Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA...

95
© Horizon Power Corporation Part 4 – HV Overhead – Drawing Register Number Description H1-1 3Ph Intermediate (Steel Pole) H1-2 3Ph Intermediate (Wood Pole) H2 Single Slack Tee Off, 3Ph without DOF H3 4 Way Intermediate H4 Horizontal Termination H5 In line Strain with/out DOF H6 Running Disc Angle or Vertical Termination H7 Running Disc Angle or Vertical Termination H8-1 Intermediate Cable with/out DOF H8-2 Intermediate Cable with DOF on separate Crossarm H9-1 Termination Cable without DOF H9-2 Termination Cable with DOF H10-1 Intermediate Transformer HV to LV Open Aerial H10-2 Intermediate Transformer HV to LV ABC H11-1 In line Termination Transformer H11-2 Side Mounted Termination Transformer with DOF H12 PTS including Earth H13 Tee Off with/out DOF H14-1 Combination Switch and Fuse with Raiser H14-2 Combination Switch and Fuse H15-1 3Ph Recloser with LV Aerial Supply Arrangement H15-2 3Ph Recloser with LV U/ground Supply Arrangement H15-3 3Ph Recloser with Transformer Supply Arrangement

Transcript of Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA...

Page 1: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

© Horizon Power Corporation

Part 4 – HV Overhead – Drawing Register

Number Description

H1-1 3Ph Intermediate (Steel Pole)

H1-2 3Ph Intermediate (Wood Pole)

H2 Single Slack Tee Off, 3Ph without DOF

H3 4 Way Intermediate

H4 Horizontal Termination

H5 In line Strain with/out DOF

H6 Running Disc Angle or Vertical Termination

H7 Running Disc Angle or Vertical Termination

H8-1 Intermediate Cable with/out DOF

H8-2 Intermediate Cable with DOF on separate Crossarm

H9-1 Termination Cable without DOF

H9-2 Termination Cable with DOF

H10-1 Intermediate Transformer HV to LV Open Aerial

H10-2 Intermediate Transformer HV to LV ABC

H11-1 In line Termination Transformer

H11-2 Side Mounted Termination Transformer with DOF

H12 PTS including Earth

H13 Tee Off with/out DOF

H14-1 Combination Switch and Fuse with Raiser

H14-2 Combination Switch and Fuse

H15-1 3Ph Recloser with LV Aerial Supply Arrangement

H15-2 3Ph Recloser with LV U/ground Supply Arrangement

H15-3 3Ph Recloser with Transformer Supply Arrangement

Page 2: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

© Horizon Power Corporation

Number Description

H15-4 3Ph Recloser with Solar Supply Arrangement

H15-6 3Ph Recloser on Combination PTS and Raiser Pole with Cable Arrangement

H15-7 3Ph Recloser with Bypass switch and VHF Antenna (Rural)

H16-2 s1 Pole mount LBS Bypass switch on single bush TX VHF Antenna (Rural)

H16-2 s2 Pole mount LBS on two bush TX VHF Antenna (Rural)

H16-3 Pole mount LBS with two bush TX VHF Antenna (Rural)

H16-4 Pole mount LBS with TX supply arrangement

H16-5 Pole mount LBS with LV Aerial supply arrangement

H16-6 Pole mount LBS with LV Underground supply arrangement

H16-7 Pole mount LBS with LV Solar supply arrangement

H17-1 s1 3Ph Recloser on Termination PTS Pole with Cable Arrangement

H17-1 s2 3Ph Recloser on Combination PTS and Raiser Pole with Cable Arrangement

H17-2 3Ph Recloser on Intermediate Pole with Cable Arrangement

H17-3 3Ph Recloser on Termination Pole with Cable Arrangement

H17-4 Stand Alone Cable to Transformer Pole

H17-5 Intermediate Transformer (1PH) 3PH Inline Cables

H18 Termination Pole PTS with Cable and DOF

H19-1 Termination Pole PTS with Cable

H19-2 Termination Pole PTS with Feeder Cable for Feeder Switching

H20-1 Isolation Transformer

H20-2 Isolation Transformer 3Ph Termination, 1Ph inline

H20-3 Isolation Transformer 3Ph Termination, 1Ph inline with DOF

Page 3: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

© Horizon Power Corporation

Number Description

H20-4 Isolation Transformer 3Ph Termination, 1Ph cable with DOF

H20-5 Isolation Transformer 3Ph Cable, 1Ph Tee-off with DOF

H20-6 Isolation Transformer 3Ph Inline, 1Ph Tee-off with DOF

H20-7 Isolation Transformer 3Ph Termination, 1Ph cable

H20-8 Termination Transformer 2 Ph line, 1ph spur

H21 Metering Transformer with Overhead Earthwire

H22 Intermediate Wishbone with Overhead Earthwire

H23 Intermediate Flat with Overhead Earthwire

H24 Termination Transformer with Overhead Earthwire

H25 Intermediate Transformer Wishbone Construction

H26 Vertical Inline Strain with Overhead Earthwire for Wishbone Constr.

H27 Wishbone Construction with Tee-off

H28 Vertical Strain Angle with Overhead Earthwire for Wishbone construction

H29-1 Fault indicator LV Aerial supply arrangement

H29-2 Fault indicator Solar supply arrangement

H30 Surge Arrestor standard Line installation

H31-2 22kV Pole Cap Bank with 10kVA Transformer Connection Details

H32-1 33kV Type TSC Oil Switch and Cap pole mounted

H32-2 33kV Single phase transformer pole mounted

H32-3 33kV Type TSC Oil Switch and Cap pole arrangement

H33-1 in-line layout TYPE GE VR-1 50A-100A Details

H33-2 in-line layout TYPE GE VR-1 50A-100A Details

H33-3 Off-set Detail type GE VR-1 50A-100A Arrangement

Page 4: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

© Horizon Power Corporation

Number Description

H33-3A Off-set Detail type GE VR-1 50A-100A Arrangement

H33-4 Off-set Detail type GE VR-1 50A-100A Construction Detail

H40-1 1Ph Intermediate

H40-2 1Ph Anti-Clash/Galah Intermediate

H41-1 1Ph Running Disc Angle or Termination

H41-2 1Ph two way Termination

H42 1Ph Intermediate with Tee-off with DOF

H43 1Ph Intermediate with Tee-off

H44 1Ph Double Termination

H45 1Ph Slack Tee-off

H46 1Ph Intermediate Transformer with DOF

H47-1 1Ph Termination Transformer with DOF

H47-2 3Ph Intermediate with 1Ph transformer with DOF

H48-1 1PH Twin Mounted Transformer each side of pole

H48-2 Vertical Mounted 1Ph two Bushing Transformer

H49 Earth and Phase Connections

H50 Earth and Phase Connections 3 to 4 Trfr's

H51-1 1Ph Recloser Strain Termination with 1Ph Transformer Supply

H51-2 1Ph Recloser Inline with 1Ph Transformer Supply

H51-3 1Ph Recloser Inline with 1Ph Transformer Supply

H52 Down Earth Running Earth

H53 1PH inline strain sectionaliser and bypass DOF

H54 1Ph Termination cable with DOF

Page 5: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

"X" "X"

300

450

750

230

TOP OF POLE

LINE OF L.V.

RUNNING EARTH

R1

R5

R3

R5

R14

R3

R1

R3

R4

SEE

NO

TE 2

(mm)

X-ARM LENGTHX (mm)

1900

2400

3300

EARTH POINT

EARTH POINT

R13 R6

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

BAT GUARDS

OR

HEAT SHRINK

TO MAINTAIN GROUND CLEARANCE.

2. 750mm STANDARD CONSTRUCTION 580mm ALLOWED

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

800

1050

1500

230

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

3 PHASE INTERMEDIATE

(STEEL POLE)

REVISION DATE

DRAWING No.

D JUNE 2011

H1-1

Page 6: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

"X" "X"

230

450

750

230

TOP OF POLE

LINE OF L.V.

RUNNING EARTH

R1

R5

R3

R5R14

R3

R1

R3

R4

SEE

NO

TE 2

(mm)

X-ARM LENGTHX (mm)

1900

2400

3300

BAT GUARDS

OR

HEAT SHRINK

MAXIMUM OF 10 DEGREES WITH CROSSARM STRAP.

CONDUCTORS UP TO 7/4.75 FOR 19/3.25 CONDUCTOR A

THAN 10 DEGREES TO A MAXIMUM OF 20 DEGREES FOR

3. USE CROSSARM STRAP (CB0485) IF DEVIATION IS GREATER

TO MAINTAIN GROUND CLEARANCE.

2. 750mm STANDARD CONSTRUCTION 580mm ALLOWED

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

SEE NOTE 3

800

1050

1500

300

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

3 PHASE INTERMEDIATE

(WOOD POLE)

FOR REFERENCE ONLY

REVISION DATE

DRAWING No.

D JUNE 2011

H1-2

Page 7: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

"X" "X"800

400

800

230

TOP OF POLE

R1

R3R3

R1

R3

R3

R4

(mm)

X-ARM LENGTHX (mm)

1900

2400

3300

EARTH POINT

EARTH POINT

R13

R3

R3

RUNNING EARTH

PHASE

RUNNING EARTH TEE-OFF

EARTH POINT

R6

BAT GUARDS

OR

HEAT SHRINK

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

NOTE:

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

800

1050

1500

230

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

SINGLE SLACK TEE OFF

3 PHASE WITHOUT DROPOUT FUSES

REVISION DATE

DRAWING No.

D JUNE 2011

H2

Page 8: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

"X" "X"

450

1725

800

230

TOP OF POLE

R1

R1

R1

R3

R4

(mm)

X-ARM LENGTHX (mm)

1900

2400

3300

EARTH POINT

R13

R3

EARTH POINT

R4

R1

R1R3

R3

R4

R1

R3

LINE OF L.V.

RUNNING EARTH

OFFSET INTERMEDIATE

75

460460920

2400

INTERMEDIATE OFFSET XARM DETAILS

BAT GUARDS

OR

HEAT SHRINK

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH BAY CONSTRUCTION USING 19/3.25 CONDUCTOR.

2. CROSSARM STRAP REQUIRED FOR RURAL/EXTENDED

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

BAT GUARDS

OR

HEAT SHRINK

SEE NOTE 2

230

800

1050

1500

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m/12.5m

4 WAY INTERMEDIATE

REVISION DATE

DRAWING No.

D JUNE 2011

H3

Page 9: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R3

R5R1

PIN

CARRY OVER

R5

R3

R5

R3

R14

R3

R5

R1

R5

R5

R5

R3

R14

945

945

450

970

230

230

300

75

L.V.

R/E

TOP OF POLE

STAYS

SINGLE TERMINATIONDOUBLE TERMINATION

945945

EARTH POINT

BAT GUARDS

OR

HEAT SHRINK

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

805

230

230

230

1565

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m/12.5m

HORIZONTAL TERMINATION

REVISION DATE

DRAWING No.

D JUNE 2011

H4

Page 10: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

1000

1000

596

585

1290

23

01200

450

TOP OF POLE

CENTRE PHASET BRACKET

RUNNING EARTH

LINE OF L.V.

EARTH POINT

R3

R3

R3

R5

R5

R5

R10

R10

R10

LINE LOAD

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM

23

0

150

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

IN-LINE STRAIN

WITH OR WITHOUT DROPOUT FUSES

REVISION DATE

DRAWING No.

