![Page 1: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/1.jpg)
T h e S h o c k e y P r e c a s t G r o u p
PARKING STRUCTUREDESIGN GUIDE2008/2009
Edition
![Page 2: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/2.jpg)
![Page 3: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/3.jpg)
Parking Structure Design Guide2008/2009 Edition
Introduction
48’ Bay System
Parking Structure Aesthetics
The AltusGroup
Shockey Parking Structure Specifications
Glossary
• WhyPrecast?• WhyShockey?
• OptimalLayout• Openness• RampWalls• DrySystem
• Colors,Features,Textures• CaseStudies • CalvertSt.ParkingStructure • WashingtonNationalsBallpark ParkingStructure • GaylordNationalHarborResort &ConventionCenter
• C-GRID®ReinforcedDoubleTeesfor ParkingStructures
81
67
63
51
11
3
T h e S h o c k e y P r e c a s t G r o u p
219 Stine Lane
Winchester, VA 22603
540.667.7700
www.shockeyprecast.com
NOTE: Thedetailsshowninthisdesignguideareintendedtobehelpfulinthepreparationofcompleteproject plans. These details are not to be used asworkingdrawings.Workingdrawingsanddetailsmustbepreparedandapprovedbyqualifiedprofessionalscertifiedinthejurisdictioninwhichtheprojectistobebuilt. Shockey acceptsno responsibility for anyerrorsoroversightsintheuseofthismaterialorinthepreparationofplans.Thispublicationisintendedforusebyprofessionalpersonnelcompetenttoevaluatethe significance and limitations of its contents andable to accept responsibility for the application ofthe material contained herein. Special conditionsandspecific local requirementsonyourprojectwillrequirespecificevaluationandpracticalengineeringjudgmentbytheproject’sEngineerofRecord.
©TheShockeyPrecastGroup2008.AllRightsReserved.
![Page 4: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/4.jpg)
FairfaxCountyJudicialCenterParkingStructure,Richmond,VA
![Page 5: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/5.jpg)
InTroducTIonAsthecostofrealestatecontinuestorise,ownersanddevelopersareingreaterneedofparkingsolutionsthatprovidesmartandcost-effectiveanswerstoavarietyofcommercial,residential,municipal,andinstitutionalparkingneeds.Inadditiontothepracticalissuesrelatingtoparkingavailabilityandcost,theseownersandgoverningbodiesareplacinganincreasedemphasisonaesthetics.Today’sparkingstructuremustbeconvenientlylocated,low-cost,andcomplementthesurroundinglandscape.
Inthischapterwewillexplorethenumerousbenefitsprecastconcreteoffersforowners,designersandgeneralcontractors,including:
• Speed-to-market
• Durability
• Sustainability
• 50-YearLifeExpectancy
• IntegratedProjectDelivery
• IncreasedValuefortheOwner
• OpennessandSecurity
Why Precast?Whyaremoreownersanddesignersselectingprecastconcreteasthematerialofchoicefortheirparkingstructureprojects?Theanswerissimple.Precastconcreteisahighlydurable,economicalandversatilebuildingmaterialthatoffersincomparablevalueandflexibility.Itsshorterectiontimeandabilitytoreducetheoverallconstructionscheduleappealtoownersandgeneralcontractors.Fordesigners,precastopensthedoortoaworldofliterallylimitlesspossibilitiesforproviding“signature”solutionstotheirindividualparkingneeds.
Speed-to-MarketThedecisiontodesignwithprecastconcretecarrieswithitamyriadofadvantagesovercast-in-place(CIP)concreteorothertraditionalconstructionmaterials.OneoftheforemostbenefitsofusingprecastratherthanCIPconcreteisthattheprecastmanufacturingprocessisunaffectedbytemperatureoradverseweatherconditions.Precastconcretecomponentsarefabricatedinacontrolledplantenvironment,whichmeansthatvaluableprojecttimeisnotlostwaitingforacceptableweatherconditions.
Typicalprecastparkingstructurecomponentssuchasdoubletees,columnsandinvertedteebeamscaneasilybeerectedatanaveragerateof12piecespercraneperday,andcanbeerectedinweatherconditionsthatwouldbeproblematicforthefullerectionofsteelcomponentsorCIPconcrete.Precastconcrete’sfastererectionmeansfollow-ontradescanbeginworkmorequicklyandtranslatestoanoverallconstructionschedulethatmaybeseveralmonthsshorterthanthatofaprojectusingCIPconcrete.
Forgeneralcontractors,thisschedulereductionresultsinaneconomicadvantageduetosignificantlyreducedoverhead(generalconditions)andincreasedavailabilityofthefirm’screwsforotherprojects.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM IntroductIon 3
![Page 6: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/6.jpg)
durabilityOneofprecastconcrete’sforemostadvantagesisitsdurability.Plant-castprecastproductsaretypicallymoredurablethanfield-placedconcreteinpartbecauseofthecontrolledenvironmentinwhichtheyaremanufactured.Thelowwater-cementratiousedinprecastconcretecreatesadenserproductthatdoesnotallowpenetrationofchloridesandotherharmfulelementsaseasilyasfield-placedconcrete.ThePrecastPrestressedConcreteInstitute(PCI)PCIHandbook6thEditionreportsthatstudieshaveshown“acceleratedcuringmakesprecastconcretemoreresistanttochloridesthanfield-curedconcrete.”
TheShockeyPrecastGroupcanuseflyash,silicafume,slagcementandothercementitiousmixturestohelpreducethewater/cementratiooftheconcretemix,increasedensity,reducealkalisilicareactivity,andincreasethelong-termstrengthanddurabilityofourprecastconcretecomponents.Theuseofcorrosioninhibitorsandgalvanizedorepoxy-coatedreinforcingintheprecastconcretecanfurtherincreasedurability.Topreventcorrosionofconnectionsandtomaximizethelifespanofaparkingdeck,TheShockeyPrecastGroupusesstainlesssteelflange-to-flangeconnectionsinthedrivingsurfacewherethemajorityofnormalwear-and-tearwilloccur.
SustainabilitySilicafume,flyash,andslagcementareallconsidered“green”productsandtheiruseaspartoftheoverallconcretemixcanaddLEEDpointstoaproject.
50-Year Life ExpectancyInaccordancewiththeLife-365ServiceLifePredictionModel™,usingslagwithacorrosioninhibitorinournormalconcretemixtures,itcanbeshownthatwitha1.9”covertosteelinourhorizontalprecastcomponents,TheShockeyPrecastGroupisabletoprovideparkingstructuresthatmeeta50-yearlifeexpectancy.
Intheeventaprimaryflangereinforcementisusedthatcannotcorrode(suchastheC-GRID®carbonfiberreinforcingsystem),durabilityofthedoubleteeswillbesignificantlygreaterthanthatofdoubleteesreinforcedwithweldedwirefabric.
Pleasenotethatachievinga50-yearlifeexpectancyiscontingentuponpropermaintenanceasoutlinedinPCI’sMaintenanceGuide,includingimmediaterepairofcracksandtimelyreplacementofjointsealantstomaintainprotectionofconnections.
Integrated Project deliveryStructuralprecastcomponentscanbeerectedinarelativelyshortperiodoftimebecausetheyinterlocktosupportoneanother.Simplerinstallationrequiresfewercrewmembers,whichtranslatestolesstraffic,congestionandwasteonthejobsite.Forthegeneralcontractor,acleanerandsaferjobsitemeanslessriskandmoreassuranceofasmoothandsuccessfulprojectflow.AndbecauseTheShockeyPrecastGroupmanufacturesanderectsitsprecastcomponents,thegeneralcontractorcanrelyonasolesubcontractorforprojectcompletion.
Increased Value to ownerFortheowner,the“speedtomarket”ofprecastmeansfasterdeliveryofthefinishedparkingstructure,whichcanresultinsignificantcostsavingsandtranslatetoafasterreturnoninvestment.Thedurabilityandlongevityofaprecastparkingstructurealsoequalsabetterlong-terminvestmentfortheowner.Aspreviouslystated,theinherentquality,strengthanddensityofprecastconcreteproducedbyTheShockeyPrecastGroup,combinedwith
4 IntroductIon The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 7: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/7.jpg)
aregularmaintenanceprogram,canresultinaparkingstructurewithatypicallifecycleof40-50years–fargreaterthanthetypicallifecycleofaCIPparkingstructure.Fortheowner,thisrepresentsasignificantreturnontheinitialinvestment.
openness and SecurityAnyonewhohaseverparkedinadimly-lit,closed-inparkinggarageunderstandsperfectlytheaestheticandsecurity-relatedadvantagesofaprecastparkingstructure.Theuseoflong-spanprecastdoubleteesandarchitecturalload-bearingspandrelsorload-bearingwallsallowdesignerstocreateparkingstructureswithwidebaysthatgivepatronsanincreasedsenseofvisibilityandsecurity.Theendresult?Morepatronsarelikelytousetheprecastparkingstructurethanadimly-lit,closed-inCIPparkingstructure.
Why Shockey?
The Shockey PedigreeWhychooseTheShockeyPrecastGroup?TheShockeypedigreeissynonymouswithquality,integrity,anddoingajobrightthefirsttime.Ourhistorystretchesbackmorethan100years,encompassinggeneralcontracting,designbuildandprecastconcreteservices.
In1896,HowardShockeystartedawagon-repairbusinessinWinchester,Virginia.ThebusinessgrewtoincludegeneralcontractingandHoward’sreputationforqualityconstructionanddo-it-right-the-first-timeattitudequicklyputhiscompanyindemandforcustomhomebuilding.Today,manyofthehomeshebuiltattheturnofthecenturyarestillstanding;monumentstohislegacyofhardwork,integrity,anddedication.Howardpassedthatlegacytohissons,andinthe1930s,JimShockeyjoinedhisfatherinthebusiness.HewaslaterfollowedbyhisbrotherRalph.In1947,thecompanybecameknownasHowardShockeyandSons.
In1955,ShockeyopenedasmallmanufacturingfacilityforprestressedconcreteasadivisionofCrider&Shockey,itsformerready-mixconcretecompany.Oneyearlater,ShockeyBrothers,Inc.becamethethirdShockeyoperatingcompany.In1999,thecompanychangeditsnametoTheShockeyPrecastGroup.Today,TheShockeyPrecastGrouphascompletedmorethan3,000precastprojectsthroughouttheMid-Atlanticregion,includingtheserecentnoteworthyparkingstructures:
• CalvertSt.ParkingStructure,Annapolis,MD
•D.C.NationalsBallparkParkingStructures,Washington,D.C.
•GaylordNationalHarborResort&ConventionCenterParkingStructure, OxenHill,MD
• JohnPaulJonesArenaParkingStructure,Charlottesville,VA
•CarilionHealthcareRiversideParkingStructure,Roanoke,VA
• ShadyGroveMetroStationParkingStructure,ShadyGrove,MD
• FairfaxJudicialCenterParkingStructure,Fairfax,VA
TheShockeyPrecastGroupisachartermemberofthePrecast/PrestressedConcreteInstitute,aswellasbeingaPCI-CertifiedPlantandPCICertifiedErector.ShockeyPrecastmanagementhasheldleadershippositionsinMAPA,the
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM IntroductIon 5
Shockey Bros, Inc. casting yard, circa 1960s.
Shockey Bros., Inc. – prestressing double tees, circa 1960s.
![Page 8: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/8.jpg)
PCIchairmanship,variousPCItechnicalcommittees,andonthePCIIndustryAdvisoryGrouptotheNationalBuildingInformationModelingStandardInitiative.TheShockeyPrecastGroupisalsoamemberoftheAltusGroup–acollaborationofprecastersdedicatedtoadvancingtheuseofC-GRID®carbonfiberreinforcing.
Sole SourceTheShockeyPrecastGroupprovidestheOwner,DesignerandGeneralContractorwithasinglepointofcontactforthefullrangeofprecastactivitiesfrominitialcoordinationanddesignthroughturnoverofthebuildingtotheowner.With50+yearsintheproductionanderectionofprecastconcrete,TheShockeyPrecastGroup’sexperienceintheparkingstructurearenaisunmatchedintheregion--makingustrulyThe Partner of Choice.
TheShockeyteamassiststheOwnerorGeneralContractorthroughtheentiredesignandconstructionprocessstartingwithearlybudgetinginformation.Westrivetobepartoftheearlydesignprocess,providingexperience-basedbudgetsinsupportofspecificprojectplanstoassisttheOwnerorGeneralContractorinlong-termfinancialforecastingofprojects.Asplanningcontinuesanddetailsofthestructurebecomemoredefined,weassistindefiningthecostofaprecaststructurebyofferingacomprehensiveproposalfortheproject.
TheprojectproposalincludesadetailedengineeringandproductionschedulethatenablestheOwnerorGeneralContractortomeetprojecterectionneeds.TheShockeyPrecastGrouptypicallyassiststheOwnerandGeneralContractorbyprovidingqualitycoordinationeffortstotheteamthroughoutthedesigndevelopmentprocess.
Shockey’steamincludesfield-experiencedcoordinatorswhospecializeinonsitemanagementofpre-erectionactivitiestofacilitateasmoothtransitiontotheerectionphaseoftheproject.Ourtransportationcoordinatorsensurethesitelogisticsdetailsareplannedwellinadvancetoallowforuninterruptederectionoftheprecast.Aftererectioniscompletedorhasadvancedtoasafedegree,ourFieldCoordinatorsprovideearlyaccessto
6 IntroductIon The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
The Shockey Precast Group Winchester Plant
![Page 9: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/9.jpg)
thestructureforfollow-ontrades.Thistimelyonsitecoordinationminimizesdisruptionsoffieldactivitiesandreducestheoverallprojectconstructionschedule.
