Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
953
Procurement, Construction and commissioning of electrical, instrumentation, Control systems and
Calibration of equipments in Gas refinery of phases 15 & 16 (South pars)
09/20/2010 03/21/2015 POGC POGCIRAN/
AssaluyeConstruction
748Procurement, Construction and Pre‐Commissioning of Electrical, Instrumentation, Control Systems in Gas
Refinery of Phases 22, 23 & 24 (South Pars)10/04/2014 04/05/2016 POGC POGC IRAN/Kangan Construction
917Installation and Precommissioning of Instrumentation and Electrical Equipments in South Pars Project, Phases
6,7,810/18/2004 04/03/2008
TIJD(Toyo‐Idro‐JGC‐DAELIM)
P.O.G.CIRAN/
AssaluyeConstruction
406CA‐Plant Control System & Field Instrument Revamping
project08/07/2012 03/21/2015 Kimia Co. BIPC
IRAN/Mahshahr
EPC
957Electrical,Instrument and Telecommunication works of area No. 1 & 12 of South Pars Gas Field Development
Phase 1402/06/2013 09/20/2014 IPMI POGC IRAN/Kangan Construction
307/2Instrumentation Work of Process unit of South Pars Gas
Field Development Phase 1210/21/2012 03/21/2014
Joint Venture of Daelim, Sazeh (DSCT)
POGC IRAN/Kangan Construction
Pars Hassas Experiences In Construction Services
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
936Installation and Commissioning of Electrical and
Instrumentation Equipments in Wide Roll Sheet factory 09/22/2007 09/20/2010
Khozestan Oksin Steal Co.
Khozestan Oksin Steal Co.
IRAN/Ahvaz Construction
303
Engineering, Designing,Integration, Installation and commissioning of DCS control system for SULPHURIC ACID & GAS TREATMENT PLANT of Razi Pet. Co. and
Installation of Anodic Protection System
07/21/2012 12/21/2014Razi
Petroch. Co.Razi
Petroch. Co.IRAN/Mahshah
rEPC
307/1Electrical Work of Process unit of South Pars Gas Field
Development Phase 1210/06/2012 03/21/2014
Joint Venture of Daelim, Sazeh (DSCT)
POGC IRAN/Kangan Construction
959Instrumentation,Control and Telecommunication works of CCB Building and telecom system in South Pars Gas
Field Development Phase 17,1804/10/2014 09/20/2014 IPMI POGC IRAN/Assaluye Construction
701Providing Electrical & InstrumentationTechnical
Services(Engineering,Procurement,Construction) to all plants of BIPC
10/18/1998 03/20/2008 BIPC BIPCIRAN/Mahshah
rEPC
728Engineering, Procurement, Construction and
commissioning Services of ASPC Co.10/17/2010 03/20/2016 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
307/3Instrumentation Work of Utility Area of South Pars Gas
Field Development Phase 1207/31/2013 03/21/2014
Joint Venture of Daelim, Sazeh (DSCT)
POGC IRAN/Kangan Construction
315Control System Revamping of 90 TON/H E&F Boilers of
MARUN UT Plant09/21/2014 03/21/2015
Maroon Petrochemical
Company
Maroon Petrochemical Companyl
IRAN/Mahshahr
EPC
913Installation and Commissioning of Instrumentation and Electrical Equipments in DOROUD Oil Fields Expansion
Project in Kharg Island04/09/2003 01/19/2005
PETROFAC/TOTAL ELF
Total & ELFIRAN/
Kharg IslandConstruction
747Procurement, Construction and commissioning of 13
flowmeters for metering system in unit NF1‐309/22/2014 09/22/2015 Faravaresh Co. BIPC
IRAN/Mahshahr
Procurement/Construction
958Construction, Installation, Precommissioning and Commissioning of Electrical and Instrumentation
Systems in Phase 16 Platform02/19/2013 03/21/2014
Techno Energy Sepehr
Co.(TESCO)POGC
IRAN/Bandar Abbas
Construction
401Engineering , Procurement , Installation , Commissioning and Start‐up of the Refinery Feed Skid Metering System
03/12/2006 03/12/2007Tehran OilRefinery Co.
Tehran OilRefinery Co.
IRAN/Tehran
EPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
305DCS Control System for Seawater Intake System in Soth
Pars Gas Field Development Phases 22‐2410/09/2012 02/09/2013
Arya Petrosina Co.
POGCIRAN/
AssaluyeProcurement/Construction
745 Electrification to UT2 substation (Via Second Line) 05/14/2014 09/10/2015 Ab Niroo Co. BIPCIRAN/Mahshah
rEPC
909Installation and Precommissioning of Instrumentation
and Electrical Equipments in Olefin plant.05/07/2004 12/21/2003 ECC Co.
Amir Kabir Petroch. Co
IRAN/Mahshahr
Construction
948Installation & Precommissioning of Instrumentation an
Electerical systems in TCF ( Tange Bijar )06/25/2009 03/19/2012 N.I.S.O.C N.I.S.O.C
IRAN/ILAM/
TANGBIJARConstruction
945Installation of all Electrical and Mechanical work in
utility No.2 (kashan)01/27/2009 08/21/2010
Saipa Engineering Expansion Co.
Saipa Co.IRAN/Kashan
Construction
912Installation of Instrumentation and Electrical
Equipments in HDPE Plant06/22/2003 07/21/2005
Mehvar Sazan Co.
Maroon Petrochemical Companyl
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
956Installation, Pre‐commissioning and commissioning of electrical and instrumentation Equipments of propane
and Bhutan Tank08/07/2011 03/21/2013 Darya Sahel Co.
Kharg
Petrochemical. Co.
IRAN/Kharg Island
Construction
937Installation & Commissioning of Electrical for Car Paint
Saloon in Zamyad (2) Project10/13/2007 12/21/2009
Saipa Engineering Expansion Co.
Saipa Co.IRAN/Kashan
Procurement/Construction
915Installation and commissioning of Instrumentation and
Electrical Equipments in EO/EG Plant10/31/2003 02/20/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
733Execution of Concrete Paving for LDPE Product
Warehouse, Loading Area and North Road Modification of Future Area
10/06/2011 04/07/2012Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr
Construction
405Procurement and installation of Power cables for feeder
"B" in 6KV substation of olefin cooling07/19/2011 01/18/2012
Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr
Procurement/Construction
907Installation and Commissioning of Instrumentation and
Electrical Equipments in PTA1 Plant09/21/2001 03/21/2003 ECC Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
954Installation of Electrical and Instrumentation
Equipments in Unit 121 of South Pars phases 15 and 1611/26/2010 01/20/2012
MAPNA BOILER Engineering & manufacturing
Sepanier Oil & Gas
Engineering Company
IRAN/Assaluye
Construction
708Repairing and Calibration of Instrumentation and
Electrical Equipment11/05/2004 02/05/2007
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
EPC
942Revamping & renovation Of Instrumentation & Control
System in Sarcheshmeh Copper Coplex01/22/2008 03/21/2010
Tam Iran .Khodro Co
NICI COIRAN/Kerman
Engineering/Construction
403Electrical and Instrumentation Reconstruction of
damaged areas in HD Plant of Bandar Imam Petrochemical Co.
