Part 6: The Monitoring and Reporting Challenge
Healthcare Engineering Consultants
What is the most effective method to provide EC
monitoring and reporting?
Monitoring Regulatory Compliance
Healthcare Engineering Consultants
How should regulatory compliance be monitored?
Monitoring Regulatory Requirements
Healthcare Engineering Consultants
Regulatory Compliance Dashboard
Description JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CommentsGeneral Reqs
SC Meetings X X X X X XDashboard Rpt X X X X X XLeadership Rpt X X X XEvaluations XPolicy Review XSafety Mgmt
Hospital Surv X XClinic Surv X XSecurity Mgmt
Alarm Tests X X X X X X X X X X X XAbduction Drills X XHazmat Mgmt
Manifests X X X X X X X X X X X XHaz Vapor Mon X X X XPermits, Lic XVerify MSDS XEmer Mgmt
Hospital Drills X XClinic Drills XHVA XFire Prev
Hosp Fire Drills X X X X X X X X X X X XClinic Drills X X X XSOC Document XILSM Measures A/R A/R A/R A/R A/R A/R A/R A/R A/R A/R A/R A/RExtinguishers X X X X X X X X X X X XFire Det Dev X X X X
Monitoring Regulatory Requirements
Healthcare Engineering Consultants
Regulatory Compliance Dashboard
Description JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Comments General Reqs SC Meetings X X X X Dashboard Rpt X X X X Leadership Rpt X X Evaluations X Policy Review X Safety Mgmt Hospital Surv X Clinic Surv X Security Mgmt Alarm Tests X X X X X X X X Abduction Drills X X Hazmat Mgmt Manifests X X X X X X X X Haz Vapor Mon X X X Permits, Lic X Verify MSDS X Emer Mgmt Hospital Drills X Clinic Drills HVA Fire Prev Hosp Fire Drills X X X X X X X X Clinic Drills X X X SOC Document ILSM Measures N/A N/A N/A N/A A/R A/R A/R A/R A/R A/R A/R A/R Extinguishers X X X X X X X X Fire Det Dev X X X
Monitoring Regulatory Requirements
Healthcare Engineering Consultants
Regulatory Compliance Dashboard (continued)
Description JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Comments Fire Prev Water Devices X X X Fire Pumps W W W W W W W W Ver/Hor Doors X F/S Dampers Med Equipmt PM LS Eqmt X X X X X X X X PM NLS Eqmt X X X X X X X X Util Systems PM LS Sys X X X X X X X X PM NLS Sys X X X X X X X X Em Gen Tests X X X X X X X X Batt Light Test X X X X X X X X Water Tests X X X HVAC Tests X X X MGAVS Tests X X X X X X X X App Environ PCRA N/A N/A N/A N/A A/R A/R A/R A/R A/R A/R A/R A/R Miscellaneous Eyewash units W W W W W W W W Showers X X X X X X X X
Key to dashboard symbols: X – Indicates that action is required during the month indicated; W – Indicates that weekly action is required A/R – Indicates that action is required when applicable Key to colored boxes: Red boxes indicate non-compliance (tests were not performed); Yellow boxes indicate partial compliance (tests have been delayed or not fully completed); Green boxes indicate full compliance (tests satisfactorily completed).
Reporting Regulatory Requirements
Healthcare Engineering Consultants
Hospital Governing Body
Hospital Executive Committee
Hospital EOC Committee
Accident and Safety Subcommittee
Hazardous Materials Subcommittee
Life Safety/ Construction Subcommittee
Equipment and Utilities Subcommittee
Emergency Management Subcommittee
Step 1: Create regulatory compliance “dashboard” for the Life Safety/ Construction Subcommittee
Reporting Regulatory Requirements
Healthcare Engineering Consultants
Regulatory Compliance Dashboard for Life Safety/ Construction Subcommittee
Description JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Comments Fire Prev Hosp Fire Drills X X X X X X X X Clinic Drills X X X SOC Document ILSM Measures N/A N/A N/A N/A A/R A/R A/R A/R A/R A/R A/R A/R Extinguishers X X X X X X X X Fire Det Dev X X X Water Devices X X X Fire Pumps W W W W W W W W Ver/ Hor Doors X F/S Dampers PCRA N/A N/A N/A N/A A/R A/R A/R A/R A/R A/R A/R A/R
Key to dashboard symbols: X – Indicates that action is required during the month indicated; W – Indicates that weekly action is required A/R – Indicates that action is required when applicable Key to colored boxes: Red boxes indicate non-compliance (tests were not performed); Yellow boxes indicate partial compliance (tests have been delayed or not fully completed); Green boxes indicate full compliance (tests satisfactorily completed).
