    High ReliabilityHigh Reliability

    Power System DesignPower System Design

    Keene M. Matsuda, P.E.Regional Electrical Manager

    Senior Member IEEEIEEE/PES Distinguished Lecturer

    [email protected]

    Buenos Aires, ArgentinaJune 25 & 26, 2009

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    2/224

    Page - 2

    Motors

    Component Energy Loss, FL (%)Motors: 1 to 10 Hp 14.00 to 35.00Motors: 10 to 200 Hp 6.00 to 12.00Motors: 200 to 1500 Hp 4.00 to 7.00Motors: 1500 Hp and up 2.30 to 4.50

    Variable Speed Drives 6.00 to 15.00Motor Control Centers 0.01 to 0.40MV Starters 0.02 to 0.15MV Switchgear 0.005 to 0.02

    LV Switchgear 0.13 to 0.34

    Reference: ANSI/IEEE Standard 141 (Red Book), Table 55

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    3/224

    Page - 3

    Motors

    z Motor driven systems represent about 60% of allelectrical energy used

    z Energy Policy Act of 1992 set min efficiencies formotors in the U.S.

    z Manufacturers have increased motor efficiencies inthe interim

    z Premium-efficiency motors can therefore decrease

    lossesReference: Copper Development Association

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    4/224

    Page - 4

    Variable Frequency Drives

    z Very common device for energy efficiency

    z AC to DC to Variable output with V/Hz constant

    z Not suitable in all cases

    z Optimum: Must have varying load

    z Or dictated by application

    z Example: Chemical feed pumps, small Hp, but

    precise dosing

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    5/224

    Page - 5

    Variable Frequency Drives

    Reference: Energy Savings in Industry, Chapter 5, UNEP-IETC

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    6/224

    Page - 6

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    7/224

    Page - 7

    Cables from VFDs to Motors

    z VFDs convert 480 V at 60 Hz to a variable voltagewith variable frequency

    z VFD holds constant the ratio of V/Hz

    z Nominal is 480 V/60 Hz = 8.0 at 100% motor speed

    z If you want 50% speed, reduce the voltage to 240 V

    z But need to correspondingly reduce the frequency by50% or else motor wont operate

    z Thus frequency is 30 Hz at 240 V, or 240 V/30 Hz = 8.0constant

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    8/224

    Page - 8

    Cables from VFDs to Motors

    z Same for any speed in the operating range

    z If you want 37% speed:

    z 480 V x 0.37 = 177.6 V

    z If V/Hz is held constant at 8.0,

    z Then frequency is V/8.0 = 177.6 V/8.0 = 22.2 Hz

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    9/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    10/224

    Page - 10

    Cables from VFDs to Motors

    z This shielding can easily be a steel conduit

    z This works if the conduit is dedicated between theVFD and the motor

    z If part of the cable run is in underground ductbank,

    then the PVC conduit in the ductbank no longerprovides that shielding

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    11/224

    Page - 11

    Cables from VFDs to Motors

    z Possible to install a steel conduit thru the ductbankto counteract

    z But that would then restrict flexibility in the future tomove these VFD cables to a spare conduit whichwould then be PVC

    z Too costly to install all ductbank with RGS conduit

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    12/224

    Page - 12

    Cables from VFDs to Motors

    z Also, if the cables pass thru a manhole or pull boxalong the way, it is very difficult to keep the VFDcables sufficiently separated from the other normalcircuits

    z If EMF is a problem with adjacent circuits, easy

    solution is to select 600 V, 3-conductor, shieldedcables

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    13/224

    Page - 13

    Cables from VFDs to Motors

    z However, the true nature of the EMF problem fromVFD cables is not well known or calculated

    z Much depends on the type of VFD installed, 6-pulse,12-pulse, 18-pulse

    z If there is an reactor on the output of the VFDz How well the reactor mitigates harmonics

    z What the length of the cable run is, i.e., introducing

    impedance in the circuit from the cable

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    14/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    15/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    16/224

    Page - 16

    California Title 24

    z Californias mandate for energy efficiency

    z Three major elements: architectural design, HVAC,lighting

    z Lighting: limiting watts/sq ft by room classification,

    motion sensors, etc.z Title 24 revised Oct 2005 to close loopholes

    z Prior: lighting indoors in air condit ioned spaces

    z Now: all lighting indoors and now outdoors

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    17/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    18/224

    Page - 18

    Lighting Design

    z Outdoor lighting on poles more complicated

    z Factors:Pole heightPole spacingFixtures per poleFixture lamps type

    Fixture wattageFixture light distribution pattern

    z Photometric analysis using software (Visual, AGI32,etc.)

    z Calculate average fc illumination & uniformity

    z Life safety illumination for egress: 1 fc average, 0.1 fcone point

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    19/224

    Page - 19

    Photometric Calculations Lighting

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    20/224

    Page - 20

    Photometric Calculations Lighting

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    21/224

    Page - 21

    Photometric Calculations Lighting

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    22/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    23/224

    Page - 23

    Photometric Calculations Lighting

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    24/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    25/224

    Page - 25

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    26/224

    Page - 26

    K-Factor Calculations Dry-Type Transformers

    z K-Factor is a measure of the amount of harmonics ina power system

    z K-Factor can be used to specify a dry-typetransformer such that it can handle certain levels ofharmonic content

    z K-Factor rated transformers are generally built tobetter dissipate the additional heat generated fromharmonic current and voltage

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    27/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    28/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    29/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    30/224

    Page - 30

    K-Factor Calculations Dry-Type Transformers

    z To calculate K-Factor, must have a power systemsanalysis software program like ETAP or SKM, etc.

    z Model all harmonic-producing equipment: biggestculprit is the 6-pulse VFD

    z

    Formula for calculating K-Factor:

    K-Factor = Ih p.u.2 x h2

    z Where, Ih p.u. = Current harmonic in per unit

    z

    Where, h = Odd harmonic (3, 5, 7, 9, 11, 13, etc.)