09/21/2010 03/21/2011 BIPC BIPCIRAN/Mahshah
rEPC
916Installation & Commissioning of Instrmentation &
Control System in PP‐Plant11/05/2004 04/22/2007
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
402 reshadat Platform test separation unit revamping 11/22/2009 01/20/2011 I.O.O.C I.O.O.CIRAN/Lavan
EPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
706Reparing and Calibration of Instrumentation & Electrical
Equipment09/20/2004 09/21/2006
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr
Engineering/Construction
379PLC Control System renovation for 10 Oil Pumping
Station in I.O.P.T.C09/01/2008 06/20/2011
I.O.P.T.C.Tehran Districted
I.O.P.T.CIRAN/Tehran
EPC
707Providing Electrical & InstrumentationTechnical
Services(Engineering,Procurement,Construction) to various parts/plants of BIPC under an open Contract.
10/04/2004 10/05/2006 BIPC BIPCIRAN/Mahshah
rEPC
708/1CONSTRUCTION OF INSTRUMENT DEVICES IN PP PLANT
OF MAROON COMPLEX08/21/2004
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
381
Engineering, Designing,Integration, Installation and commissioning of PLC control system for Material
Handeling unit of Razi Petrochemical CO.01/10/2009 01/05/2010
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr
EPC
718Sepahan Oil Company detail / Procurement /
Precommissioning /Construction /Engineering for Re‐Instrumentation from pnewmatic to Fcs/Dcs Project
11/10/2007 08/20/2008Sepahan Oil Refinery
Sepahan Oil Refinery
IRAN/Isfahan
Engineering/Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
312 Execution of Electrical Heat Tracing System 09/21/2013 01/22/2014
Joint Venture of Daelim,
Sazeh, Kayson (DSK)
POGC IRAN/Kangan Construction
924Construction , Termination & Loop Checking of Instrument & Control system in Gas Refinery
09/05/2006 03/20/2007Ahwaz Rad mechanic co.
Parsian refinery
IRAN/Lamerd
Construction
390Cabling and installation of instruments and electrical
equipment for 2MTPY Iron Ore Concentrate Plant in Gol Gohar iron Ore Co.
07/31/2010 09/20/2011Tehran Fakor Sanat CO.
Gol‐E‐Gohar Iron Ore Co.
IRAN/Tehran
Construction
949Installation & Precommissioning of Control system in
MCR Area (SARP/SUB/C‐045 )04/14/2010 04/14/2011
Consortium of SAZEH,SEL and
ODCC
Shazand Arak Refinery
IRAN/Arak Construction
827Instrumentation & electrical equipment installation for
C3+ Project of Arya Sasol Polymer Company01/28/2014 02/26/2015 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
950Electrification to equipments of concentration factory in
sarcheshme cooper03/30/2010 10/20/2011
Moshiran Company
NICI COIRAN/Kerman
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
385Design, Engineering and Integration of
SCADA/Telemetry Control system for Shiraz water and wastewater company (Mianrood region)
12/22/2009 09/20/2011Water and Wastewater Fars Province
Water and Wastewater Fars Province
IRAN/Shiraz
EPC
943 Loop test of olefin plant (BIPC) 01/12/2009 04/22/2009 BIPC BIPCIRAN/Mahshah
rConstruction
824Future Area Electrification for Arya Sasol Polymer
Company11/21/2012 11/20/2013 ASPC CO. ASPC CO. IRAN/Assaluye
Procurement/Construction
919Installation and Commissioning of Fire Alarm and
Fighting System08/25/2005 11/20/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
707/2Cable ladder /tray Installation for OL‐plant expantion &
revamping project07/26/2005 01/26/2006 BIPC BIPC
IRAN/Mahshahr
Construction
901Revamping the Instrumentation and Renovation of
Control System to DCS in Sulphuric Acid, Gas Purification and Sulphur Plants
03/17/1997 01/20/1998Razi
Petroch. Co.Razi
Petroch. Co.IRAN/Mahshah
rConstruction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
386PLC control system Integration and commissioning for 2MTPY Iron Ore Concentrate Plant in Gole‐Gohar Iron
ore Co.01/05/2010 07/06/2010
Tehran Fakor Sanat CO.
Gol Gohar Iron Stone Co.
IRAN/Tehran
EPC
743Cable Pulling, Procurement & Installation of Cable Tray
/ Ladder from AIS PowerPlant to Sub‐Station 5
08/13/2013 09/27/2013Sahel
consultant Co.
Damavand Petrochemical
ComplexIRAN/Assaluye Construction
953/3Installation and commisining of instrument and fire
alarm system for 32'' line of 15 & 16 phases04/18/2013 07/21/2013
Sanat Gostar Kish
P.O.G.C IRAN/Assaluye Construction
391/1Engineering, Designing, Installation and commissioning of PLC control system and monitoring for water block of
Fajr 2 petrochemical company (EC Contract)08/22/2010 10/19/2012 Zolal Iran Co.
Fajr Petroch. Co.
IRAN/Mahshahr
Engineering/Construction
952Installation of communication system in Pars
petrochemical port08/22/2010 10/20/2013
Pars Petroch. Seaport
N.I.P.CIRAN/
AssaluyeConstruction
313Control and Monitoring System Modification for Urea Plant No.2 & Ammonia plant No.3 In Razi Petrochemical
Co.03/06/2014 10/04/2014
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr
EPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
735 3‐Phase Civil Project 11/22/2011 05/21/2012Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr
Construction
744Construction activities of online analyzers on Faravaresh
plants stacks05/22/2014 12/22/2014 Faravaresh Co. BIPC
IRAN/Mahshahr
Procurement/Construction
906Installation and Precommissioning of Instrumentation
and Electrical Equipments in AMMONIA Plant (Revamping project)
06/22/2001 01/24/2001Razi
Petroch. Co.Razi
Petroch. Co.IRAN/Mahshah
rConstruction
738E&I Engineering , Procurement , Construction &
Commissioning for Absorbtion Chillers of CA/VC Units04/10/2012 12/11/2013 BIPC BIPC
IRAN/Mahshahr
EPC
905Installation and Commissioning of Instrumentation and
Electrical Equipments in Urea/ammonia Plant08/31/2000 12/23/2000 Shakhes Co.
Razi Petroch. Co.