E NOV 2012

H5

Page 11: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R5R14

R3

450

1200

900

450

450

230

LINE OF L.V.

RUNNING EARTH

STAY

R5

R5

EARTH POINT

4. FOR RDA USE BALLHOOK AND SOCKET

PHASE SPACING. ALL OTHER GROUND CLEARANCES STILL APPLY.

3. FOR BAY LENGTHS OVER 80m USE 12.5m OR 14m POLE WITH 1200mm

SPACINGS APPLY. ALL OTHER GROUND CLEARANCES ALSO APPLY.

2. FOR BAY LENGTHS LESS THAN 80m ON A 12.5m POLE, H7 CONDUCTOR

1. FOR BAY LENGTHS LESS THAN 55m WITH R/E - 12.5m POLE.

SEE NOTE 4

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 12.5m

RUNNING DISC ANGLE

OR VERTICAL TERMINATION

REVISION DATE

DRAWING No.

D JUNE 2011

H6

Page 12: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R14

R3

LINE OF L.V.

RUNNING EARTH

STAY

R5

R5

EARTH POINT

600

600

1200

600

600

230

450

PHASE

PHASE

PHASE

STAY

R5

R5

R14

R5

R14

R5

R14

OVERHEAD R/E

R5 R3

PHASE

PHASE

PHASE

LINE OF L.V.

STAY

STAY

TOP OF POLE

600

600

1200

600

600

230

450

SEE NOTE 1

SEE NOTE 1

1. FOR RDA USE BALLHOOK AND SOCKET

ARRANGEMENT

OVERHEAD RUNNING EARTH

ARRANGEMENT

STANDARD RUNNING EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 14m

RUNNING DISC ANGLE

OR VERTICAL TERMINATION

(1200mm SPACING)

REVISION DATE

DRAWING No.

C JUNE 2011

H7

Page 13: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

23

09

00

25

50

1290

585 575

R9

585

870

TOP OF POLE

LINE OF L.V.

R4

R3

R3

R3

R8R8

R1

R1

R10

R1

R7

R6

R13

EARTH POINT

EARTH POINT

BAND-IT

STRAPS

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

2. FOR INTERMEDIATE CABLE WITHOUT DROPOUT

FUSES USE H9 DIMENSIONS FROM CROSSARM

TO CABLE BRACKET AND IF REQUIRED FROM

TOP OF POLE TO RUNNING EARTH.

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R7

2100

450

NO

TE

2

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m/12.5m

INTERMEDIATE CABLE

WITH OR WITHOUT DROPOUT FUSES

REVISION DATE

DRAWING No.

F NOV 2012

H8-1

Page 14: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

23

0635

26

25

1080

430 860

R9

870

1080

TOP OF POLE

LINE OF L.V.

R4

R3

R3R3

R8R8

R1

R1

R10

R1

R7

R6

R13

EARTH POINT

EARTH POINT

BAND-IT

STRAPS9

00

86

0

R1

450

R8

R1

R/E

REFER R6 FOR

EARTH RESISTANCE

REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

2. FOR INTERMEDIATE CABLE WITHOUT DROPOUT

FUSES USE H9 DIMENSIONS FROM CROSSARM

TO CABLE BRACKET AND IF REQUIRED FROM

TOP OF POLE TO RUNNING EARTH.

R7

HEAT SHRINK

OR

BAT GUARDS

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

INTERMEDIATE CABLE

WITH DROPOUT FUSES

(ALTERNATE CROSSARM)

REVISION DATE

DRAWING No.

E NOV 2012

H8-2

Page 15: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

EARTH POINT

945

945

R5

R3

R3

RUNNING EARTH

R1

230

1650

450

LINE OF L.V.

R14

R1

R3

R5

R3R5

R8

R9

R7

R7

R6

R3

R1

R8 R8

R3R3

R3

R1

R5

R13

EARTH POINT

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF HV OVERHEAD

230

230

630

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m/12.5m

TERMINATION CABLE

WITH DROPOUT FUSES UPSTREAM

REVISION DATE

DRAWING No.

D JUNE 2011

H9-1

Page 16: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

EARTH POINT

1000

1000

585

585

1290

23

02

30

90

0 R10

R10

R10

R5

R3

R3

RUNNING EARTH

63

0

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM.

89

0

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m/12.5m

TERMINATION & CABLE

WITH DROPOUT FUSES

REVISION DATE

DRAWING No.

E NOV 2012

H9-2

Page 17: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

X-ARM LENGTH

(mm)X (mm)

1900

2400

3300

NOTE:

TOP OF POLE

RUNNING EARTH

23

02

30

635

75

0

22

50

1200

"X" "X"

R13

R6

R3

R3R3

R4 R4

R1

R1

R1

R12 R12

EARTH POINT

R1 (HOLES 22 DIA.)

TRANSFORMER

SUPPORT

R1

R10

R12

PHN

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

INTERMEDIATE TRANSFORMER

HV TO LV OPEN AERIAL

REVISION DATE

DRAWING No.

D AUG 2012

H10-1

ABC

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

R6

800

1050

1500

R8-1

EARTH POINT (R6)

70sqmm DOWN EARTH (R6)

Page 18: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

X-ARM LENGTH

(mm)X (mm)

1900

2400

3300

NOTE:

TOP OF POLE

RUNNING EARTH

23

02

30

635

1500

"X" "X"

R13

R6

R1 (HOLES 22 DIA.)

TRANSFORMER

SUPPORT

30

00

R3

R3

R4

R4

R1

R1

R12

R10R1

R3

EARTH POINT

MIN

IMU

M 5

000

KRONE ISOLATORS

ABC

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM.

R8-1

800

1050

1500

EARTH POINT (R6)

70sqmm DOWN EARTH (R6)

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

INTERMEDIATE TRANSFORMER

HV TO LV ABC

REVISION DATE

DRAWING No.

E NOV 2012

H10-2

Page 19: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

EARTH POINT

NOTE:

TOP OF POLE

R6

L.V. BRACKET

HV ARRANGEMENT TOP VIEW

R3

R12

LV INTERMEDIATE

LV TERMINATION

945 945

600

450

2250

R13

R/E

R5

HOLES

DIAMETER

(R1) 22

R12

R5 R5R1

R8

R5

R3

R5

R1

R1

R5

R14

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

X-ARM.

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING

ABC

R8-1

R6

230

230

760

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 12.5m

IN-LINE

TERMINATION TRANSFORMER

REVISION DATE

DRAWING No.

D JUNE 2011

H11-1

Page 20: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R6

R13

L.V. BRACKET

RUNNING EARTH

945 945

SIDE STAY

IF REQUIRED

23

02

30

835

35

50

90

0450

HV ARRANGEMENT TOP VIEW

LV ARRANGEMENT TOP VIEW

R3

R8

(R1) 22 DIAMETER

HOLES

R12

TRANSFORMER

SUPPORT

ABC

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING

X-ARM

2. STAY POSITION TO SUIT TAPS, MIN OF 400mm TO

NEAREST HV CONDUCTOR

3. 3550mm DISTANCE MAY BE REDUCED TO 2700mm FOR

GROUND CLEARANCE.

WITH A REDUCED 2500mm CONSTRUCTION ALL WORK

TASK CLEARANCE STANDARDS MUST BE COMPLIED WITH.

SE

E N

OT

E 3

STAY

SEE NOTE 2

STAY SEE

NOTE 2

R8-1

EARTH POINT (R6)

70sqmm DOWN EARTH

(R6)EARTH POINT

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

SIDE MOUNTED

TERMINATION TRANSFORMER

WITH DROPOUT FUSES

REVISION DATE

DRAWING No.

F NOV 2012

H11-2

Page 21: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

EARTH POINT

R13

R6

23

02

30

1000

LINE OF L.V.

(R1) 22 DIAMETER HOLES

R3

72

0

20

70

R7 - STANDARD CABLE GUARD

(R1) 14 DIAMETER HOLES

EARTH MAT

3 EXTRA ROD GUIDES

REQUIRED

POSITION TO SUIT

BAND-IT

STRAPS

600 SQ.

EARTH

MAT

R6

EARTH SPEAR450

ROADSIDE

33kV22kV

MIN

IMU

M H

EIG

HT

150

ROD GUIDE

30

0

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV

OVERHEAD REGARDING X-ARM

R6

450

RUNNING EARTH

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

POLE TOP SWITCH

INCLUDING EARTH

REVISION DATE

DRAWING No.

F DEC 2012

H12

TOP OF

POLE

Page 22: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

705

585

585

1000

1000

23

06

00

1200

450

75

1725

X-ARM LENGTH

(mm)X (mm)

1900

2400

3300

"X" "X"

TOP OF POLE

RUNNING EARTH

R3

R3

R3

R3

R4R1

R5

R5

R5

R5

R10

R1

R14

30

0

EARTH POINT

R10

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM

L.V.

HEAT SHRINK

OR

BAT GUARDS

800

1050

1500

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m/12.5m

TEE OFF WITH OR WITHOUT

DROPOUT FUSES

REVISION DATE

DRAWING No.

F DEC 2012

H13

Page 23: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

EARTH POINT

R6

TOP OF POLE

(R1) 22 DIAMETER HOLES

R7 - STANDARD CABLE GUARD

EARTH MAT

3 EXTRA ROD GUIDES

REQUIRED

POSITION TO SUIT

BAND-IT

STRAPS

600 SQ.

EARTH

MAT

R6

EARTH SPEAR450

ROADSIDE

MIN

IMU

M H

EIG

HT

23

02

30

1300

72

0

20

70

R13

(R1)

14 DIAMETER

HOLES

R10

R3

R8

R1R9

R8

R7

R6

ROD GUIDE

150

30

0

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM.

2. 1300mm WITH FUSES AND 900mm WITHOUT

FUSES.

3. PG CLAMP POSITION TO ALLOW FULL

OPERATION OF P.T.S. WITHOUT STRAINING

CONNECTIONS AND LEAD

4. ENSURE ADEQUATE CLEARANCE BETWEEN

LINE AND P.T.S.

SE

E N

OT

E 2

SEE NOTE 4 SEE NOTE 3

R7 - CABLE GUARD

R6

R6

97

0R/E

450

LINE OF L.V.

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m/12.5m

COMBINATION SWITCH AND FUSE

WITH RAISER (11kV AND 22kV)

REVISION DATE

DRAWING No.

F NOV 2012

H14-1

Page 24: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:R6

TOP OF POLE

(R1) 14 DIAMETER HOLES

EARTH MAT

3 EXTRA ROD GUIDES

REQUIRED

POSITION TO SUIT

BAND-IT

STRAPS

600 SQ.

EARTH

MAT

R6

EARTH SPEAR450

ROADSIDE

MIN

IMU

M H

EIG

HT

23

02

30

20

01000

72

0

20

70

R13

R3(R1) 22 DIAMETER

HOLES

R3

R8

R8

R9

R7

R7 - STANDARD CABLE GUARD

ROD GUIDE

150

30

0

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R7 CABLE GUARD

SEE NOTE 2

1. REFER TO GENERAL NOTE OF HV

OVERHEAD REGARDING X-ARM

2. DROPOUT FUSE EXTENDER BRACKETS.

PART No. CB3051

R6

R6

450

97

0

LINE OF L.V.

