© Horizon Power Corporation
Part 5 – LV Underground – Drawing Register
Number Description
U8 URD Mini Pillar Installation Guide
U9 UDS Universal Pillar Installation Guide
U10-1 UDS Universal Pillar Double Link Unit Drilling Detail
U10-2 UDS Universal Pillar Double Link Unit Arrangement
U15 Cable to LV Isolators, Crossarm and Cable Detail
U16-1 Cable to LV Bare, Intermediate Direct Connection
U16-2 Cable to LV Bare, Termination Direct Connection
U17 ABC Fused Connection to Cable
U18 25 SQ. mm Cable to ABC Direct Connection
U19-1 25 SQ. mm Cable to LV Bare Intermediate Direct Connection
U19-2 25 SQ. mm 4 Core Cable to 1 Phase Open Aerial
U19-3 Transformer Pole to Pillar on Customer’s Property
U19-4 25 SQ. mm Cable to LV Bare Termination Direct Connection
U20 Wall Mounted Box, 100 Amp
U21 Wall Mounted Box, 200 Amp
U23-1 Unmetered Supply Cable Pit, Components Assembly
U23-2 Unmetered Supply Mini Pillar Termination Details
U24 LV Kiosk Type 1
U25 LV Kiosk Type 2
U26 LV Kiosk Type 3
U27 LV Cable to Fuse Switch
U30-1 Below Ground Service Pit Installation Detail
U30-2 Below Ground Service Pit Installation Detail – Application Guideline
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
URD MINI PILLAR
INSTALLATION GUIDE
REVISION DATE
DRAWING No.
B JUNE 2011
U8
2
REAR VIEW
TERMINATIONS
SHEATH CUT
25mm SERVICE CABLE
ABOVE SOIL LEVEL
EARTH CLAMP
(STOCK FE0109 (1 KIT))
ON NEUTRAL
ALL CABLES & HEATSHRINK
FIT MASTIC LINED GLOVE TO
EARTH ROD
TOP OF
GL
RW
BN
FRONT VIEW
TERMINATIONS
ROAD
STREET LIGHTING
RED SPOT FUSE
100
440
300
EARTH ROD
BOLTED TO
NOTES:
5. FOR SPUDS SEE R35
4. FOR WORKING END SEE R33
FUSE SEE R32
3. FOR WAVECON TERMINAL BLOCK AND STREET LIGHT
2. FOR TERMINAL BLOCKS EXTRA NEUTRAL SEE R31
AND 500mm FROM EDGE.
1. PILLAR TO BE CENTRED 500mm INSIDE BOUNDARY
ALIGNMENT
PVC CONDUIT WHEN OFF
20-25mm DIAMETER ORANGE
FUSEWAY ENCLOSED WITH
CABLE TO STREET LIGHT
25mm SERVICE CABLE2
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
UDS UNIVERSAL PILLAR
INSTALLATION GUIDE
REVISION DATE
DRAWING No.
B JUNE 2011
U9
100
700 B
EF
OR
E C
UT
TIN
G
400
200
300
(INTERCONNECTOR OR SERVICE CABLE TO LARGE LOAD)
THIRD CABLE IF REQUIRED
TO ROADTO PROPERTY
TO ROADTO PROPERTY
TOP OF EARTH ROD
SHEATH CUT
G.L.
TOP BAR
LOWER BAR
RWB
P.V.C.
TOP OF EARTH ROD
PVC POULTICE
STREET MAINS
TERMINAL LUGS VIEWED FROM PROPERTY
BLOCK
TERMINAL
CUSTOMER
SUPPLY TO
FROM SHEATH CUT
TAIL LENGTHS 700
WITHIN PILLAR
EARTH SPEAR LOCATED
PILLAR
STREET MAINS
STREET MAINS
TERMINAL BLOCK
CONNECT TO NEUTRAL
SEE NOTE 3
NOTES:
ON NEUTRAL SCREENS & OVER PHASE LUGS
3. FIT MASTIC LINED GLOVE TO ALL CABLES & SHRINK
AND 500mm FROM EDGE.