IRAN/Mahshahr
Construction
953/2Installation and commisining of instrument and fire
alarm system for 32" line of 6,7 & 8 phases03/05/2013 05/20/2013
Sanat Gostar Kish
P.O.G.C IRAN/Assaluye Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
728/104 Civil work and electrical Cable pulling for C3+ area 04/23/2013 12/22/2013 ASPC CO. ASPC CO.IRAN/
AssaluyeConstruction
941Procurment and Cable Laying for Power Transformers between fajr and Maroon Petrochemical Complex
10/31/2007 03/21/2009Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
706/9INSTALLATION OF FIRE ALARM SYSTEM FOR KHOUZESTAN PETROCHEMICAL COMPLEX
10/21/2004KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr
Construction
810Design, Engineering, Procurement, Construction & Commissioning of Electrical & Intstrumentation
equipments in Tang Bijar07/02/2007 04/08/2008 N.I.S.O.C I.C.O.F.C
Iran/Ilam/
Tange‐BijarEPC
929Installation , Commissioning & Start‐up of
Instrumentation & Control System in Gas Refinery (Tabnac)
01/26/2007 08/21/2007 Payandan co.Parsian refinery
IRAN/Lamerd
Construction
951Performing Piping and bridging gasoline tanks to pump house in Saipa automobile manufacturing site in Kashan
06/19/2010 01/20/2011 Saipa Co. Saipa Co.IRAN/Kashan
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
599/31Procurement of Protection system‐surveillance camera
(CCTV)08/06/2012 05/09/2013
Petrochemical Kala
BIPC (Basparan Co.
)
IRAN/Mahshahr
Procurement/Construction
910Engineering, Procurement Services,Installation and
procommissioning of Electrification of New units in 3rd ammonia plant.
04/25/2003 05/14/2004 P.I.D.E.M. Co.Razi
Petroch. Co.IRAN/Mahshah
rConstruction
383Engineering , Procurement, Installation and
commissioning of Electrical Distribution Panles for SINA Chemical Industry
10/04/2009 05/21/2010Sina
Petroch. Co.Sina
Petroch. Co.IRAN/Shiraz
EPC
701/63Procurement, Installation and Commissioning of Instrumentation and Electricalworks of Jetty No.2
09/18/2001 04/07/2002 Faravaresh Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
914Engineering , Procurement and Execution of
Electrification of Sea Water Pumps10/30/2004 03/16/2005 P.I.D.E.M. Co.
Razi Petroch. Co.
IRAN/Mahshahr
Construction
918Engineering, Procurement, Installation and
Commissioning of Analysers06/25/2005 11/11/2005
Isfahan Refinery Co.
Isfahan Refinery Co.
IRAN/Isfahan
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
706/5CALIBRATION & LOOP CHECK OF INSTRUMENTS IN
KHOUZESTAN PETROCHEMICAL COMPLEX11/06/2004
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr
Construction
706/10ELECTRICAL/ INSTRUMENT CONSTRUCTION &
PRECOMMISSIONING ACTIVITIES OF KHOUZESTAN PETROCHEMICAL COMPLEX
10/21/2004KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr
Construction
736development of Utility Services to new administrative
office04/06/2012 04/10/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Procurement/Construction
944 Installation of industrial sewage in kashan 01/21/2009 02/21/2010Saipa
Engineering Expansion Co.
Saipa Co.IRAN/Kashan
Construction
928Installation , Commissioning & Star‐up of Fuel Cord
System in 120 Gas Station12/02/2006 05/21/2007 I.T.I N.I.O.P.D.C
IRAN/Hormozgan,Booshehr,A
badanConstruction
911Procurement, Installation and Commissioning of 4th
Dryer in Air & Nitrogen Plant05/25/2003 09/04/2004 Ab Niroo Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
723/5 DISMANTLING OF OBSOLETE PANELS OF OL PLANT 01/03/2010 03/05/2010 BIPC BIPCIRAN/Mahshah
rConstruction
728/212Upgrading of 'Human Interface System' computers at C2
Cracker plant05/12/2012 03/21/2013 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
933Installation and commisioning of Cathodic Protection
System in Oxydental Refinery (Oman)01/01/2007 06/16/2008 RITS Co. OXY Co. OMAN Construction
728/308Permanent Electrical Power Supply for PACK LINE
Equipment06/05/2011 09/28/2011 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
928/1The Commisioning, Maintanance, Defect Removal and
the Periodical Audit Services of Fuel Cord System04/20/2007 07/18/2007 I.T.I N.I.O.P.D.C
IRAN/Hormozgan,Booshehr,A
badanConstruction
701/241Revamping , Renovation and Commissioning of the
Instrumentation06/27/2005 04/02/2006 Kimia Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
926 Construction & Commissioning of 4th Nitrugen Tank 10/05/2006 09/04/2007 Ab Niroo Co. BIPCIRAN/Mahshah
rConstruction
940Repair and Rearrangment of telephone cables between MDF to Communication Boxes of all Plants in Bandar
Imam Petrochemical Complex11/22/2007 05/21/2008 Kharazmi Co. BIPC
IRAN/Mahshahr
Construction
939Procurement, Construction & Commissioning of
Instrumentation Equipments of Tank FB‐ 201 in AR plant (Bandar Imam Petrochemical Complex)
11/10/2007 05/12/2008 Faravaresh Co. BIPCIRAN/Mahshah
rProcurement/Construction
728/219 Instr. Cable laying of C3+line extension 02/14/2013 07/16/2013 ASPC CO. ASPC CO.IRAN/
AssaluyeConstruction
728/301 Design, Supply of socket outlets on towers 12/27/2010 11/14/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
701/187Procurement, Installation and Commissioning of
Instrumentation of Phase 1 of the OL Expansion Project09/07/2004 12/06/2006 BIPC BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
728/339Installation of electrification system for open yard
shelter of spare parts warehouse03/09/2014 08/31/2014 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
938Procurement, Construction & Commissioning of
Instrumentation Equipments of Tank FB‐ 901 in AR plant (Bandar Imam Petrochemical Complex)
11/03/2007 09/19/2008 Faravaresh Co. BIPCIRAN/Mahshah
rProcurement/Construction
599/32Procurement ,Construction & commissioning Services
of Surveillance Camera for BD/SR Unit12/03/2012 06/03/2013 Basparan Co. BIPC
IRAN/Mahshahr
Procurement/Construction
706/1ENG./ CONSTRUCTION & COMMISSIONING SERVICES
FOR SINCRONIZING OF THE DIESEL GENERATOR WITH POWER NETWORK
09/25/2004KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr
Engineering/Construction
728/325installation of waterproof electrical Socket across the
Pipe way from area 1 to area 807/28/2012 11/20/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
396/2Design, procurement and commissioning of an operator work station computer for reshadat platform PLC system
12/04/2013 02/03/2014 EPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/179Revamping and Renovation of Instrumentation for
area's 900D,200B,250 A/B/C07/23/2004 02/01/2005 Kimia Co. BIPC
IRAN/Mahshahr
Construction
701/22 Installation and Commissioning of the CA/VC Analysers 02/09/2000 08/08/2000 Kimia Co. BIPCIRAN/Mahshah
rConstruction
378Design & Implementation and Commissioning of HMI
& PLC logic for PET Pilot plant01/22/2008 01/04/2009
Pajohesh & Ffanavari
Petrochemical Co.
Pajohesh & Ffanavari
Petrochemical Co.
IRAN/Mahshahr
EPC
903Installation and Commissioning of Instrumentation and
Electrical Equipments in Sulphunasion Unit09/21/1999 11/08/1999 Nasb Gostar Co. Paksan Co.