RUNNING EARTH

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m/12.5m

COMBINATION SWITCH AND FUSE

(11kV AND 22kV)

REVISION DATE

DRAWING No.

G DEC 2012

H14-2

EARTH

POINT

Page 25: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R13

1200

1000

1800

450

PHN

1 PH C.B.

L.V.

BOLT HOLE

RECLOSER

SECURED AGAINST POLE

MECHANICAL PROTECTION OVER COAX

CORRUGATED CONDUIT FITTED AS

WARNING SIGN

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

XLPE

2.5mm SQ. 1C

PROTECTION OF CABLES

25mm CONDUIT FOR MECHANICAL

2700

R36

POINT

EARTH

R6

230

ANTENNA UPPER EDGE

2 x 20mm BANDIT STRAPS.

SELECTED RADIO BASE SUPPORTED WITH

3. ORIENTATION OF ANTENNA DEPENDANT ON

2. RECLOSER INDICATION TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

SEE NOTE 3

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

3 PHASE RECLOSER

WITH LV AERIAL SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H15-1

THIS ANTENNA IS EARTHED

OBSTRUCTED. RESTORE WHEN FINISHED

REMOVE ANTENNA IF WORK AREA IS

ANTENNA CABLE AT CONTROL BOX.

TO ISOLATE FROM EARTH DISCONNECT

WARNING

Page 26: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

R13

BOLT HOLE

RECLOSER

SECURED AGAINST POLE

MECHANICAL PROTECTION OVER COAX

CORRUGATED CONDUIT FITTED AS

WARNING SIGN

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

PROTECTION OF CABLES

25mm CONDUIT FOR MECHANICAL

R36

POINT

EARTH

R6

230

1500

2200

1800

R7

CB

ANTENNA UPPER EDGE

NOTE:

2 x 20mm BANDIT STRAPS.

SELECTED RADIO BASE SUPPORTED WITH

3. ORIENTATION OF ANTENNA DEPENDANT ON

2. RECLOSER INDICATION TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OFRESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

SEE NOTE 3

R6

2700

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

3 PHASE RECLOSER

WITH LV UNDERGROUND SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H15-2

THIS ANTENNA IS EARTHED

OBSTRUCTED. RESTORE WHEN FINISHED

REMOVE ANTENNA IF WORK AREA IS

ANTENNA CABLE AT CONTROL BOX.

TO ISOLATE FROM EARTH DISCONNECT

WARNING

Page 27: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

R13

RECLOSER

BOLT HOLE

CORRUGATED CONDUIT FITTED AS

MECHANICAL PROTECTION OVER COAX

SECURED AGAINST POLE

WARNING SIGN

MAXIMUM SEPARATION

BETWEEN EARTH AND

CONTROL CABLE (UMBILICAL)

25mm CONDUIT FOR MECHANICAL

PROTECTION OF CABLES

R36

R6

23

0

1500

1800

22

00

1 PH C.B.

ANTENNA UPPER EDGE

NOTE:

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM.

2. RECLOSER INDICATION TO FACE ROADWAY.

3. ORIENTATION OF ANTENNA DEPENDANT ON

SELECTED RADIO BASE SUPPORTED WITH

2 x 20mm BANDIT STRAPS.REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

SEE NOTE 3

LOAD LINE

27

00

R6

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

3 PHASE RECLOSER

WITH TRANSFORMER SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

G DEC 2012

H15-3

EARTH POINT

THIS ANTENNA IS EARTHED

TO ISOLATE FROM EARTH DISCONNECT

ANTENNA CABLE AT CONTROL BOX.

REMOVE ANTENNA IF WORK AREA IS

OBSTRUCTED. RESTORE WHEN FINISHED

WARNING

Page 28: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R13

BOLT HOLE

RECLOSER

SECURED AGAINST POLE

MECHANICAL PROTECTION OVER COAX

CORRUGATED CONDUIT FITTED AS

WARNING SIGN

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

PROTECTION OF CABLES

25mm CONDUIT FOR MECHANICAL

R36

POINT

EARTH

R6

230

1500

2200

1800

(R37) BATTERY ENCLOSURE

450

ANTENNA UPPER EDGE

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

SOLAR PANELS WHICH MUST FACE NORTH

4. USE MAXIMUM SEPERATION POSSIBLE BETWEEN

2 x 20mm BANDIT STRAPS.

SELECTED RADIO BASE SUPPORTED WITH

3. ORIENTATION OF ANTENNA DEPENDANT ON

2. RECLOSER INDICATION TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

SEE NOTE 4

SEE NOTE 3

2700

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

3 PHASE RECLOSER

WITH SOLAR SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H15-4

THIS ANTENNA IS EARTHED

OBSTRUCTED. RESTORE WHEN FINISHED

REMOVE ANTENNA IF WORK AREA IS

ANTENNA CABLE AT CONTROL BOX.

TO ISOLATE FROM EARTH DISCONNECT

WARNING

Page 29: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

R13

27

00

72

03

00

EARTH

POINT

R6EARTH MAT

20

70

MIN

IMU

M H

EIG

HT

ROD GUIDE

150

(R1) 14 DIAMETER

HOLES

NOTE:

R7 - STANDARD CABLE GUARD

R36

3 EXTRA ROD GUIDES

REQUIRED

POSITION TO SUIT

EARTH SPEAR

450

600 SQ.

EARTH

MAT

R6

ROADSIDE

(R1) 22 DIAMETER

HOLES

LINE OF L.V.

1200

1200

80

0

RECLOSER

BOLT HOLE

23

0

TOP OF POLE(R1) 22 DIAMETER

HOLES

R8

R9

R6

R7

MAXIMUM SEPARATION

BETWEEN EARTH AND

CONTROL CABLE (UMBILICAL)

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM.

2. RECLOSER INDICATION TO FACE ROADWAY.

(IF POSSIBLE)

3. SEE H15 SERIES FOR LV CONNECTION DETAIL

AND COMMS (IF APPLICABLE)

LV SUPPLY ARRANGEMENT

NOT SHOWN - SEE NOTE 3

REFER R6 FOR EARTH RESISTANCE REQUIREMENTS

R7 - CABLE GUARD

R6

R6

R6

R1

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

3 PHASE RECLOSER

ON COMBINATION PTS & RAISER POLE

WITH CABLE ARRANGEMENT

REVISION DATE

DRAWING No.

F DEC 2012

H15-6

Page 30: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

(R1) 22 DIAMETER

HOLES

R3

(R1) 22 DIAMETER

HOLES

R6

R13

REFER R6 FOR EARTH RESISTANCE REQUIREMENTS

R6

NO

TE

5

R6

ROD GUIDE

MIN

IMU

M H

EIG

HT

NOTE:

ANTICLIMB GUARDR36

SEE NOTE 5

SEE NOTE 4

ANTENNA UPPER EDGE

MIN

IMU

M

MAXIMUM SEPARATION

BETWEEN EARTH AND

CONTROL CABLE (UMBILICAL)

WARNING SIGN

3 EXTRA ROD GUIDES

REQUIRED

POSITION TO SUIT

27

00

20

70

150

(R1) 14 DIAMETER

HOLES

72

03

00

23

0

70

0

R/E

EARTH SPEAR

450

600 SQ.

EARTH

MAT

R6

ROADSIDE

27

00

TOP OF POLE

TOP OF RECLOSER

EARTH

POINT (R6)

EARTH

MAT

1. ALL HOLES 18 DIAMETER U.O.N.

2. RECLOSER INDICATION TO FACE ROADWAY.

3. SEE H15 SERIES FOR COMMS (IF APPLICABLE).

4. ANTENNA MODEL AND ORIENTATION TO RADIO

BASE TO BE PROVIDED BEFORE INSTALLATION

SUPPORTED WITH 2 x 20mm BANDIT STRAPS.

5. CONTROL BOX HEIGHT MAY BE REDUCED TO

1500mm IN LOW VANDALISM AREAS

6. DROPOUT FUSE EXTENDER BRACKETS.

PART No. CB3051

1 PH. C.B.

EARTH POINT1200

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

3 PHASE RECLOSER

WITH BY-PASS SWITCH AND VHF ANTENNA

(RURAL AREAS)

REVISION DATE

DRAWING No.

E DEC 2012

H15-7

400

23

0

THIS ANTENNA IS EARTHED

TO ISOLATE FROM EARTH DISCONNECT

ANTENNA CABLE AT CONTROL BOX.

REMOVE ANTENNA IF WORK AREA IS

OBSTRUCTED. RESTORE WHEN FINISHED

WARNING

Page 31: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

WARNING SIGN

MAXIMUM SEPARATION

BETWEEN EARTH AND

CONTROL CABLE (UMBILICAL)

R6

150

27

00

R13

23

0

23

0

R3

(R1) 22 DIAMETER HOLES

ANTENNA UPPER EDGE

1 PH. C.B.

CONTROL BOX50

0

400

1500

(R1) 22 DIAMETER HOLES

ANTICLIMB GUARD

20

70

72

03

00

(R1) 14 DIAMETER

HOLES

150

MIN

IMU

M H

EIG

HT

ROD GUIDE

EARTH MAT

R6

ROADSIDE

EARTH

SPEAR450

600 SQ.

EARTH MAT

3 EXTRA ROD GUIDES

REQUIRED

POSITION TO SUIT

SHEET 1

25mm CONDUIT FOR MECHANICAL

PROTECTION OF CABLES

SEE NOTE 6

REFER R6 FOR EARTH RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM.

2. LOAD BREAK SWITCH TO FACE ROADWAY.

3. SEE H15 SERIES FOR COMMS

(IF APPLICABLE)

4. ANTENNA MODEL AND ORIENTATION TO

RADIO BASE TO BE PROVIDED BEFORE

INSTALLATION.

5. CONTROL BOX HEIGHT MAY BE REDUCED

TO 1500mm IN LOW VANDALISM AREAS

6. DROPOUT FUSE EXTENDER BRACKETS.

PART No. CB3051

R36

SEE NOTE 5

SEE NOTE 4

NO

TE

5

R6

R6

R/E 60

0

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

POLE MOUNT LOAD BREAK SWITCH

BYPASS SWITCH ON SINGLE BUSH TX

VHF ANTENNA (RURAL AREAS)

REVISION DATE

DRAWING No.

G DEC 2012

H16-2

EARTH

POINT

MIN

THIS ANTENNA IS EARTHED

TO ISOLATE FROM EARTH DISCONNECT

ANTENNA CABLE AT CONTROL BOX.

REMOVE ANTENNA IF WORK AREA IS

OBSTRUCTED. RESTORE WHEN FINISHED

WARNING

Page 32: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

WARNING SIGN

MAXIMUM SEPARATION

BETWEEN EARTH AND

CONTROL CABLE (UMBILICAL)

R6

60

0

27

00

R13

23

0

23

0

R3

ANTENNA UPPER EDGE

MIN

IMU

M

1 PH. C.B.

CONTROL BOX

400

1500

ANTICLIMB GUARD

20

70

150

MIN

IMU

M H

EIG

HT

ROD GUIDE

EARTH MAT

R6

ROADSIDE

EARTH

SPEAR450

600 SQ.

EARTH MAT

3 EXTRA ROD GUIDES

REQUIRED

POSITION TO SUIT

SHEET 2

1200

(R1) 22 DIAMETER

HOLES

TOP VIEW 330- LARGE X-ARM

(UPPER P.T.S. NOT SHOWN)

25mm CONDUIT FOR MECHANICAL

PROTECTION OF CABLES

SEE NOTE 6

REFER R6 FOR EARTH RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM.