2. PILLAR TO BE CENTRED 500mm INSIDE BOUNDARY
IN-LINE FUSE CARRIER INSTALLATION
1. REFER TO DRAWING U8 FOR STREET LIGHT
NEUTRAL LEAD FROM TERMINAL BLOCK
BOLTED TO NEUTRAL BAR AND ATTACHED TO
NEUTRAL SCREEN LUGS (ONE PER CABLE)
200
110
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
UDS UNIVERSAL PILLAR
DOUBLE LINK UNIT
DRILLING DETAIL
REVISION DATE
DRAWING No.
B JUNE 2011
U10-1
SEE NOTE 2
B W R
WITHIN PILLAR
EARTH SPEAR LOCATED
PILLAR
STREET MAINS
TO PROPERTY TO ROAD
CABLE TO LARGE LOAD)
(INTERCONNECTOR OR SERVICE
THIRD CABLE IF REQUIRED
BEF
OR
E
850
BEF
OR
E C
UT
TIN
G
700
200
300
200
400
100
(REAR VIEW)
TERMINAL BLOCKS
LINK
LINK
STREET MAINS
PVC POULTICE
P.V.C.
EARTH BAR
CONNECT TO
EARTH ROD
TOP OF
CU
TTIN
GLINKS (FRONT VIEW)
CONNECTION DIAGRAM
1 PHASE ONLY
PILLAR KIT
DOUBLE LINK
KEYED LINKS
REMOVABLE
EARTH BAR
G.L.
SHEATH CUT
TO ROADTO PROPERTY
STREET LIGHTS
SUPPLY TO
OR CUSTOMER
TRANSFORMER
TO RMU,
STREET MAINS
ON NEUTRAL SCREENS & OVER PHASE LUGS
2. FIT MASTIC LINED GLOVE TO ALL CABLES & SHRINK
AND 500mm FROM EDGE.
1. PILLAR TO BE CENTRED 500mm INSIDE BOUNDARY
NOTES:
EARTH ROD
TOP OF
TERMINAL LUGS VIEWED FROM PROPERTY
SHEATH CUT
850 FROM
TAIL LENGTHS
SHEATH CUT
700 FROM
TAIL LENGTHS
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
UDS UNIVERSAL PILLAR
DOUBLE LINK UNIT
ARRANGEMENT
REVISION DATE
DRAWING No.
B JUNE 2011
U10-2
DANGER
ELECTRICCABLES
WARNING : DO NOT BURY
ABOVE THIS LINE
SIDE ELEVATION
SECTION A-A
TOP VIEW
INDICATION ARROW
VIEW SHOWING
FRONT ELEVATION
WITH PILLAR SURFACE
BOLT TO BE FLUSH
TOP OF SECURITY
PVC Cu
25mm2 Gn/y
(IN 1 POSITION ONLY ON LID)
20 WIDE RAISED 1.5mm.
INDICATING ARROW TO BE
ONLY & AT 90 DEG TO SECURITY BOLTS
POSITIONS 180 DEG APART ON BASE SECTION
INDICATING ARROW TO BE LOCATED IN 2
COVER
SECURITY BOLT CL
255
500
APP
RO
X
345
20
25
10
(WITH COVER REMOVED)
10 HIGH LETTERING TO BE RAISED OR INDENTED 1.5mm
LOGO & 25mm LETTERING TO BE RAISED OR INDENTED 2mm.
INDICATOR LINE
GROUND LEVEL
LOGO : 40 x 25
SECURITY BOLTCL
A
A
CL
G.L.
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
CABLE TO LV ISOLATORS
CROSSARM AND CABLE
DETAIL
REVISION DATE
DRAWING No.