IRAN/Tehran
Construction
701/107Engineering , Construction and Commissioning of
Neutralization Pond03/04/2003 07/13/2003 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
728/327Design of electrification system for new storage area in the north side of initiator storage building( LD‐Plant)
11/11/2012 07/13/2013 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
707/27 INSTALLATION OF CATALYST PUMPS IN LD PLANT 03/15/2006 04/28/2006 Basparan Co. BIPCIRAN/Mahshah
rConstruction
708/8Installation of SAMPLE POINT for Lab with frame
construct and installation03/08/2006 03/29/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
728/220Modification in channels of analog input Cards (C‐
501/502)04/12/2013 04/02/2014 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
380Engeeniring, Design, Software Development, installation
and commissioning of HMI for PSA plant in BARCO11/14/2008 08/15/2009
Bandar abbas Refinery Co.
Bandar abbas Refinery Co.
IRAN/Bandar Abbas
EPC
396/1 02/20/2013 05/22/2013Engineering/Co
nstruction
706/7INSTALLATION OF CABLE TRAY COVERS IN KHOUZESTAN
PETROCHEMICAL COMPLEX02/02/2005
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
728/304
1‐ Sandwich panel office building in corner of PE‐warehouse building for SGS and chain people. 2‐ Drawing for power supply for Roll‐up Doors. 3‐
Additional load on LV1 & LV2 panel due to additional of 322 fans in product warehouse
12/30/2010 03/18/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
701/207Engineering, Procurement Services and Installation of
Closed Circuit Cameras11/09/2004 04/18/2005 Ab Niroo Co. BIPC
IRAN/Mahshahr
EPC
728/322 Test Board for 6 KV Motors 05/02/2012 09/29/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeEngineering/Co
nstruction
701/43 Engineering and Procurement Services for the Analysers 04/26/2001 09/30/2003 Faravaresh Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
701/177Engineering and Installation of Instrumentation and
Electrical Equipment of Ethylene Tank07/10/2004 08/16/2004 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
947Repair and Rearrangment of telephone cables between MDF to Communication Boxes of all Plants in Bandar
Imam Petrochemical Complex02/02/2009 06/27/2009 Kharazmi Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
404Procurement and installation of level gauge and Level
Switch for Waste Oil Tank in PX Plant01/11/2011 07/21/2011 BIPC BIPC
IRAN/Mahshahr
EPC
707/17COMMUNICATION OF IMPORTANT SIGNALS OF LOAD
SHEDING SYSTEM IND UT PLANT03/27/2006 12/25/2006 Ab Niroo Co. BIPC
IRAN/Mahshahr
Construction
708/22Electrical and instrumentation work associated with
TRAICING و ANALYZER unit 05/03/2006 05/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
728/107Installation of Lighting modification of C2 cracker plant
storage area11/15/2013 03/21/2014 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
701/249Instalation and Commissioning of Instrumentation of
Condition Monitoring of the Compressors07/20/2005 12/16/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
707/6INSTALLATION OF INLINE FLOW METERS IN SR PLANT OF
BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/120Installation of Instrumentation and Electrical Equipment
of PTA‐1 Project02/20/2003 05/21/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Construction
701/111Installation and Testing the Electrical Devices of Diesel
Gen. House and Main Workshop01/23/2003 01/23/2004
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Construction
701/71Engineering, Installation and Commissioning of the
Tanks Management System10/19/2001 03/07/2002 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/12Engineering, Procurement and Construction of LYNX‐
1000 Heptane Drying Unit05/14/1999 10/18/1999 Basparan Co. BIPC
IRAN/Mahshahr
EPC
728/305 Modification of PE WAREHOUSE Internal Lighting System 04/26/2011 08/14/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
706/12DETAIL ENGINEERING FOR PACKAGE'S INTERLOCKS IN
KHOUZESTAN PETROCHEMICAL COMPLEX04/28/2005
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr
Engineering/Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/57 Installation of Qquipments in New Laboratory 08/07/2001 12/08/2001 Kimia Co. BIPCIRAN/Mahshah
rConstruction
728/329Providing proper lighting facilities for CCTVs in offsite
area08/22/2013 05/21/2014 ASPC CO. ASPC CO.
IRAN/Assaluye
Engineering/Construction
931Instrumentation Cable Laying in Parsian ‐ 2 Gas Refinery
(lamerd)04/28/2007 05/24/2007 Payandan co.
Parsian refinery
IRAN/Lamerd
Construction
701/26 Monthly Maintenance of the Fire Fighting Vehicles 03/16/2000 03/11/2001 BIPC BIPCIRAN/Mahshah
rConstruction
728/102Instrument procurement engineering activities for new
C3+ export pipeline01/04/2012 08/25/2015 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
728/217Transmission signals from PLC at gas station to DCS
system at offsite control room11/13/2012 01/19/2013 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/156 Rehabilitation of Instrumentation of Section 400 12/10/2003 01/11/2005 Basparan Co. BIPCIRAN/Mahshah
rConstruction
932Installation and commisioning of Fire Alarm System in Karoon Petrochemical Company (Bandar Imam Free
Zone )06/06/2007 12/21/2007
Karoon Petroch. Co.
Karoon Petroch. Co.