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    31/224

    Page - 31

    K-Factor Calculations Dry-Type Transformers

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    32/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    33/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    34/224

    Page - 34

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    35/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    36/224

    Page - 36

    System Design Summary

    z A. Prepare Load Study Calculation

    z

    B. Size Transformer to 480 V Loadsz C. Size 480 V Motor Control Center (MCC)

    z D. Select Short Circuit Rating of 480 V MCC

    z E. Size 480 V Feeder from Transformer to MCC

    z F. Size Transformer 12 kV Primary Disconnect

    z G. Select Surge Protection at Transformer Primary

    z H. Size 12 kV Feeder to Transformer (MV Cable)

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    37/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    38/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    39/224

    Page - 39

    System Design: Load Study

    1 of 4

    4 of 4

    3 of 42 of 4

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    40/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    41/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    42/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    43/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    44/224

    Page - 44

    System Design: Load Study

    z View 3 of 4:

    z

    Connected values represent any load connected tothe power system regardless of operation or not

    z Running values represent actual operating loads atmax demand

    z If a pump is a standby, or backup, or spare, thispump would be turned off, or shown as zero, in therunning columns

    z The Demand Factor entry of zero is what turns offany particular load

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    45/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    46/224

    Page - 46

    System Design: Load Study

    Off

    On

    Off

    On

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    47/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    48/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    49/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    50/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    51/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    52/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    53/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    54/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    55/224

    Page - 55

    System Design: Load Flow Study

    z Before a short circuit study can be performed usingpower systems analysis software, a model of the

    power system must be created

    z System modeling parameters include the following:

    z - Utility short circuit contribution

    z - Transformers

    z - Motors

    z - Conductor sizes and lengths

    z - On-site generation, etc.

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    56/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    57/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    58/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    59/224

    Page - 59

    System Design: Sample Short Circuit Study

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    60/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    61/224

    S t D i Sh t Ci it f 480 V MCC

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    62/224

    Page - 62

    System Design: Short Circuit of 480 V MCC

    z If power systems analysis software is not available,can use a conservative approximation

    z The MVA method represents the worst case faultcurrent thru transformer

    z Transformers naturally limit the current thrutransformer to secondary bushings

    z Need transformer impedance, or assume typical is5.75%Z, plus or minus

    z Assume utility supply can provide infinite short

    circuit amperes to transformer primary (i.e.,substation across the street)

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    63/224

    S t D i 480 V F d f T f t MCC

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    64/224

    Page - 64

    System Design: 480 V Feeder from Transf to MCC

    z E. Size 480 V Feeder from Transformer to MCC

    z First calculate IFL from transformer secondary

    Transformer kVAIFL = ----------------------------

    Sq Rt (3) x kV

    2000 kVAIFL = ----------------------------- = 2405.7 ASq Rt (3) x 0.48 kV

    z IFL x 125% = 2405.7 A x 1.25 = 3007 A

    z No one makes a cable to handle 3000 A

    System Design: 480 V Feeder from Transf to MCC

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    65/224

    Page - 65

    System Design: 480 V Feeder from Transf to MCC

    z Must use parallel sets of conductors

    z Each conduit will have A, B, C, and GND cables, plusneutral if required for 1-phase loads

    z Standard engineering practice is to use 500 kcmil(253 mm2) or 600 kcmil (304 mm2) conductors

    z Why?

    z Largest standard conductor that will fit easily into a

    standard 103 mm2

    conduitz For this example, we will use 500 kcmil (253 mm2)

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    66/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    67/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    68/224

    System Design: 480 V Feeder from Transf to MCC

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    69/224

    Page - 69

    System Design: 480 V Feeder from Transf to MCC

    z Select grounding conductor

    z Per NEC Table 250.122,

    z Based on 3000 A trip rating

    z Grounding conductor = 400 kcmil (203 mm2)

    z Total cables = 8 sets of 3-500 kcmil (253 mm2), 1-400kcmil (203 mm2) GND

    z Or, total 24-500 kcmil (253 mm2), 8-400 kcmil (203mm2) GND

    System Design: 480 V Feeder from Transf to MCC

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    70/224

    Page - 70

    System Design: 480 V Feeder from Transf to MCC

    z Calculate total cross-sectional area of each set ofcables

    z Per NEC Chapter 9, Table 5, for XHHW cables

    z Area of 500 kcmil (253 mm2) cable = 450.6 mm2

    z Area of 400 kcmil (203 mm2) cable = 373.0 mm2

    z Total cross-sectional area of each parallel set =3 x 450.6 mm2 + 1 x 373.0 mm2 = 1724.8 mm2

    z Select conduit to maintain FF < 40%

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    71/224

    NEC Chapter 9, Table 4, RMC Conduit Dimensions

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    72/224

    Page - 72

    NEC Chapter 9, Table 4, RMC Conduit Dimensions

    System Design: 480 V Feeder from Transf to MCC

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    73/224

    Page - 73

    System Design: 480 V Feeder from Transf to MCC

    z Per NEC Chapter 9, Table 4:

    z For RMC, a conduit diameter of 103 mm has an areaof 8316 mm2

    z Fill Factor = 1724.8 mm2/8316 mm2 = 20.7%

    z FF < 40%, OK

    z For large cables in one conduit, it is notrecommended to approach the FF = 40% due to the

    excessive pulling tensions when installing the cables

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    74/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    75/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    76/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    77/224

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    78/224

    Page - 78

    Fused Switch

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    79/224

    Page - 79

    Circuit

    Breaker

    Transformer

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    80/224

    Page - 80

    z Minimum bus rating of metal-enclosed fused loadinterrupter switches = 600 A

    z Bus rating > IFL x 125%

    z 600 A > 120.3 A, OK

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    81/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    82/224

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    83/224

    Page - 83

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    84/224

    Page - 84

    z Per NEC Table 450.3(A),

    z For transformer typical impedance = 5.75%

    z Maximum size fuse = IFL x 300%

    z Maximum size fuse = 96.2 A x 3.0 = 288.7 A

    z NEC allows next higher size available

    z Thus, fuse = 300 A

    z Although NEC dictates maximum, standardengineering practice is to select fuse at IFL x 125% =120.3 A, or round up to 150 A

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    85/224

    Page - 85

    z Select OCPD relay trip setting with metal-cladvacuum breaker switchgear

    z NEC governs maximum relay trip setting fortransformer protection

    z NEC Table 450.3(A), Maximum Rating or Setting of

    Overcurrent Protection for Transformers Over 600Volts (as a Percentage of Transformer-Rated Current)

    z For transformer IFL = 96.2 A

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    86/224

    Page - 86

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    87/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    88/224