B JUNE 2011
U15
ABC TAPS700
150
ABC TO CABLE TERMINATION
AND SPLICE
PG CLAMP
N B W R
ROADSIDE
(R7) CABLE GUARD
R3
(R7) CABLE CLEAT AND FITTINGS
R1
NOTE:
1. ALL HOLES 18 DIAMETER U.O.N.
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
CABLE TO LV BARE INTERMEDIATE
DIRECT CONNECTION
REVISION DATE
DRAWING No.
B JUNE 2011
U16-1
ABC TAPS
500
150
ABC TO CABLE TERMINATION
AND SPLICE
PG CLAMP
N B W R
ROADSIDE
(R7) CABLE GUARD
R3
(R7) CABLE CLEAT AND FITTINGS
R1
NOTE:
1. ALL HOLES 18 DIAMETER U.O.N.
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
CABLE TO LV BARE TERMINATION
DIRECT CONNECTION
REVISION DATE
DRAWING No.
B JUNE 2011
U16-2
ABC TAPS
500
150
ABC TO CABLE TERMINATION
CABLE CLEAT AND FITTINGS (R7)
AND SPLICE
PG CLAMP
CABLE GUARD (R7)
N B W RR3
R1
ROADSIDE
NOTE:
1. ALL HOLES 18 DIAMETER U.O.N.
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
ABC FUSED CONNECTION TO CABLE
REVISION DATE
DRAWING No.
B JUNE 2011
U17
R1
R7
R8
ABC TO CABLE TERMINATION
(R7) CABLE CLEAT AND FITTINGS
(LV ONLY POLE)
TOP OF POLE
R8-3
(R7) CABLE GUARD AND FITTINGS
NOTE:
1. ALL HOLES 18 DIAMETER U.O.N.
(R1) 14 DIAMETER HOLES
4 CORE BUNDLED ABC
230
500
150
(R1) 14 DIAMETER HOLE
5000
NEUTRAL CONNECTION
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
25 SQ. mm CABLE TO ABC
DIRECT CONNECTION
REVISION DATE
DRAWING No.
B JUNE 2011
U18
NOTE:
1. ALL HOLES 18 DIAMETER U.O.N.
500
150
HEAT SHRINK OVER CORES
HEAT SHRINK GLOVE
ABC IPC
(R7) CONDUIT SADDLE
FIXING DETAILS
(R7) CONDUIT UNDER CABLE GUARD
(R7) CABLE GUARD
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
25sqmm CABLE TO LV BARE INTERMEDIATE
DIRECT CONNECTION
REVISION DATE
DRAWING No.
B JUNE 2011
U19-1
500
HEAT SHRINK GLOVE
OVER CORES
HEAT SHRINK
N B W RR3
R1
FIXING DETAILS
(R7) CONDUIT UNDER CABLE GUARD
(R7) CABLE GUARD
(R7) CONDUIT SADDLE
ROADSIDE
150
BI-METAL PG CLAMP
COPPER OR
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
25sqmm 4 CORE CABLE TO
1 PHASE OPEN AERIAL
REVISION DATE
DRAWING No.
B JUNE 2011
U19-2
500
HEAT SHRINK GLOVE
N R
R1
FIXING DETAILS
(R7) CONDUIT UNDER CABLE GUARD
(R7) CABLE GUARD
(R7) CONDUIT SADDLE
ROADSIDE
150
BI-METAL PG CLAMP
COPPER OR
BLUE CORES
BLACK AND
WHITE CORES
RED AND
WITH CABLE TIES
HELD TOGETHER
OVER CORES
HEAT SHRINK
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
TRANSFORMER POLE TO PILLAR
ON CUSTOMER PROPERTY
REVISION DATE
DRAWING No.
B JUNE 2011
U19-3
22
R7
LV CABLE ( 25mm - 185mm )
MINI/UNI PILLAR
G.L.
NOTES:
1000
750
150
SEE NOTES 1 & 2
500
AVAILABLE ON REQUEST).