IRAN/Mahshahr
Construction
734Installation and Commissioning of Gas Detection System
, LDPE Plant10/10/2011 11/25/2011
Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr
Construction
727 UT‐600 Neutralization pound control system 06/05/2010 08/05/2010 Ab Niroo Co. BIPCIRAN/Mahshah
rConstruction
904Installation and Commissioning of Instrumentation and Electrical Equipments in Automobile car Painting Saloon
07/17/2000 10/10/2001 Saipa Co. Saipa Co.IRAN/Tehran
Construction
701/16Engineering, Procurement and Construction of Silica
Analyser08/03/1999 Ab Niroo Co. BIPC
IRAN/Mahshahr
EPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
707/7 CABLE LAYING OF NEW COOLING TOWER OF NF PLANT 04/07/2006 06/05/2006 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
708/33Electrical and instrument work according to announced work such as Cabling,Gland & Termination,… related to
TANKAGE AREA و PROCESS AREA of EO/EG unit05/03/2006 10/05/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
922Power Feeder Installation & Cable Laying for Explosion‐
Proof Air Condition System in Olefin Plant07/19/2006 08/13/2006 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/188Engineering, Installation and Commissioning of New
Control Loops of Ethylene Tank09/10/2004 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
706/3CABLING/ TERMINATION OF UNIT 50 OF KHOUZESTAN
PETROCHEMICAL COMPLEX10/15/2004
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr
Construction
728/316 Lighting Modification of C2 Cracker Plant Storage Area 12/17/2011 04/17/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
728/224Adding temperature Control Valve on 4 MPS11201 A‐EA22‐H to E‐1107 for automatic control of bypass gas
11/25/2013 08/04/2014 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
924/1 Installation and cabling of 20/11 KV transformer 10/22/2006 11/20/2006 N.I.S.O.CParsian refinery
IRAN/Lamerd Construction
946Installation, test and precommisioning of Lood Sheding
system in Bandar Imam01/05/2009 03/21/2010 Ab Niroo Co. BIPC
IRAN/Mahshahr
Construction
728/319Making induction loop and safety light barrier switch for
big bag station (42w‐80003)02/21/2012 07/21/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
701/108Engineering, Installation and Commissioning of the
Modified Parts of the LV Panels01/23/2003 05/13/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Engineering/Construction
701/157Repaire and Installation of the Instrument & Electrical
Equipment of Jetty NO.112/28/2003 06/05/2004 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/103Installation and Commissioning of Instrumentation of
NOXEL Project01/04/2003 03/16/2004 Basparan Co. BIPC
IRAN/Mahshahr
Construction
728/218installation acceleration sensors to pump 701 A/B
forpreventing of overall pump damage12/22/2012 03/21/2013 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
706/14INSTALLATION OF PACKAGE'S INTERCONNECTION IN
KHOUZESTAN PETROCHEMICAL COMPLEX12/05/2005
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr
Engineering/Construction
708/28Electrical and instrumentation work associated with ANALYZER , TRACING and P‐2020A, B‐2014,B Pumps
Push button in EO/EG units05/19/2006 08/03/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/37F&G work such as Cabling,Device installation,Gland & Termination,… related to TANKAGE AREA و PROCESS
AREA of EO/EG unit07/22/2006 10/20/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/109Installation and Commerssioning of Electrical Facilities
of BAGGING Building01/23/2003 05/13/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
707/29INSTALLATION CM RELATED ACCESSORIES OF LD PLANT
COMPRESSORS01/01/2006 02/01/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
707/14INSTALLATION OF INLINE FLOW METERS IN LD PLANT OF
BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
920Installation & Commissioning of Ex‐Proof Electrical
Equipments in the Catalyst Warehouse02/03/2006 04/26/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
728/303 Relocating of Diesel Generator's Batteries 04/26/2011 10/13/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
701/214Engineering, Installation and Commissioning of New
electrical Actuators of the Furnaces12/19/2004 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
728/311Engineering and Installation of Emergency Push Botton
to Trip PE Warehouse lighting system09/02/2011 12/04/2011 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
728/312 Heat Decreasing of the Chilled Water Panel 09/03/2011 01/05/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
728/204Changing The Mech. Switches Of C‐501/502 Stp1‐Mp1
(Psl‐ 51410/51402) To Transmitters01/01/2011 08/29/2011 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
902 Installation of Tank Gauging System in Common Facilities 05/11/1999 09/12/1997 BIPC BIPCIRAN/Mahshah
rConstruction
701/48Cabling the New Route to COOLING TOWER in NEW
Urea Unit07/18/2001 08/05/2001
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr
Construction
707/26INSTALLATION OF INLINE FLOW METERS OF MASS &
ENERGY BALANCE IN KIMIA COMPANY06/26/2006 10/26/2006 Kimia Co. BIPC
IRAN/Mahshahr
Construction
923Installation & Commissioning of Turbine Compressor
Vibration System.06/11/2006 07/01/2006 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/233 Installation and Commissioning of 7 Nos. Flowmeters 05/12/2005 04/26/2006 Faravaresh Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
701/28Engineering, Procurement and Installation of 11 Nos.
Oxygen Analysers06/21/2000 12/01/2000 Faravaresh Co. BIPC
IRAN/Mahshahr
EPC
701/32Engineering and Installation of Catalyst Firing Remote
Control for the DEAC Tanks01/04/2001 Basparan Co. BIPC
IRAN/Mahshahr
Construction
728/332 Upgrading of Relays protection 10/10/2013 03/20/2014 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
708/10STEAM TRACE TUBING OF EO/EG PLANT OF MAROON
COMPLEX05/03/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
371Engineering, Designing,Integration, Installation and
commissioning of PLC control system for fire extinguishing systems, station No 1,2
11/14/2006 06/14/2007Shiraz
petroch. Co.Shiraz
Petroch. Co.IRAN/Shiraz
EPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/93 Installation and Commissioning of 8 Nos. Flowmeters 10/11/2002 04/20/2003 Faravaresh Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
701/146Engineering , Procurement Services and Construction Supervision Services for the Condition Manitoring
System of Compressors08/19/2003 Basparan Co. BIPC
IRAN/Mahshahr
EPC
701/167 Installation and Commissioning of 6 Nos. Electric Pumps 04/09/2004 07/03/2006 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
701/113Installation and Testing the Electrical Devices of Analyser, Weighbridge (S&N) Buildings and HOSE
STATIONS 1 &201/23/2003 04/17/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Construction
728/105Installation of main input power cables for offsite data
center08/07/2013 10/20/2013 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
728/313Paging system modification for Compressor Area, LDPE‐
plant09/10/2011 01/11/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/206Engineering, Procurement, Installation and
Commissioning of Instrumentation of Loading Arm of the Jetty No.1
11/06/2004 02/28/2006 Faravaresh Co. BIPCIRAN/Mahshah
rEPC
701/223 Installation of Instrumentation and Electrical Works of
New Motors .03/15/2005 Basparan Co. BIPC
IRAN/Mahshahr
Engineering/Construction
728/321 Procurement & Installation of Eexd. Air Conditioner 04/17/2012 07/16/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeProcurement/Construction
701/159Engineering & Installation of Equipment on LV/MV
Panels in the NF Plant01/06/2004 04/02/2004 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/46Procurement, Installation and Commissioning of
Ultrasonic Flowmeters of Benzen and Propane Lines05/21/2001 10/05/2001 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
728/223 11/05/2013 01/05/2014 ASPC CO. ASPC CO.IRAN/
AssaluyeConstruction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/221 Installation of Local Control Units for the New Pumps 02/24/2005 05/26/2005 Basparan Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
701/190Engineering, Installation and Commissioning of Level
Indicators on the IW Tanks09/10/2004 01/01/2007 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/208Installation and Commissioning of Level Control
Instrumentation of Propylene Exchangers10/14/2004 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
728/340INSTALLATION AND WIRING OF LCS FOR 6KV FLARE'S
MOTORS (FL‐BWM‐8010A/B)09/06/2014 10/22/2014 ASPC CO. ASPC CO. IRAN/Assaluye
Engineering/Construction
728/214 Installation of manual call points in storage area 06/05/2012 08/05/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeConstruction
728/103checking and construction new septic system for admin
& restaurant bldg.04/11/2012 05/20/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/224Engineering, Procurement and Commissioning of
Loading System of EDC Line04/18/2005 04/07/2006 Kimia Co. BIPC
IRAN/Mahshahr
EPC
701/39Procurement, Installation and Commissioning the
Electrical Equipment of LATEX Project03/14/2001 07/06/2001 Basparan Co. BIPC
IRAN/Mahshahr
Construction
701/112Installation and Testing the Electrical Devices of Hot OIL,
TICKET, CONTROL and AUX. Rooms.01/23/2003 05/05/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Construction
701/204 Installation of Flowmeter on the Treated Waste Line to
Sea10/26/2004 03/28/2005 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/218 Installation & Commissioning oftachometers. 02/06/2005 04/28/2006 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
701/70 Installation and Commissioning of 5 Nos. Flowmeters. 10/19/2001 01/31/2002 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
728/320 Replacement of W‐402 with New Dosage Pump 04/17/2012 07/16/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
701/77Procurement Services and Installation of Electrical Facilities of the Rest Room of SEA WATER Area.