Duringerectionofthebuilding,TheShockeyPrecastGroup’sfieldfinisherscompletetheonsitework--enablingtheprecastportionofthestructuretobecompletedwithinamonthoferectioncompletion.Thisquickresponseallowspunch-listreviewofthestructuretoproceedwithoutdelay.Finally,uponcompletionoftheprecastwork,weprovideanindustry-leadingmanualforcareandmaintenanceofparkingfacilities,alongwithawarrantyofourwork.Ownerswhofollowthecyclicmaintenanceactivitiesoutlinedinthismanualandwhohavetrainedpersonnelresponsibleforthecareoftheirparkingstructurewillensurethestructuremeetsorexceedstheservicelifeobjectives.TheShockeyPrecastGroup’sfieldrepresentativesalsoprovideexperience-basedassistancetotheownersonanas-neededbasisduringparkingstructureoperations.
Fromdesigndevelopmentthroughon-lineoperations,TheShockeyPrecastGroupprovidesone-stopserviceforalltheactivitiesnecessarytobringanewparkingstructuretoreality.
design Assist ProgramIn1996,legislationwaspassedthatenabledthefederalgovernmenttoenterintodesign-buildcontracts.Sincethattime,therehasbeenadramaticriseinthenumberoffederally-fundeddesign-buildprojects.Asaresult,theneedforspecialtysubcontractorstosupportthissignificantincreasehasneverbeengreater.
TheShockeyPrecastGrouptypicallyseekstobecomeinvolvedinthedevelopmentofprojectsthatarelessthan15%designed.EarlyinvolvementinthedesignprocessenablesTheShockeyPrecastGrouptohelpourcustomersmakesound,informedchoicesthatbestservethefinancialandaestheticneedsoftheowner.
Design Assistance ServicesTheShockeyPrecastGroupprovidesthefollowingdesignassistanceservicestoourcustomers:
1. Prepareandupdatebudgetestimates.
2. Participateinconstructabilityreviews.
3. Supportvalueengineeringoptions.
4. AttendmeetingswiththeA/EDesignTeamasrequired.
5. ProvideassistancetotheA/EDesignTeamintheformofconstructiondetails,loading
concepts,productsamples,anddrawingsfromsimilarproducts.
6. Participateinregularphone,written,andemailcommunicationswiththeA/EDesign
Teamduringthedevelopmentofthedesignthrough100%ConstructionDocuments.
7. UseBIMProcesstoprovide3Dprojectmodels.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM IntroductIon 7
![Page 10: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/10.jpg)
FrequencyTheShockeyPrecastGroupprovidesdesignassistprogramserviceswiththefollowingfrequency:
1. AtCoreandShell100%DesignDevelopmentDocuments.
2. At10%,50%,and100%ConstructionDocuments.
Building Information Modeling (BIM)“ABuildingInformationModel(BIM)isadigitalrepresentationofphysicalandfunctionalcharacteristicsofafacility.Assuchitservesasasharedknowledgeresourceforinformationaboutafacilityformingareliablebasisfordecisionsduringitslife-cyclefrominceptiononward.
AbasicpremiseofBIMiscollaborationbydifferentstakeholdersatdifferentphasesofthelifecycleofafacilitytoinsert,extract,updateormodifyinformationintheBIMtosupportandreflecttherolesofthatstakeholder.TheBIMisashareddigitalrepresentationfoundedonopenstandardsforinteroperability.”—NationalInstituteofBuildingSciences
TheShockeyPrecastGroup’sEngineeringdepartmenthasplayedanintegralroleinthedevelopmentofBIMfortheprecastindustrythroughitspartnershipwithTEKLAStructures.ThiscommitmenttoremainingattheforefrontofBIMtechnologyhasmadeTheShockeyPrecastGroupinstrumentalintheadvancementanduseofBIMthroughouttheprecastindustry.Forourcustomers,TheShockeyPrecastGroup’sextensiveknowledgeanduseofBIMtechnologymeanswecanmaximizetheeffectivenessofthisvaluableintegrationtooltoensuresmoothprojectflowandopenteamcommunication.
Safety: First at All LevelsTheShockeyPrecastGroupiscommittedtoprovidingasafeandhealthfulworkenvironmentforallouremployeesandotherswhomaywork,visit,orenterourfacilitiesorjobsites.Itisourpolicytoconductbusinessinamannerthatoffersmaximumprotectiontoeachandeveryemployeeandanypersonthatmaybeaffectedbyouroperationsandbusiness.Wewillmakeeveryefforttoprovideaworkingenvironmentthatisfreefromanyrecognizedorpotentialhazard.ThecommitmentisbestdescribedbytheShockeymaxim–Safety: First at all levels.
Thegroundworkforasafeandsuccessfulprojectisestablishedlongbeforethefirstpieceofprecastisdeliveredtothesite.TheShockeyPrecastGroupisproudofitsthoroughpre-constructionplanningandsafeexecutionofallworkactivities.Shockeymanagersandfieldoperationsexpertsmentallybuildtheproject,anticipatingasmanyissuesaspossiblethatcouldadverselyaffecttheprogressoftheworkonsite.Thoroughon-sitereviewofaccessrequirementsforthecraneandtruckstransportingtheprecastarediscussedlongbeforethefirstlayeroftopsoilisdisturbed.
Duringtheprojectproposalstage,theFieldOperationsManager,withassistancefromTheShockeyPrecastGroup’sEstimatingDepartment,usesavailablecontractdocumentstodeterminethesafestandmosteconomicalmethodforerectingtheprecast.TheFieldOperationsManagerdeterminesrequiredaccessforthecraneandestablishesthesizeofthecrane,lengthsofboom,andboomconfigurationrequiredtosafelyerecttheprecastwellwithinthecrane-specifiedcapacities.Anaccesssketchshowingtherequiredcranepathisprovidedwitheachproposal.Additionally,thecranegeometry(length,width)andthemaximumcranebearingpressureareprovidedsotheownercandeterminecostsfor
8 IntroductIon The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 11: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/11.jpg)
providingstabilizedcraneaccessandastablebasecoursetosupportthetrucksprovidingprecastdeliverytothesite.
ErectionoftheprecastisperformedbyerectorsQualifiedunderPCI’sErectorCertificationProgram.PCI-QualifiedErectorsmustundergoarigorousauditoftheirerectionoperationsatleasteverysixmonths.Anydeficienciesfoundduringtheauditsareimmediatelycorrected.Follow-upauditsensurecontinuedcompliancewiththissafety-orientedCertificationProgram.
Duringthedesigndevelopmentstageofallawardedprojects,theprecastdesignengineerusestheerectionplantodetermineifadditionalerectionbracingisrequired.Theprecastdesignengineerevaluatesthestabilityofthepartiallyerectedstructuretoensureitcanwithstandthemostsevereweatherconditionsatanypointduringerection.Ifadditionalerectionbracingisrequired,theerectionbracingplanwithspecifiedbracingdetailswillbeincorporatedintotheerectionplanforthestructure.Thedesignanalysisanddetailswillbesealedbytheprecastdesignprofessional.
Internalpreconstructionmeetingsbetweentheerectionforemanandtheprecastdesignprofessionalsandon-sitepreconstructionmeetingsbetweentheGeneralContractor,InspectionAgencies,andtheEngineerofRecord,areheldtoensurethatallaspectsofprecasterectionarefullyunderstoodandagreedupon.Thisincludesin-depthdiscussionsonprecastconnectionsandrequirederectionbracing.
Apre-erectionsurveyoftheCIPconcreteorsteelsubstructuresupportingtheprecastiscompletedwellinadvanceoferectionsoanyrequiredmodificationsorrepairstotheCIPorsteelcanbeaccomplishedwithoutaffectingtheerectionstartdate.ErectioncommencesonlyafterassurancefromtheEngineerofRecordthattheCIPhasachievedrequiredstrengthorthesteelstructureisreadytoacceptprecast.
Theerectorisrequiredtodevelopasite-specificSafetyPlanforeachproject.Thisplancontainsacompletehazardanalysisandfallprotectionplanningfortheproject.Priortostartoftheerection,theerectioncrewisfullybriefedontheSafetyPlanandunderstandsthesafetyconstraintsoftheproject.Thisincludeshandlingofthetypesofprecastproductsfortheproject.Allprecastdeliveredtotheprojectarriveswithashippingandhandlingtagattached.Thistagoutlinesthespecifiedmethodoferectingthepanelandgivesanyspecialhandlinginstructionsforrotatingorrollingtheprecast.Weeklyfollow-upsafetymeetingssometimesreferredtoas“ToolBoxTalks,”areheldonsiteforthedurationoftheproject.
Duringerectionoftheprecast,theerectionforemanisresponsibleforsafetyontheproject.TheforemancontinuallyobservestheworkofthecrewtoensurecompliancewiththepublishedSafetyPlan.PropersafetymarkingofthesiteismaintainedinaccordancewiththeSafetyPlanandtheforemanensuresthatnon-erectionpersonnelremainoutsidetheerectionarea.Onlywhentheproperlydocumentedturnoveroftheerectedstructurehasbeencompletedwillnon-erectionpersonnelbeallowedtoperformworkonthestructure.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM IntroductIon 9
![Page 12: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/12.jpg)
10 IntroductIon The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
JohnPaulJonesArenaParkingStructure,UniversityofVirginia,Charlottesville,VA
©Er
ic A
. Tay
lor P
hoto
grap
hy
![Page 13: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/13.jpg)
Bay SizeTheShockeyPrecastGroup’s48’baymoduleuses12’widedoubletees,whichresultinthemostcost-effectiveuseofprecastcomponents.Basedonthe12’doubleteewidth,thishandbookwillofferapossible“typical”parkingstructurelayout.Wheneverpossible,limittheuseofnon-standardteewidthsorbaysizes,asthiswillinfluencethecost.Thebaysizeyouchoosemayresultinverydifferentspandreldimensions,floortofloorheights,drainageplansand/orsupportingwallsystems.
drainageForownersanddesigners,assuranceofaproperdrainagesystemisoneofthemostimportantconsiderationsinthedesignofaparkingdeck–bothforthehealthandlifeofthedeckaswellasforthecomfortandconvenienceofitspatrons.Theuseofa“drysystem”forwashesthatdirectwatertowardthedrainisconsideredsuperiortotheuseofCIPconcretepourstrips.WhileCIPtoppings,suchasthoseusedinpourstrips,typicallyfeaturea3,000psiconcretemix,theconcreteusedforaprecastdrysystemwillusea6,000psimix.Sincetheprecastdrysystemisproducedinacontrolledplantenvironment,itismonitoredbythePCIQualityControlprogram.ThequalityofCIPwashcastingsmaynotbecontrolledinthesamemanner.
Designedcorrectly,aneffectivedrainageplanwillhelppreventwaterfrompondingorcausingprematuredegradationtothejointinterfaces.Generally,drainsarelocatedattheinteriorbays,atalternatinggridlines.Oneeconomicalwaytoprovideproperdeckdrainageisto“warp”thedecksurface.Warpingoccurswhenthedeckperimeterisheldataconstantelevationandtheinteriorbaysarealternatelyraisedandlowered.Warpingisgenerallynotcauseforconcernregardingcrackingofthedoubleteesurface,providedthewarpisheldtoalimitof.175inchperfootofwidthfora60’longtee.PleasereferencePCIJournalJanuary/February2003,page35forstandardindustrypractice.Thefollowingdiagramprovidesanillustrationofthisconcept.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 11
48’ BAY SYSTEM
![Page 14: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/14.jpg)
12 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Whilewarpingofthedecksurfaceisanoptionworthconsidering,itisalsopossibletoalternatelyraiseandlowertheperimeterofthedeckequallywiththeinteriorbays,resultinginatwo-waydeckcrossslope.Thiseliminatestheneedforwarpingteesbut,inturn,tendstobelesscosteffective.Theamountofcrossslopealongthelengthoftheteewilldependonthedecksystemandbaysizechosen.Eitheroptionispossibleandmayormaynotbesuitabletothedesigninquestion.
Afewimportantdrainagefacts-
• TheShockeyPrecastGroupcastspre-manufactureddrainunitsintotheflangesofthedoubleteesthatprovidecosteconomyandbettersealingqualitycomparedtofieldinstalledvarietiesandeliminatesfieldcuttingandinstallation.
• TheShockeyPrecastGroup’s“totalprecast”decksurfacedoesnotrelyontheuseoffieldtoppedCIPconcrete.Thisrepresentsasubstantialadvantageoverotherprecastsystemsandprovidesbetterdurabilityandlowercosts.Italsominimizesthechanceforwaterinfiltrationattheprecastinterface.
• TheShockeyPrecastGroupcandivertwatertowardthedrainusingoneofthreepossiblesystems:precastcurbs,monolithicprecastwashes,orCIPwashes.
• Locatinghandicappedparkingspacesshouldincludeconsiderationofmaximumallowableslope.
drainage considerationsThemovementofwaterfromthedecksurfaceisillustratedbelow.Theslopingofthedeckstructureenablesthewatertobedirectedtostrategicallylocateddrains.Thisslopinghasaverysignificanteffectonstructureframing.Therefore,earlydeterminationiscriticalandvitaltofloorheights.