3. CUSTOMER'S SPD TO GRADE WITH UPSTREAM PROTECTION (FUSE CURVE FOR UPSTREAM PROTECTION
2. TRANSFORMERS ABOVE 63kVA, FUSING TO BE INSTALLED IN THE PILLAR.
1. TRANSFORMERS 63kVA & SMALLER, FLOW LINE FUSE'S TO BE INSTALLED.
FITTING DETAILS
(R7) CABLE SADDLE/CLAMP
FIXING DETAILS
(R7) CONDUIT UNDER CABLE GUARD
(R7) CABLE GUARD
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
25sqmm CABLE TO LV BARE TERMINATION
DIRECT CONNECTION
REVISION DATE
DRAWING No.
B JUNE 2011
U19-4
500
HEAT SHRINK GLOVE
OVER CORES
HEAT SHRINK
(R7) CONDUIT SADDLE
150
ROADSIDE
N BR3 W R
FIXING DETAILS
(R7) CONDUIT UNDER CABLE GUARD
(R7) CABLE GUARD
BI-METAL PG CLAMP
COPPER OR
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
WALL MOUNTED BOX
100 AMP
REVISION DATE
DRAWING No.
B JUNE 2011
U20
N
300 175
370
2. MOUNTING HEIGHT MUST COMPLY WITH HORIZON POWER DESIGN REQUIREMENTS.
1. CUTOUT BOX ENCLOSURE MUST HAVE AN APPROVED HORIZON POWER LABEL.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
WALL MOUNTED BOX
200 AMP
REVISION DATE
DRAWING No.
B JUNE 2011
U21
2. MOUNTING HEIGHT MUST COMPLY WITH HORIZON POWER DESIGN REQUIREMENTS.
1. CUTOUT BOX ENCLOSURE MUST HAVE AN APPROVED HORIZON POWER LABEL.
NOTES:
N
300 175
600
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
UNMETERED SUPPLY
CABLE PIT
COMPONENTS ASSEMBLY
REVISION DATE
DRAWING No.
B JUNE 2011
U23-1
DANGER ELECTRICITY
CUSTOMERSUPPLY
POWER
WHEN NOT IN ALLOTED ALIGNMENT
ORANGE 25O/DIA.
RIGID/CORRUGATED PVC CONDUIT
CABLE END
WITH 1M OF SHEATHING FROM
1.6M CABLE LAID INTO PIT
OVER CONDUCTORS
HEATSHRINK
CUSTOMER CABLE
DOUBLE INSULATED
CAT. No 563L2 OR SIMILAR.
CONNECTOR (2 SCREW) CLIPSAL
OVER CONDUCTOR
HEATSHRINK
MAIN POWER FUSE
LABEL 1
BLACK
RED
1 HOLE 27 DIA. ON CENTRE LINE
30A FUSE
ISOLATING POINT
POWER SUPPLY
LABEL 1
WIRING ARRANGEMENT
60
30
155
130
OF GEL WRAP SEAL AND SNAP SHUT
FIT NEUTRAL CONNECTOR IN CENTRE
CUSTOMER SIDE
OR SIMILAR.
25 DIA. CLIPSAL CAT NO 263/25
ADAPTOR (PLAIN TO SCREWED)
SEE NOTE 1
25 DIAMETER
PVC CORRUGATED CONDUIT
279C25 OR SIMILAR
25 DIA. CAT No
GLAND, CLIPSAL,
ABRADE SHEATH END
HEATSHRINK SLEEVE
MASTIC FILLED GLOVE
NOTES:
FOR DOUBLE INSULATION (REINFORCED INSULATION)
2. HEATSHRINK NOT REQUIRED FOR CABLE MEETING REQUIREMENTS
1. LID LIFTER AVAILABLE, RAMSET PART No. RCU013
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
UNMETERED SUPPLY
MINI PILLAR
TERMINATION DETAILS
REVISION DATE
DRAWING No.