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    89/224

    Page - 89

    z Standard engineering practice is to size the CT suchthat the expected maximum current is about 2/3 of

    the CT ratioz For this transformer IFL = 96.2 A

    z The 2/3 point = 96.2 A/(2/3) = 144.3 A

    z Select next standard available CT ratio of 150:5

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    90/224

    Page - 90

    z For many years the most common type ofovercurrent relay was an induction disk type of relay

    z Depending on the secondary CT current input to therelay, the disk would rotate a corresponding angle

    z Todays technology uses electronic-based relays

    z As such, electronic relays are more accurate insensing pick-up and contain smaller incrementalgradations of available settings than induction disk

    relays

    System Design: Transformer 12 kV Disconnect

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    91/224

    Page - 91

    z For example: Induction disk relays had available tapsettings in increments of 1 A or 0.5 A

    z Todays electronic relays have tap settings inincrements of 0.01 A

    z Thus, a more exact tap setting could be selected,

    thereby making coordination with upstream anddownstream devices much easier

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    92/224

    System Design: Surge Protection at Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    93/224

    Page - 93

    z Example, for delta circuit, most common:

    z Utility Nominal Supply Voltage x 125%

    z 12 kV x 1.25% = 15 kV

    z Thus, surge arrester voltage rating = 15 kV, minimum

    z Could select higher voltage if util ity has widelyvarying voltage supply

    z Surge arrester is connected phase-to-ground

    System Design: Surge Protection at Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    94/224

    Page - 94

    z If wrong selection of 8.6 kV surge arrester on 12 kVcircuit, then the surge arrester would probably

    explode upon energization because it will shunt toground any voltage higher than 8.6 kV

    z The switchgear would be under short circuitconditions and the fuse would blow or the relaywould trip

    System Design: 12 kV Feeder to Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    95/224

    Page - 95

    z H. Size 12 kV Feeder to Transformer (MV Cable)

    z Sizing 15 kV conductors for 12 kV circuits stil l uses

    transformer IFL = 96.2 A

    z IFL x 125% = 96.2 A x 1.25 = 120.3 A

    z

    Select conductor size based on NEC tablesz Similar to 600 V cables, depends on aboveground or

    underground installation for Medium Voltage (MV)cable

    System Design: 12 kV Feeder to Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    96/224

    Page - 96

    z One of the more popular 15 kV cables is rated asfollows:

    z - 15 kV, 100% or 133% insulation

    z - 15 kV with 133% insulation = 15 kV x 1.33 = 20 kV(optional rating for circuit voltages between 15 kV

    and 20 kV)

    z - MV-105 = medium voltage cable, rated for 105Cconductor temperature (previous rating was MV-90,

    and had lower ampacity)

    System Design: 12 kV Feeder to Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    97/224

    Page - 97

    z - EPR insulation = Ethylene Propylene Rubberinsulation (traditional insulation versus newer cross-

    linked polyethylene, or XLP)z - Cu = copper conductor

    z - Shielded = Copper tape wrapped around EPR

    insulation (to aid in containing electric field and animmediate ground fault return path)

    z - PVC jacket = overall jacket around cable

    System Design: Okonite 15 kV Cable

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    98/224

    Page - 98

    System Design: Okonite 15 kV Cable

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    99/224

    Page - 99

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    100/224

    System Design: 12 kV Feeder to Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    101/224

    Page - 101

    System Design: 12 kV Feeder to Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    102/224

    Page - 102

    z Per NEC Table 310.73, for 15 kV, MV-105,

    z 4 AWG (21.15 mm2) ampacity = 120 A

    z 2 AWG (33.62 mm2) ampacity = 165 A

    z 4 AWG (21.15 mm2) is not a common size in 15 kV

    cablesz 2 AWG (33.62 mm2) is much more common and

    available

    z Thus, select 2 AWG (33.62 mm2) for phaseconductors

    System Design: 12 kV Feeder to Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    103/224

    Page - 103

    z Select grounding conductor

    z Use NEC Table 250.122

    z Relay trip setting would be set to 120 A, soovercurrent rating would be 200 A per NEC table

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    104/224

    System Design: 12 kV Feeder to Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    105/224

    Page - 105

    z Per NEC Table 250.122,

    z Grounding conductor is 6 AWG (13.30 mm2)

    z Does grounding cable for 12 kV circuit need to berated for 15 kV, same as phase cables?

    z No.

    z Grounding conductor is not being subject to 12 kVvoltage

    z Circuit = 3-2 AWG (33.62 mm2), 15 kV, 1-6 AWG (13.30mm2) GND

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    106/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    107/224

    System Design: 12 kV Feeder to Transformer

    F Ok it 100% i l ti bl t di t

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    108/224

    Page - 108

    z For Okonite 100% insulation, cable outer diameter =23.0 mm

    z Cable cross-sectional area = Pi x d2/4

    z Cable cross-sectional area = 3.14 x 23.0 mm2/4

    z Cable cross-sectional area = 415.5 mm2

    System Design: 12 kV Feeder to Transformer

    For Okonite 133% ins lation cable o ter diameter

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    109/224

    Page - 109

    z For Okonite 133% insulation, cable outer diameter =25.3 mm

    z Cable cross-sectional area = Pi x d2/4

    z Cable cross-sectional area = 3.14 x 25.3 mm2/4

    z Cable cross-sectional area = 502.7 mm2

    System Design: 12 kV Feeder to Transformer

    z For grounding conductor = 6 AWG (13 30 mm2)

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    110/224

    Page - 110

    z For grounding conductor = 6 AWG (13.30 mm2)

    z Use NEC Chapter 9, Table 5, XHHW Insulation

    System Design: 12 kV Feeder to Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    111/224

    Page - 111

    System Design: 12 kV Feeder to Transformer

    z Per NEC Chapter 9 Table 5 for 6 AWG (13 30 mm2)