2. LOAD BREAK SWITCH TO FACE ROADWAY.

3. SEE H15 SERIES FOR COMMS (IF APPLICABLE).

4. ANTENNA MODEL AND ORIENTATION TO RADIO BASE

TO BE PROVIDED BEFORE INSTALLATION SUPPORTED

WITH 2 x 20mm BANDIT STRAPS.

5. CONTROL BOX HEIGHT MAY BE REDUCED TO 1500mm

IN LOW VANDALISM AREAS

6. DROPOUT FUSE EXTENDER BRACKETS.

PART No. CB3051

SEE NOTE 4

R36

SEE NOTE 5

NO

TE

5

150

R/E

R6

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

POLE MOUNT LOAD BREAK SWITCH

BYPASS SWITCH ON TWO BUSH TX

VHF ANTENNA (LOCAL AREAS)

REVISION DATE

DRAWING No.

G DEC 2012

H16-2

72

03

00

(R1) 14 DIAMETER

HOLES

EARTH

POINT

(R1) 22

DIAMETER

HOLES

THIS ANTENNA IS EARTHED

TO ISOLATE FROM EARTH DISCONNECT

ANTENNA CABLE AT CONTROL BOX.

REMOVE ANTENNA IF WORK AREA IS

OBSTRUCTED. RESTORE WHEN FINISHED

WARNING

Page 33: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

WARNING SIGN

MAXIMUM SEPARATION

BETWEEN EARTH AND

CONTROL CABLE (UMBILICAL)

EARTH

POINT

R6

150

1200

27

00

R13

1080

1500

23

0

80

23

0

R3

(R1) 22 DIAMETER HOLES

ANTENNA UPPER EDGE

MIN

IMU

M

1 PH. C.B.

CONTROL BOX

25mm CONDUIT FOR MECHANICAL

PROTECTION OF CABLES

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM.

2. LOAD BREAK SWITCH TO FACE ROADWAY.

3. SEE H15 SERIES FOR COMMS (IF APPLICABLE)

4. ORIENTATION OF ANTENNA DEPENDANT ON

SELECTED RADIO BASE SUPPORTED WITH

2 x 20mm BANDIT STRAPS.

5. CONTROL BOX HEIGHT MAY BE REDUCED TO

1500mm IN LOW VANDALISM AREAS

6. DROPOUT FUSE EXTENDER BRACKETS.

PART No. CB3051

SEE NOTE 4

R36

NOTE 5

NO

TE

5

REFER R6 FOR EARTH RESISTANCE REQUIREMENTS

SEE

NOTE 6

R/E 60

0

R6

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

POLE MOUNT LOAD BREAK SWITCH

IN-LINE STRAIN WITH

2 BUSHING TX SUPPLY

REVISION DATE

DRAWING No.

G DEC 2012

H16-3

THIS ANTENNA IS EARTHED

TO ISOLATE FROM EARTH DISCONNECT

ANTENNA CABLE AT CONTROL BOX.

REMOVE ANTENNA IF WORK AREA IS

OBSTRUCTED. RESTORE WHEN FINISHED

WARNING

Page 34: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

WARNING SIGN

MAXIMUM SEPARATION

BETWEEN EARTH AND

CONTROL CABLE (UMBILICAL)

EARTH

POINT

R6

1 PH. C.B.

1900

27

00

R13

CONTROL BOX

ANTENNA UPPER EDGE

MIN

IMU

M

25mm CONDUIT FOR MECHANICAL

PROTECTION OF CABLES

25mm CORRUGATED CONDUIT FITTED AS

MECHANICAL PROTECTION OVER COAX

SECURED AGAINST POLE AND CONDUIT

1200

TOP VIEW

(UPPER X-ARM NOT SHOWN)

NO

TE

4

R36

NOTE 4

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM.

2. LOAD BREAK SWITCH TO FACE ROADWAY.

3. ORIENTATION OF ANTENNA DEPENDANT ON

SELECTED RADIO BASE SUPPORTED WITH

2 x 20mm BANDIT STRAPS.

4. CONTROL BOX HEIGHT MAY BE REDUCED TO

1500mm IN LOW VANDALISM AREAS

5. DROPOUT FUSE EXTENDER BRACKETS.

PART No. CB3051

SEE

NOTE 5

SEE NOTE 3

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

150

R/ER6

60

0

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

POLE MOUNT LOAD BREAK SWITCH

WITH TRANSFORMER SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

G DEC 2012

H16-4

THIS ANTENNA IS EARTHED

TO ISOLATE FROM EARTH DISCONNECT

ANTENNA CABLE AT CONTROL BOX.

REMOVE ANTENNA IF WORK AREA IS

OBSTRUCTED. RESTORE WHEN FINISHED

WARNING

Page 35: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

WARNING SIGN

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

POINT

EARTH

R6

1 PH. C.B.

RUNNING EARTH

1500

150

1200

1200

2700

R13

CONTROL BOX

N PH

450

L.V.

ANTENNA UPPER EDGE

MINIM

UM

PROTECTION OF CABLES

25mm CONDUIT FOR MECHANICAL

SECURED AGAINST POLE AND CONDUIT

MECHANICAL PROTECTION OVER COAX

25mm CORRUGATED CONDUIT FITTED AS

NO

TE 4

NOTE 4

R36

1500mm IN LOW VANDALISM AREAS

4. CONTROL BOX HEIGHT MAY BE REDUCED TO

2 x 20mm BANDIT STRAPS.

SELECTED RADIO BASE SUPPORTED WITH

3. ORIENTATION OF ANTENNA DEPENDANT ON

2. LOAD BREAK SWITCH TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

SEE NOTE 3

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

POLE MOUNT LOAD BREAK SWITCH

WITH LV AERIAL SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H16-5

THIS ANTENNA IS EARTHED

OBSTRUCTED. RESTORE WHEN FINISHED

REMOVE ANTENNA IF WORK AREA IS

ANTENNA CABLE AT CONTROL BOX.

TO ISOLATE FROM EARTH DISCONNECT

WARNING

Page 36: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

WARNING SIGN

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

POINT

EARTH

R6

1 PH. C.B.

RUNNING EARTH

1500

150

2700

R13

CONTROL BOX

ANTENNA UPPER EDGE

PROTECTION OF CABLES

25mm CONDUIT FOR MECHANICALSECURED AGAINST POLE AND CONDUIT

MECHANICAL PROTECTION OVER COAX

25mm CORRUGATED CONDUIT FITTED AS

1200

R7

BASE OF POLE

CABLE PIT AT

NO

TE 4

NOTE 4

R36

1500mm IN LOW VANDALISM AREAS

4. CONTROL BOX HEIGHT MAY BE REDUCED TO

2 x 20mm BANDIT STRAPS.

SELECTED RADIO BASE SUPPORTED WITH

3. ORIENTATION OF ANTENNA DEPENDANT ON

2. LOAD BREAK SWITCH TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

SEE NOTE 3

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

POLE MOUNT LOAD BREAK SWITCH

WITH LV UNDERGROUND SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H16-6

THIS ANTENNA IS EARTHED

OBSTRUCTED. RESTORE WHEN FINISHED

REMOVE ANTENNA IF WORK AREA IS

ANTENNA CABLE AT CONTROL BOX.

TO ISOLATE FROM EARTH DISCONNECT

WARNING

Page 37: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

WARNING SIGN

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

POINT

EARTH

R6

RUNNING EARTH

1500

150

2700

R13

CONTROL BOX

ANTENNA UPPER EDGE

PROTECTION OF CABLES

25mm CONDUIT FOR MECHANICAL

SECURED AGAINST POLE AND CONDUIT

MECHANICAL PROTECTION OVER COAX

25mm CORRUGATED CONDUIT FITTED AS12

00

1200MINIM

UM

MINIM

UM

450

R37

NO

TE 5

NOTE 5

R36

1500mm IN LOW VANDALISM AREAS

5. CONTROL BOX HEIGHT MAY BE REDUCED TO

SOLAR PANELS AND THEY MUST FACE NORTH.

4. USE MAXIMUM SEPERATION POSSIBLE BETWEEN

2 x 20mm BANDIT STRAPS.

SELECTED RADIO BASE SUPPORTED WITH

3. ORIENTATION OF ANTENNA DEPENDANT ON

2. LOAD BREAK SWITCH TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

SEE NOTE 3

SEE NOTE 4

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

POLE MOUNT LOAD BREAK SWITCH

WITH SOLAR SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H16-7

THIS ANTENNA IS EARTHED

OBSTRUCTED. RESTORE WHEN FINISHED

REMOVE ANTENNA IF WORK AREA IS

ANTENNA CABLE AT CONTROL BOX.

TO ISOLATE FROM EARTH DISCONNECT

WARNING

Page 38: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLER13

800

1200

1200

BOLT HOLE

RECLOSER

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

2700

R36

POINT

EARTH

R6

230

300

720

(R1) 14 DIAMETER HOLES

ROD GUIDE

2070

150

R7 - STANDARD CABLE GUARD

EARTH MAT

MINIM

UM

HEIG

HT

MAT

EARTH

600 SQ.

R6

EARTH SPEAR

ROADSIDE

POSITION TO SUIT

REQUIRED

3 EXTRA ROD GUIDES

450

HOLES

(R1) 22 DIAMETER

R3

LINE OF L.V.

EXTENSION

RAYCHEM BRACKET

HOLES

(R1) 22 DIAMETER

R8

R9

R7

R6

2000

R7

R9R8

R4

FOR CLARITY

RECLOSER OMITTED

SHEET 1

GF1592

IC0047

NOT SHOWN - SEE NOTE 3

LV SUPPLY ARRANGEMENT

AND COMMS (IF APPLICABLE)

3. SEE H15 SERIES FOR LV CONNECTION DETAIL

2. RECLOSER INDICATION TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R7 - CABLE GUARD

R6

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

3 PHASE RECLOSER

ON TERMINATION PTS POLE

WITH CABLE ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H17-1

Page 39: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

R13

2700

300

720

POINT

EARTH

R6EARTH MAT

2070

MINIM

UM

HEIG

HT

ROD GUIDE

150

HOLES

(R1) 14 DIAMETER

NOTE:

R7 - STANDARD CABLE GUARD

R36

POSITION TO SUIT

REQUIRED

3 EXTRA ROD GUIDES

EARTH SPEAR

450

MAT

EARTH

600 SQ.

R6

ROADSIDE

HOLES

(R1) 22 DIAMETER

LINE OF L.V.