B JUNE 2011
U23-2
R W B N
TO UMS/STREET LIGHT SUPPLY
WA
RNIN
G
SUPPLY
UNMETERED
UMS/STREET LIGHT SUPPLY
UMS/STREET LIGHT NEUTRAL
COVER
MOUNTING BOARD
TO ROAD CROSSING
FROM TEE JOINT
25mm SERVICE2
FROM TEE JOINT
SUPPLY FOR UMS/STREET LIGHT FUSE
UMS/STREET LIGHT FUSE WHERE REQUIRED
RED SPOT FUSECONNECTION LINK
37
87
(TO EARTH ROD)
EARTH
LABEL
ATTACH
RED
WHITE BACKGROUND
RED LETTERING ON
STOCK No. C20307
VIEW FROM STREET
VIEW FROM SIDE
LABEL DETAIL
CROSSING
TO ROAD
TERMINAL BLOCKS
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
LV KIOSK
TYPE 1
REVISION DATE
DRAWING No.
B JUNE 2011
U24
IN EACH DIAGRAM
EARTH SPEAR (2 OFF)
FRONT VIEW OF KIOSK
PLAN VIEW OF KIOSK FREESTANDING PLAN VIEW OF KIOSK IN RECESS
FRONT
750
750750
750
810
1400
750
600
FRONT
EARTH BAR
EARTH STAKE @ LESS THAN 10 OHM.
CABLE CLAMPS
U BOLT
TO EARTH GRID
(500 x 200 x 25)
CONCRETE SLABS
BUSBAR DETAILS
NOTES:
AND WHEN REQUIRED THE INSTALLATION OF THE FEEDER PILLAR
4. THE CUSTOMER IS RESPONSIBLE FOR THE FEEDER PILLAR RECESS IN THE WALL
OF 150mm, EARTH GRID TO BE CONNECTED AT EARTH BAR.
3. INSTALL EARTH GRID AROUND / IN FRONT OF KIOSK AT 750mm AND A DEPTH
2. REFER TO DCS REFERENCE R24 FOR KIOSK GENERAL ARRANGEMENT.
1. KIOSK NOT SUPPLIED WITH BUSBARS
SEE NOTE 3
BARE 70MM EARTH GRID
SEE NOTE 4
RECESS FOR PILLAR
EASEMENT
CABLE
GRID - 1 OHM MAX.
BARE 70MM Cu EARTH
R
W
BGROUND LINEGROUND LINE
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
LV KIOSK
TYPE 2
REVISION DATE
DRAWING No.
B JUNE 2011
U25
NOTES:
LV KIOSK TYPE 2 - DISTRICT SUBSTATION
FREESTANDINGIN 2HR FIRE RATED SUBSTATION
1m DEEP TRENCH
1600A
FGL
DISCONNECT
CUSTOMER
1600A
TRANSFORMERS
315/500/630/1000kVA
SEE NOTE 2
(500 x 200 x 25 THICK)
CONCRETE SLABS
1025
1600
1300
SUBSTATION
FLOOR OF
400 DEEP
MD METER
COVER
CABLE TERMINATION
DISCONNECT
1600A TRANSFORMER
FUSEWAYS
400/630A
DISCONNECT
1600A CUSTOMER
COVER
CABLE TERMINATION
3. APPROX MAXIMUM WEIGHT WITH 5 FUSEWAYS AND 2 DISCONNECTORS IS 240kg
4 x 10mm RAWLNUTS AND 4 x 10mm BOLTS x 75 LONG.
KIOSK BOLTED TO SUBSTATION WALL ABOVE THE TRENCH WITH
2. DRILL 4-HOLES 12 DIAMETER THRU REINFORCED SECTIONS.
1. REFER TO DCS REFERENCE R24 FOR KIOSK GENERAL ARRANGEMENT.
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
LV KIOSK
TYPE 3
REVISION DATE
DRAWING No.