03/03/2002 05/18/2002 Faravaresh Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
708/16TERMINATION & TEST OF FIRE ALARM SYSTEM FOR
POLYPEXT & CATA PLANT04/23/2006 05/22/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/194Engineering, Procurement and Installationof the Flow
Control Loops of the LATEX Project09/23/2004 01/25/2007 Basparan Co. BIPC
IRAN/Mahshahr
EPC
701/193 Electrification of Portable Air Compressors 08/14/2004 04/16/2005 Ab Niroo Co. BIPCIRAN/Mahshah
rConstruction
701/197Relocating and Commissioning of the CONTROL ROOM
Computers10/03/2004 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/191Engineering, Installation and Commissioning of Alarm
System on MS Line.09/10/2004 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
708/4 Fire alarm cabling for HD unitMaroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/123Installation and Commissioning of Rotameters, Volume
Tank, and Diesel Generator Electrification03/17/2003 06/19/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Construction
701/184Installation and Commissioning of Flowmeter on the
Water In‐take Line to the Complex07/03/2004 11/17/2004 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
711/4Installation and setup K402A/B و P‐201E/F to installed
diesel generator in site09/26/2006 12/01/2006 Kimia Co. BIPC
IRAN/Mahshahr
Engineering/Construction
707/11INSTALLATION OF INLINE FLOW METERS IN HD PLANT
OF BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/76Procurement Services and Construction of 2 Nos. Lift
Electrical works.03/03/2002 05/12/2002 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/195Engineering, Istallationn and Commissioning of the CRA‐
609Analyser of Industrial Water Unit09/13/2004 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/58Engineering & Installation of the Instrumentation of
New Tower C‐70108/11/2001 12/18/2001 Kimia Co. BIPC
IRAN/Mahshahr
Engineering/Construction
728/222 Instrument modification on C2 & MDHD Plant 10/22/2013 11/22/2013 ASPC CO. ASPC CO.IRAN/
AssaluyeConstruction
701/153Engineering, Procurement Services and Installation of 4
Nos. Level Transmitters in CA Plant11/30/2003 Kimia Co. BIPC
IRAN/Mahshahr
EPC
728/106Installation of the Electrical Panel in northwest of future
area10/28/2013 12/28/2013 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
708/14CABLE LAYING BETWEEN PROCESS & TANKAGE AREA
FOR EO/EG PLANT OF MAROON COMPLEX05/03/2006 05/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/135Installation and Testing of Instrument Devices of Modified (Pneumatic to Electronic) Control Loops
06/21/2003 05/17/2005 Kimia Co. BIPCIRAN/Mahshah
rConstruction
701/136Installation and Testing the Instrumentation of CHILLING
POND06/21/2003 10/19/2003 Kimia Co. BIPC
IRAN/Mahshahr
Construction
701/217Cabling and Termination of Compressor Governer
System01/23/2005 04/15/2005 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/25Troubleshooting and Repairing the ACCELERATION UNIT
of Fire Fighting Vehicle03/16/2000 08/17/2000 BIPC BIPC
IRAN/Mahshahr
Construction
708/38Electrical and instrument work such as Cabling,Device installation,Gland & Termination,… related to TANKAGE
AREA و PROCESS AREA of EO/EG unit10/01/2006 11/01/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
921Cabling, Termination and Commissioning the Electrical
Governer of GT‐1501 Compressor in NF Plant01/18/2006 02/02/2006 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
707/10INSTALLATION OF INLINE FLOW METERS IN BD PLANT OF
BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
701/115Installation and Testing the Electrical Devices of
WAREHOUSE & SUB‐STATION02/10/2003 04/02/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Construction
708/29 Commisioning assistance in EO/EG unit 04/29/2006 07/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/237Engineering for Relocation & Installation of Fire
Extingnishers05/24/2004 08/13/2005 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
707/28ELECTRICAL/ INSTRUMENT INSTALLATION SERVICES OF
LD PLANT CATALYST PUMPS02/05/2006 03/07/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
707/15 COMMUNICATION OF ALARMS BETWEEN OL & UT PLANT 04/13/2006 05/22/2006 Ab Niroo Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
701/90Relocating and Commissioning the Instrument Air Piping
of Purging System of Cell‐Room Panels.09/13/2002 04/15/2003 Kimia Co. BIPC
IRAN/Mahshahr
Construction
701/130Engineering, Procurement Services, Installation and Commissioning of Automatic Fire Fighting System
12/16/2003 Basparan Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
701/192Engineering, Installaton and Commissioning of Alarm
System for the Feul and Steam Pumps08/10/2004 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
728/317 Fire alarm system execution for asset integrity building 01/10/2012 03/11/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeProcurement/Construction
701/166Construction and commissioning the Connection of Fire
Fighting water Line to Cooling Tower Package04/07/2004 04/27/2005 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
728/216Transmition fire and gas alarms signals from Flare
substation to offsite control room07/21/2012 10/09/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
701/236Installation and Commissioning of 4 Nos. Flowmeters on
the HCL Line of Section 60005/25/2005 08/05/2005 Kimia Co. BIPC
IRAN/Mahshahr
Construction
701/180Installation and Commissioning of one totalizer on the
Fire Fighting Water Line .06/16/2004 05/14/2006 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
708/35
Electrical and instrument work according to announced work such as Cabling,Device installation,Gland &
Termination,… related to TANKAGE AREA و PROCESS AREA of EO/EG unit
07/22/2006 09/05/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
728/314 F&G SENSORS ADDITION IN NEW OIL STORAGE 11/20/2011 03/01/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
701/183Installation and Commissioning of Totalizer on the HCL
Line07/03/2004 10/04/2004 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
707/13INSTALLATION OF INLINE FLOW METERS IN PP PLANT OF
BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
701/222Installation and Commissioning of TOTAL HYDRO
CARBON Analyser of Nitrogen Unit03/02/2005 05/07/2005 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
708/6 Termination and test of Fire alarm 01/15/2007 02/05/2007Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/67Installation and Commissioning of 4 Nos. TOTALIZERS, ISOLATORS and Flowmeters in the Control Room Panels
10/01/2001 04/13/2002 Ab Niroo Co. BIPCIRAN/Mahshah
rConstruction
701/118Installation and Testing of Electrical Devices for the
Mahshahr Export Storge Tanks02/09/2003 05/12/2006 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
728/215 transferring of 6 JB and 1 PT in the pipeline path 07/10/2012 08/09/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeConstruction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
708/36
Electrical and instrument work according to announced work such as Cabling,Device installation,Gland &
Termination,… related to TANKAGE AREA و PROCESS AREA of EO/EG unit
07/22/2006 10/20/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/40Electrical and instrument work such as Cabling,Device installation,Gland & Termination,… related to TANKAGE
AREA و PROCESS AREA of EO/EG unit11/07/2006 12/08/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
370Design and implementaion of Thinkpac Control &