High point
Bay width
High point Low point w/ drain
Interior bay
Bu ilding perim eter Constan t elevation
Approx . 60 ’
Concep t of Warping
ma x .175 inch per
Arrows indicate direction of water
flow
Concept of Warping
![Page 15: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/15.jpg)
Expansion JointsUndernormalseasonalheatingandcoolingcycles,concretewillexpandandcontract.Thisinturngeneratesin-planeforcesanddisplacementsthatmustbeaccountedfor.Expansionjoints,whencorrectlylocated,allowtheseeffectstooccurwithoutadverselyaffectingtheprecastjointsandconnections.Dependingonthedeckconfiguration,expansionjointsshouldbelocatedamaximumof300feetapart.Theexpansionjointisfrequentlylocatedatthejointbetweentwoteesatacolumngridlineandshouldbelargeenoughtoaccommodatethecombinedthermalmovementoneachhalfofthestructure.Thelocationoftheshearresistingelementsalsoplaysaroleindeterminingthelocationofexpansionjoints.If,forexample,a300’longdeckcontainedstiff,shear-resistingelementsonbothends,itmightbeadvisabletointroduceanexpansionjointsomewhereinthemiddleofthedecktohelp“relieve”thebuildupofstressattheends.Thisisbecauseshearelementsactas“pointsoffixity”andwillacttorestrainthedeck,therebycausingconnectionforcestoexceedreasonablelimits.Itisessentialtorememberthatexpansionjointsalsoservetointerruptthelateralforceresistingsystem,which,forthepurposesofdesign,effectivelycreatestwoseparatebuildingstructures.Eachbuildinghalfmustcontainsufficientlateralloadresistingelements.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 13
Typical Framed Level Drainge Plan
![Page 16: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/16.jpg)
14 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
General LoadingAparkinggaragemustsatisfyavarietyofloadingrequirements.Inadditiontotheirownselfweight,parkinggaragesaredesignedtoresistuniformvehicularloadsof40psfortheapplicationofa3,000poundsactingonanareaof20squareinches(typicalsizeofthebaseofatirejack).Ifhigherloadingcriteriaareneededtoresistfiretrucksorotherlargevehicles,specialprovisionsmayberequired,includingthedeepeningofelementsortheadditionofreinforcing.Otherloadsincludewindorseismic,asdeterminedbytheapplicablebuildingcode.
Seismic/Wind considerationsParkingstructurestypicallyutilizeshearwallstoresistthelateralwindorseismicforcesprescribedbylocalbuildingcodes.Dependingonlocationandsiteconditions,thedesignloadswillvary,aswillthenumberorsizeofshearwallsneeded.Shockeyengineersalwaysperformacomprehensivelateralloadanalysisofeachbuildingthecompanydesigns.LoadsfromthisanalysisarethengiventotheEngineerofRecordforverifyingtheCIPfootingandwalldesigns.
Whenpossible,itisadvantageoustoprovideshearwallslocatedalongthelineoframpwallswithanadditionalwalloneachendoftherampasshowninthefigurebelow.Anotheroption,dependingontheprescribedloads,istooffertheshearwallswith“punched”windowopeningstoprovideadditionallightandopenness.Horizontalrampwallscanbeusedtoprovidetherequiredlateralstabilityparalleltotheramp.Thesewallshaveopeningstoprovidelightandopenness.
Wallsshouldbelocatedinawaythattakesmaximumadvantageofthesurroundingdeadloadelements.Shearwallsthatsupportdoubleteesorinvertedteebeamswill“engage”moredeadload,whichhelpstocounteractthewalloverturningmoment.Whenoverturningmomentsarelargerthandeadloadresistingmoments,aconditionknownas“netuplift”onashearwallelementoccurs.Thisrequiresthedesignofhold-downdevicesorconnections,which,inturn,increasescost.
SincethedesignoftheCIPfootingsandwallsistheresponsibilityoftheEngineerofRecord,itisimportantthatsufficientthoughtbegiventoshearwallplacementearlyinthedesignprocess.TheShockeyPrecastGroupisableandqualifiedtoworkwiththeprojectengineerstohelpdeveloprational,economicalandpracticalload-resistingsystemsthatwillprovidesuperiorbuildingperformance.
Shea r walls
Possible Stair shafts
Shear Wall Layout
![Page 17: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/17.jpg)
Floor-to-Floor HeightThefloor-to-floorheightofaparkingstructuredependsonavarietyoffactors,includingtheprecastelementsusedandtheusagerequirementsoftheoccupants.Thesampleparkingstructureincludedinthishandbooksuggestsafloor-to-floorheightof10’-8.”Thisheightprovidesforoptimaleconomyandallowsaminimum7’-0”verticalclearanceundertheinvertedteebeams.
Fire resistanceDependingonnumerousfactors,aparkingstructuremayberequiredtohaveeithera1-houror2-hourfirerating.MostparkingstructuresfallunderthecategorytypeIIB,asdefinedbytheInternationalBuildingCode,anddonotrequireanyparticularfireresistanceratingatall.However,whenrequiredbydesign,precastparkingstructurescaneasilybedesignedtoahigherleveloffireresistance.
Fireresistanceratingsofprecastcomponentsaremeasuredandspecifiedaccordingtothecommonstandard,ASTME119.Fireenduranceisdefinedastheperiodoftimeelapsedbeforeaprescribedconditionoffailureisreachedduringastandardfiretest.Designingprecastelementstosatisfyagivenfireresistanceratingwillincreasecoststosomedegree–primarilywhenadditionalreinforcingorlargermembersizesareneeded.
opennessAprimarybenefitofthe48’bayisthattherearefewerverticalelementstointerruptthenaturalsightlines.Theinherentopennessofa48’bayparkingstructurecontributestoincreasedsecurityofparkingstructurepatronsandprovidesnaturalventilation.
Joints and revealsJointsizesbetweenprecastandCIPelementsvary.Recommendednominaljointdimensionsarenotedinthishandbook.Thesejointshavebeenestablishedbasedontolerancerequirements(seesectionbelow),andtoensurealong-lastingjointinterface.
Whendiscussingthesejoints,itisimportanttounderstandthatthedimensionsgivenare
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 15
Reveal
1”
Cau lk with backer rod
Pan el
1”
Tra pezoidal Reveal
Color #1
Color #2
Joints and Reveals
![Page 18: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/18.jpg)
16 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
“nominal”–meaningactualjointsizesareallowedtodeviatefromthesevaluestowithinindustryacceptedranges,asdescribedinPCIMNL135.Whenselectingaccentrevealsorrusticationlines,itisimportanttotiethemtothechosenjointsize.Avoidtriangularrevealswherepossiblebecausetheyaredifficulttoaffixtotheforms.Instead,atrapezoidalrevealwillprovideaflatnailingsurfacefortheformbuildersandhelpminimizepossiblenailholeirregularities.Whenchoosingarevealsize,considerlimitingthedepthto¾”.Deeperrevealsdecreasetheeffectivesectionofthepanel.Thisreducespanelstrengthandincreasesthechanceforpanelcracking,whichmayrequireanincreaseinthepanelthickness.Besuretoincluderevealsbetweenanyandallcolorbreaks--whentwoseparatefacemixesareusedwithinthesamepanel,it’sstronglyrecommendedthatdesignersincludearevealbetweenthetwomixestoprovidethecastingcrewadistinctstoppingpointandhelpreducecolorbleed.Thiswillhelpensureasmoothbreaklinebetweenthetwocolors,asillustratedinthefigurebelow.
corners and QuirksWhenconsideringdetailsatbuildingcorners,it’srecommendedthata¾”quirkbeintroducedatpanelreturns–especiallythoseexceeding1’-1”inlength.Toachieveasuperiorfinishalongthepanelface,panelsareoftenproducedintwophases,whichresultsinacastingorpourlinebetweenthetwopieces(seesketchbelow).Thequirkwillminimizethiseffectbyessentiallyhidingthelineintheapexofthenotch.
Corners and Quirks
Panel Corner Detail –(Monolithic Pour)
Panel Corner Detail –(Sequential Pour)
Maximum panelreturn length = + 1’1”
Square corner possiblebut not recommended –
use quirk if possible
Pane 1 returnsgreater than 1’ - 1”
quirk¾” quirk
First pour
Second pour
Sequentialpour line
![Page 19: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/19.jpg)
Facial ProjectionsFacialprojectionscanaddauniqueaccenttoyourbuildingproject.Becausethesefeaturesarecasttothepanels“bottominform”,aminimumdraftdimensionisnecessaryinordertobeabletostripthepanelsoutoftheforms.Withoutproperdraft,suctionforcesgeneratedbetweentheconcreteandtheformmaycausethepanelstobindupduringstrippingandpossiblydamagethepaneland/orforms.Toensurethisdoesnotoccur,Shockeyrecommendsaminimumdraftof1:6onfacialprojections,asnotedinthesketchbelow.Alsokeepinmindthatfacialprojectionsincreaseproductioncosts,sinceformsneedtobebuiltuptoaccommodatethefeature.
TolerancesPrecastconnectionsandpaneldimensionsneedtoallowforindustrystandardtolerances.AnexcellentguidetoprecasttolerancesisavailablethroughPCI.TheToleranceManual,MNL135,describesindetailtheallowableproductionanderectiontolerancesforvariousprecastelements.Requestacopyatwww.shockeyprecast.com.
PenetrationsVerticalpenetrationsthroughthedoubleteeflangescanbelocatedanywhereexceptinthestem.Penetrationsthroughtheprecastthatmayberequiredforwallhydrants,pipepenetrationsandlightfixturescanbecastintothepanelsprovidedthecoordinationforlocationandsizeisdoneearlyenoughintheshopdrawingdevelopment.ThelocationandsizeofthesepenetrationsshouldbefurnishedtoShockeyduringtheshopdrawingprocess.Thisistoensurethattheinformationcanbeincorporatedintotheshopdrawingsandfabricationdrawingsinadequatetime.Foropeningslessthan10”square,itisrecommendedthatthepenetrationsbefieldcut.
connectionsDesignoftheconnectionsisalwaystheresponsibilityoftheprecaster.Shockeyutilizesavarietyof“user-friendly,”safeandefficientconnectionsthatallowprecastelementstobesetandsecuredinatimelyfashion.Includedinthishandbookareanumberoftypical
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 17
Facial Projections
Panel as-cast
Forms built up to createfacial projections
Loops for stripping
Panel in finalerected position
Facial projection
6
1
Minimum draft
![Page 20: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/20.jpg)
18 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
connectionswhichprovidethedesignerwithasolidbasisforcosteffectiveandhighlyefficientdesigns.Dependingonvariousfactors,includinglifeexpectancyanddurabilityrequirements,embedmentfinisheswillvaryfromjobtojob.TheShockeyPrecastGrouptypicallyrecommendsthefollowingplatefinishes:
• Non-weldedplateconnectionsexposed Hot-dippedgalvanized totheelements or‘J’Finish
• Weldedplateconnectionsexposed ZincRichCold totheelements GalvanizingCoated
• RodsandBolts Electroplated
• Allothermaterial Plain
• Flange-to-flangeshearconnections Stainlesssteel
MaintenanceEnsuringlong-lastingdurabilityofaparkingstructurerequiresownerstakethenecessarystepstomaintainthestructureoncecompleted.Properlymaintainingaparkingstructurenecessitatesregularinspectionsandcleaningoftheprecastjoints,andarangeofotheritems.Theissueofsnowremovalshouldbeaddressedearlyinthedesignphasewithownerssoitdoesnotbecomeasourceofconcernoncethesnowplowsbegintheirwork.Forexample,theimpropermoundingorremovalofsnowcancauseadegradationofthejointsorteesurfaces.
cIP concreteCIPconcreteistypicallynotincludedintheprecastscopeofwork.However,sinceCIPinterfaceswiththeprecastelements,thecoordinationofprecasttoCIPinterfaceisextremelyimportant.CIPelevationsanddetailsshouldcloselymatchtheprecastdesigntoensuretheproperfit-upandexecutionofthepieceswhentheyarriveonsite.
Followingisanexplanationofeachdesignteammember’sresponsibilitiesregardingthecoordinationofCIP-to-precastinterface:
• Engineer of Record (EOR) –TheEORshouldspecifytopofCIPpier,wallandfootingelevationsandprovideadequatereinforcingdetailsoftheseelementswithinthecontractdocuments.Pierandfootingdesignsshouldaccountforthepossibilityofupliftandslidingforcesatshearwalllocations.Reinforcingdetailsshouldspecifyadequateconfinementsteelatthetopsofpiersandwalls,asrequiredbytheACIcode.Pierandwallsizesshouldtypicallybealargerdimensionthantheprecasttheysupportsothatanchorboltsandembeddedplatescanbeeasilyplacedwithintheconfinementsteel.DowelsoranchorboltsusedtoconnecttheprecasttotheCIParetypicallytheresponsibilityoftheprecaster.Inmanycases,TheShockeyPrecastGroupmaysuggestalternatetopofpierorfootingelevationsthateitherenhancethestructure’sperformanceorimprovecost-effectiveness.Inthiscase,theCIPsubcontractorisaskedtoexecutethedetailsaccordingtotheprecastdrawings,sincethisishowthepiecesarefabricated.
• General Contractor (GC)–CoordinatetopofCIPpierandwallelevationswiththestructuralandprecastdrawings.EnsurethattheCIPsubcontractorfollowsandproperlyexecutesthereinforcingdetailsthatareshownontheContractDrawings(seenotesabove).
![Page 21: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/21.jpg)
• The Shockey Precast Group–DesignandprepareanchorboltlayoutdrawingsforusebytheGCandCIPsubcontractor.SupplyallloosehardwareandanchorboltsneededfortheattachmentoftheprecastelementstotheCIPconcrete.
• CIP Subcontractor–CarefullyexecutetheCIPreinforcinglayoutsperthestructuraldrawings,includingtheconfinementtieslocatednearthetopsofpiersandwalls.Incorporateloosehardwarefortheprecastconnectionsaccordingtothelocationsshownontheprecastlayoutdrawings.WhenadiscrepancyexistsbetweenthestructuraldrawingsandtheprecastdrawingsfortopofCIPelevations,theprecastdrawingsgovern.