800

1200

1200

BOLT HOLE

RECLOSER

230

TOP OF POLE

HOLES

(R1) 22 DIAMETER

R8

R9

R6

R7

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

SHEET 2

AND COMMS (IF APPLICABLE)

3. SEE H15 SERIES FOR LV CONNECTION DETAIL

(IF POSSIBLE)

2. RECLOSER INDICATION TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

NOT SHOWN - SEE NOTE 3

LV SUPPLY ARRANGEMENT

REFER R6 FOR EARTH RESISTANCE REQUIREMENTS

R7 - CABLE GUARD

R6

R6

R6

R1

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

3 PHASE RECLOSER

ON COMBINATION PTS & RAISER POLE

WITH CABLE ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H17-1

Page 40: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R13

800

1200

1200

BOLT HOLE

RECLOSER

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

2700

R36

POINT

EARTH

R6

230

POSITION TO SUIT

REQUIRED

3 EXTRA ROD GUIDES

R3

HOLES

(R1) 22 DIAMETER

R8

R9

R7

R6

2000

R7

R9

R8

R4

FOR CLARITY

RECLOSER OMITTED

LINE OF L.V./PILOT

GF1592

IC0047

R1

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

AND COMMS (IF APPLICABLE)

3. SEE H15 SERIES FOR LV CONNECTION DETAIL

2. RECLOSER INDICATION TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

NOT SHOWN - SEE NOTE 3

LV SUPPLY ARRANGEMENT

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

3 PHASE RECLOSER

ON INTERMEDIATE POLE

WITH CABLE ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H17-2

Page 41: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R13

CONTROL CABLE (UMBILICAL)

BETWEEN EARTH AND

MAXIMUM SEPARATION

2700

R36

POINT

EARTH

R6

230

HOLES

(R1) 22 DIAMETER

R8

R9

R7

R6

R7

R9

R8

R4

FOR CLARITY

RECLOSER OMITTED

GF1592

IC0047

1200

1300

1240

TOP OF CONTROL BOX

RECLOSER BOLT HOLE

NOT SHOWN - SEE NOTE 3

LV SUPPLY ARRANGEMENT

AND COMMS (IF APPLICABLE)

3. SEE H15 SERIES FOR LV CONNECTION DETAIL

2. RECLOSER INDICATION TO FACE ROADWAY.

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

3 PHASE RECLOSER

ON TERMINATION POLE

WITH CABLE ARRANGEMENT

REVISION DATE

DRAWING No.

D JUNE 2011

H17-3

Page 42: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R13 R6

HOLES

(R1) 22 DIAMETER

R9

R7

GF1591

IC0047

630

2500

POINT

EARTH

EARTH POINT

OFFSET ARM CB1121

LESS MOVEMENT IN AIR

150 ABC AND LUGS FOR

CZ0366

PHN

HOLE

(R1) 14 DIAMETER

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R6

1200

GROUND CLEARANCE REQUIREMENTS

2. POLE HEIGHT DETERMINED BY FINAL

HV OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 12.5m

STAND ALONE

CABLE TO TRANSFORMER POLE

REVISION DATE

DRAWING No.

D JUNE 2011

H17-4

Page 43: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLER

131000

90

01

10

4

R6

23

0

R3

(R1) 22 DIAMETER

HOLES

R9

75

0

R7

R9

R8

80

80

R/E

OPTION 1

OP

TIO

N 2

OPTION 2

LOWER RAYCHEM SIDE

HIGHER RAYCHEM SIDE

R8

R5

R3

D.O.FUSE

DOWNLINE

R9

R9

R/E SPURS

PLAN VIEW

(R1) 14 DIAMETER

HOLES

EARTH POINT

EARTH POINT

(R1) 14 DIAMETER

HOLE

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM.REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R7

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

INTERMEDIATE TRANSFORMER (1PH)

3PH INLINE CABLES/2x1PH SPURS

WITH/WITHOUT DROPOUT FUSES

REVISION DATE

DRAWING No.

G DEC 2012

H17-5

Page 44: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

EARTH POINT

TOP OF POLE

LINE OF L.V.

(R1) 22 DIAMETER HOLES

R3

600 SQ.

EARTH

MAT

R6

EARTH SPEAR450

ROADSIDE

23

02

30

1000

1650

20

70

150

ANTI-CLIMBING GUARD

ROD GUIDE

MIN

IMU

M

(R1) 14 DIAMETER HOLES

EARTH MAT

R6R13

CABLE

AWAY

FROM

TRAFFIC

30

0

R10

R8

R9

(R1) 14 DIAMETER HOLES

72

0

3 EXTRA ROD GUIDES

REQUIRED

POSITION TO SUIT

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R7 - CABLE GUARD

R7 - CABLE GUARD

R6

97

0

75

0

STAY

RUNNING EARTH

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m/12.5m

TERMINATION POLE TOP SWITCH

WITH CABLE AND DROPOUT FUSE

REVISION DATE

DRAWING No.

F DEC 2012

H18

Page 45: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:EARTH POINT

TOP OF POLE

LINE OF L.V.

(R1) 22 DIAMETER HOLES

R3

MAT

EARTH

600 SQ.

R6

EARTH SPEAR

450

ROADSIDE

230

230

900

1650

2070

150

ANTI-CLIMBING GUARD

ROD GUIDE

MINIM

UM

(R1) 14 DIAMETER HOLES

EARTH MAT

R6R13

R7

720

650

TOP OF POLE

STAY

POSITION TO SUIT

CARRY OVER INSULATOR

PREFERRED CONSTRUCTION

H19/2 IS THE

REQUIRED

3 EXTRA ROD GUIDES

(R1) 14 DIAMETER HOLE

TRAFFIC

FROM

AWAY

CABLE

300

HV OVERHEAD REGARDING X-ARM

1. REFER TO GENERAL NOTE OF

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R7 - CABLE GUARD

R7 - CABLE GUARD

R6

970

RUNNING EARTH

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m/12.5m

TERMINATION POLE TOP SWITCH

WITH CABLE

REVISION DATE

DRAWING No.

D JUNE 2011

H19-1

Page 46: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

EARTH POINT

TOP OF POLE

LINE OF L.V.

(R1) 22 DIAMETER HOLES

R3

MAT

EARTH

600 SQ.

R6

EARTH SPEAR450

ROADSIDE

230

230

900

1650

2070

150

GF2134

IF NEEDED

CARRY OVER INSULATOR

ANTI-CLIMBING GUARD

ROD GUIDE

MINIM

UM

(R1) 14 DIAMETER HOLES

EARTH MAT

R6R13

TRAFFIC

FROM

AWAY

CABLE

720

300

DUE TO STAY POSITION.

/ POLE RATING INCLUDED IN DESIGN

AS POSSIBLE AND SOIL CONDITIONS

BRACKET AND STAY TO BE AS HIGH

2. IF THIS LAYOUT IS USED THE CABLE

HV OVERHEAD REGARDING X-ARM

1. REFER TO GENERAL NOTE OF

SEE NOTE 2

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R7 - CABLE GUARD

R7 - CABLE GUARD

R6

970

R1

RUNNING EARTH

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m/12.5m

TERMINATION POLE TOP SWITCH

WITH FEEDER CABLE

FOR FEEDER SWITCHING

REVISION DATE

DRAWING No.

D JUNE 2011

H19-2

Page 47: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

23

0

23

0

1900

400

MIN

IMU

M

ANTI-CLIMBING GUARDROD GUIDE

EARTH POINT

EARTH MATR13

R6

(R1) 14 DIAMETER HOLES

NOTE:

20

70

150

R6

ROADSIDE

EARTH

SPEAR450

600 SQ.

EARTH MAT

72

03

00

(R1) 22 DIAMETER

HOLES

R10

R3

(R1) 14 DIAMETER

HOLE

R9

R8

R8

CABLE BRACKET

TX SUPPORT

(R1) 22 DIAMETER

HOLE

(R1) 22 DIAMETER

HOLE

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

2. PG CLAMP POSITION TO ALLOW FULL OPERATION

OF P.T.S. WITHOUT STRAINING CONNECTIONS AND

LEADS

SEE NOTE 2

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R7 - CABLE GUARD

R7 - CABLE GUARD

R6

R6

R6

1000

RUNNING EARTH

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

ISOLATION TRANSFORMER

REVISION DATE

DRAWING No.

F NOV 2012

H20-1

Page 48: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLER

13 R6

NOTE:

EARTH POINT

R10

R3

R1

460

1000

1000

50

07

50

23

0

STAY

TX SUPPORT

RUNNING EARTH

R1

78

00

R3 EARTH POINT

R3

R3R5

R1 R8

R5

R8

D.O.FUSE

DOWNLINE

(R1) 22 DIAMETER

HOLES

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

2. STAY POSITION TO SUIT TAPS, MINIMUM OF 400mm

TO NEAREST HV CONDUCTOR

R14

SEE NOTE 2

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

ISOLATION TRANSFORMER

3 PHASE TERMINATION, 1 PHASE INLINE

WITHOUT 1 PHASE DROPOUT FUSE

REVISION DATE

DRAWING No.

F NOV 2012

H20-2

Page 49: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

R13 R6

NOTE:

EARTH POINT

R10

R3

R1

460

1000

1000

50

07

50

23

0

STAY

TX SUPPORT

RUNNING EARTH

R1

R3 EARTH POINT

R3

R3R5

R1

R8R5

R8

OPTION NOT

SHOWN ON

PLAN VIEW

R3

R5

1 PHASE INLINE

SECTIONAL PLAN VIEW

(R1) 22 DIAMETER

HOLES

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

2. STAY POSITION TO SUIT TAPS, MINIMUM OF 400mm

TO NEAREST HV CONDUCTOR

R14

SEE NOTE 2

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

ISOLATION TRANSFORMER

3 PHASE TERMINATION, 1 PHASE INLINE

WITH 1 PHASE DROPOUT FUSE

REVISION DATE

DRAWING No.

F NOV 2012

H20-3

Page 50: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLER

13 R6

NOTE:

EARTH POINT

R10

R12

30

STAY

TX SUPPORT

RUNNING EARTH

R1

R3

EARTH POINT

R3

R3

R5

R1

R8R5

R8

R1

50

0

R7

(R1) 22 DIAMETER

HOLES

CABLE BRACKET

R14

PLAN VIEW

460

1000

1000

50

0

75

0

78

00

(R1) 14

DIAMETER

HOLE

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

ISOLATION TRANSFORMER

3 PHASE TERMINATION, 1 PHASE CABLE

WITH/WITHOUT 1 PHASE DROPOUT FUSE

REVISION DATE

DRAWING No.

G DEC 2012

H20-4

Page 51: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

R13 R6

NOTE:

EARTH POINT

R10

R3

23

0

STAY

TX SUPPORT

RUNNING EARTH

R5 EARTH POINT

R8

R9

R5

R8

(R1) 22 DIAMETER

HOLES

1200

1000

50

07

50

CABLE BRACKET(R1) 14 DIAMETER

HOLE

R5

R7

R14

PLAN VIEW

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

2. INSULATOR REQUIRED ONLY IF DOF IS USED FOR

THE INLINE CONNECTION OTHERWISE NOT NEEDED IF

DOF IS DOWNLINE

R3

SEE NOTE 2

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

ISOLATION TRANSFORMER

3 PHASE CABLE, 1 PHASE TEE OFF

WITH/WITHOUT 1 PHASE DROPOUT FUSE

REVISION DATE

DRAWING No.