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    112/224

    Page - 112

    z Per NEC Chapter 9, Table 5, for 6 AWG (13.30 mm2)

    z Cable cross-sectional area = 38.06 mm2

    z Total cable cross-sectional area with 15 kV, 100%insulation = 3 x 415.5 mm2 + 1 x 38.06 mm2 = 1246.4mm2

    z Total cable cross-sectional area with 15 kV, 133%insulation = 3 x 502.7 mm2 + 1 x 38.06 mm2 = 1508.1

    mm2

    z Select conduit for FF < 40%

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    113/224

    System Design: 480 V Feeder from Transf to MCC

    z Per NEC Chapter 9 Table 4:

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    114/224

    Page - 114

    z Per NEC Chapter 9, Table 4:

    z For RMC, a conduit diameter of 78 mm has an area of

    4840 mm2

    z For 15 kV, 100% insulation:

    z Fill Factor = 1246.4 mm2/4840 mm2 = 25.8%

    z FF < 40%, OK

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    115/224

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    116/224

    Page - 116

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    117/224

    System Design: 12 kV Feeder to Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    118/224

    Page - 118

    System Design: 12 kV Feeder to Transformer

    z Per NEC Table 310.77, for 15 kV, MV-105,

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    119/224

    Page - 119

    , , ,

    z 4 AWG (21.15 mm2) ampacity = 125 A

    z 2 AWG (33.62 mm2) ampacity = 165 A

    z 4 AWG (21.15 mm2) is not a common size in 15 kVcables

    z 2 AWG (33.62 mm2) is much more common andavailable

    z Thus, select 2 AWG (33.62 mm2) for phaseconductors

    System Design: 12 kV Feeder to Transformer

    z Per NEC Table 250.122,

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    120/224

    Page - 120

    z Grounding conductor is stil l 6 AWG (13.30 mm2)

    z Circuit = 3-2 AWG (33.62 mm2), 15 kV, 1-6 AWG (13.30mm2) GND

    System Design: 12 kV Feeder to Transformer

    z Select conduit size for 12 kV circuit

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    121/224

    Page - 121

    z For 15 kV cables, use Okonite data sheet

    z Same as for RMC conduit

    System Design: 12 kV Feeder to Transformer

    z For grounding conductor = 6 AWG (13.30 mm2)

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    122/224

    Page - 122

    z Use NEC Chapter 9, Table 5, XHHW Insulation

    z Same as for RMC conduit

    System Design: 12 kV Feeder to Transformer

    z Per NEC Chapter 9, Table 5, for 6 AWG (13.30 mm2)

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    123/224

    Page - 123

    z Cable cross-sectional area = 38.06 mm2

    z Total cable cross-sectional area with 15 kV, 100%insulation = 3 x 415.5 mm2 + 1 x 38.06 mm2 = 1246.4mm2

    z Total cable cross-sectional area with 15 kV, 133%insulation = 3 x 502.7 mm2 + 1 x 38.06 mm2 = 1508.1

    mm2

    z Select conduit for FF < 40%

    NEC Chapter 9, Table 4, PVC Conduit Dimensions

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    124/224

    Page - 124

    System Design: 480 V Feeder from Transf to MCC

    z Per NEC Chapter 9, Table 4:

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    125/224

    Page - 125

    z For PVC, a conduit diameter of 78 mm has an area of

    4693 mm2

    z For 15 kV, 100% insulation:

    z Fill Factor = 1246.4 mm2/4693 mm2 = 26.6%

    z FF < 40%, OK

    System Design: 480 V Feeder from Transf to MCC

    z Per NEC Chapter 9, Table 4:

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    126/224

    Page - 126

    z For PVC, a conduit diameter of 78 mm has an area of

    4693 mm2

    z For 15 kV, 133% insulation:

    z Fill Factor = 1508.1 mm2/4693 mm2 = 32.1%

    z FF < 40%, OK

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    127/224

    Utility Voltage Supply Affects Reliability

    z Most utility distr ibution circuits are 12 kV, 13.8 kV,etc

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    128/224

    Page - 128

    etc.

    z Obtaining a higher utili ty voltage circuit will increasereliability

    z Dont always have a choice in utility voltage

    z If available, a higher transmission voltage like 46 kV,60 kV, etc. is advantageous

    Utility Voltage Supply Affects Reliability

    z Higher voltage circuit means more power transfercapability

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    129/224

    Page - 129

    capability

    z Also means fewer direct connections to othercustomers

    z Also means lesser chances for the line to fail or

    impacted by other customersz Transmission circuits usually feed distribution

    substations down to 12 kV

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    130/224

    Page - 130

    System Optimization Siting Main Substation

    z In siting the utility substation for a plant, systemoptimization helps to reduce costs

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    131/224

    Page - 131

    optimization helps to reduce costs

    z Most util ities are only obligated to bring service tothe nearest property line

    z If you want the place the utili ty substation at the

    opposite corner, you will have to pay for the extraconstruction around the plant or thru the plant

    Location of Main Substation

    z Electric utility circuit is usually MV

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    132/224

    Page - 132

    z Voltage: 12.47 kV or 13.8 kV, 3-phase

    z Capacity: 7-12 MW per circuit for bulk power

    z Main substation near existing l ines

    z Utility obligated to bring service to property line

    z Represent large revenue stream of kWh

    Reference: Rule 16, Service Extensions, per SCE,LADWP, PG&E, SMUD

    Electric Utility Overhead Line

    Location of Main Substation

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    133/224

    Page - 133

    MainSubstation

    Main

    Substation

    Site Plan

    forPlant

    Location of Main Substation

    z You pay for extension of line around property

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    134/224

    Page - 134

    z You pay for extension of line within property

    z Line losses increase = square of current x resistance,or I2R

    CAVEATS

    z Pay for losses in longer feeder circuit as in kWh

    z May be limited in choices of site plan

    z Need to catch layout early in conceptual stages

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    135/224

    Page - 135

    Electrical Center of Gravity

    z Should optimize location of large load centerbalanced with small loads

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    136/224

    Page - 136

    z Example is pump station, with 10-100 Hp pumpsz Optimized location would have pump station next to

    main substation

    z Minimize voltage drop and losses in feeder cables

    Location of Large Load Centers

    z Locate large load centers near main substation

    E l P t ti ith l H t

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    137/224

    Page - 137

    z Example: Pump stations with large Hp motors

    z Minimize losses in feeder conductors

    z Optimum: electrical center-of-gravity of all loads

    z Run SKM, ETAP, etc., power systems software tooptimize system

    Electric Utility Overhead Line

    Location of Large Load Centers

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    138/224

    Page - 138

    MainSubstation

    Site Plan

    forWTP or WWTP

    Large HpPump Station

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    139/224

    Page - 139

    Double Ended Substation

    z Also known as a main-tie-main power system

    z The main tie main can be both at 12 kV or 480 V to

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    140/224

    Page - 140

    z The main-tie-main can be both at 12 kV or 480 V to

    take advantage of two separate power sourcesz At 480 V, there are two 12 kV to 480 V transformers

    feeding two separate 480 V buses with a tie breaker

    between

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    141/224

    Double Ended Substation

    z For process optimization, the loads should beequally distr ibuted between the buses