ThefollowingsketchillustratestheCIP-to-precastinterface:
ItisgenerallyrecommendedthattheCIPsystembedesignedsuchthattheprecastelementsarenotrequiredtoretainearthloads.Instead,CIPretainingwallscanbeprovidedthatactindependentlyfromtheprecasttowithstandtheseforces.Ifnecessary,itispossibletodesigntheprecastteesorwallsbelowgradetoacttoresistearthloads,asshowninthefollowingsketch.Thiscouldinfluencethelocationofshearresistingelements,connections,andmaynecessitatetheuseofacast-in-placetoppingonthetees.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 19
Reinforcing including ACI requiredconfinement ties to be designed and detailed by the EOR, furnished andinstalled by the GC or CIP subcontractor
Anchor bolts or embedded platessupplied by Shockey, installed byCIP subcontractor at locationsshown on precast anchor bolt layouts
Always maintain top of pier or wallelevations as shown on the precastdrawings. Notify GC of anydiscrepancies between the structuraland precast drawings
Ideally, the CIP section should bewider than the supported precast.For piers, this should be 2” on allsides. For walls, 1” is suggested
CIP Pier for Precast Column
Free-Standing Wall Fixed Wall
Free standing, CIP retaining wall.Backfill wall and allow foranticipated wall movement orrotation to occur prior to setting precast .
Precast double tee
Precast double tee
CIP or precast retaining wall.
Possible CIP topping
Connection
![Page 22: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/22.jpg)
20 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
The 48’ Bay SystemToillustratethetypicalpaththatTheShockeyPrecastGroup’sdesign-assisteffortwouldtake,pleaseconsiderthefollowingexample:
TheShockeyPrecastGroupisapproachedbyapotentialcustomer,whobringstothetablethisinformationregardingaparkingstructure:
1. Thestructuremusthaveafloor-to-floorheightof11’8”gradetofirstelevated level,and10’8”onallotherlevels.
2. Rampslopeis6.1%atthefirstlevel,and5.6%attheupperlevels.
3. The256,000SFstructuremustbedesignedtoaccommodate790cars.
Usingthisinformation,TheShockeyPrecastGroupwillworkwiththedesignteamtoachieveanoptimallayoutusingthe12’doubleteesand48’baysystem.Onthefollowingpageisanexampleofowner-providedsketchestypicallyreceivedbyTheShockeyPrecastGroupatthebeginningofthedesign-assistprocess:
![Page 23: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/23.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 21
![Page 24: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/24.jpg)
22 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Usingtheowner-providedsketchesandbasicdeckrequirementsasaguide,TheShockeyPrecastGroupworkswiththeprojectdesignteamtodevelopacustomized48’baysolutionthatmeetstheowner’sneedsandsatisfiesthedesigner’svision.Specificsofthedeckarelistedbelow:
Deck Type12’wide,30”deeptees 48’widebays 10’-8”floortofloorheight 7’-0”minfreeverticalclearance 192’longrampwitha5.55%slope 177parkingspacespertypicallevel
ThefollowingpagesillustratethetypicalprecastcomponentsandconnectionsthatcompriseTheShockeyPrecastGroup’s48’baysystem.Thesedetailsareincludedtogivethedesignerabetterunderstandingofthe48’baymoduleasawhole,andtogiveinsightastonecessarydesignconsiderationsspecifictoprecastconcreteparkingstructures.
![Page 25: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/25.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 23
results: Floor Framing Plans and Parking Layout Plans
![Page 26: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/26.jpg)
24 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 27: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/27.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 25
![Page 28: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/28.jpg)
26 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 29: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/29.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 27
![Page 30: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/30.jpg)
28 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 31: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/31.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 29
South Building Elevation (Highlightingproductdescription)
North Building Elevation (Highlightingproductdescription)
![Page 32: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/32.jpg)
30 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
East Building Elevation (Highlightingproductdescription)
West Building Elevation (Highlightingproductdescription)
![Page 33: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/33.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 31
West Elevation at Stairwall (Highlightingstairwallcutaway)
Longitudinal Building Cross Section at Ramp walls
![Page 34: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/34.jpg)
32 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Building Cut-Away Section Illustrating Building Assembly
![Page 35: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/35.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 33
Pocketed Shear Wall Details
![Page 36: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/36.jpg)
34 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Horizontal Ramp Wall and Details
![Page 37: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/37.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 35
Vertical Ramp Wall Options
![Page 38: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/38.jpg)
36 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
12’ Wide Double Tee Profile W/6’-0” Stem Spacing
![Page 39: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/39.jpg)
12’ Wide Double Tee Profile W/5’-0” Stem Spacing
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 37
![Page 40: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/40.jpg)
38 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Inverted Tee Beam Profile Detail
![Page 41: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/41.jpg)
Deck Drain Details
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 39
![Page 42: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/42.jpg)
40 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Stem Block-Out Details
![Page 43: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/43.jpg)
Double Tee to Flange Chord Connections
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 41
![Page 44: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/44.jpg)
42 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 45: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/45.jpg)
Column to CIP Footing or Pier
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 43
![Page 46: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/46.jpg)
44 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Double Tee to Spandrel Connection Details
![Page 47: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/47.jpg)
Double Tee to Spandrel Details Corbel Detail
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 45
![Page 48: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/48.jpg)
46 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Double Tee to Spandrel Connection Details Top Connection
![Page 49: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/49.jpg)
Double Tee to Beam Connection Details
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 47
![Page 50: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/50.jpg)
48 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Non-Load Bearing Spandrel to Column Connection
![Page 51: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/51.jpg)
Load-Bearing Spandrel to Column Connection
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM 48’ Bay 49
![Page 52: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/52.jpg)
50 48’ Bay The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Outboard Column Option
![Page 53: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/53.jpg)
TheShockeyPrecastGroup’s48’baymoduleoffersincomparableefficiencyandcost-effectivenessfortheowner.Thefollowingchapterhighlightstheflexibilityandfreedomavailabletothedesignerthroughthe48’baymodule.
PArkInG STrucTurE AESTHETIcSThedaysofplain,gray,box-likeparkingstructuresareover.Savvyownersanddesignersaretakingadvantageofthenearlylimitlessdesignfreedomofferedbyprecastconcrete.AtShockey,wehelpourcustomersrealizetheiruniqueprojectvisionswithindividualizedprecastsolutionsthataredurable,costeffectiveandbeautiful.Inthischapter,wewillexplorethevarietyoffinishoptionsavailablewithprecastconcretefromShockey.
color, Textures and Applied FinishesThroughavarietyofaggregates,choiceofmatrixcolors,varyingdepthsofexposure,andfinishingtechniques,precastcanmeetalmostanycolor,formortexturethatmaybespecifiedbythedesigner.Additionally,thebeautyofnaturalaggregatesisgreatlyaccentuatedwhentheaggregatesarefusedwiththecolorandtexturebenefitsofprecast.
colorTheShockeyPrecastGrouprecommendsthatcolorselectionsbemadeinthesameorsimilarlightingconditionsasthefinal,in-placeconditions.Inordertomaintainmatrixcoloruniformity,whitecementshouldalwaysbeusedalongwithcolorpigmentsconformingtoASTMC979.Evenwhenthedesiredmatrixcolorisgray,theuseofwhitecementandgraypigmentisstillhighlyrecommended.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure aeSthetIcS 51
![Page 54: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/54.jpg)
52 ParkIng Structure aeSthetIcS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Whenreviewingcostinselections,itisimportanttoconsiderthesourceofaggregateifdeepexposureisrequired(localsourcesarealmostalwaysmorecosteffective);andtorealizethatmatrixcolorssuchasblueandgreenarehighercostselections.
Variationsincolorcanbeachievedwithinareasofthestructureorwithineachindividualprecastunit.Useofmultiplecolorsrequiresclearlydefinedcolorbreaks,whichcanbeachievedwithreveals,jointsandprofilechangestoensurecrisptransitions.
Deepexposurefinishescanbeachievedeitherthroughtheuseofchemicalretardantsorthroughthesand-blastingprocess.Inbothcases,morethanjusttheextremesurfaceareaoftheaggregateisexposed,allowingthecoarsestoneaggregatetoprojectbeyondthecementmatrix.Theexposureshouldremainat40%ofthenarrowdiameterofthecoarseaggregateinordertopreventtheoccurrenceof“baldspots.”Bothtypesofsurfacetreatmentshighlightthenaturalbeautyofthestonewhileprovidingatexturethatcannotbeobtainedthroughtheuseoflighterfinishingtechniques.
TextureTextureexpressesthenaturalbeautyofthematerialcomponentsandcanbeusedtodefineoraccentuatespecificareasofthestructure’sfaçade.Texturetakesadvantageofitschangingrelationshiptolighttocreatearangeofsurfacedifferencesfromsubtletodramatic.Whenchangingtexturesorexposureswithinasingleprecastunit,clearandwell-definedbreakpointsareneededsimilartothoseforcolor.Texturedsurfacesalsohavetheaddedbenefitofhidingtheeffectsofweatheringandhigh-volumeuseareassincetheirregularitiesinthesurfacehelpdivertattentionfromlinestreakinganddiminishtrafficusemarks.
Texturecanbeachievedthroughavarietyofdifferenttechniques,andcanrangefromlightexposuretodeepexposure.
Applied FinishesTheseareavarietyofpost-appliedtechniquesusedtoachievethedesiredappearanceandcharacterofthefaçade.Thestructure’sfinalappearanceisobtainedthroughthecombinationofmixdesignselectionandthechoiceofappliedfinish.Althoughfinalfinishessuchasbrickveneersarecastinnaturalstoneorformliners,andmayreceiveapost-castingfinish,theyareaddressedseparatelysincethecriticalelementsofobtainingthedesiredappearanceareachievedduringthepre-pouroperation.
Thedepthoftheappliedfinishshouldtakeintoaccountthesize,function,articulationandconfigurationoftheunits.Finalselectionofthefinishgradationshouldbemadeduringthemock-upphaseandshouldincluderecommendationsfromTheShockeyPrecastGroup.Variationofappliedfinisheswithintheindividualunitscanbeusedtoenhancetheoverallappearanceofthestructure.Thiscanbeamorecost-effectivemeansofaccentuatingkeycomponentsorareasofthefaçadethantheuseofmultiplemixes.Whenmultipleappliedfinishesarepartofthedesign,thesamelogicregardingprofilechangesand/orrevealworktoensurecleanbreaksshouldbeappliedasthatofmultiplemixes.
Acid Etch FinishAcidetchingisaprocessthatdissolvesthesurfacecementmatrixtoexposethesandand,toalesserextent,thecoarseaggregate.Acidetchingistypicallyusedtoachievealight-to-medium-lightexposure.Theendresultissimilartothatofnaturalproductssuchas
![Page 55: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/55.jpg)
sandstoneorlimestone.Theetchingprocessleavesasugar-cubeappearance,whichisenhancedbydirectsunlight.
Thedecisiontoincorporateanacid-etchfinishmustbemadepriortoorduringthemixdesignprocesssinceonlyacid-resistancesiliceousaggregates(granite,quartz,etc.)shouldbeused.Carbonateaggregatessuchasdolomiteandlimestone,suitableforsandblastingmixes,willdissolveordiscolorthroughtheacid-etchingprocessduetotheircalciumcontent.Complementaryaggregates(fineandcoarse)andcementpigmentsshouldalwaysbechosenwhenanacidetchfinishisselected.
Acidetchingisthecrucialsecond-stepprocesswhenthefaçadeofthestructurewillincludeclayproductssuchasthinbrickveneer.Thisprocessnotonlyhelpsremovesomeofthesurfacelaitanceonthebrickduringthemanufacturingprocess,butalsoexposesthesandbetweenthethinbrickjointstomimicthatofhand-laidbrickmortar.Itisusedasasafefinisharoundthebrickveneerforincorporatedprecastfeaturessuchaslintels,sills,bands,andprojectionsthathaveallbeenintegratedwithinthesameprecastunit.
Sand-Blasted FinishSandblastisthegenerictermusedfortheabrasiveblastingprocess.Varyinggradationsofblastmaterialareusedtochipawaytheprecastsurface.Selectionofaparticulargradationdependsonthedesireddepthoffinish.Sandblastingallowsthedesignerthefullrangeofdepthsobtainableinprecast(lighttoheavy).Onfinalexposedsurfaces,brushblastingshouldbeavoidedbecauseofitsinabilitytouniformlyremoveallthesurfacelaitance.Lightblastingprovidesasimilarappearancetothatfoundinnaturallimestonewithoutthe“sugarcube”appearancecreatedbyacidetching.
Incontrasttoacidetching,blastingtendstobebettersuitedtomutingorcamouflagingminorvariationsthatoccurinthemanufacturingprocess.Thisisespeciallytruewhenaddressingdeepprofilearticulations.Deeperblastshaveanincreasedabilitytoensureuniformity.However,onceblastingexceedsthelightleveloffinishandtexture,theendresultismoredependentonthenaturalelementsofthemix(aggregates).Complementaryaggregatesandmatricesshouldalwaysbeconsideredwhenspecifyingdeeperlevelsofexposure.Adeeperblastcanmimicothernaturalmaterialssuchasflamedgraniteandcancreateinterestingplaysoflightthroughitstexture.
Blastingcanalsobeamoreeconomicalmeansofachievingmultiplevariationswithinthesameunitthanincorporatingmultiplemixdesigns.Blastingcreatesmultiplevariationsbyexposingdifferinglevelsofthecoarseaggregateinpre-definedareasoneachpanel.Theoveralldesiredeffectoftextureisalsoinfluencedbythetypeandselectionofcoarseaggregateinrelationtothepsiofthematrix.Softeraggregateswillbecomeconcaveduringtheblastingprocess,whileharderaggregateswillbecomeconvex,dependinguponthedepthofexposure.