Monitoring software09/29/2006 12/17/2006 Ventus S.A Ventus S.A Belgium EPC
701/100Engineering, Installation and Commissioning of Electrical works for New Rooms of Warehouse Mechanization
System11/23/2002 01/29/2003 Basparan Co. BIPC
IRAN/Mahshahr
Engineering/Construction
708/9The cabling and its associated works for feeding pumps
A,B‐2020,A,B P‐2014
05/03/2006 05/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/34F&G work according to announced work such as
Cabling,Gland & Termination,… related to TANKAGE AREA و PROCESS AREA of EO/EG unit
06/22/2006 09/05/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/140Installation of Vaccum Breaker and Safety Valve on the
Condensate Storage Tanks07/02/2003 10/10/2003 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/182Installation and Commissioning of Alarms of NF1 & 2
Units07/15/2004 10/01/2004 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
708/21Installation of the analyzers: AE/AT‐21002‐20701‐77001‐
20901 of EOEG unit05/02/2001 06/24/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/110Refurbishing and Testing the damaged Instrument &
Electrical Panels01/23/2003 04/04/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr
Construction
701/68Installation and Commissioning of Instrumentation and
Electrical works of New Turbo Pump OL‐GA‐7013010/11/2001 09/30/2003 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/125Procurement and Construction of Kiosk for Tower
Monitoring of Jetty No.204/11/2003 07/10/2003 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/88 Installation and Commissioning the Mass Flowmeters 08/24/2002 10/24/2002 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
707/12INSTALLATION OF INLINE FLOW METERS IN PVC PLANT
OF BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
701/89Installation and Commissioning for 2 Nos. Conductivity
Meters08/24/2002 03/26/2003 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/44Engineering, Procurement Services and Installation of %6 Caustic Injection Package for QW and PW Lines
05/14/2001 05/07/2003 Faravaresh Co. BIPCIRAN/Mahshah
rEPC
728/226Installation of instrument equipment for unloading
package system05/10/2014 06/07/2014 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
701/62Commpletion of Installation of Area Lighting of Granual
Urea Unit08/05/2001 10/28/2001
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/34 Installation of AL Analyser 12/21/2000 04/27/2001 Basparan Co. BIPCIRAN/Mahshah
rConstruction
701/227Engineering and Procurement Services for Electrical System and Air Conditioning Facilities of Central
Electrical Workshop04/27/2005 Faravaresh Co. BIPC
IRAN/Mahshahr
EPC
701/163Engineering, Procurement and Installation of Pumps
Ammeters in the Control Room02/06/2004 Faravaresh Co. BIPC
IRAN/Mahshahr
EPC
707/23INSTALLATION OF TEMPERATURE CONTROL DEVICES IN
EDC PLANT05/19/2006 06/16/2006 Kimia Co. BIPC
IRAN/Mahshahr
Construction
701/230Execution of Instrument Air Piping for the Fans of
Section 400.05/10/2005 05/11/2006 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/225Installation and Commissionig of Multi Temp. Indicators
of Floating Roof Tanks04/26/2005 05/07/2006 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
708/45Sunshade preparation and installation for
instrumentation device10/29/2006 11/29/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/242 Installation and Commissioning of DR‐103 Density Meter 07/11/2005 08/10/2005 Faravaresh Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
927 Installation & Commissioning of CCTV System 12/22/2006 03/21/2007 Basparan Co. BIPCIRAN/Mahshah
rConstruction
701/143Installation and Commissioning of Instrumentation and
Electrical Equipment of EDC Unit08/04/2003 11/04/2003 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/97 Installation and Commissioning of the AR‐201 Analyser 11/05/2002 05/08/2003 Faravaresh Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
701/243Installation and Commissioning of Instruments of Filters
of Train 206/29/2005 07/06/2006 Basparan Co. BIPC
IRAN/Mahshahr
Engineering/Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
925 Cable Laying & Termination for Air Conditioning systems 10/29/2006 11/18/2006 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
708/20Installation, Cabling, Gland and termination of F&G
system of EOEG unit04/28/2006 06/23/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/85Installation and Commissioning of Counters for Utility
Measuring System08/02/2002 09/17/2002 Ab Niroo Co. BIPC
IRAN/Mahshahr
Construction
708/39F&G work such as Cabling,Device installation,Gland & Termination,… related to TANKAGE AREA و PROCESS
AREA of EO/EG unit10/14/2006 11/14/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/127Engineering, Installation and, Commissioning of the
Lighting System in BD/SR Plant04/29/2003 07/27/2003 Basparan Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/235Installation and Commissioning of one GAMA RAY LEVEL
Detector05/20/2005 05/21/2006 Kimia Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/137Engineering, Installation and Testing of the Pumps
Control Circuits06/24/2003 09/23/2003 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/96 Installation and Commissioning of the TIC of Soil Tank 10/18/2002 Basparan Co. BIPCIRAN/Mahshah
rConstruction
707/4Installation and Commissioning of Thermostats and
Alarm System in the Panles of Packing Unit11/20/2005 01/20/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
701/154Engineering , Procurement Services and Installation of
BELT SCALER01/30/2004 Kimia Co. BIPC
IRAN/Mahshahr
EPC
708/48Cabling from fire alarm panel to jb‐1‐b‐4000i inside of
control roomin loading Area for Gas Detector
01/15/2007 02/15/2007Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/82Installation and Commissioning 2 Nos. Ultrasonic
Flowmeters on the Ethylane Line07/15/2002 07/13/2003 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
708/7TEE CONNECTOR installationn for Hook up typs L01 and
plug installation03/16/2006 04/07/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/13INSTALLATION OF F&G SYSTEM IN CONTROL/ AUXILIARY
ROOM & UPS ROOM OF MAROON COMPLEX03/16/2006 04/17/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/44Cabling from F&G PANEL to HVAC & from HVAC PANEL
to HVAC Compressor in HDPE unit11/05/2006 12/06/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/199Engineering, Installation and Commissioning of 3 NOS Thermometers on the Liquid Nitrogen Line to FB Tanks
10/10/2004 10/11/2006 Ab Niroo Co. BIPCIRAN/Mahshah
rEngineering/Co
nstruction
701/98Installation and Commissioning of the Ex‐Proof
Equipment of AL Analyser house.10/15/2002 11/04/2002 Basparan Co. BIPC
IRAN/Mahshahr
Construction
701/56 Installation and Commissioning of the OXYGEN Analyser 08/07/2001 10/25/2001 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/205Installation of Pressure Gauge on Waste Water Line and
Contruction of Shelfer for the Control Valves09/20/2004 05/12/2005 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/189 Installaton and Commissioningof two actuator. 09/10/2004 08/27/2004 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
701/181Installation and Commissioning of HIGH and LOW
Alarms in Control Loop PRC‐70106/16/2004 09/16/2004 Ab Niroo Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/54Engineering and Installation of NF‐FQ‐101 Accessories in
the Metering Station08/07/2001 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