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    142/224

    Page - 142

    z Example, four 100 Hp pumps

    z Should be Pumps 1 and 3 on Bus A, and Pumps 2and 4 on Bus B

    z If all four pumps were on Bus A, and Bus A failed,

    you have zero pumps available

    Double Ended Substation

    z Normally, main breaker A and main breaker B isclosed and the tie breaker is open

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    143/224

    Page - 143

    z For full redundancy, both transformers are sized to

    carry the full load of both busesz Normally, they are operating at 50% load

    z In the previous example, each transformer is sized at

    2000 kVA, but operating at 1000 kVA when the tiebreaker is open

    Double Ended Substation

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    144/224

    Page - 144

    Double Ended Substation

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    145/224

    Page - 145

    Double Ended Substation

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    146/224

    Page - 146

    12.47 kV Source 1 12.47 kV Source 2

    Dual Redundant Transformers, Main-Tie-Main

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    147/224

    Page - 147

    750 kVA Load 750 kVA Load

    N.O.

    T11500 kVA

    12.47 kV-480 V

    T21500 kVA

    12.47 kV-480 V

    Bus 1, 480 V Bus 2, 480 VN.C. N.C.

    12.47 kV Source 2

    Dual Redundant Transformers, Main-Tie-Main

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    148/224

    Page - 148

    750 kVA Load 750 kVA Load

    Close

    T21500 kVA

    12.47 kV-480 V

    Bus 1, 480 V Bus 2, 480 VTrip N.C.

    Lose 12.47 kV Source 1,or T1 Failure,or Prev. Maintenance

    12.47 kV Source 2

    Dual Redundant Transformers, Main-Tie-Main

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    149/224

    Page - 149

    750 kVA Load 750 kVA Load

    Close

    T21500 kVA

    12.47 kV-480 V

    Bus 1, 480 V Bus 2, 480 VN.C.

    All Loads Restored

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    150/224

    Page - 150

    Main-Tie-Tie Main System

    z For personnel safety, a dummy tie breaker is addedto create a main-tie-tie-main system

    Wh ki B A f i t ll l d

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    151/224

    Page - 151

    z When working on Bus A for maintenance, all loadscan be shifted to Bus B for continued operation

    z Then the tie breaker is opened and Bus A is dead

    z However, the line side of the tie breaker is sti llenergized

    z Hence, a dummy tie is inserted to eliminate thepresence of voltage to the tie breaker

    12.47 kV Source 1 12.47 kV Source 2

    Main-Tie-Tie Main System

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    152/224

    Page - 152

    750 kVA Load 750 kVA Load

    N.O.

    T11500 kVA

    12.47 kV-480 V

    T21500 kVA

    12.47 kV-480 V

    Bus 1, 480 V Bus 2, 480 VN.C. N.C.

    N.O.

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    153/224

    Page - 153

    MV vs. LV Feeders

    z Recall: I2R losses increase with square of current

    z Worst case is large load far away

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    154/224

    Page - 154

    z Fuzzy math: increase voltage and reduce current

    z Example: 1,500 kVA of load, 3-phase

    z Current at 480 V = 1500/1.732/.48 = 1804 A

    z Current at 4.16 kV = 1500/1.732/4.16 = 208 A

    z Current at 12.47 kV = 1500/1.732/12.47 = 69 A

    MV vs. LV Feeders

    z Sizing feeders: 100% noncontinuous + 125% ofcontinuous

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    155/224

    Page - 155

    Reference: NEC 215.2(A)(1)z Engineering practice is 125% of all loads

    z Sometimes a source of over-engineering

    MV vs. LV Feeders

    z Example: 2-500 Hp pumps + 1-500 Hp standby

    z Worst-worst: All 3-500 Hp pumps running

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    156/224

    Page - 156

    z What if system shuts down or fails

    z May need 4th pump as standby

    MV vs. LV Feeders

    z Recall: I2R losses increase with resistance

    z As conductor diameter increases, resistance

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    157/224

    Page - 157

    decreasesz Can increase all conductors by one size to decrease

    resistance

    z Thereby decreasing line losses & increase energyefficiency

    z Comes at increased cost for cables/raceway

    Reference: Copper Development Association

    MV vs. LV Feeders

    z 480 V: drop more Cu in ground w/600 V cable

    z 5 kV cable: more expensive than 600 V cable

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    158/224

    Page - 158

    z 15 kV cable: more expensive than 5 kV cable

    z 4.16 kV switchgear: more expensive than 480 Vswitchgear or motor control centers

    z 12.47 kV swgr: more expensive than 4.16 kV

    z Underground ductbank is smaller with MV cables

    MV vs. LV Feeders

    z Previous example with 1,500 kVA load:

    z At 480 V, ampacity = 1804 A x 125% = 2255 A

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    159/224

    Page - 159

    z Ampacity of 600 V cable, 500 kcmil, Cu = 380 A

    Reference: NEC Table 310.16

    z

    Need six per phase: 6 x 380 A = 2280 Az Feeder: 18-500 kcmil + Gnd in 6 conduits

    MV vs. LV Feeders

    z At 4.16 kV, ampacity = 208 A x 125% = 260 A

    z Ampacity of 5 kV cable, 3/0 AWG, Cu = 270 A

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    160/224

    Page - 160

    Reference: NEC Table 310.77, for MV-105, 1 cktconfiguration

    z Feeder: 3-3/0 AWG, 5 kV cables + Gnd in 1 conduit

    MV vs. LV Feeders

    z At 12.47 kV, ampacity = 69 A x 125% = 87 A

    z Ampacity of 15 kV cable, 6 AWG, Cu = 97 A

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    161/224

    Page - 161

    z Ampacity of 15 kV cable, 2 AWG, Cu = 165 A

    Reference: NEC Table 310.77, for MV-105, 1 cktconfiguration

    z 2 AWG far more common; sometimes costs less

    z Larger conductor has less R, hence less losses

    z Feeder: 3-2 AWG, 15 kV cables + G in 1 conduit

    MV vs. LV Feeders

    z Use of MV-105 is superior to MV-90 cable for sameconductor size

    z The 105 or 90 refers to rated temperature in C

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    162/224

    Page - 162

    z The 105 or 90 refers to rated temperature in C

    z MV-90 is being slowly phased out by manufacturerstoday

    MV vs. LV Feeders

    z Higher ampacity available from MV-105

    Conductor Size MV-90 Amps MV-105 Amps

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    163/224

    Page - 163

    2 AWG, 5 kV 145 A 155 A

    2/0 AWG, 5 kV 220 A 235 A

    4/0 AWG, 5 kV 290 A 310 A500 kcmil, 5 kV 470 A 505 A

    Reference: NEC Table 310.77, 1 circuit configuration

    MV vs. LV Feeders

    z Multiple circuits in ductbank require derating

    z Heat rejection due to I2R is severely limited

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    164/224

    Page - 164

    z Worst case: middle & lower conduits; trapped

    No. of Circuits Ampacity1 270 A

    3 225 A6 185 A

    Reference: NEC Table 310.77, for 3/0 AWG, Cu, 5 kV,

    MV-105

    z NEC based on Neher-McGrath (ETAP software)

    Transformer Sizing

    z Two basic types of transformers:

    z Liquid-fil led transformers (2 types)- Pad-Mount type

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    165/224

    Page - 165

    Pad Mount type- Substation type

    z Dry-type transformers

    Liquid-Filled: Pad-Mount Type Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    166/224

    Page - 166

    Liquid-Filled: Substation Type Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    167/224

    Page - 167

    Dry-Type Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    168/224

    Page - 168

    Dry-Type Transformer

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    169/224

    Page - 169

    Transformer Sizing

    z Common mistake is to oversize transformers

    z Example: Average load is 1,500 kVA, thentransformer is 1,500 or even 2,000 kVA

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    170/224

    Page - 170

    z Prudent engineering: cover worst case demand

    z Theres a better way and stil l use solid engineering

    principles

    Transformer Sizing

    z Use the temperature rise rating and/or add fans forcooling

    z For liquid-filled transformers in 1,500 kVA range:

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    171/224

    Page - 171

    z Standard rating is 65C rise above ambient of 30C

    z Alternate rating is 55/65C, which increases capacity

    by 12%

    Reference: ANSI/IEEE Standard 141 (Red Book), section10.4.3

    Transformer Sizing

    z Capacity can be further increased with fans

    z OA = liquid-immersed, self-cooled

    z FA f d i l d

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    172/224

    Page - 172

    z FA = forced-air-cooled

    Reference: ANSI/IEEE Standard 141 (Red Book), Table10-11

    z In 1,500 kVA range, adding fans increases capacityby 15%

    Reference: Westinghouse Electrical Transmission &Distribution Reference Book

    Transformer Sizing

    z Example: 1,500/1,932 kVA, OA/FA, 55/65COA, 55C = 1,500 kVAOA, 65C = 1,680 kVA (1.12 x 1,500)

    FA 55C 1 725 kVA (1 15 1 500)

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    173/224

    Page - 173

    FA, 55C = 1,725 kVA (1.15 x 1,500)FA, 65C = 1,932 kVA (1.15 x 1.12 x 1,500)

    z Increased capacity by 29%

    z Avoid larger transformer and higher losses

    z Note: All we did was cool the transformer

    Transformer Sizing

    z Same concept for dry-type transformers

    z AA = dry-type, ventilated self-cooled

    z FA f d i l d

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    174/224

    Page - 174

    z FA = forced-air-cooled

    Reference: ANSI/IEEE Standard 141 (Red Book), Table10-11

    z Adding fans increases capacity by 33.3%

    Reference: ANSI Standard C57.12.51, Table 6

    z Example: 1,500/2000 kVA, AA/FA

    Transformer Losses

    z Transformers are ubiquitous throughout water &wastewater plants

    z Transformer losses = 2 components:

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    175/224

    Page - 175

    z No-load losses + load losses

    z No-load = constant when transformer energized

    z Load = vary with the loading level

    Transformer Losses

    z Losses for 1,500 kVA transformer (W)

    Type No-Load Full-Load Total (W)Dry-Type 4,700 19,000 23,700Liquid (sub) 3 000 19 000 22 000

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    176/224

    Page - 176

    Liquid (sub) 3,000 19,000 22,000Liquid (pad) 2,880 15,700 18,580

    Reference: Square D Power Dry II, Pad-Mount, &

    Substation Transformers

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    177/224

    Transformer Losses

    z Trivial difference between 98.44% (dry) and 98.78%(liquid), or 0.34%?

    z Assume 10-1500 kVA transformers for 1 year at$0 14/kWh = $62 550 savings

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    178/224

    Page - 178

    $0.14/kWh = $62,550 savings

    Transformer Losses

    z Heat Contribution for 1,500 kVA transformer atvarious loading levels (Btu/hr)

    Type 100% 75% 50%Dry Type 80 860 52 510 32 240

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    179/224

    Page - 179

    Dry-Type 80,860 52,510 32,240Liquid (sub) 75,065 46,700 26,445Liquid (pad) N/A N/A N/A

    Reference: Square D Power Dry II & SubstationTransformers

    Transformer Losses

    z Energy Policy Act 2005 effective Jan 1, 2007; usesNEMA TP-1 standards as reference

    z Mandates transformers meet efficiency levels,especially at low loads > larger share of total

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    180/224

    Page - 180

    especially at low loads > larger share of total

    z Target: higher grade of grain oriented steel

    z Thinner gauge and purer material quality

    z Reduces heat from eddy/stray currents

    Reference: New Energy Regulations to Impact the

    Commercial Transformer Market, Electricity Today,March 2007

    Transformer Overloading

    z Can you exceed the rating of a transformer?

    z Without loss of life expectancy?