Exposed AggregateThisprocessisachievedbychemicallyretardingthematrix,whichprovidesanon-abrasivemethodofexposingthenaturalbeautyofthecoarseaggregates.Unlikethesandblastingprocess,thechemicalretarderdoesnotmuteordamagethecoarseaggregates.Thechemicalretarderisappliedtothemoldsurface,whichdelaysthecementpastefromsettingup.Afterstrippingthepanel,theretardedoutersurfacelayerofcementisremovedwitha
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure aeSthetIcS 53
![Page 56: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/56.jpg)
54 ParkIng Structure aeSthetIcS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
high-pressurewasher.Avarietyofdepths,fromshallowtodeep,canbeachieveddependingonthetypeofretarderused.Aswithotherfinishes,variationsofexposurewithinthesameunitcanbeachievedwithchemicalretarders;however,aclearrevealorprofilechangeisamustforthetransitionpointstopreventbleedingofexposure.Thechoiceofaggregatesizeisessentialwhenchoosingdepthtopreventexcessiveaggregateloss“baldspots.”Iftheownerordesigner’svisionistoenhancethebright,naturalcolorsoftheaggregates,chemicalretardersshouldbeused.Itisrecommendedthatcontrastingmatricesandaggregatesbeavoidedtopreventa“patchy”appearance.
Form LinersFormlinersofferthedesignerawidearrayofpossibilitiesinshapes,patterns,textures,anddesigns.Thelinermaterialuseddependsonthedesiredeffectandthenumberas-castrequired.Anycombinationofappliedfinishescanbeutilizedinconjunctionwithformliners.Formlinerfinishescanbeimplementedeitherasthemainaestheticfeatureorasahighlight,medallion,orlogo.Advancesinformlinertechnologieshavecreatedadesignpalettelimitedonlybytheimagination.Whenvastareasofprecastwilluseformliners,limitationsoflinersizesshouldbeincorporatedwithrevealworktopreventlinerbuttjoints.Formlinersprovidethehighestdegreeoftextureandwillenhancetheplayoflightandshadows,creatingachangingappearanceofthefaçadethroughouttheday.Keyplacementofnightilluminationcanalsocomplementtheeffectsoftheliner.
Formlinersareakeycomponentwhenimplementingathinbrickveneer.Thethreemaintypesofbrickliners(elastomeric,plasticgrids,andsnaps)eachhavetheirownpositiveattributes,dependingonprojectdesignandpanelconfiguration.TheselectionofalinershouldbemadewiththeguidanceofTheShockeyPrecastGroup.Whenadesignerchoosestouseaformliner,itisveryimportantthatthedesignerrecognizetheleadtimerequiredwithformliners.Leadtimewillvarybytypeoflinerandpatternselected.Linersrequiringuniqueartworkwillrequireadditionaltimefortheartisantocreatethemastermold.
Formlinerleadtimescanrangefrombetweenfourtoeightweeks.Whenelastomericlinersareusedinconjunctionwiththinbrick,asamplerunoftheactualbrickbeingusedisrequiredinordertoobtainthecorrect“fit.”Thefirst100bricksfromarunaremeasuredandtheformlinerisbasedontheaveragebricksize.Inadditiontotheleadtimefortheformliner,theleadtimerequiredonthebrickmustbeconsideredaswell.Brickmanufacturerswillusuallyfabricatethelightershadesinthebeginningofthemonthandthedarkershadesattheend(orviceversa).Dependingonthetimeofthemonthandthetypeandcolorofthebrickselected,itistypicallyfourweeksminimumuntilthefirstrunofbricksisdelivered.
case StudiesInthissection,wefeaturecurrentexamplesofprojectsthatbenefitedfromTheShockeyPrecastGroup’sdesign-buildcapabilities.Eachoftheseprojectsoffereditsownchallenges,includingaggressiveschedule,complexdesign,tightbudget,andlimitedsiteaccess.Theuseofprecastconcretecontributedsignificantlytotheoverallsuccessofeachoftheseprojects.
![Page 57: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/57.jpg)
calvert Street Parking Structure, Annapolis, Md
TheCalvertStreetParkingGarageinhistoricdowntownAnnapolis,Marylandisa168,000SFparkingstructureownedbytheDepartmentofGeneralServicesoftheStateofMaryland.Designofthestructurecalledforfourbaysoffourlevelsofelevatedprecastframing,consistingoftworampedbaysandtwoflatbays,providing727parkingspaces.Exterioraestheticswereofparamountconcerntotheownerthroughoutthedurationoftheprojectgiventhecloseproximityofthenewstructuretoseveralhistoricalbrick-cladbuildingsoftheStateCapitolcomplex.TheShockeyPrecastGroupmetthisdesiredintentbyprovidingastructuralgrayprecastframesurroundedbyaseparatefaçadeofarchitecturalprecastusingamixofhighlyarticulatedthin-brickandarchitecturalprecastelements.Thearchitecturalfaçadewasessentiallyself-supportingwithregardtogravityload,withrequiredlateralsupportprovidedbytiebacktothestructuralframe.Inordertoensureasuccessfulproject,thedesignteamhadtobevigilantindetailingthenumerousinterface/offsetconditionsandconnectionschemessuchthatrequirementsforconstructabilityandaccesswereinconcurrencewithaestheticrequirements.
TheShockeyPrecastGroup’sWinchesterproductionfacilityprovided554piecesofstructuralprecastfortheproject,includingdoubletees,beams,columns,spandrels,verticalrampwalls,shearwalls,flatslabs,andstair/elevatorcorewalls.The223elementsofthearchitecturalfaçadewereprovidedbyTheShockeyPrecastGroup’sFredericksburgproductionfacilityandconsistedofanarrayofspandrels,wallpanels,cornices,coping,andcolumncovers.
ThedesignofthefaçadespecifiedtwocolorsofthinbricktobeusedineitherstandardrunningorFlemishbondcoursingatspecificlocationsalongtheexteriorelevations.Layoutanddetailingofthehorizontalandverticalcoursingofbrickpresentedaformidablechallengetoallmembersofthedesignandproductionteam,thusrequiringdiligentattentiontoassureproperalignmentofbrickbetweenprecastelements.Thepresenceofseveralhighlyarticulated,ornatecorniceandsilldetailsofarchitecturalprecastpresentedachallengetobothdesignandproductionteams.Inordertoaccenttheprecastfaçade,numerouspiecesofdecorativesteelcolumns,channels,beams,grilles,andglazingwerefield-installed.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure aeSthetIcS 55
![Page 58: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/58.jpg)
56 ParkIng Structure aeSthetIcS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Erectionofthestructurewasextremelydifficultduetolimitedaccesstotheinteriorfootprintofthestructure.Thearchitecturalfaçadehadtobeerectedinconjunctionwiththestructuralcomponentsoftheparkingstructure.Theaccessplanwaschangedtoeliminaterampconstruction,andthelastphaseofconstructionwasmovedtothetopofBladenStreetoutofthefootprint.Thischangesavedtimeandexpenseforthegeneralcontractor,andresultedinashorterandmorecontinuouserectionprocess.Erectionwascompletedonscheduleinapproximately12weeks.
Project Timeline:Design July2005–December2005Construction December2005–February2007ProductionWinchester January9,2006–May16,2006ProductionFredericksburg January3,2006–May17,2006PrecastErectionStart April3,2006ErectionComplete July21,2006OpentoPublic January10,2007
![Page 59: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/59.jpg)
d.c. nationals Parking Structures, Washington, dc
Thisprojectincludedtwoparkingstructuresthatwouldprovide1,250parkingspacestoD.C.Nationals’patrons.Bothgarageswerescheduledtobebuiltduringconstructionofthenewbaseballstadium,NationalsPark.Theoriginalconceptspecifiedanundergroundparkinggarage;however,complicationsinthedesignprocessmadethisconceptimpractical.
Withonly12monthsremainingintheprojectschedule,theprojectwasredesignedasaprecastparkingstructureandTheShockeyPrecastGroupwasrecruitedasadesign-buildpartner.Shockeyassistedtheteamwithdevelopmentoftheoveralllayoutofthegaragessothattheowner’sconstructioncompletiondeadlineofApril2008couldbemet.On-timecompletionwasessential,asApril2008markedthestartofthe2008baseballseasonandopeningdayoftheNationals’newstadium.
Thesiteitselfpresentedsignificantchallenges.TheDCNationalsBallparkissetbelowgradeelevation,soitwasnecessarytoincludearetainingwallbetweentheballparkandthegaragesinthedesignoftheparkingstructures.InordertomeetLEEDrequirements,thedesignerhadtoallowforadditionalprogramfeatures,suchasbicycleparking,inthedesign.Parkingaccesscontrolswerealsoincludedtoaccommodatethefuturepossibilityofcommercialuseofthegaragesbytheowner.
TheShockeyPrecastGroupproducedatotalof308,000squarefeetofprecastdoubleteesfortheproject.Bothgaragesconsistofthreeframedlevelsandarethreebayswide.TheEastgaragefeatures170,000squarefeetofdoubleteesandtheWestgarageincludes138,000squarefeetofdoubletees.DesigndevelopmentwasanongoingprocessandtheShockeyteam’scoordinationeffortsincludeddevelopmentofthedrawingsandmatchingtheparkingstructures’precastfinishestothoseoftheballpark.TheShockeyPrecastGrouphadtoallowforretailandticketsalesonthefirstfloorofbothparkingstructures.Sincetheseretailareashadcast-in-placeconcretearoundthem,itwasnecessaryforTheShockeyPrecastGroup
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure aeSthetIcS 57
“©Er
ic A
. Tay
lor P
hoto
grap
hy
![Page 60: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/60.jpg)
58 ParkIng Structure aeSthetIcS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
toincludecoordinationandinteractionwithCIPinitsplanninganddesign.Becauseofthesurroundingretailareas,thefirstfloorofthegarageswasunusuallytall,addingtothecoordinationconsiderationsincorporatedbythedesignteam.
Complexrevealsandtwodifferentsandblastpatternsincreasedtheoverallintensityoftheproject,buttheuseofarchitecturalprecastmadeitpossibleforthedesigner’svisiontoberealizedwellwithintheprojecttimelineandbudget.AnotheruniqueaspectoftheprojectforthedesignerandforTheShockeyPrecastGroupwasthattheprecastdesignhadtoaccommodatethehangingofartworkontheexteriorofthegarages.Theprecastshearwallswereincorporatedintotheexterior“windowdressing,”andatowereffectwasaddedtothefaçadetocreatevisualinterest.
ErectionoftheparkingstructuresbeganinJuly2007andwascompletedonNovember21,2007.ThefinishingofthestructureswascompletedonMarch1,2008.
Nationals Parking Structures Construction Timeline:June6,2007 ProductionstartJuly23,2007 ErectionstartNovember21,2007 ErectionCompleteMarch1,2008 FinishingCompleteApril15,2008 Walk-throughwitharchitect
![Page 61: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/61.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure aeSthetIcS 59
“©Er
ic A
. Tay
lor P
hoto
grap
hy“©
Eric
A. T
aylo
r Pho
togr
aphy
![Page 62: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/62.jpg)
60 ParkIng Structure aeSthetIcS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Gaylord national Harbor resort and convention center
ThePetersonNationalHarborCenterisa300-acresitelocatedona1¼milewaterfrontstretchofthePotomacRiverinPrinceGeorge,Maryland.NationalHarborishometo7,000,000squarefeetofrestaurants,shopping,officespace,residencesandhotels,includingtheGaylordNationalHarborResortandConventionCenter.TheGaylordNationalHarborResortisthelargestnon-gaminghotelandconventioncenterontheeastcoastandthelargesthotelinWashingtonD.C.
Anumberofdifferentparkingstructureconfigurationswereconsideredinordertomaximizetheoptimalnumberofparkingspaces.Theapproveddesignspecifieda247,700SF,six-levelstructuretoprovide1,933parkingspacesforstaffandvisitorstotheGaylordNationalHarborResortandConventionCenter.TheupperfivelevelsoftheparkingstructurewereconstructedofprecastcomponentsproducedbyShockeyatitsFredericksburgandWinchesterplants.Shockeymanufacturedanderected12’x30”doubleteeswitha4”flange,12’x30⅝”doubleteeswitha4⅝”flange,8”flatslabs,10”thickwalls,stairunits,columnswitharchitecturalfinish,L-beams,24”x36”inverted-teebeams,10”thickprestressedspandrelswithanarchitecturalfinishand10”thickprestressedverticalrampwallsfor6’stems.
Theparkingstructure’sarchitecturalprecastfeaturesincludehorizontalribsonspandrelsandexteriorelevatorwallpanels,columncoversandaplanteronthenorthendofthegarageroof.TheexterioroftheparkingstructurerequiredarchitecturalmixdesignandfinishesbeconsistentwiththoseoftheHotelandConventionCenter.