F NOV 2012

H20-5

Page 52: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLER

13 R6

NOTE:

EARTH POINT

R10

R3

R1

23

0

TX SUPPORT

RUNNING EARTH

R3 EARTH POINT

R3

R3

R5

R1

R5

R8

(R1) 22 DIAMETER

HOLES

83

01500

75

0

160

R3

R3

R3

R8

DOF/RECLOSER

DOWNLINE

PLAN VIEW

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

HEAT SHRINK OR

BAT GUARDS

R6

30

0

STAY

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

ISOLATION TRANSFORMER

3 PHASE IN-LINE, 1 PHASE TEE OFF

WITHOUT 1 PHASE DROPOUT FUSE

REVISION DATE

DRAWING No.

F NOV 2012

H20-6

Page 53: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

R13 R6

NOTE:

EARTH POINT

R10

R1

23

0STAY

TX SUPPORT

RUNNING EARTH

R1

R3

EARTH POINT

R3

R5

R5

R1

R8

(R1) 22 DIAMETER

HOLES

460

1000

1500

75

0

R14

R7

R14

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

R1

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

ISOLATION TRANSFORMER

3 PHASE TERMINATION, 1 PHASE CABLE

REVISION DATE

DRAWING No.

F NOV 2012

H20-7

Page 54: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

R13

R6

NOTE:

EARTH POINT

R3

R1

230

TOP OF TX

RUNNING EARTH

R3

R3

R5

HOLES

(R1) 22 DIAMETER

230

1200

R14

PLAN VIEW

TO NEAREST HV CONDUCTOR

2. STAY POSITION TO SUIT TAPS, MINIMUM OF 400mm

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

SEE NOTE 2

R14

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 12.5m

TERMINATION TRANSFORMER

2 PHASE LINE, 1 PHASE SPUR

REVISION DATE

DRAWING No.

D JUNE 2011

H20-8

Page 55: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

EARTH POINT

EARTH POINT

80

1200

1200

230

230

1200

1200

230230

TOP OF POLE

RUNNING EARTH

OVERHEAD RUNNING EARTH

RUNNING EARTH

(STANDARD CONSTRUCTION ONLY)

R6

R13

STANDARD CONSTRUCTION

OVERHEAD RUNNING EARTH

R3

R3

R4R1

(R1) 22 DIAMETER HOLES

HOLES

(R1) 22 DIAMETER

R4

R3R1

R1

R3

R3

R3

R3

R1

R1

R8

COMMS PANEL

OF 400mm TO HV TAPS.

3. STAY POSITION TO BE AT MINIMUM DISTANCE

----> CURRENT FLOW FROM A1 TO A2

A2 TERMINAL CLOSEST TO LOAD

2. A1 TERMINAL CLOSEST TO SOURCE

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

BAT GUARDS

HEAT SHRINK OR

R6

R6

R6

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

METERING TRANSFORMER

REVISION DATE

DRAWING No.

D JUNE 2011

H21

METER METER

Page 56: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

STAY

EARTH POINT

230

1200

750

380

80

R13 R6

(R1) 22 DIAMETER HOLES

R3

R5

R3

OVERHEAD RUNNING EARTH

POINT

EARTH

OF 400mm TO HV TAPS.

2. STAY POSITION TO BE AT A MINIMUM DISTANCE

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

SEE NOTE 2

R14

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 14m

INTERMEDIATE WISHBONE

WITH OVERHEAD EARTHWIRE

REVISION DATE

DRAWING No.

C JUNE 2011

H22

Page 57: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

EARTH POINT

EARTH POINT

R13 R6

80

300

1200

230

STAY

OVERHEAD RUNNING EARTH

R1

R1

R1

R1

R5R5

R3

R4

R4

R3

R14

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

INTERMEDIATE FLAT CONSTRUCTION

WITH OVERHEAD EARTHWIRE

REVISION DATE

DRAWING No.

C JUNE 2011

H23

Page 58: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

EARTH POINT

NOTE:

TOP OF POLE

1200

230

900

230

R13

R6

R1

PH N

1200

TX SUPPORT

RUNNING EARTH

L.V.

R5

EARTH POINT

R3 R5

R5

R14

R8

HOLES

(R1) 22 DIAMETER

R12

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEADRESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 12.5m

TERMINATION TRANSFORMER

WITH OVERHEAD EARTH

REVISION DATE

DRAWING No.

D JUNE 2011

H24

Page 59: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R3OVERHEAD RUNNING EARTH

80

23

0

38

07

50

1000

95

02

25

01200

R13

R6

EARTH POINT

EARTH

POINT

23

0(R1) 22 DIAMETER

HOLES

(R3) CENTRE PHASE

R3

R8

R8

R8

R10

(R1) 22 DIAMETER HOLES

R1

R12

PH N

L.V.

TX

1. REFER TO GENERAL NOTE OF HV

OVERHEAD REGARDING X-ARM.

REFER R6 FOR EARTH RESISTANCE REQUIREMENTS

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 14m

INTERMEDIATE TRANSFORMER

WISHBONE CONSTRUCTION

REVISION DATE

DRAWING No.

G DEC 2012

H25

Page 60: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

STAY

750

1200

1200

1200

230

75

75

250

75

325

75

325

75

R5

R5

R5

R5

R14

R3

R3

R3

R3

R3R5

RUNNING EARTH

EARTH POINT

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 14m

VERTICAL IN-LINE STRAIN

WITH OVERHEAD EARTHWIRE

FOR WISHBONE CONSTRUCTION

REVISION DATE

DRAWING No.

C JUNE 2011

H26

Page 61: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

EARTH POINT

230

1000

750

380

80

R13 R6

(R1) 22 DIAMETER HOLES

R3

R3

R3

OVERHEAD RUNNING EARTH

POINT

EARTH

750

R3

R3R5R1

R1

R5

R3

R3

230

OVERHEAD REGARDING X-ARM.

1. REFER TO GENERAL NOTE OF HV

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 14m

WISHBONE CONSTRUCTION

WITH TEE-OFF

REVISION DATE

DRAWING No.

C JUNE 2011

H27

Page 62: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

STAY

RUNNING EARTH

1200

1200

1200

230

600

600

600

600

75

75

75

75

75

75

STAY

R3

R3

R3

R3

R5

R5

R5

R5

R14

R14

EARTH POINT

R5R14

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 14m

VERTICAL STRAIN ANGLE

WITH OVERHEAD EARTHWIRE

FOR WISHBONE CONSTRUCTION

REVISION DATE

DRAWING No.

C JUNE 2011

H28

Page 63: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

EARTH POINT

R6

R13

500

1500

1200

NO

TE 10

DRAIN HOLE AT BOTTOM

N PH

BAND-IT STRAPS

2-3 METERS.

10. SEPERATION TO LOWEST CONDUCTOR SHOULD BE

ISOLATED PRIOR TO MAINTAINANCE.

9. SINGLE PHASE CONNECTION BOX - ENCLOSURE TO BE

EXPOSURE.

INSTALLED ON SOUTH SIDE OF POLE TO MINIMISE U.V.

8. ARRANGEMENT DEPENDANT ON ANTENNA, USUALLY

7. WARNING SIGN (SEE L00-1704)

REFLECTIVE NUMBERS ON ROAD SIDE OF ENCLOSURE.

6. FAULT INDICATOR NUMBER TO BE DISPLAYED WITH

BASE.

5. ORIENTATION OF ANTENNA DEPENDANT ON SELECTED RADIO

OVER COAX BUNDLED AND SECURED AGAINST POLE.

4. CORRUGATED CONDUIT FITTED AS MECHANICAL PROTECTION

3. 25mm CONDUIT FOR MECHANICAL PROTECTION OF CABLES.

2. CONNECTION TO LV DEPENDANT ON SUPPLY ARRANGEMENTS.

X-ARM.

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING

SEE NOTE 7

SEE NOTE 5

SEE NOTE 8

SEE NOTE 4

SEE NOTE 3

SEE NOTE 6

SEE NOTE 9

SEE NOTE 2

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

FAULT INDICATOR

L.V. AERIAL SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

C JUNE 2011

H29-1

0

9

4

7

6

4

2

CBC 1C6

THIS ANTENNA IS EARTHED

OBSTRUCTED. RESTORE WHEN FINISHED

REMOVE ANTENNA IF WORK AREA IS

ANTENNA CABLE AT CONTROL BOX.

TO ISOLATE FROM EARTH DISCONNECT

WARNING

Page 64: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

EARTH POINT

R6

R13

500

DRAIN HOLE AT BOTTOM

BAND-IT STRAPS

1200

NO

TE 8

STRAPS OR BOLT AS PERMITTED.

9. ALTERNATIVELY FITTED DIRECTLY TO POLE WITH BAND-IT

2-3 METERS.

8. SEPERATION TO LOWEST CONDUCTOR SHOULD BE

EXPOSURE.

INSTALLED ON SOUTH SIDE OF POLE TO MINIMISE U.V.

7. ARRANGEMENT DEPENDANT ON ANTENNA, USUALLY

REFLECTIVE NUMBERS ON ROAD SIDE OF ENCLOSURE.

6. FAULT INDICATOR NUMBER TO BE DISPLAYED WITH

BASE.

5. ORIENTATION OF ANTENNA DEPENDANT ON SELECTED RADIO

OVER COAX BUNDLED AND SECURED AGAINST POLE.

4. CORRUGATED CONDUIT FITTED AS MECHANICAL PROTECTION

3. 25mm CONDUIT FOR MECHANICAL PROTECTION OF CABLES.

2. SOLAR PANELS TO BE FACING NORTH

X-ARM.

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING

SEE NOTE 5

SEE NOTE 4

SEE NOTE 3

SEE NOTE 7

SEE NOTE 6

SEE NOTE 9SEE NOTE 2

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

FAULT INDICATOR

WITH SOLAR CELL SUPPLY

ARRANGEMENT

REVISION DATE

DRAWING No.

C JUNE 2011

H29-2

0

9

4

7

6

4

2

THIS ANTENNA IS EARTHED

OBSTRUCTED. RESTORE WHEN FINISHED

REMOVE ANTENNA IF WORK AREA IS

ANTENNA CABLE AT CONTROL BOX.

TO ISOLATE FROM EARTH DISCONNECT

WARNING

Page 65: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

(mm)

X-ARM LENGTH

1350

2100

80

EARTH POINT

R13 R6

TOP BOLT HOLE

LINE OF L.V.

SURGE ARRESTOR

ABC TAPS

1300mm LG.

900mm LG.900mm LG.

"X"

230

230

"Y"

80

Y (mm)

300

300

>=900

<900 NOTE 2

>=900

<900

NOTE 2

X (mm)

ALTERNATIVE METHODS USED TO MEET L.V. CLEARANCE.

3. IF BREASTPLATE FITTED, X MUST BE 300mm AND

LIVE LINE CREW.

2. WORK MUST BE UNDERTAKEN DE-ENERGISED OR BY

REGARDING X-ARM

1. REFER TO GENERAL NOTE OF HV OVERHEAD

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

OR BAT GUARDS

HEAT SHRINK

R6

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m/12.5m

SURGE ARRESTOR

STANDARD LINE INSTALLATION

REVISION DATE

DRAWING No.

D JUNE 2011

H30

Page 66: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

EARTH POINT

NOTE:

TOP OF POLE

R6R13

(R1) 22 DIAMETER

HOLES

NL C T

AC LINE

(BLACK)

NEUTRAL

(ORANGE)

CLOSE

(BLUE)

TRIP

(RED)

POWER - ACTIVE NEUTRAL TO CONTROLLER

TO TRANSFORMER L.V.