    z Depends on the following conditions:

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    181/224

    Page - 181

    Depends on the following conditions:

    z Frequency of overload conditions

    z Loading level of transformer prior/during to overload

    z Duration of overload conditions

    Reference: ANSI/IEEE C57.92, IEEE Guide for Loading

    Mineral-Oil-Immersed Power Transformers Up to andIncluding 100 MVA

    Transformer Overloading

    z Allowable overload forliquid-filled transformer, 1overload/day

    Duration 90% 70% 50%0 5 hrs 1 80xRated 2 00xRated 2 00xRated

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    182/224

    Page - 182

    0.5 hrs 1.80xRated 2.00xRated 2.00xRated1.0 hrs 1.56xRated 1.78xRated 1.88xRated2.0 hrs 1.38xRated 1.54xRated 1.62xRated

    4.0 hrs 1.22xRated 1.33xRated 1.38xRated8.0 hrs 1.11xRated 1.17xRated 1.20xRated

    Reference: Square D Substation Transformers

    Transformer Overloading

    z Overloading a transformer is not strictly taboo

    z Okay if you can engineer the system and control theconditions, i.e., dual redundant transformers

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    183/224

    Page - 183

    z Allows purchase of smaller transformer

    z Less losses, higher energy efficiency, lower energy

    costs

    Transformer Overloading

    z Spill containment issues with liquid-fil led: PCB,mineral oil, sil icone, etc.

    z Mitigated by using environmentally benign fluid:

    E i FR3 i b d fi i PCB

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    184/224

    Page - 184

    z Envirotemp FR3 is soy-based, fire-resistant, PCB-free, can cook with it

    z Meets NEC & NESC standards for less-flammable, ULlisted for transformers

    Reference: Cooper Power Systems Envirotemp FR3

    Fluid

    Transformer Overloading

    z For a typical transformer: 1,500 kVA, 5/15 kV primary,480Y/277 V secondary

    z Cost is about 45% to 93% higher for dry-type vs.

    liquid-filled

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    185/224

    Page - 185

    qu d ed

    z Adding fans and temp ratings costs are incremental:capital cost only

    Reference: 2000 Means Electrical Cost Data, Section16270

    Transformer Overloading

    z Maintenance/Reliability

    z Most significant and salient point

    z Not advisable to have radial feed to one transformert f d ll l d

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    186/224

    Page - 186

    to feed all loads

    z Dual-redundant source to two transformers with

    main-tie-main configuration for reliability andredundancy; transformers at 50% capacity

    z Decision Point: Lower capital cost with radial system

    vs. high reliability and flexibility

    12.47 kV Source 1 12.47 kV Source 2

    Dual Redundant Transformers, Main-Tie-Main

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    187/224

    Page - 187

    750 kVA Load 750 kVA Load

    N.O.

    T11500 kVA

    12.47 kV-480 V

    T21500 kVA

    12.47 kV-480 VBus 1, 480 V Bus 2, 480 V

    N.C. N.C.

    12.47 kV Source 2

    Dual Redundant Transformers, Main-Tie-Main

    Lose 12.47 kV Source 1,T1 F il

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    188/224

    Page - 188

    750 kVA Load 750 kVA Load

    Close

    T21500 kVA

    12.47 kV-480 VBus 1, 480 V Bus 2, 480 V

    Trip N.C.

    or T1 Failure,or Prev. Maintenance

    12.47 kV Source 2

    Dual Redundant Transformers, Main-Tie-Main

    All Loads Restored

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    189/224

    Page - 189

    750 kVA Load 750 kVA Load

    Close

    T21500 kVA

    12.47 kV-480 VBus 1, 480 V Bus 2, 480 V

    N.C.

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    190/224

    Page - 190

    Emergency/Standby Engine-Generators

    z Very common source of alternate power on site

    z Diesel is most common choice for fuel

    z Generator output at 480 V or 12 kV

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    191/224

    Page - 191

    z NEC Article 700, Emergency Systems, directed at lifesafety

    z Emergency: ready to accept load in 10 secondsmaximum

    Emergency/Standby Engine-Generators

    z NEC Article 701, Legally Required Standby Systems,directed at general power & ltg

    z Standby: ready to accept load in 60 seconds

    maximum

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    192/224

    Page - 192

    z Both are legally required per federal, state, govt.jurisdiction

    z Similar requirements, but more stringent foremergency

    z

    Example: equipment listed for emergency, exercisingequipment, markings, separate raceway

    Emergency/Standby Engine-Generators

    z NEC Article 702, Optional Standby Systems, directedat non-life safety, alternate source

    z Even less stringent requirements

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    193/224

    Page - 193

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    194/224

    Page - 194

    Automatic Transfer Switches

    z Used in conjunction with emergency/standby powersources

    z Constantly sensing presence of normal power

    source, utility, using UV relay

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    195/224

    Page - 195

    z When normal power source fails, automatic sendssignal to start engine-generator

    z When up to speed, transfers from NP to EP, in opentransition

    Automatic Transfer Switches

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    196/224

    Page - 196

    Automatic Transfer Switches

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    197/224

    Page - 197

    Automatic Transfer Switches

    z Open transition: Break-Before-Make, or f inite deadtime

    z Upon return of utility power, initiate time delay

    z To ensure utility power is stable and not switching of

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    198/224

    Page - 198

    y p gcircuits while restoring system

    z

    After time delay timeout, ATS transfers back to NP, inopen transition

    z Plant loads will be down momentarily

    Automatic Transfer Switches

    z Option is Closed transition: Make-Before-Break, nodead time

    z For brief time, the engine-generator is operating in

    parallel with uti lity

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    199/224

    Page - 199

    z Plant loads stay up

    z

    In closed transition, then subject to uti lity regulationsfor parallel generation