Reporting Regulatory Requirements
Healthcare Engineering Consultants
Hospital Governing Body
Hospital Executive Committee
Hospital EOC Committee
Accident and Safety Subcommittee
Hazardous Materials Subcommittee
Life Safety/ Construction Subcommittee
Equipment and Utilities Subcommittee
Emergency Management Subcommittee
Step 2: Create regulatory compliance “dashboard” for the Hospital EOC Committee from each subcommittee “dashboard”
Monitoring Regulatory Requirements
Healthcare Engineering Consultants
Hospital Governing Body
Hospital Executive Committee
Hospital EOC Committee
Accident and Safety Subcommittee
Hazardous Materials Subcommittee
Life Safety/ Construction Subcommittee
Equipment and Utilities Subcommittee
Emergency Management Subcommittee
Step 3: Create a simplified regulatory compliance “dashboard” for the Hospital Executive Committee from the EOC Committee “dashboard”
Reporting Regulatory Requirements
Healthcare Engineering Consultants
Hospital Executive Committee Regulatory Compliance Dashboard
Description JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Comments General Reqs Safety Mgmt Security Mgmt Hazmat Mgmt Emer Mgmt Fire Prev Medical Eqmt Utilities Mgmt
Key to colored boxes: Red boxes indicate non-compliance (tests were not performed); Yellow boxes indicate partial compliance (tests have been delayed or not fully completed); Green boxes indicate full compliance (tests satisfactorily completed).
Reporting Regulatory Requirements
Healthcare Engineering Consultants
Hospital Governing Body
Hospital Executive Committee
Hospital EOC Committee
Accident and Safety Subcommittee
Hazardous Materials Subcommittee
Life Safety/ Construction Subcommittee
Equipment and Utilities Subcommittee
Emergency Management Subcommittee
Step 4: Create a simplified regulatory compliance “dashboard” for the Hospital Governing body from the Executive Committee “dashboard”
Reporting Regulatory Requirements
Healthcare Engineering Consultants
Hospital Governing Body Regulatory Compliance Dashboard
Description JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Comments EOC Reqs
Key to colored boxes: Red boxes indicate non-compliance (tests were not performed); Yellow boxes indicate partial compliance (tests have been delayed or not fully completed); Green boxes indicate full compliance (tests satisfactorily completed).
Monitoring Performance Improvement
Performance Improvement“Attempting to measure and improve
performance on an ongoing basis in the Environment of Care”
Healthcare Engineering Consultants
Measurement and Improvement
The “PI Continuum”
Healthcare Engineering Consultants
Very simple Very complex
Measurement and Improvement
What Measurements are Required?
Patient and visitor injuries
Property damage incidents
Staff injuries and illnesses
Security incidents for patients, staff, visitors
Hazmat spills , exposures and related issues
Fire safety problems, deficiencies and failures
Medical equipment problems, failures, user errors
Utility system problems, failures and user errors
Healthcare Engineering Consultants
Measurement and Improvement
What Performance Improvement Measures are Required for each “EC” area?
Minimum of seven performance measures
Should be numerical
No maximum number
Should measure performance improvement
Adopt goals, objectives and benchmarks
Regular reporting and tracking to SC
Healthcare Engineering Consultants
Selection of “EC” PI Indicators
Healthcare Engineering Consultants
“EC” Performance Measure Worksheet
“EC” Area: ____________________ Calendar Year: _______________
Description ofPerformance Measure
Indicator Type (PI or regulatory)
NumericalMeasurement
Benchmark Objective ResponsibleDepartment
ReportingFrequency
Measurement and Improvement
How Should Terms Should be Defined? Goal: The attempted attainment of “perfection”
Example: No patient falls during the year!
Benchmark: Actual, historical, internal or external data used for comparative purposes
Example: “X” patient falls occurred last year
Objective: Attempted attainment of “realism”
Example: Reduce patient falls from last year by at least 10%
Threshold: The point at which action is taken
Example: Investigate every patient fall that occurs
Healthcare Engineering Consultants
Monitoring and Improvement
How are “EC” Performance Improvement Measures Monitored?
Healthcare Engineering Consultants
Monitoring and Improvement
Monitoring of “EC” issues through:
Creation of the “Multi-Disciplinary Improvement Team”
Safety committee membership and meetings
Communication to leadership
Annual PI initiative recommendation to management
Monitoring of Effectiveness
Selection of numerical performance measures
Establishment of goals, objectives, benchmarks
Aggregation of data (“dashboard” or spreadsheet?)
Healthcare Engineering Consultants
Reporting of “EC” PI Indicators
Healthcare Engineering Consultants
Performance Improvement Dashboard
Description of Measure
Benchmark FY 2004
Objective FY 2005
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Trend
Safety Management
Lost time injuries
21/ year <1.5 per month
1 2 1 3
Security Management
Internal theft (equipment, $)
$ 25, 426 for the year
<$ 2,000 per month
1,200 425 0 1,720
Hazmat Management
Decrease in RMW
124,560# for the year
< 9,500# per month
9,245 9,386 9,142 9,524
Emergency Management
Call-back response rate
68% within 20 minutes
75% 69% 73% 84% 81%
Fire Prevention
Average fire drill score
87 per drill average
> 90 per drill avg
93 91 94 91
Medical Equipment
Maint cost/ device/ month
$48.13 per device/ mo
$45.00/ dev/ mo
53.14 47.86 58.22 39.78
Utility Management
Priority I WO response time
3.2 days < 3 days 3.1 3.1 2.9 3.0
Key to colored boxes: Green boxes indicate data within the desired objective and an improvement trend Yellow boxes indicate data at or slightly above the desired objective with no discernible trend Red boxes indicate data above the desired objective and a negative trend
Monitoring and Improvement
The “PI Process”
Healthcare Engineering Consultants
Measurement Initiative Implementation
Monitoring and Improvement
The “PI Process”
Healthcare Engineering Consultants
Measurement without implementation and ongoing monitoring to validate
improvement is of little value!