable  Finolex / KEI / RR Kabel/Havells 

11.0  PVC rigid conduits & Accessories  1.5mm thick MMS ISI and FIA approved 

12.0  TFA  Zeco /Vts /Citizen / edgetech /Blowtech/ equivent approved 

13.0   Blower / Fans  KRUGER / SYSTEM AIR  / Nicotra /flaktwood  

14.0  LOW VOC Adhasive  Pidilite 

          

13/16

Page 14: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

14/16

Page 15: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

CLIENT: UNION BANK OF INDIA,

 VADODARA REGIONBAJUWA BRANCH, VADODARA DIST. BOQ_AIR CONDITIONING

 AND ALLIED WORKS

Sr. No. ITEM  DESCRIPTION QTY. UNIT RATE (Rs.) AMOUNT (Rs.)

1 Supply of 1.0 TR Hi Wall (Copper Condesnor) Split Unit (3 Star BEE Rating WEF 1‐1‐

16) Including 3 mtr.Copper pipe and interconnecting cable. (1‐BM) 1 no.

2 Supply of 2.0 TR Hi Wall (Copper Condesnor) Split Unit (3 Star BEE Rating WEF 1‐1‐

16) Including 3 mtr.Copper pipe and interconnecting cable. (3 ‐ Banking Hall) 3 no.

3 Installation of IDU & ODU of 1 / 1.5 / 2.0 TR Hi‐wall split unit with first oil & gas 

charge & commissioning etc. complete . Also Handling over all complete standard set 

accessories upto 10 rft. 4 no.

4 Pump down, disconnection of electrical wiring, drain pipe,Indoor unit and out door 

unit alongwith stand and tranfer to new premises OR as per instruction of RO from 

exisiting ATM/Bajuwa Branch. Any old materials shall not be used in new installation 

work & as per instruction of Architects/Bank. 2‐ATM , 5‐Branch.

7 no.

5 OLD AC Reinstallation along with laying of new Copper piping, electrical cabling with 

servicing,  pressure testing, vaccumissing and gas charging etc complete in all respect 

for working condition in OLD AC machine. Rate to include 1 year free AMC from the 

date of final commissioning. 2‐ATM

2 no.

6 Referigerant piping‐insulated copper tube between indoor to outdoor unit. Of 1 / 1.5 

/ 2.0 TR Hi‐wall split unit.  45 rmt

7 Electrical Cabling between indoor to out door unit beyond 3 Rmt dist. Of 1 / 1.5 / 2.0

TR Hi‐wall split unit.(2.5 sqmm , 4 core RR Cable Polycab / Finolex/ Havells) 45 mts

8 25/32 mm Dia UPVC drain pipe with insulation of Dutron / Supreme / Astral make ‐ 

schedule 40 pipe , white in colour, joint properly glued with UPVC adhesive for water 

outlet from indoor unit. 65 rmt

9 Misc Civil work like wall opeaning, chisling and same plaster & paint finish for each 

machines.  6 No.

10 MS White/ black painted Fabricated structure for mounting outdoor units as well as 

safety cage with locking arrangements for out door units made out of MS angles of 

size 35x35x5 mm and 25x25x3mm respectively and cage frame shall be covered with 

jali 25x25mm with lock & key as per unit.(drawing shall be provided by Architect). 

Rate to include all scafoldings, equipments, tools, hardware , Oil Paints of approved 

shade to be required for completion of job. 265 kg

11 BUY BACK ITEMS ‐ FIXED 2 No. ‐2000 ‐4000

Buy Back of Copper Pipe, Electrical Cabling ,drain pipes & M.s Stands between indoor 

to outdoor unit. Of  1.0 TR Hi‐wall split unit. For 2 units only. Removing of these 

items shall be done as per the instruction from Architect/Bank.

Part B : Low Side Work  

BOQ ‐ AIR CONDITIONING AND  ALLIED WORKS ‐ RESHIFTING OF BAJUWA BRANCH, VADODARA REGION

MAKE: CARRIER/VOLTAS/MIDEA OR APPROVED EQUIVALENT (SPLIT ‐ 3 STAR*** RATED)

Part A ‐ Supply of A.C Equipments 

Include all Excise + Transport)

Total For Part ‐ I ‐ Supply of A.C Equipments

SUB TOTAL FOR ‐ PART I + PART II

DISCOUNT OFFERED (IF ANY)

GRAND TOTAL FOR ‐ PART I + PART II (AFTER DISCOUNT)

(Include all Excise + Transport necessary scafolding, equipments required for completion of job)

Total For Part ‐ II ‐ Installation of A.C Equipments

SIGN SEAL OF TENDERER 15/16

Page 16: PART –A B TECHNICAL PRICE BID TENDER DOCUMENTS FOR … · 7. Unless and until a formal agreement is prepared and executed this tender together with your written acceptance thereof

      2ND FLOOR, UNION BANK OF INDIA BUILDING, SAYAJIGANJ, VADODARA REGION 

M/s SHAW ARCHITECTS      SIGN & SEAL OF CONTRACTOR 

  

TENDER FOR AIR CONDITIONING WORKS OF UNION BANK OF INDIA AT   :  BAJUWA BRANCH, VADODARA, STATE:  GUJARAT 

 BILL OF QUANTITIES ‐ ABSTRACT 

  

SECTION  TITLE  AMOUNT ( Rs.) 

     

     

SECTION ‘A’  FURNITURE WORK     

     

  Discount Offered ( If Any )   

     

  FINAL TOTAL AMOUNT (AFTER DISCOUNT)   

          

    TOTAL …………………………………….   

  In  words  (Rupees  _________________________________________________ 

________________________________________________________Only ) 

  

  

DATE :    PLACE :                                                                 SIGNATURE OF TENDERER 

(WITH COMPANY  SEAL)     

 

16/16