Parks priorities
-
Upload
jay-senter -
Category
Documents
-
view
1.819 -
download
2
Transcript of Parks priorities
McCrum Park—Priorities &
Costs2009
Master Plan
2014-2017
Priorities
Parking New play
set/nature play
New play set Tryke Path
Spray park Shelter
Tryke path Fence along Roe
Perimeter path Bury electrical
Shelter
Crosswalk
Sign orientation
Fence along Roe
Black fence,
tennis
2009 Master
Plan
2014-2017
Priorities
$420,000 $148,800
Prairie Park—Priorities & Costs
2009
Master Plan
2014-2017
Priorities
Toddler swings Toddler swings
Fencing Move climbing
rock to McCrum
Park
Trees
Fountain
2009 Master
Plan
2014-2017
Priorities
$6,000 $5,000
Taliaferro Park—Priorities &
Costs2009
Master Plan
2014-2017
Priorities
8’ walking paths Nature play area
Sport field
improvements
Sport field
improvements
Nature play area New play set
New play set
Bike rack
2009 Master
Plan
2014-2017
Priorities
$365,000 $147,000
Harmon Park—Priorties &
Costs2009
Master Plan
2014-2017
Priorities
Amphitheater Disc golf course
Santa Fe Trail-
themed
playground
Nature play
Increase parking New play set
Replace large
shelter, patio,
restrooms
8’ perimeter path
Landscaping
Climbing wall
Skate park
improvements
Sculpture garden
2009 Master
Plan
2014-2017
Priorities
$2,725,000 $130,000
Bennett Park—Priorities &
Costs2009
Master Plan
2014-2017
Priorities
Parking 8’ perimeter path
Tryke path Nature play
8’ perimeter path New play set
Sign orientation
Relocate sandbox
for ADA
accessibility
2009 Master
Plan
2014-2017
Priorities
$65,000 $133,000
Porter Park—Priorities & Costs
2009
Master Plan
2014-2017
Priorities
8’ perimeter path
& widen trails
Nature play
Nature play area Improve drainage
Decorative fence Extend trail along
creek
Improve drainage New backstops
Parking New play set
Add play
equipment; expand
shelter
Improve ADA
accessibility
Relocate tire swing
Landscaping
2009 Master
Plan
2014-2017
Priorities
$406,000 $190,000
Windsor Park—Priorities &
Costs2009
Master Plan
2014-2017
Priorities
8’ paths New play set
Nature play area Nature play area
New play set Improve drainage
Replace shelter New tables/
benches
Landscaping
New entry
Replace/widen one
bridge
Improve drainage
2009 Master
Plan
2014-2017
Priorities
$520,000 $119,000
Park Priorities & Estimated
Costs2009
Master Plan
2014-2017
Priorities
McCrum Park $420,000 $148,800
Prairie Park $6,000 $5,000
Taliaferro Park $365,000 $147,000
Harmon Park $2,725,000 $130,000
Bennett Park $65,000 $131,000
Porter Park $406,000 $190,000
Windsor Park $520,000 $119,000
Total $4,507,000 $872,800 + design and
inspection costs =
$985,000
Park Priorities & Estimated
CostsYear Parks Estimated costs
2014 McCrum, Prairie,
Taliaferro, Harmon
$250,000
2015 Taliaferro, Bennett $225,000
2016 Porter, Windsor, Taliaferro $375,000
2017 Harmon $135,000
Future Porter, Franklin, northland
park development
$200,000
Total $985,000
Parks & Ground Maintenance
Operations Budget
Proposed $12,500 increase in 2014:
$5,000—Santa Fe Pavilion stone wall repair
$4,000—Turf management
$3,500—Playground equipment repair
Parks & Ground Maintenance
Items to
be
addresse
d in the
near
future
Fix broken swings
Add recycle bins and trash cans as necessary
Remove old pool at Taliaferro Park
Making concrete repairs
Asphalt repairs in parking lots
Sand volleyball court maintenance
Play equipment cleaning and repairs
Trimming of park trees
Adding mulch at play areas
Repairs to black fall pads at play areas
Improve daily/weekly park attention