701/134 Electrification and Testing of the Vaccum‐Pump Motor 06/14/2003 07/15/2003 Basparan Co. BIPCIRAN/Mahshah
rConstruction
701/234 Installation and Commissioning of 2 Intercom Sations 05/19/2005 05/20/2006 Basparan Co. BIPCIRAN/Mahshah
rConstruction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/117Procurement and Installation of one CLAMP‐ON
Flowmeter on the 24" Salt Line.02/10/2003 03/18/2003 Kimia Co. BIPC
IRAN/Mahshahr
Construction
701/84Engineering and Installation of Interlock System for LPG
Transfer Unit07/27/2002 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
708/41Cabling for EBC‐20‐MCC‐HVAC from C.R to S.STAK AREA
&Sunshade installation for GAS DETECTOR of EO/EG unit
11/04/2006 12/02/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/198Installation and Commissionoing of the GAMA RAY
LEVEL INDICATOR.10/17/2004 10/18/2006 Basparan Co. BIPC
IRAN/Mahshahr
Construction
708/43Device,Gland,Tube,…installation number FT‐99002‐
FT99001,PT‐99002 & PT‐9900110/29/2006 11/18/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/32Electrical and instrument work according to announced work such as Cabling,Hook Up,Gland & Termination…
07/02/2006 07/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/79Installation and Commissioning the Ultrasonic
Flowmeter on the Flare Line05/17/2002 08/19/2002 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/239Installation and Commissioning of the Flowmeter of
Buthane Line to CF Unit06/09/2005 07/24/2005 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/59Installation and Commissioning of One PH METER in
Unit 30008/22/2001 10/20/2001 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/238Installation of Commissioning two Nos. Totalizers for
FRQ‐004 & FRQ‐401A Loops05/31/2005 05/31/2006 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
708/5 Hand switch installation 01/15/2007 02/05/2007Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/244Engineering, Electrification and Commissioning of Power
Feed to 110V Distribution Panel of the Analysers08/09/2005 10/14/2005 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/148 Installation of Alarm System on HD Control Panel. 09/28/2003 10/19/2003 Basparan Co. BIPCIRAN/Mahshah
rConstruction
701/128Installation and Testing of Cables & Control Room
Equipment for New Ultrasonic Flowmeter of OL Plant Flare Line
05/06/2003 06/03/2003 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
701/87Relocating and Commissioning the Electrification of
Main Office Airconditioning Package(Electrical works)
08/20/2002 09/05/2002 Kimia Co. BIPCIRAN/Mahshah
rConstruction
701/95 Revamping in Main Office Building 10/29/2002 11/29/2002 Kimia Co. BIPCIRAN/Mahshah
rConstruction
708/26FT‐50305 magnetic Installation and setup an additional
PT for map05/29/2006 05/23/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/41Installation & Commissioning of the Instrumentation of
LATEX Project03/14/2001 06/28/2001 Basparan Co. BIPC
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/42 Installation and Commissioning of the Mass Flowmeters 03/14/2001 06/13/2001 Basparan Co. BIPCIRAN/Mahshah
rConstruction
701/40Installation and Commissioning of Two OXYGEN
Analysers03/13/2001 06/12/2001 Kimia Co. BIPC
IRAN/Mahshahr
Construction
701/92 Installation and Commissioning for 5 Nos. KWH Meters 09/22/2002 09/22/2005 Faravaresh Co. BIPCIRAN/Mahshah
rConstruction
701/155 Installation of Flowmeter on Cooling Water Line 11/30/2003 04/08/2004 Kimia Co. BIPCIRAN/Mahshah
rConstruction
708/25Cable and Conduit Performing of PT‐00550 / FQI‐3060
related to HD unit05/19/2006 06/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/11 INSTALLATION OF DETECTORS & ALARMS 04/27/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
708/15GENERAL CONSTRUCTION SERVICES FOR CABLE/ GLAND
& TERMINATION05/03/2006 05/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/74Troubleshooting the Electronic Cards of Switching Unit
device of RS‐24 unit01/06/2002 03/18/2002 BIPC BIPC
IRAN/Mahshahr
Construction
701/248Installation and Testing of Circuit Breakersof Power
feeders of the Analysers08/29/2005 09/17/2005 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
611/2Functional Test of fire alarm and Instrumentation Systems in PP plant of Maroon Petrochemical Co.
08/05/2007 08/12/2007Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/17ERECTION & CONSTRUCTION OF SAMPLE CONNECTION
FOR HDPE PLANT04/14/2006 05/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/30Installation of Gland and Termination for F&G system
and PVC installation of EO/EG unit05/25/2006 07/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/226Engineering , Installation and Commissioning of Alarm
for Loop TRC‐30104/27/2005 Faravaresh Co. BIPC
IRAN/Mahshahr
Engineering/Construction
708/31Changing the PT‐00601 Cable route from FJBIF‐0424 to
FJBIF‐044907/08/2006 08/06/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/60Installation of Gas Detectors, Cabling, Termination and
Commissioning the System08/10/2001 09/10/2001 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
701/72Engineering and Installation of Digital Pressure and
Temprature Indicators of Meter Prover Panel12/15/2001 02/27/2002 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
708/18 Moving X‐HSH‐50315 according to the request 05/04/2006 05/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/42 Cabling for HVAC system of analizer room (No.2) 10/29/2006 11/01/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/152Installation and Commissioning of two PDI Meters on
the Chillers I/O Lines11/30/2003 03/17/2004 Kimia Co. BIPC
IRAN/Mahshahr
Construction
708/19 Changing the cable and conduit roth of TV‐30109 05/02/2006 05/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/144 Installation of two TOTALIZER on DM Water panels. 08/11/2003 09/11/2003 Kimia Co. BIPCIRAN/Mahshah
rConstruction
701/132Troubleshooting and Repair of Electronic Cards of PLC in
PVC Plant07/29/2003 Basparan Co. BIPC
IRAN/Mahshahr
Construction
708/24 Insallation of HAND SWITCH related to XVY‐10203 of HD
unit05/21/2006 06/20/2006
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/139 Installation and Testing the TOTALIZER & P/I for FQ‐203 . 07/25/2003 07/27/2003 Kimia Co. BIPCIRAN/Mahshah
rConstruction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
701/203 Construction of Fresh Air Ducting for the Containers 11/07/2004 Ab Niroo Co. BIPCIRAN/Mahshah
rConstruction
708/49process related to F&G system such as
Gland,Termination,… for Pro. Area and Tk. Area01/15/2007 02/05/2007
Maroon Petrochemical
Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/23 Control room Cabling from FACP01 to FACP02 in HD unit 05/21/2006 06/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
701/55Procurement and Installation of the Electric Actuator of
Reflav Valve08/07/2001 08/07/2003 Faravaresh Co. BIPC
IRAN/Mahshahr
Construction
708/47 Gas Detector,Gland and...installation in gas station 01/22/2007 02/06/2007Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
708/46Installation of JB,Gland,Termination,Tray and Ladder in
electrical zonearea 7 & 8
11/15/2006 11/20/2006Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Mahshahr
Construction
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
Pars Hassas Experiences In Construction Services
934Installation and commisioning of Instrumentation
Equipments in RAK Lube Oil Refinery (UAE)06/19/2007 09/20/2007 RITS Co.
RAK Lube Oil Co.
UAE Construction