“©Er
ic A
. Tay
lor P
hoto
grap
hy
![Page 63: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/63.jpg)
TheuseofprecastratherthanCIPconcreteenabledthebuildingtobeconstructedwithinitsownfootprint.TheproposedschedulewasveryrestrictiveregardingShockey’sactivitiesandscheduleduringtheconstructionprocess.TheuseofprecastallowedthemajorityoftheworktobeperformedatShockey’smanufacturingfacility,whichenabledShockeytomeettheschedule’srestraints.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure aeSthetIcS 61
Products Used:12’x30”DTwith4”flange12’x30⅝”DTwith4⅝”flangeColumnCovers8”precastflatslabs10”thickwallsPrecastStairUnitsColumnswithArchitecturalFinishL–Beams24”x36”PrestressedInvertedTeeBeam10”thickprestressedspandrelswitharchitecturalfinish10”thickprestressedverticalrampwallfor6’stems
![Page 64: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/64.jpg)
62 ParkIng Structure aeSthetIcS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
“©Er
ic A
. Tay
lor P
hoto
grap
hy
Long&FosterParkingStructure,Chantilly,VA
![Page 65: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/65.jpg)
THE ALTuSGrouPc-GrId® reinforced double Tees for Parking StructuresTheShockeyPrecastGroupisamemberofAltusGroup,anationalpartnershipofprecastconcretemanufacturersandsuppliers.Committedtoinnovation,AltusGroupdevelopsandmarketsCarbonCastproductsmadeusingC-GRID®carbonfibergridreinforcing–includingprecastwallpanels(architecturalcladdingpanelsandhighperformanceinsulatedwallpanels)pretoppeddoubletees,andresidentialwallpanelsandstemdecks.LEED-friendlyCarbonCastproductscanweighless,insulatebetterandlastlongerthancompetitivebuildingtechnologies.
In2008,ShockeyembarkedonitsfirstCarbonCastproject:the$7.68millionWinchesterParkingStructure.The140,000square-foot,five-storyWinchesterParkingStructureissituatedatacornerinWinchester’shistoricdistrict.Theparkingstructurefeaturesabrickfaçade,accentedwithprecastconcretefeaturesthatmimiclimestone.Anenclosed,elevatedpedestrianwalkwaywillconnecttheparkingstructurewiththeFrederickCountyOfficeComplex.TheWinchesterParkingStructurefeatures482precastcomponents,including204precastdoubleteesreinforcedwithCarbonCastC-GRID®carbonfiber.TheuseofC-GRID®reinforceddoubleteesprovidedacost-effectivesolutionthatenabledtheprojecttostaywithinbudget,whiletheuseofprecastconcreteenabledtheteamtomeettheowner’sveryaggressiveschedule.TheShockeyPrecastGroup’sotherC-GRID®projectsincludeparkingstructuresforTheUniversityofMarylandatShadyGroveandWalterReedMedicalCenter.
Shockey’smembershipintheAltusGroupenablesustobringknowledgeofandexperiencewiththeindustry’slatestinnovationsandtechnologytoeveryoneofourparkingstructureprojects.Notonlycanweoffereconomic,attractiveparkingstructuresolutions,wealsousematerialsandsystemsthatcanresultingreaterparkingstructurelongevity,durability,andoverallstrength.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM the altuSgrouP 63
TheShockeyPrecastGroup’sC-GRID®EmbedmentMachineplacesC-GRID®intoadoubleteefortheWinchesterParkingStructureproject.
![Page 66: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/66.jpg)
64 the altuSgrouP The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 67: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/67.jpg)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM the altuSgrouP 65
These sections have been reprinted with permission from the Altus Group’s Carbon Cast Pretopped Precast Double Tees brochure.
![Page 68: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/68.jpg)
66 the altuSgrouP The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
“©Er
ic A
. Tay
lor P
hoto
grap
hy
WashingtonDCNationalsParkingStructures,Washington,DC
![Page 69: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/69.jpg)
SEcTIon 03 41 00PrEcAST STrucTurAL concrETE
GuIdE SPEcIFIcATIon
General1.1 SuMMArYA. Section includes: 1. Structuralprecastconcretefor: a. Columns b. Beams c. Spandrels d. FloorandRoofDoubleTees e. InvertedTeeBeam f. StairRiserSections g. WallPanels h. FlatSlabs i. ShearWalls 2. CaulkingandExpansionJoints 3. AccessoriesandSupportingDevices
B. Related Requirements: 1. Section034500-PrecastArchitecturalConcrete 2. Section079201–JointSealants
1.2 rEFErEncESA. American Concrete Institute: 1. ACI301-SpecificationsforStructuralConcrete 2. ACI318-BuildingCodeRequirementsforStructuralConcrete
B. ASTM International: 1. ASTMC33–StandardSpecificationforConcreteAggregates 2. ASTMA36/A36M-StandardSpecificationforCarbonStructuralSteel 3. ASTMC94–StandardSpecificationforReady-MixedConcrete 4. ASTME119-StandardTestMethodsforFireTestsofBuilding ConstructionandMaterials
T h e S h o c k e y P r e c a s t G r o u p
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure SPecIfIcatIonS 67
![Page 70: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/70.jpg)
5. ASTMC150-StandardSpecificationforPortlandCement 6. ASTMA153/A153M-StandardSpecificationforZincCoating(Hot-Dip)on
IronandSteelHardware 7. ASTMA185-StandardSpecificationforSteelWeldedWireFabric,Plain,for
ConcreteReinforcement 8. ASTMC260–StandardSpecificationforAir-EntrainingAdmixturesforConcrete 9. ASTMA416/A416M-StandardSpecificationforSteelStrand,Uncoated
Seven-WireforPrestressedConcrete 10. ASTMC494–StandardSpecificationforChemicalAdmixturesforConcrete 11. ASTMA497-StandardSpecificationforSteelWeldedWireFabric,Deformed,
forConcreteReinforcement 12. ASTMA615–StandardSpecificationforDeformedandPlainBillet-SteelBars
forConcreteReinforcement 13. ASTMC618–StandardSpecificationforCoalFlyAshandRaworCalcined
NaturalPozzolanforUseasaMineralAdmixtureinPortlandCementConcrete 14. ASTMA666-StandardSpecificationforAusteniticStainlessSteelSheet,Strip,
Plate,andFlatBar 15. ASTMA706/A706M-StandardSpecificationforLow-AlloySteelDeformed
andPlainBarsforConcreteReinforcement 16. ASTMC979–StandardSpecificationforPigmentsforIntegrally
ColoredConcrete 17. ASTMC989–StandardSpecificationforGroundGranulatedBlast-FurnaceSlag
forUseinConcreteandMortars 18. ASTMF1554–Grade36AnchorBolts
C. American Welding Society: 1. AWSD1.1-StructuralWeldingCode-Steel 2. AWSD1.4-StructuralWeldingCode-ReinforcingSteel 3. AWSD1.6–StructuralWeldingCode–StainlessSteel
D. Precast/Prestressed Concrete Institute: 1. PCIMNL-116-ManualforQualityControlforPlantsandProductionof
StructuralPrecastConcreteProducts 2. PCIMNL-120-PCIDesignHandbook-PrecastandPrestressedConcrete 3. PCIMNL-123-DesignandTypicalDetailsofConnectionsforPrecastand
PrestressedConcrete 4. PCIMNL-127–PCICommitteeReport–Erectors’ManualStandardsand
GuidelinesfortheErectionofPrecastConcreteProducts 5. PCIMNL135–TolerancesforPrecastandPrestressedConcreteConstruction
68 ParkIng Structure SPecIfIcatIonS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 71: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/71.jpg)
1.3 dEFInITIonS
A. Fabrication Drawings: Documentsusedbytheproductionfacilityto manufacturetheprecastcomponents.Sometimesreferredtoas“Shop Drawings.”Informationincluded: 1. Requireddimensionalinformation 2. Descriptionandlocationonallinserts,bearingplates,anchorsand
reinforcementmaterialsrequiredtomanufacture,transport,anderecttheprecastcomponent
3. Finishrequirementsforeachcomponent 4. Handling,storageandshippinginstructions 5. Providedasaninformationalsubmittalonly
B. Erection Drawings:Documentsprovidingtheassemblyplacementofprecast componentsonthejobsite.ErectionDrawingsarereviewedandsealedbya ProfessionalEngineer.Informationincluded: 1. Plansandelevationslocatinganddimensioningallprecastcomponents.
Eachprecastcomponentisindividuallyidentified. 2. Sectionsanddetailsshowingconnections,openings,blockouts,andcast-initems
andtheirrelationshiptothestructure. 3. Descriptionofalllooseandcast-inhardwareformakingconnections.
C. Construction Plan: Amanagementplanforthesequenceofassemblyoftheprecast componentsoftheproject.Thisplanincludes: 1. Accessplanforcraneandtransportofprecastcomponents. 2. Erectionsequencebyloadsbeingshipped. 3. Erectionblockplanoutliningthesequenceoferectionactivity. 4. Specificerectioncriteriarequiredfortheparticularproject. 5. Project-specificconstructionstabilityplanthatoutlinesanyadditionalerection bracingthatmayberequired. 6. Technicaldatasheetongroutusedfortheproject. 7. Erectiontolerancesfortheproject.
D. Field-Use Erection Drawings: Theerectiondrawingswithanymodificationsmade duringtheapprovalprocessthataredistributedpriortoactualerectionoftheproject.
E. Control Number:Auniqueidentificationofeachprecastcomponentforaproject.
F. Piece Mark:Acomponentidentificationofaprecastelementonaproject.Similar piecescanhavethesamePieceMarkbuteachwillhaveauniqueControlNumber.
G. CIP: Cast-in-Place Concrete
H. Architectural Features: Wherefinalappearanceorformofprecastcomponents requiretheuseofcoloredaggregate,pigmentedconcretemixorsurfacetexturessuch assandblasting,waterwash,etchedfinishesorthinbrick.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure SPecIfIcatIonS 69
![Page 72: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/72.jpg)
I. BIF:“Bottominform”indicatesthesurfaceofprecastthatwillbeinthebottomofthe formduringcasting.
J. SIF:“Sideinform”indicatesthesurfaceoftheprecastthatwillbeinthesideofthe formduringcastingbybuilt-uprails.
K. TIF:“Topinform”indicatesthetopexposedsurfaceduringcasting.
1.4 AdMInISTrATIVE rEQuIrEMEnTS
A. Coordination 1. CoordinatetheWorkofframingcomponentsnotpre-tensionedbutassociatedwith
theWorkofthissection. 2. Coordinatecutting,drillingorcoringinprecastmemberswiththemanufacturer. 3. Coordinateallprecastopeningorpenetrationgreaterthan10inchesinany
dimensionwiththemanufacturerpriortosubmittalofErectionDrawings.
B. Pre-installation meetings 1. Conveneminimumoneweekpriortocommencingtheonsiteworkofthissection. 2. Coordinatethesequenceofinstallationwithfoundationandsupportingelements
inplacewithprecastitemstobedelivered.
C. Site Survey:Provideasitesurveytoverifyfielddimensionsandtolerancesaminimum of2weekspriortodeliveryofprecastunitsforinstallation.
1.5 SuBMITTALS
A. Action Submittals:Provideforreviewandapproval. 1. ErectionDrawings:Indicatelayout,unitlocations,unitidentificationmarks,
connectiondetails,dimensions,openings,andrelationshiptoadjacentmaterialsandconformancewiththerequirementsoftheContractDocumentsandsealedbyprofessionalengineer.Providecoordinationinformationforitemsrequiredtobeembeddedinadjacentmaterials.
2. DesignCalculations:Submitdesigndatareportsindicatingcalculationsforloadingsandstressesoffabricatedprecastcomponents,connections,andreinforcement.CalculationsshallbepreparedbyProfessionalEngineerexperiencedinprecastconcretedesign.
3. Samples:Submitthreesamples12x12inch(304.8x304.8mm)insizeillustratingsurfacefinishtreatmentofarchitecturalfeaturedcomponent.
4. Mockup:ProvideaccesstoamockuppanelattheprecastmanufacturingplantforapprovalbytheArchitectforcolorandtexture.Theapprovedmockupshallbethecontrolstandardforcolorandtexture.
B. Informational Submittals 1. MixDesign:Providetheconcretedesignmixwithcertificationregarding
compliancewithrequirementsoftheContractDocuments. 2. FieldUseErectionDrawings:Submitfielduseerectiondrawingsincorporating
commentsfromapprovedErectionDrawings.
70 ParkIng Structure SPecIfIcatIonS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 73: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/73.jpg)
3. ConstructionPlan:Submitpriortothepre-installationmeeting,aconstructionplan,includingcalculationsanddetailsforguying,stayingandshoringprecastelementstoassurestructuralstabilityduringtheerectionphase.Providefortheremoval,replacement,andrelocationofguying,bracingandshoringrequireduntilallpermanentstructuralconnectionsarecompleted.
C. Closeout Submittals 1. ProvideManufacturer’sWarrantyletter.
1.6 QuALITY ASSurAncE
A. Perform Work in accordance with requirements of PCI MNL-116, PCI MNL-123, PCI MNL-120, PCI MNL 135.
B. Fire Rated Construction: Rating as indicated by construction type on contract documents.
C. Source Quality Performance Testing: Provide for tests for all precast concrete workinconformancewithPCIPlantCertificationrequirements.Usecertifiedtest equipment,andunlessotherwisespecified,conformwith: 1. ManualForQualityControlForPlantsandProductionofPrecastand
PrestressedConcreteProducts,PCIMNL-116(latestedition) 2. PCIDesignHandbook,LatestEdition. 3. ACI318fortheBuildingCodeRequirementsforReinforcedConcrete
(latestedition)
D. Mockup Control Sample Unit:Provideamockuppanelattheplant,4feetby4feet insize,forqualitycomparisonoffinishedunittoanapprovedappearancesamplefor colorandtexture.
E. The plant quality control records and inspection procedures for this project shall be available for review, verification and in-plant inspection by an independent testing agent or the Architect/Engineer.
1.7 QuALIFIcATIonS
A. Fabricator:CompanycertifiedbythePrestressedConcreteInstitute(PCI)Plant CertificationProgramwithanin-houseengineeringdepartmentmanagedbya registeredprofessionalengineer.