B JUNE 2011
U26
NOTES:
LV KIOSK TYPE 3 - DISTRICT SUBSTATION
IN 2HR FIRE RATED SUBSTATION FREESTANDING
3. APPROX MAXIMUM WEIGHT WITH 5 FUSEWAYS AND 2 DISCONNECTORS IS 350kg
6 x 10mm RAWLNUTS AND 6 x 10mm BOLTS x 75 LONG.
KIOSK BOLTED TO SUBSTATION WALL ABOVE THE TRENCH WITH
2. DRILL 6-HOLES 12 DIAMETER THRU REINFORCED POINTS AS SHOWN.
1. REFER TO DCS REFERENCE R24 FOR KIOSK GENERAL ARRANGEMENT.
1m DEEP TRENCH
SUBSTATION
FLOOR OF
400 DEEP
SEE NOTE 2
(500 x 200 x 25 THICK)
CONCRETE SLABS
FGL
2200
1025
1600
TRANSFORMERS
2 x 1000kVA
DISCONNECT
TRANSFORMER
1600A
DISCONNECT
CUSTOMER
2000A
- UNITS
UP TO 4-400/630A FUSE
MD METER
DISCONNECT
2000A CUSTOMER
COVER
CABLE TERMINATION
COVER
CABLE TERMINATION
DISCONNECT
1600A TRANSFORMER
DISCONNECT
TRANSFORMER
1600A
FUSE - UNITS
UP TO 4-400/630A
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
SUBSTATION REFERENCE
LV CABLE TO FUSE SWITCH
REVISION DATE
DRAWING No.
B JUNE 2011
U27
TERMINATION PROCEDURE
SAFETY INSTRUCTION
400
STRIP
N
R
W
B
B
R
W
RE
AR
OF C
UBIC
LE
4 WAY GLOVE
HEAT SHRINK
15. LABEL CIRCUIT.
PROVIDED.
LUGS TO CONNECTORS USING BOLTS
14. ENSURE PHASING IS CORRECT, THEN BOLT
LUGS AND CONNECTIONS.
13. APPLY JOINTING COMPOUND TO PALMS OF
EACH LUG TO SEAL LUG AND CORE.
12. FIT 100mm LENGTH OF HEATSHRINK OVER
CORES.
11. FIT AND CRIMP SECTOR LUGS TO PHASE
FRONT.
THE BACK OF THE UNIT TO BLUE AT THE
POSITIONS, STARTING WITH RED PHASE AT
10. SET PHASE CORES TO FINAL TERMINATING
9. BOLT NEUTRAL TO NEUTRAL BAR.
WITH HEATSHRINK.
APPROPRIATE SIZE LUG. COVER EXPOSED LUG
TO NEUTRAL BAR, CUT AND CRIMP
8. SHAPE NEUTRAL CORE TO SUIT CONNECTION
REQUIRED LENGTH AND HEATSHRINK.
7. FIT BLACK HEATSHRINK OVER NEUTRAL FOR
STARTING FROM CENTRE.
INTO CRUTCH AREA AND HEATSHRINK
6. FIT HEATSHRINK GLOVE, PULL WELL DOWN
100mm.
5. ABRADE CABLE SHEATH FOR APPROXIMATELY
ONE CORE AT THE BACK OF THE CABLE.
4. BRING OUT NEUTRAL WIRES AND FORM INTO
3. REMOVE SHEATH ABOVE THIS MARK.
OF FUSE UNIT.
2. MARK SHEATH, CUT 600mm BELOW BOTTOM
CIRCUIT ON THE LV DISTRIBUTION BOARD.
1. POSITION THE CABLE TO SUIT THE CORRECT
TERMINATED OR MADE OFF BEFORE WORK COMMENCES AT THE FUSE SWITCH.
THE CABLE TO BE WORKED ON MUST BE DEAD AND THE REMOTE END MUST BE
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
BELOW GROUND SERVICE
PIT INSTALLATION DETAIL
REVISION DATE
DRAWING No.