SECTION A-A

TERMINAL STRIP ON CAPACITOR BANK

27

00

1200

90

0

23

01000

TO CAPACITOR DOF

TO PHASE TO PHASE

DOF NOT

REQUIRED

FOR 1

BUSHING TX

CONTROL CABLE

(CONNECT TO TERMINAL

STRIP ON FRAME)

EARTH

CONTROL BOX

AA

(R1) 22 DIAMETER

HOLES

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING

X-ARM

2. FRAME AND CONTROL BOX MUST BE GROUNDED WITH

70mm2 STRANDED COPPER.

3. WARNING SIGN FITTED 1.8m - 2m ON CAPACITOR FUSE

SIDE.

4. LV ABC CABLE TO BE USED FOR PHASE CONNECTIONS.

1000kVAR BANKS REQUIRE 40 AMP DOFS

500kVAR BANKS REQUIRE 20 AMP DOFS

5. FIT SIGN "TRANSFORMER MUST BE SET TO TAP 1.

6. ADJUST TRANSFORMER TAP POSITION AND TX DATA PLATE.

7. SWITCH TERMINALS TO BE PROTECTED BY INSULATING CAPS

NOTE 7

NOTE 3

NOTE 5

NOTE 6

R6

R6

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

22kV POLE MOUNTED CAPACITOR BANK

WITH 10kVA TRANSFORMER

CONNECTION DETAILS

REVISION DATE

DRAWING No.

F NOV 2012

H31-2

Page 67: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

R6R13

23

06

00

23

01335

(R1) 22 DIAMETER

HOLES

440

1200

47

6

22

35

30

04000

27

00

LAYOUT FOR

OPTIONAL

UPPER X-ARM

OIL SWITCH

23

0

CONTROL BOX

RUNNING EARTH

L.V. SUPPLY

STAY

CAPACITOR

(R1) 22 DIAMETER

HOLES

COMMON

R3W3

B3

B2B1

W2

W1

R2

R1

VIEW OF LOWER X-ARM

VIEW OF UPPER X-ARM

R4

B4

W4

UPPER X-ARM

LOWER X-ARM

LOWER X-ARM

OIL SWITCH

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

33kV TYPE TSC OIL SWITCH

AND CAPACITOR

POLE MOUNTED

REVISION DATE

DRAWING No.

F DEC 2012

H32-1

Page 68: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

R6R13

(R1) 22 DIAMETER

HOLES

RUNNING EARTH

TX SUPPORT

RW

B

TOP OF POLE

23

04

05

23

01900

36

50

60

0

(AP

PR

OX

)

STAY

L.V. SUPPLY

35

0340

R

B

W

WB R

PLAN VIEWREFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM

2. FRAME AND CONTROL MUST BE GROUNDED WITH 70mm2

STRANDED COPPER CABLE.

3. LV ABC CABLE TO BE USED FOR PHASE CONNECTIONS

4. FIT SIGN "TRANSFORMER MUST BE SET TO TAP 1".

5. ADJUST TRANSFORMER TAP POSITION AND Tx DATA PLATE

HEAT SHRINK OR

BAT GUARDS

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

33kV SINGLE PHASE TRANSFORMER

POLE MOUNTED

REVISION DATE

DRAWING No.

G DEC 2012

H32-2

Page 69: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

R6R13

23

0635

1540

865

(R1) 22 DIAMETER

HOLES450

2040

47

6

27

00

OIL SWITCH 2405

CONTROL BOX

RUNNING EARTH

CAPACITOR

R

W

B

TOP OF POLE

L.V. SUPPLY

(R1) 22

DIAMETER

HOLES

R/E

RUNNING EARTH

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF

HV OVERHEAD REGARDING X-ARM

HEAT SHRINK OR

BAT GUARDS

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

33kV TYPE TSC OIL SWITCH

AND CAPACITOR

ARRANGEMENT

REVISION DATE

DRAWING No.

G DEC 2012

H32-3

Page 70: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

R W B

39

00

39

00 1700 1700

LOAD

SOURCE

1 B

AY

23

0

23

0

A

A

SECTION

E

KING BOLT HOLE

RUNNING EARTH

A

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

VOLTAGE REGULATOR - 11m

IN-LINE LAYOUT

TYPE GE VR-1 50A-100A

DETAILS

REVISION DATE

DRAWING No.

E DEC 2012

H33-1

52

0

SE

E

NO

TE

2

1. REFER R6 FOR EARTH RESISTANCE

REQUIREMENTS.

2. 520mm STANDARD CONSTRUCTION 350mm ALLOWED

TO MAINTAIN GROUND CLEARANCE.

Page 71: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

23

0

80

1200

23

0

1800

R13

27

00

4100

MIN

IMU

M

SE

E N

OT

E 2

(R1) 22 DIAMETER

HOLES

630290

50

0

SURGE

ARRESTOR

STAY

IF REQ’D

INLINE

DOF

CONTROL

BOX

1200

R/E

DIS

T T

O S

UIT

VR BASE

EARTH

POINT

EARTH LINK

BETWEEN

REG. POLES

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

2. VOLTAGE REGULATOR TYPE 95kV BIL

DISTANCE - 50A: 2380

- 100A: 2550

3. MINIMUM 6kN POLE

4. LOCAL AND SOIL CONDITIONS MAY REQUIRE STAYS

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

VOLTAGE REGULATOR - 11m

IN-LINE DETAIL

TYPE GE VR-1 50A-100A

CONSTRUCTION DETAIL

REVISION DATE

DRAWING No.

G DEC 2012

H33-2

Page 72: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

CSECTION

E

C

3000 3000 10000

B

B

BSECTION

23

0

80

23

0

R/E

1 B

AY

23

0

23

0

R/E

OFFSET

X-ARM

X-ARM

X-ARMCENTRE PHASE

STAY

SEE NOTE 2

SEE NOTE 2

REFER DRG. No. H33/4

SECTION D

T-OFF STAY

SEE NOTE 3.

T-OFF STAY

SEE NOTE 3

IN-LINE 100A

DOF N/O

1. REFER R6 FOR EARTH RESISTANCE

REQUIREMENTS

2. ISOLATORS ON REGULATOR POLE

OR AT BOTH T-OFF POLES.

3. OFFSET ARM SLACK STRAIN, FOR FULL

STRAIN USE H33-3A (H13 (DCS) T-OFF)

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

VOLTAGE REGULATOR - 11m

OFF-SET DETAIL

TYPE GE VR-1 50A-100A

ARRANGEMENT

REVISION DATE

DRAWING No.

E DEC 2012

H33-3

1200

635

1200

Page 73: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

CSECTION

E

C

3000 3000 10000

B

B

BSECTION

23

0

80

23

0

R/E

1 B

AY

23

0

23

0

R/E

OFFSET

X-ARM

X-ARM

X-ARMCENTRE PHASE

STAY

SEE NOTE 2

SEE NOTE 2

REFER DRG. No. H33/4

SECTION D

T-OFF STAY

SEE NOTE 3.

T-OFF STAY

SEE NOTE 3

IN-LINE 100A

DOF N/O

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

VOLTAGE REGULATOR - 11m

OFF-SET DETAIL

TYPE GE VR-1 50A-100A

DETAILS

REVISION DATE

DRAWING No.

E DEC 2012

H33-3A

1200

635

1200

1. REFER R6 FOR EARTH RESISTANCE

REQUIREMENTS

2. ISOLATORS ON REGULATOR POLE

OR AT BOTH T-OFF POLES.

3. FULL STRAIN (REFER H13 DCS)

FOR OFFSET ARM SLACK STRAIN USE H33-3.

Page 74: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

23

0

80

R13

27

00

4100

MIN

IMU

M

SE

E N

OT

E 2

CONTROL

BOX

VR BASE

EARTH

POINT

80

23

01000

23

01800

DIS

TA

NC

E

TO

SU

IT

STAY

(R1) 22

DIAMETER

HOLES

DSECTION

Sht 3

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM

2. VOLTAGE REGULATOR TYPE 95kV BIL - DISTANCE - (50A: 2380mm) - 100A: (2550mm)

3. MINIMUM 6kN POLE

4. LOCAL AND SOIL CONDITIONS MAY REQUIRE STAYS.

5. EARTH LINK REQUIRED BETWEEN REGULATOR POLES.

6. ISOLATORS ON REGULATOR POLE OR AT BOTH T-OFF POLES.

7. 1800mm WITH ISOLATORS OR 1200mm WITHOUT.

SE

E N

OT

E 7

SEE NOTE 5

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

VOLTAGE REGULATOR - 11m

OFF-SET DETAIL

TYPE GE VR-1 50A-100A

CONSTRUCTION DETAIL

REVISION DATE

DRAWING No.

G DEC 2012

H33-4

(B PHASE) (W PHASE)

AERIAL

STAY

Page 75: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

350

230

230

TOP OF POLE

RUNNING EARTH

R3

R1

R3

R4

EARTH POINT

R13 R6

R1

EARTH POINT

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE INTERMEDIATE

REVISION DATE

DRAWING No.

C JUNE 2011

H40-1

Page 76: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

RUNNING EARTH

R3

R1

R3

R4

EARTH POINT

R13 R6

230

230

EARTH POINT

HEAT SHRINK

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE

ANTI CLASH/GALAH INTERMEDIATE

REVISION DATE

DRAWING No.

C JUNE 2011

H40-2

Page 77: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R5

R3

EARTH POINT

R13 R6

230

300

EARTH POINT

900

EARTH POINT

R14

RUNNING EARTH

PHASE

RUNNING DISC ANGLE

EARTH

RUNNING DISC ANGLE

19.1kV NETWORK.

1. STAY TO BE BONDED TO EARTH ON

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE

RUNNING DISC ANGLE OR TERMINATION

REVISION DATE

DRAWING No.

C JUNE 2011

H41-1

Page 78: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

RUNNING EARTH

R1

R4

EARTH POINT

R13 R6

300

75

300

1200

230

1500

230

230

(R3) CARRY OVER INSULATOR

RUNNING EARTH

LO

NG

ER

BA

Y

SID

E

POINT

EARTH

EARTH POINT

MANUAL REFERENCE.

FOR 33kV, OPTIONAL FOR 22kV. R14 CONSTRUCTION

POSITIONED TO AVOID CONTACT. BONDED TOGETHER

2. R/E TERMINATIONS AND STAY WIRE (EYEBOLT)

1. RUNNING EARTH POSITION IF NOT TERMINATED.

SEE NOTE 1

SEE NOTE 2

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE

TWO WAY TERMINATION

REVISION DATE

DRAWING No.

C JUNE 2011

H41-2

Page 79: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

RUNNING EARTH

R3

R4

EARTH POINT

R13 R6

23

02

30

1200

30

07

5

75

R3

R3

R3

R4

R1

R5R10

R5

STAY

14 DIAMETER HOLES

R14

40

EARTH POINT

1. STAY TO BE BONDED TO EARTH ON 19.1kV NETWORK.

2. STAY NOT REQUIRED FOR SLACK BAY ARRANGEMENT.

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE INTERMEDIATE WITH TEE OFF

WITH DROPOUT FUSE

REVISION DATE

DRAWING No.