B. Precast Engineer: Designprecastconcretemembersunderdirectsupervision ofProfessionalEngineerexperiencedinprecastdesignandlicensedinthestateof theproject.
C. Erector: Companywithexperienceintheerectionofprecastunitssimilartothose requiredforthisprojectandshallbeaQualifiedorCertifiedErectorunderthePCI FieldCertificationProgram.
D. Welder: QualifiedinaccordancewithAWSD1.1,AWSD1.4,andAWSD1.6
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure SPecIfIcatIonS 71
![Page 74: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/74.jpg)
1.8 dELIVErY, STorAGE, And HAndLInG
A. Lift and support precast concrete members during manufacturing, yarding, transporting and erection operations only from identified support points with suitable lifting and handling devices.
B. Lifting inserts will have a minimum safety factor of 4. Reusable lifting hardware and rigging will have a minimum safety factor of 5.
C. Lifting or Handling Devices: Capable of supporting member in positions anticipated during manufacture, storage, transportation, and erection.
D. Storage: 1. Protectmemberstopreventstaining,chipping,orspallingofconcrete.Store membersoffthegroundondunnagematerialsasrecommendedbyfabricator. 2. Placeallunitssothatidentificationmarksarereadable. 3. Stacksothatliftingdevicesareaccessibleandundamaged.
E. Mark each member with date of production, job number, control number, and piece mark referenced from Erection Drawings.
1.9 WArrAnTY
A. Provide Manufacturer’s Warranty for a 1-year period.
ProducTS2.1 FABrIcATorS
A. Fabricators: 1. TheShockeyPrecastGroup,WinchesterVirginia,Tel:(540)667-7700,
www.shockeyprecast.com.
2.2 dESIGn rEQuIrEMEnTS
A. General: Theproject,asshownonthedrawings,includingcomponentdimensionsandconnectionconfigurations,providestherequirementsforthedevelopmentofthedesigndocuments.Designshallincludeconsiderationforcustomarystressesincurredinfactoryprecasting,transporting,anderecting.Thedesign,manufacturing,transportationanderectionprocessshallbecompatiblewiththerequirementsoftheContractDocuments.
B. Design Criteria: 1. Designallledges,haunches,bearingareas,andconnectionsasrecommendedin
PCIDesignHandbook.Haunches,dappedendbearingsandconnectionswithoutredundantmeansofloadtransferareconsideredcritical.
2. MinimumreinforcingforallprecastprestressedconcreteandprecastreinforcedconcreteshallbeinaccordancewithACI318.Analysisofprestressedcomponentswillincludeacheckoftheshearreinforcingrequirementsat.1L,.2L,.25Land.3L,whereListhecomponentlength.
72 ParkIng Structure SPecIfIcatIonS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 75: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/75.jpg)
C. Modifications:Submitallproposedmodificationstotheprojectdesignsrepresented onthedrawingswithcompletedesigncalculationsanddrawings,preparedandsigned byalicensedprofessionalengineerforreviewandapproval.
D. Maximum Allowable Deflection:PerACI318-9.5-ControlofDeflections
E. Seismic Design: Design and detail elements and connections to resist seismic force in accordance with code requirements and ACI 318 for the following:
1. As specified by contract documents.
F. Design members exposed to weather to allow movement of components without damage, failure of joint seals, undue stress on fasteners or other detrimental effects, when subject to seasonal or cyclic day/night temperature ranges.
G. Design system to accommodate construction tolerances, deflection of other building structural members and clearances of intended openings.
H. Calculate structural properties of framing members in accordance with ACI 318.
2.3 MATErIALS
A. Concrete Materials:AsappropriatetodesignrequirementsandPCIMNL-116. 1. Cement:GrayPortland,conformingtoASTMC150TypeIorIII. 2. Cement:WhitePortland,conformingtoASTMC150TypeI
(forarchitecturalmixes). 3. FlyAshAdmixture:ASTMC618ClassCorF--25%maximum. 4. GroundGranulatedBlast-FurnaceSlag:ASTMC989Grade100or
120–40%maximum. 5. Aggregates:ASTMC33exceptasmodifiedbyPCIMNL116. 6. Air-entrainingadmixtures:ASTMC260 7. Water-reducing,Retarding,AcceleratingAdmixtures:ASTMC494 8. Pigments:Non-fading,lime-resistantpigments:ASTMC979
B. Concrete Mix Design: ACI318,Chapter5,usingstandarddeviationcalculationsinaccordancewithsection5.3.1.1or5.3.1.2. 1. Theconcretemixdesignswillconformtothefollowingrequirements: Structuralconcrete:Columns,Walls,Stairs,SpandrelBeams StrengthofConcrete–5000psiminimum Water-cementitiousmaterialsratio–maximum0.42 AirContent–5.5%+/-1.5%
Structuralconcrete:DoubleTees,Beams StrengthofConcrete–6000psiminimum Water-cementitiousmaterialsratio–maximum0.40 Aircontent–5.5%+/-1.5%
Self-ConsolidatingConcrete(SCC) StrengthofConcrete–6000psiminimum Water-cementitiousmaterialsratio–maximum0.38 Aircontent–5.5%+/-1.5%
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure SPecIfIcatIonS 73
![Page 76: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/76.jpg)
Architecturalconcrete: StrengthofConcrete–5000psiminimum Water-cementitiousmaterialsratio–maximum0.44 Aircontent–5.5%+/-1.5%
C. Batching concrete: 1. TheconcretebatchingplantwillbeinconformancewithASTMC94andwillbe
certifiedbytheNationalReadyMixedConcreteAssociation.Volumetricbatchingofconcretewillnotbepermitted.Allmeasurementsofthevariouscomponentswillbebyweightandwillbeaccurate(withinthemostrecenttolerancelimitsofASTMC94).
2. Theuseofcalciumchlorideoradmixturescontainingchlorideionsorothersaltsisnotmorethan0.15%chlorideionsorothersaltsbyweightofadmixture.
2.4 rEInForcInG And connEcTIon MATErIALS
A. General:Provideallreinforcement,accessoryandconnectionmaterialsrequiredforacompleteinstallationasindicatedontheapproveddrawings.Pourstripreinforcementtobesuppliedandinstalledbyothersunlessspecified.ProvideGroutingasrequiredfordesignbearing.
B. Reinforcing Bars:ASTMA615,Grade60.ReinforcingusedtofabricateembeddedpartsorconnectionsbyweldingwillbeASTMA706.
C. Welded anchor studs:AWSD1.1
D. Prestressing Strand:ASTMA416,270,000psiminimumultimatestrength,uncoated,7-wire,lowrelaxation.
E. Anchor Bolts:ASTMF1554Grade36
F. Welded Wire Fabric:ASTMA185(plainsteel)orASTMA497(deformedsteel);inflatsheets;unfinished
G. Carbon Fiber Reinforcement:C-GRID®asmanufacturedbyChomarat
H. Tensioning Steel Tendons:ASTMA416/A416MGrade270Kofsufficientstrengthcommensuratewithmemberdesign.
I. Rod Anchor bars: Dayton/Superior High Strength Coil Rod, or approved equal.
J. Supports for Reinforcement for Exposed-to-View Concrete: CRSI Class 1,
plastic protected legs
2.5 AccESSorIES
A. Connecting and Supporting Devices: 1. ASTMA36/A36Mcarbonsteel,Plates,angles,itemscastintoconcrete[or]
[itemsconnectedtosteelframingmembers,]insertsconformingtoPCIMNL-123;hot-dipgalvanizedinaccordancewithASTMA153/A153M.SurfacesrequiringfieldweldingshallbeZRCpainted.
74 ParkIng Structure SPecIfIcatIonS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 77: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/77.jpg)
2. ASTMA666Type201LN,302or304stainlesssteel,Tee-to-Teeflange connectionsconformingtoPCIMNL-123. 3. AnchorBolts:ASTMF1554Grade36
B. Grout:Non-shrink,non-staining,minimumyieldstrengthof5,000psiat28days.
C. Bearing Pads: 1. StandardBearingPad:Rubberpadcomposedofhomogeneousblendof
ozone-resistantrubberelastomerandhighstrengthrandomsyntheticfibercords;Surfacehardnessof75ShoreAdurometer+/-5percent;Compression,8000psi;MASTICORDasmanufacturedbyJVIInc.orapprovedequal.
2. LaminatedFabric-rubberPads:Preformed,unusedsyntheticfibersandnewunvulcanizedrubber.Surfacehardnessof80ShoreAdurometer+/-10%.(Capralonorapprovedequal).
3. ExpansionBearingPads:Assembliesconsistingofloweranduppercomponents.Dynalonorapprovedequal.
a. Theuppercomponent:Anassemblyofasheetofstainless(14gageminimum)withaminimum2Bmillfinish.Sizedlargerthanthelowerelementbyaminimumof1/2inchineachdirection.
b. Thelowerelement:AnassemblyofaStandardBearingpad,withastainlesssteelsupportplateandabondedcontactlayerofPTFE(Teflon).
D. Shims:Steel,ASTMA36;orengineeredmultipolymerplasticmaterial,compressive strengthof8000psi;Korolath,oranapprovedequal.
E. Mechanical Splice for Future Expansion Column and Wall Reinforcing
Anchorage: Erico Lenton or NMB Splice Sleeve.
F. Double Tee Flange-to-Flange Shear Connectors:JVIVectorConnector,or approvedequal,manufacturedfromASTMA666Type201LNor304Lstainless steel,or,wherestainlesssteelisnotrequired,ASTMA36steelwithJ-Finish corrosionprotection.
G. Bolts, Nuts and Washers:ASTMA307High-strengthsteeltyperecommendedfor structuralsteeljoints;Corrosionresistantchromium-nickeltype.
H. Prime Paint: (ZRC) Zinc rich alkyd type coating.
2.6 FABrIcATIon
A. Fabrication procedure to conform to PCI MNL-116 and ACI 318.
B. Maintain plant records and quality control program during production of precast members. Make records available upon request.
C. Ensure reinforcing steel, anchors, inserts, plates, angles, and other cast-in items are embedded and located as indicated on erection drawings. Clean surfaces of all embedded items of rust, scale, grease, and foreign matter.
D. Hardware supplied by other trades shall be furnished to the fabricator fully assembled and tagged for location a minimum of 30 days prior to scheduled production.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure SPecIfIcatIonS 75
![Page 78: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/78.jpg)
E. Fabricate required openings with dimension larger than 10 inches (250 mm) in diameter or larger for rectangular openings as shown and approved on erection drawings. Provide openings in Tee stems for running electrical conduit as coordinated with approved shop drawings; and embed accessories provided by other Sections, at indicated locations.
F. Tension reinforcement tendons as required to achieve design load criteria.
G. Ends at Stressing Tendons:Coattheexposedendsofprestressingstrandsinallprestressedmemberswithabitumasticcoating;SonnebornHydrocide700orapprovedequal.Recessexteriorexposedtoviewendsoftendonsandpatchtomatchsurroundingsurface.
H. Weld steel fabrications in accordance with AWS D1.1. Weld reinforcing steel in accordance with AWS D1.4. Welding processes shall not reduce the cross-sectional area of the concrete reinforcement. Do not tack weld reinforcing. Paint all field welds with ZRC.
I. Mark each piece of precast concrete for identification and record the date of casting. Marks will be placed so the final appearance of the product is not impaired.
J. Provide free access by the Architect/Engineer to all parts of the manufacturing facility.
K. Minor patching in plant is acceptable, providing structural adequacy and appearance of units is not impaired.
2.7 FInISHES
A. Finish exposed-to-view architectural finish surfaces of precast concrete members to be uniform in color and appearance.
B. Cure members under similar conditions to develop required concrete quality, and minimize appearance blemishes including non-uniformity, staining, or surface cracking.
C. Patching where required, shall be accomplished by skilled craftsmen in such a manner that the structural adequacy is maintained and the appearance and durability are not impaired.
D. Provide finishes as indicated on the finishes schedule listed below.
Double Tees 1. TeeareasofCIPconcretetopping:Topsurfaceshallbetransverserakedto0.25”
depthminimumtoinsurebondoftopping 2. TeeareaswithoutCIPconcretetopping:Topsurfaceshallreceiveroughhorizontal
broomorswirlbroomfinishthatshallnotexceedadepthof0.25” 3. SIF,BIFandedges:Standardformfinish 4. Depressorholes:Shallbefilledwithnon-shrink,non-staininggrouttomatch
surroundingsurfaces
76 ParkIng Structure SPecIfIcatIonS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 79: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/79.jpg)
Inverted T-Beams 1. TopsurfacestoreceiveCIPtopping:Topsurfaceshallbetransverserakedto
0.25”depthminimumtoinsurebondoftopping 2. TopsurfacesnotreceivingCIPtopping:Topsurfaceshallreceiveroughbroom
finishthatshallnotexceedadepthof0.25”andthatshallbeperpendiculartothelengthofthebeam
3. SIF,BIFandedges:Standardformfinish
Columns 1. Fornon-architecturallyfinishedcolumns:SIFandBIFshallbestandardform
finish.TIFfinishshallbesteeltrowel 2. Forarchitecturallyfinishedcolumns:SIFandBIFsurfacesshallreceivefinishas
prescribedbyapprovedarchitecturalsample.TIFfinishshallbesteeltrowel
Spandrels 1. TIFsurface:Shallreceivealightbroomfinishthatshallnotexceedadepthof
0.125”andthatshallrunperpendiculartothelengthofthespandrel 2. SIFandBIFsurfaces:Standardformfinish 3. Forspandrelsthatrequirearchitecturalfinish:SIFandBIFwillreceivefinishas
prescribedbyapprovedarchitecturalsample
Walls 1. TIFsurface:Shallreceivealightbroomfinishnottoexceedadepthof0.125”ora
steeltrowelfinish 2. SIFandBIFsurfaces:Standardformfinish 3. Forwallsthatrequirearchitecturalfinish:SIF(whererequired)andBIFwill
receivefinishasprescribedbyapprovedarchitecturalsample
Stairs 1. Topsurfaceinfinalconstruction:Roughbroomfinishnottoexceedadepthof
0.25”orsandblastfinishtoprovidenon-slipsurface 2. SIFandBIFsurfaces:Standardformfinish
Flat Slabs 1. FlatslabareasofCIPconcretetopping:Topsurfaceshallbetransverserakedto
0.25”depthminimumtoinsurebondoftopping 2. FlatslabareaswithoutCIPconcretetopping:Topsurfaceshallreceiverough
broomfinishthatshallnotexceedadepthof0.25” 3. SIFandBIFsurfaces:Standardformfinish
2.8 FABrIcATIon ToLErAncES
A. Conform to PCI MNL-135 1. Exception:Doubleteelengths+1/4inches/-3/4inches
2.9 SourcE QuALITY conTroL And TESTS
A. Test and analyze concrete in accordance with PCI MNL-116.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure SPecIfIcatIonS 77
![Page 80: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/80.jpg)
EXEcuTIon3.1 EXAMInATIon
A. A minimum of 2 weeks prior to scheduled delivery of precast materials, verify supporting work and site conditions are ready to receive work and field measurements are as indicated on field use erection drawings.