B JUNE 2011
U30-1
EXTENDED TO FINISHED G.L.
CONCRETE COLLAR MAYBE
LOCKED IN PLACE TO FULLY SEAL.
THE TERMINAL CAPS MUST BE
8mm "ALLEN" KEY DRIVE TERMINAL SCREW.
CC0846
STOCK No
2 Finger glove
4 Finger glove
6mm2
Heatshrink tubing
10-25mm2
Heatshrink tubing
Raychem part no.
HP stock
Raychem part no.
HP stock
RED WHITE BLUE BLACK
COLOUR CODEDESCRIPTION
N/A 302K333-23/239(S20)
FE0032
FE0031
502K033-53/239(S15)
FE0105
RNF100 3/8'' Bk
FE0071
RNF100 1/2'' BkRNF100 1/2'' Bl
FE0104
RNF100 3/8'' Bl
FE0108FE0107
RNF100 3/8'' Wh
FE0103
RNF100 1/2'' WhRNF100 1/2'' Rd
FE0102
RNF100 3/8'' Rd
FE0106
STOCK No HL0360
CORES INTO CONNECTOR THRU GEL
PRE STRIPPED HEATSHRINK
FINISHED G.L.
GLOVE
MASTIC FILLED
SHEATH
Raychem part no.
HP stock
Raychem part no.
HP stock
N/A N/A
IN CONRETE LID CENTRE
RECESSED LIFTING BOLT WITH FLUSH MOUNTED CAP
UNDER LIDINSULATED DISC
8mm "ALLEN KEY SCREW CAP
CORE ENTRY
BELOW LOWER NECK OF PIT
EARTH ELECTRODE TO BE INSTALLED
SLEEVE
HEATSHRINK
NOTES:
USAGE OR POOR SOIL/SAND COMPOSITION.
6. CONCRETE COLLAR MAYBE REQUIRED FOR EXCESSIVE LOAD
FOR DOUBLE INSULATION (REINFORCED INSULATION).
5. HEATSHRINK NOT REQUIRED FOR CABLES MEETING REQUIREMENTS
CONNECTION LENGTH (SEE CONNECTOR).
4. STRIP HEATSHRINK & INSULATION FROM CORES TO REQUIRED
3. FIT GLOVE OVER CORES & CABLE THEN SHRINK TO FIT.
2. APPLY HEATSHRINK FULL LENGTH OVER CORES.
CROWDING.
1. CORE LENGTH SHOULD BE LIMITED TO 500mm TO AVOID OVER
SEE NOTE 6
WITH DRAWING U30-2
WHEN READ IN-CONJUNCTION
THIS DRAWING IS VALID ONLY
ROD STOCK No CE0300
13mm DIAMETER EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
BELOW GROUND SERVICE
PIT INSTALLATION DETAIL
REVISION DATE
DRAWING No.
B JUNE 2011
U30-2 A FIRST REVISION
B
REV DESCRIPTION
MINOR AESTHETICS REVISED
NOTES:
APPLICATION GUIDELINE
� THE PIT SHALL BE ACCESSIBLE FROM THE ROADWAY BOUNDARY
� THIS INFRASTRUCTURE SHALL COVER A MINIMUM OF 1m SQUARE, AND
THE PIT CANNOT BE BURIED, AND
� FINISHED GROUND LEVEL SHALL BE OF FIXED INFRASTRUCTURE, i.e. CONCRETE, PAVING OR OTHER WHERE
AS THE TOP OF THE CONCRETE LID, AND
� THE PIT SHALL BE LOCATED IN AN AREA SUCH THAT THE FINISHED GROUND LEVEL IS AT THE SAME HEIGHT
BELOW GROUND SERVICE PITS MAY BE INSTALLED UNDER THE FOLLOWING CONDITIONS
FURTHER DETAILS ARE AVAILABLE FROM DMS# 2074582
IS NOT DESIRABLE AND SHALL BE UNDERTAKEN WITHIN THE FOLLOWING GUIDELINE.