E NOV 2012

H42

Page 80: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

350

230

230

TOP OF POLE

RUNNING EARTH

R3

R1

R3

R4

EARTH POINT

R13 R6

1200

300

600

R5

R1

R5

R14

EARTH POINT

R3

RUNNING EARTH

STAY

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH ARRANGEMENT.

2. STAY NOT REQUIRED FOR SLACK BAY

19.1kV NETWORK.

1. STAY TO BE BONDED TO EARTH ON

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE INTERMEDIATE WITH TEE OFF

WITHOUT DROPOUT FUSE

REVISION DATE

DRAWING No.

C JUNE 2011

H43

Page 81: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

EARTH POINT

R13 R6

EARTH POINT

RUNNING EARTH

230

230

75

75

1200

75

R5

R5

R5

R5

R3

R3

R14

R14

A A

TWIN EARTHS

SECTION A-A

R5

19.1kV NETWORK.

1. STAY TO BE BONDED TO EARTH ON

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE

DOUBLE TERMINATION

REVISION DATE

DRAWING No.

C JUNE 2011

H44

Page 82: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

R3

R1

R3

R4

EARTH POINT

R13 R6

R1

R5EARTH POINT

RUNNING EARTH

230

230

930

40

850

RUNNING EARTH

STANDOFF BRACKET

HOLES

(R1) 14 DIAMETER

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE SLACK TEE-OFF

WITHOUT DROPOUT FUSE

REVISION DATE

DRAWING No.

C JUNE 2011

H45

Page 83: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

R3

R4

R13

R6

R3

R4

R1

35

023

02

30

35

0

1500

30

0

R3R1

R10

16mm2

XLPE

(R1) 22 DIAMETER HOLES

R/E

TX SUPPORT

16mm2

XLPE

EARTH POINT

1000 W

ITH

OU

T D

OF

(R1) 14 DIAMETER HOLES

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

EARTH POINT (R6)

25sqmm DOWN EARTH (R6)

a2

a1

a3

a4

25sqmm PVC COVERED

COPPER DOWN EARTH

TO EARTH POINT

16sqmm TAP

TERMINAL BLOCK

SERVICE

NEUTRAL 100A FUSE HOLDER

QUICK LUGS TO 25sqmm

DOWN EARTH

TRANSFORMER

WIRING DETAILS

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE

INTERMEDIATE TRANSFORMER

WITH OR WITHOUT DROPOUT FUSE

REVISION DATE

DRAWING No.

F NOV 2012

H46

Page 84: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R13 R6

R3 R10

16mm2

XLPE

(R1) 22 DIAMETER HOLES

16mm2

XLPE

23

03

00

90

02

50

30

0

23

0

STAY

RUNNING EARTH

Tx SUPPORT

Tx SUPPORT

R5

R5R14

(R1) 14 DIAMETER HOLES

90

1. STAY TO BE BONDED TO EARTH ON

19.1kV NETWORK.

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

a2

a1

a3

a4

25sqmm PVC COVERED

COPPER DOWN EARTH

TO EARTH POINT

16sqmm TAP

TERMINAL BLOCK

SERVICE

NEUTRAL 100A FUSE HOLDER

QUICK LUGS TO 25sqmm

DOWN EARTH

TRANSFORMER

WIRING DETAILS

EARTH POINT

25sqmm DOWN EARTH (R6)

EARTH POINT (R6)

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE

TERMINATION TRANSFORMER

WITH OR WITHOUT DROPOUT FUSE

REVISION DATE

DRAWING No.

F NOV 2012

H47-1

Page 85: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

TOP OF POLE

R13

R6

16mm2

XLPE

RUNNING EARTH

Tx SUPPORT

(R1) 14 DIAMETER HOLES

23

02

30

635

180

1500

25

03

00

Tx SUPPORT

(R1) 22 DIAMETER

HOLES

R3

R3

R4

R4

R1

R1

R10

16mm2

XLPE

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

HEAT SHRINK

OR BAT GUARDS

NOTE:

1. REFER TO GENERAL NOTE OF HV OVERHEAD

REGARDING X-ARM

a2

a1

a3

a4

25sqmm PVC COVERED

COPPER DOWN EARTH

TO EARTH POINT

16sqmm TAP

TERMINAL BLOCK

SERVICE

NEUTRAL 100A FUSE HOLDER

QUICK LUGS TO 25sqmm

DOWN EARTH

TRANSFORMER

WIRING DETAILS

EARTH POINT (R6)

25sqmm DOWN EARTH (R6)

EARTH POINT

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 12.5m

3 PH INTERMEDIATE WITH SINGLE PHASE

TRANSFORMER WITH DROPOUT FUSE

REVISION DATE

DRAWING No.

F NOV 2012

H47-2

Page 86: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

2/09/2016 10:31:56 AM ___H:\00 - Temp - 00\HP\AB\H48-1.dgn___GIS900526___mleroux

Page 87: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

2/09/2016 10:37:38 AM ___H:\00 - Temp - 00\HP\AB\H48-2.dgn___GIS900526___mleroux

Page 88: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

2/09/2016 11:03:48 AM ___H:\00 - Temp - 00\HP\AB\H49_C.dgn___GIS900526___mleroux

Page 89: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

2/09/2016 10:58:42 AM ___H:\00 - Temp - 00\HP\AB\H50_C.dgn___GIS900526___mleroux

Page 90: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

23

0

20

0 80

1200

1200

450

675

R13

27

00

TOP OF POLE

LOAD LINE

SURGE ARRESTOR

20 BAND-IT STRAP

LINE OF L.V.

RUNNING EARTH

LV ABC OR

16mm2 XLPE

CONTROL

R6

R10

(R1) 22

DIAMETER

HOLES

(R1) 22 DIAMETER HOLES

LV ABC OR

16mm2 XLPE

STANDARD CONSTRUCTION

EARTH POSITION

COMMS CABLE

MAX. DIST. AWAY

FROM L.V. AND EARTH

R36

C.B. OR FUSES

ALTERNATE POSITION

OF RUNNING EARTH

DOWN EARTH NOTE:

SURGE ARRESTORS DIRECT MOUNTED ON RECLOSER/FRAME

CONSIDERED EARTHED.

THE EARTH OF SEPARATE SURGE ARRESTORS (CROSSARM ETC.) TO

BE CONNECTED TO THE RECLOSER EARTH STUD OR AS COLSE AS

POSSIBLE ONTO THE MAIN EARTH.

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM.

2. PHASE TO EARTH SEPARATED MIDBAY TO BE MAINTAINED.

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

R6

EARTH POINT (R6)

70sqmm DOWN EARTH (R6)

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE RECLOSER

STRAIN TERMINATION WITH

SINGLE PHASE TRANSFORMER SUPPLY

REVISION DATE

DRAWING No.

F NOV 2012

H51-1

Page 91: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

23

01000

1200

450

TOP OF POLE

LOAD

SURGE ARRESTOR

LINE OF L.V.

RUNNING EARTH

R6

EARTH POINT

(R1) 22 DIAMETER HOLES

LV ABC OR

16mm2 XLPE

COMMS CABLE

MAX. DIST. AWAY

FROM L.V. AND EARTH

R36

C.B. OR FUSES

DOWN EARTH NOTE:

SURGE ARRESTORS DIRECT MOUNTED ON RECLOSER/FRAME

CONSIDERED EARTHED.

THE EARTH OF SEPARATE SURGE ARRESTORS (CROSSARM ETC.) TO

BE CONNECTED TO THE RECLOSER EARTH STUD OR AS COLSE AS

POSSIBLE ONTO THE MAIN EARTH.

R13

27

00

R3

R4

R1

R10

SOURCE

(R1) 22 DIAMETER

HOLE

TX

SUPPLY

RECLOSER

BYPASS

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM.

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE RECLOSER

INLINE WITH

SINGLE PHASE TRANSFORMER SUPPLY

REVISION DATE

DRAWING No.

F NOV 2012

H51-2

Page 92: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

23

0

80

1780

1530

450

675

R13

27

00

TOP OF POLE LOAD LINE

SURGE ARRESTOR

LINE OF L.V.

RUNNING EARTH

CONTROL

R6

R10

(R1) 22 DIAMETER HOLES

STANDARD CONSTRUCTION

EARTH POSITION

COMMS CABLE

MAX. DIST. AWAY

FROM L.V. AND EARTH

R36

C.B. OR FUSES

DOWN EARTH NOTE:

SURGE ARRESTORS DIRECT MOUNTED ON RECLOSER/FRAME

CONSIDERED EARTHED.

THE EARTH OF SEPARATE SURGE ARRESTORS (CROSSARM ETC.) TO

BE CONNECTED TO THE RECLOSER EARTH STUD OR AS COLSE AS

POSSIBLE ONTO THE MAIN EARTH.

80

LV ABC OR

16mm2 XLPE

WITH L/L CLAMPS

(R1) 22 DIAMETER

HOLE

EARTH POINT

R8 LV ABC

R14

1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM.

REFER R6 FOR EARTH

RESISTANCE REQUIREMENTS

R6

R6

DISTRIBUTION CONSTRUCTION

STANDARDS

OPERATIONS

STRUCTURE - 11m

SINGLE PHASE RECLOSER

IN-LINE DOF/STANDOFF BRACKETS

WITH SINGLE PHASE TRANSFORMER SUPPLY

REVISION DATE

DRAWING No.

G DEC 2012

H51-3

EARTH

POINT

27

0

Page 93: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

RUNNING EARTH

R3

EARTH POINT

R13 R6

EARTH POINT

R8

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m

DOWN EARTH-RUNNING EARTH

REVISION DATE

DRAWING No.

C JUNE 2011

H52

Page 94: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

TOP OF POLE

R3

EARTH POINT

EARTH POINT

R13 R6

230

80

1400

270

STAND OFF

RUNNING EARTH

LOADLINE

HOLES

(R1) 14 DIAMETER

R3R5

DOF SECTIONALISER

12.5m POLE IF INADEQUATE GROUND CLEARANCE.

1. USE 11m POLE.

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m/12.5m

SINGLE PHASE INLINE STRAIN WITH

SECTIONALISER AND BY-PASS FUSE

REVISION DATE

DRAWING No.

C JUNE 2011

H53

Page 95: Part 4 – HV Overhead – Drawing Register · PDF file22kV Pole Cap Bank with 10kVA Transformer Connection Details . ... STRUCTURE - 11m ... TOP OF POLE STAYS DOUBLE TERMINATION SINGLE

NOTE:

EARTH POINT

EARTH POINT

R13 R6

RUNNING EARTH

R3

450

860

230

400

230

LINE OF L.V.

TOP OF POLE

STAY

R5

R5

R14

R3 R3

R7

R7

R9

RESISTANCE REQUIREMENTS

REFER R6 FOR EARTH

RUNNING EARTH AND L.V. LOWERED TO SUIT.

H9 DIMENSION 400 WILL BE 900.

1. IF FUSES FITTED SEE H8 FOR LOCATION THEN

STANDARDS

DISTRIBUTION CONSTRUCTION

OPERATIONS

STRUCTURE - 11m/12.5m

SINGLE PHASE TERMINATION CABLE

WITH DROPOUT FUSE UPSTREAM

REVISION DATE

DRAWING No.

C JUNE 2011

H54