    Automatic Transfer Switches

    z Need to match voltage, frequency, and phase anglewith utility source

    z Phase angle is most important, worst case is 180

    degrees out of phase

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    200/224

    Page - 200

    z Other consideration is preventing small generatorfeeding out of plant into utility distribution network

    z Load would be too large for small generator

    z Generator cant generate enough power andexcitation collapses

    z Would trip out on low voltage and/or low frequency

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    201/224

    Page - 201

    Uninterruptible Power Supply (UPS) Systems

    z UPS units are very common sources of backup ACpower for a variety of uses

    z They can be very large to power 100s of kWs of

    crit ical loads in the power system

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    202/224

    Page - 202

    z Or they can be small on the order of a few kW topower control system functions

    Uninterruptible Power Supply (UPS) Systems

    z A true UPS is always on line

    z Incoming AC is converted to DC thru a bridgerectif ier to a DC bus

    z The DC bus charges a battery bank

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    203/224

    Page - 203

    z Power from the DC bus is then inverted to AC for use

    by loadsz If normal power fails, power to the loads is

    maintained without interruption

    z AC output power is being drawn from the batteries

    z Battery bank is no longer being charged

    Uninterruptible Power Supply (UPS) Systems

    z An off-line unit is technically not a UPS since there isa static switch for transferring between sources

    z An off-line unit feeds the load directly from the

    incoming utility AC power

    A ti f th i i AC i tifi d t DC

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    204/224

    Page - 204

    z A portion of the incoming AC power is rectified to DCand charges a battery bank

    z If normal power fails, the static switch transfers tothe inverter AC output

    z Again, the AC output power is being drawn from thebattery bank

    Uninterruptible Power Supply (UPS) Systems

    z Some off-line units today employ very fast statictransfer switches that allege to be so fast the loadswont notice

    z Need to research this carefully since some computerloads cannot handle a momentary outage

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    205/224

    Page - 205

    y g

    z However, a reliable power system design would

    include a true on-line UPS unit so the momentaryoutage question is no longer relevant

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    206/224

    Page - 206

    Switchgear Auxiliaries

    z Switchgear auxiliaries are an important component inpower system reliability

    z Applies to both 12 kV switchgear and 480 V

    switchgear, or whatever is in the power system

    z The ability to continue to operate after utility power

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    207/224

    Page - 207

    z The ability to continue to operate after utility powerfails is crit ical

    Switchgear Auxiliaries

    z Key Components:

    z Control power for tripping

    z

    Charging springsz Relays

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    208/224

    Page - 208

    y

    z PLC for automatic functions

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    209/224

    Page - 209

    Switchgear Control Power for Tripping Breakers

    z If there is a fault in the system, the relay must sensethe fault condition and send a trip signal to thebreaker to clear the fault

    z A fault could happen at any time

    z Could be minutes after the utility circuit fails

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    210/224

    Page - 210

    z Could be minutes after the utility circuit fails

    z Must clear the fault

    Switchgear Control Power for Tripping Breakers

    z The circuit breaker contactor is held closed undernormal operations

    z When a fault is detected, the trip coil in the breaker

    control circuit operates the charged spring to quicklyopen the contactor

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    211/224

    Page - 211

    z If control power is available, the motor operated

    spring immediately recharges for the next operation

    z Typical demand from the charging motor is about 7 Afor about 5-10 seconds

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    212/224

    Page - 212

    Switchgear Control Power

    z Maintaining a secure source of power for control ofthe switchgear is essential

    z If there is a fault in the system, the relay must sense

    the fault condition and send a trip signal to thebreaker to clear the fault

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    213/224

    Page - 213

    z Several sources of control power:

    z Stored energy in a capacitor

    z 120 VAC

    z 125 VDC or 48 VDC

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    214/224

    Page - 214

    Switchgear Control: Stored Energy (Capacitors)

    z Only useful for non-crit ical systems

    z Amount of stored energy is limited

    z

    Not commonly used

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    215/224

    Page - 215

    Switchgear Control: 120 VAC

    z Only operational while 120 VAC is available

    z First option is obviously 120 VAC from the utility

    z

    If util ity fails, then could be a small UPSz Not well l iked by maintenance personnel since they

    h t b ti ll h ki th bil it d

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    216/224

    Page - 216

    have to be continually checking the operability andfunctionality of small UPS units all over the place

    Switchgear Control: 120 VDC or 48 VDC

    z Most reliable since control power is obtained directlyfrom the battery bank

    z There is no conversion to AC

    z Less chance of component failure

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    217/224

    Page - 217

    Switchgear Relays

    z Can be powered from 120 VAC

    z For reliability, select 125 VDC, particularly when thereis a battery bank for switchgear control

    z Relays are a critical component in order to detect thepresence of a fault on a circuit

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    218/224

    Page - 218

    z Again, the fault must be cleared

    PLC for Overall Substation Control

    z A PLC can be just as critical to switchgear operationif there are other automatic functions carried out bythe PLC

    z The PLC can also detect alarm signals and sendthem on to the central control room or dial a phonenumber for help

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    219/224

    Page - 219

    number for help

    z For reliabili ty, select 125 VDC as the power sourcefor the PLC

    z Or the same small UPS used for switchgear control

    power

    Elbow Terminations for MV Cable

    z Terminations for MV cable can sometimes be a pointof failure in the power system

    z Most common is the use of stress cones and skirts

    with bare surfaces exposed

    z The concept is to prevent a flashover from the phase

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    220/224

    Page - 220

    voltage to a grounded surface, or ground fault

    Elbow Terminations for MV Cable

    z Dirt and dust build up along the cable from thetermination can create a flashover path, especiallywith moisture

    z The skirts help to break up the voltage field as it triesto bridge the gap to the grounded potential

    f

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    221/224

    Page - 221

    z A molded elbow has no exposed energized surfaces

    z The elbow also contains the electric field withinthereby decreasing chances for corona

    z The molded elbow costs a little more but provides

    another level of reliabil ity in the power system

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    222/224

    Page - 222

    Demand Side Management

    z Managing the duty cycle on large continuous loadscan keep systems at a minimum

    z Example: Clean-in-Place heater, 400 kW, 480 V

    400 kW x 2 hour warm-up cycle = 800 kWh200 kW x 4 hour warm-up cycle = 800 kWhLower energy cost in dollars if off-peak

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    223/224

    Page - 223

    gy p

    z Program CIP via SCADA CIP to start beforemaintenance crews arrive via PLC or SCADA

    z 400 kW would have increased system size

    Questions .?

    Keene Matsuda, P.E.

    Black & Veatch

  • 7/29/2019 Part 3of3 Reliability Power System Design Buenos Aires

    224/224

    Page - 224

    (949) 788-4291

    [email protected]