THE BELOW GROUND SERVICE PIT HAS BEEN DEVELOPED FOR USE IN AREAS IN WHICH A MINI-PILLAR LOCATION
CAUTION WHEN APPLYING HEATSHRINK TO AVOID DAMAGE TO GEL AREA.
PROTRUDING OUT OF GELPORT THEN CAP WITH HEATSHRINK.
10. PERMANENT DISCONNECTION - DO NOT REMOVE CABLE FROM PORT. CUT CABLE TO LEAVE APPROX 50mm
ANY ONE PORT.
MARK PORT WITH ONE SCRIBE FOR EACH DISCONNECTION. REPLACE CONNECTOR AFTER 3 DISCONNECTS FOR
9. TEMPORARY DISCONNECTION - COVER CABLE PORT WITH BLUE CAP OR TAPE TO AVOID GEL CONTAMINATION.
THE CABLE AS IT IS REMOVED.
8. WHEN DISCONNECTING CABLE FROM CONNECTOR REMOVE SLOWLY TO ALLOW GEL TO RE-SEAL ITSELF BEHIND
7. AFTER CLAMPING CABLE THE CLAMP CAP MUST BE LOCKED IN PLACE TO FULLY SEAL
LOOSE/OUT OF THE TERMINAL BLOCK
6. UPON TIGHTENING THE CLAMPING BOLT, GIVE THE CORE A SWIFT TUG TO ENSURE THAT IT DOES NOT COME
� 67.4 TO 180sqmm CONDUCTOR ---- 31.1 TO 39.5Nm TORQUE
� 21.1 TO 53.5sqmm CONDUCTOR ---- 25.4 TO 31.1Nm TORQUE
� 4 TO 15sqmm CONDUCTOR ---- 14.1 TO 19.8Nm TORQUE
THE RECOMMENDED TORQUE SETTINGS ARE LISTED BELOW IF TORQUE WRENCHES ARE USED.
WHILE TIGHTENING THE CLAMPING BOLT WITH A 8mm ALLEN KEY DRIVE.
5. INSERT THE STRIPPED CORE GENTLY THRU THE GEL AND HOLD IT FULLY HOME AGAINST THE TERMINAL BLOCK
4. WIPE CLEAN THE STRIPPED CORE AND ENSURE IT IS NOT CONTAMINATED WITH SAND, GREASE, etc.
3. STRIP INSULATION/HEATSHRINK FROM CORE END. SEE CONNECTOR FOR STRIP LENGTH.
2. DOUBLE INSULATION IS TO BE MAINTAINED INTO CONNECTOR GEL
1. DUST CAPS MUST BE LEFT ON ANY UNUSED CONNECTOR CABLE ENTRY TO AVOID GEL CONTAMINATION.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE
PILLAR EXCLUSION ZONES
REVISION DATE
DRAWING No.
A 24/08/15
U35
UTILITY SERVICE PROVIDERS CODE OF PRACTICE.
WHERE THERE IS A FRONT RETAINING WALL LESS THAN 1.1m IN HEIGHT, REFER TO ADDENDUM 1 OF THE 3.
SAME ZONES APPLY TO BOTH UNI-PILLARS AND MINI-PILLARS.2.
RADIUS SHALL BE MEASURED FROM CENTRE POINT OF PILLAR.1.
PILLAR EXCLUSION ZONES
EXCLUSION ZONE FOR FENCES(FOR BOTH MINI-PILLARS AND UNI-PILLARS)
1000
1000
500
500
PROPERTY BOUNDARY
PROPERTY BOUNDARY
EXCLUSION ZONE
PROPERTY BOUNDARY
STORMWATER EXCLUSION ZONE R600mm
EXCLUSION ZONE R500mm