B. General Contractor shall provide to fabricator verification that supporting structure has met or exceeded the design requirements of the precast system design as required by PCI guidelines and Contract Documents. Support requirements shall include but not be limited to:
1. FieldPlacedBearingWallsorFootings:Providetruelevelbearingsurfaceswithelevationsof+/-1/2inchunlessshownotherwiseontheDrawings.
2. Accurateplacementandalignmentofanchorbolts,plates,ordowelsinCIPcolumnfootings,beams,wallfootings,andotherfieldplacedsupportingelements.
3. CIPConcretesupportingstructurehasmetdesignstrengthrequirementsasspecified.
3.2 PrEPArATIonA. Preparesupportequipmentforerectionprocedure.
3.3 ErEcTIon
A. Install and secure precast units as shown on the Contract Documents and as indicated by the field erection drawings in conformance with PCI – MNL 127.
B. Erect members without damage to structural capacity, shape, or finish. Replace or repair damaged members.
C. Align and maintain uniform horizontal and vertical joints, as erection progresses.
D. Maintain temporary bracing in place until final support is provided.
E. Provide temporary lateral support to prevent bowing, twisting, or warping of members.
F. Adjust differential camber between precast members to tolerance before final attachment.
G. Secure units in place. Perform welding in accordance with AWS D1.1, and AWS D1.6 for stainless.
3.4 ErEcTIon ToLErAncES
A. Erect members level and plumb within allowable tolerances.
B. Conform to PCI MNL-135 and PCI MNL 127 – Tolerances for Precast and Prestressed Concrete Construction.
C. When members cannot be adjusted to conform to design or tolerance criteria, consult with Architect/Engineer. Execute modifications as directed by Architect/Engineer.
78 ParkIng Structure SPecIfIcatIonS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
![Page 81: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/81.jpg)
3.5 FIELd QuALITY conTroL
A. Welding: Inspect welds in accordance with AWS D1.1, AWS D1.4, and AWS D1.6 as appropriate.
3.6 ProTEcTIon oF InSTALLEd conSTrucTIon
A. Protect members from damage caused by field welding or erection operations.
B. Use non-combustible shields during welding operations to protect adjacent Work.
3.7 cLEAnInG
A. Clean weld marks, dirt, or blemishes from surface of exposed members.
B. Remove all debris and surplus materials associated with this scope of work from the premises.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM ParkIng Structure SPecIfIcatIonS 79
![Page 82: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/82.jpg)
80 ParkIng Structure SPecIfIcatIonS The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
“©Er
ic A
. Tay
lor P
hoto
grap
hy
ShadyGroveMetroStationParkingStructure,Gaithersburg,MD
![Page 83: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/83.jpg)
GLoSSArYA
Abrasivenosing-anon-skidmetalunitwhichiscastintothenoseofaprecaststairpanel.
Addendum-asupplementtospecificationsorcontractdrawingsissuedpriortotheexecutionoftheconstructioncontract.
Admixture-amaterialotherthanwater,aggregates,andcementusedasaningredientofconcreteorgrouttoimpartspecialcharacteristics.
Admixture,airentraining–amaterialaddedtotheconcreteforthepurposeofentrainingminutebubblesofairintheconcreteduringmixingandthusimprovingthedurabilityofconcreteexposedtocyclicalfreezingandthawinginthepresenceofmoisture.
Aframe–anA-Shapedframeusedtosupportpanelsonflatbedtrucksduringshipping.
Aggregate–naturaloccurring,processedormanufacturedinorganicparticleswhicharemixedwithPortlandcementandwatertoproduceconcrete;normallycomprises60to80percentofthetotalvolumeofconcrete.
Aircraftcable–multi-strandsteelcable,inloopform,castinprecastpanelsforhandlingpurposes;cableismoreflexiblethanprestressingstrand.
Airentrainment–anincreaseintheamountofairinaconcretemixthroughtheuseofanair-entrainingadmixture(seeadmixture,airentraining);airentrainedconcretedisplaysincreasedworkabilityandcohesiveness.
Airpocket–pits(entrappedairorwaterbubbles)intheformfacesofapanelcausedbyimproperconsolidationorinadequatedraft.
Alignmentface–faceofawallpanelwhichistobesetinalignmentwiththefaceofadjacentpanels.
Anchor–(1)headedstuds,deformedstuds,straps,rebar,etc.weldedtosteelangelsorplatesandembeddedinconcreteforuseaspartofaconnection(2)anyitemcastintoorpre-affixedtothestructureforthepurposeofreceivingaconnection
Approval–acceptanceofthePrecaster’sdrawingsbytheArchitect,EngineerofRecord,andGeneralContractorindicatingthatallbuildingconditionsanddimensionsshownarecorrectandfinal.
Architecturalprecastconcrete–anyprecastconcreteunitofspecialoroccasionallystandardshapethatthroughapplicationorfinish,shape,color,ortexturecontributestothearchitecturalformandfinishedeffectofthestructure;unitsmaybestructuralordecorative,andmaybeconventionallyreinforcedorprestressed.
Assembly–asetofpartsarrangedintooneunit.
B
Backupmaterial–materialusedtolimitthedepthofthesealantinpaneljoints.
Backupmix–theconcretecastintothemoldasafillerbehindathinlayerofthemoreexpensivefacemix
Bagtie–thingagewireties(generallyNo.
16,15,or14gage)usedtofastenreinforcing
barstogetheratintersections.
Barchair–anon-corrosive,rigiddeviceusedtosupportand/orholdreinforcingbarsatagivendistancefromtheformfacebeforeandduringconcreting.
Baseplate–asteelplateanchoredtothebottomofaprecastunitforthepurposeoffastingittothefoundation.
Batch–theamountofconcreteproducedinonemixingoperation.
Beampocket–openinginaverticalmemberinwhichabeamistorest.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM gloSSary 81
![Page 84: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/84.jpg)
82 gloSSary The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Bearingarea-thesurfaceinsquareincheswhichcomesintocontactwithaverticalloadtransferringmember.
Bearingpad–apad,usuallyneoprene,
whichisplacedbetweenamemberanditssupport.
Bearingplate–asteel-orTeflon-coated
plateplacedbetweenamemberanditssupport.
Billofmaterials–materiallistforindividualproject
Bleedhole–aholdinaplateoranglewhichisprovidedsolelytoreleaseentrappedairorwaterduringconcreteplacingoperation.
Bleeding–aformofsegregationinwhichsomeofthewaterinamixrisestothesurfaceoffreshlyplacedconcrete;alsoknowaswatergain.
Blocking–theshimsrequiredtoleveland/orplumbaunitinitsproperposition.
Blockout–toformahole,orreducetheheightorwidthofapanelbyaffixingmaterialtotheform(spacewithinaforminwhichconcreteisnottobeplaced).
Bondbreaker–asubstanceplacedonamaterialtopercentitfrombondingtotheconcrete,orbetweenafacematerialsuchasnaturalstoneandconcretebackup.
Bowing–thedeflectionofaverticalpanelinasingleplane.
Bulkhead–averticalpartitionintheformblockingfreshconcretefromasectionoftheform;dividesacontinuouscastingbedintogivenunitlengths.
Bundling–placingseveralparallelelementsofreinforcementincontractwitheachother.
c
Camber–(1)theupwarddeflectionwhichoccursinprestressedconcreteelementsdue
tothenetbendingresultingfromstressingforcesandself-weight.Itspecificallydoesnotincludedimensionalinaccuraciesduetoerrorsinmanufacture,improperbearings,orotherdeficienciesinconstruction;(2)abuilt-inupwardcurvatureinsomeformsforprecastconcrete,otherthanprestressed,toavoiddeflectionunderloadtobelowadefinedlineoffinishedproduct.
Cast–toplaceconcrete(inplasticstate)intoaform.
Cast-in–catintegrallywithaconcreteunit;notstabbedinaftercasting.
Cast-in-place–concretewhichisplacedinthefield.
Caststone–precastconcretewhosefinishresemblesthatofcutorpolishedstone.
Caulking–anelastomericsealantusedtofillpaneljointsthussealingabuildingfromtheelements.
Chamfer–abeveledcorneroredgewhichisformedinconcreteworkbyplacingathree-corneredpieceofwood(cantstriporskewback)intheformcorner.
Chamferstrip–triangularorcuredinsertplacedinsidecornerofformtoproduceroundedorbeveledcorner;alsocalledfillet,cantstrip,skewback.
Clearance–thedistancebetweentwosurfaced.
Clearspan–thedistancebetweentheinsideedgesofthebearingsurfacesoftwosupportingmembers.
ColdJoint–ajointnecessitatedbyseveralcastingstagesbutdesignedandexecutedtoallowtheseparatecomponentstoappearandperformasonehomogeneousunit;termonlyapplieswhenthefirstcastingisallowedtohardenpriortoplacingthesecond.
Column–anelementusedprimarilytosupportaxialcompressiveloadsandwitha
![Page 85: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/85.jpg)
heightatleastthreetimesitssmallestlateraldimension.
Columncover–aprecastpanelwhichcoversoneormoresidesofacolumnwhichwouldotherwisebeexposed.
Compositeconstruction–atypeofconstructionwhereinthefloorslabisfastenedtothebeamsinsuchamannerthattheyacttogetherasamoreefficientmemberincarryingliveloads.
Concrete–amixtureofportlandcement,fineaggregate,coarseaggregate,andwater.
Concrete,structurallightweight–concretethathasa28-daycompressivestrengthinexcessof2,500PSIandanair-dryunitweightoflessthan115PCF,;alightweightconcretewithoutnaturalsandistermedall-lightweightconcreteandlightweightconcreteinwhichallfineaggregateconsistsofnormalweightsandistermedsand-lightweightconcrete.
Concretecover–thecleardistancefromthefaceoftheconcretetothereinforcingsteel.
Consolidation–theuseofhandtools,vibrators,orfinishingmachinesduringthecastingprocesstoeliminatevoids,otherthanentrainedair,andtoprovideadenseconcrete,goodbondwithreinforcement,andasmoothsurface.
Coping–apanelwhichformsthetopofawallandsealsitformtheelements.
Corbel–steelorreinforcedconcretebracketwhichprotrudesfromacolumnorwallpaneltoprovidesupportforanothermemberortakesupportfromanadjacentpartofstructure.
Cornice–panelwhichfitsunderaceilingorprojectingroof.
Curtainwall–precastwallpanelswhichwheninplacemayformwindowframesandinterior/exteriorwallconstruction,butsupportnoloadsfrombuilding.
d
Deflection–thedistanceastructuralmembermovesfromitsnormalpositionwhensubjectedtoaload.
Draft–theslopeofconcretesurfaceinrelationtothedirectioninwhichtheprecastelementiswithdrawnfromthemold;itisprovidedtofacilitatestrippingwithaminimumofmoldbreakdown.
Drip–aprojectingfinorgrooveattheouteredgeofasill,projectinghorizontalwallelementorsoffit,designedtointerrupttheflowofrainwaterdownwardoverthewallorinwardacrossthesoffit;dripsarenormallyusedonlyonunitshavingsmoothorlightlyexposedfinish.
E
Elongation–inprestressedwork,thedifferencebetweenastrand’sinitiallengthanditslengthafterstressing.
Engineerofrecord-engineerwhocreatesoriginalbuildingdesignandisresponsibleforthedesign.
Erection–theplacingofprecastunitsintotheirrespectivepositionsinthestructure.
Expansionboltoranchor–anexpandabledevicemadeofmetalinsertedintoadrilledholeinhardenedconcretethatgripsconcretebywedgingactionwhenthenutorheadisrotated.
F
Fabrication–actualworkonreinforcingbarsorhardwaresuchascutting,bending,andassembly.
Face–thesurfaceofapanel.
Facemix–theconcreteattheexposedfaceofaconcreteunit;usedforspecificappearancereasons.
Falsejoint–scoringonthefaceofaprecastunit;usedforaestheticorweatheringpurposesandnormallymadetostimulateanactualjoint.
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM gloSSary 83
![Page 86: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/86.jpg)
84 gloSSary The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Fascia–theoutsidehorizontalpanelontheedgeofarooforoverhang.
Fenestration–thedesignandplacingofwindowsinabuilding.
Finish-treatmentortexturegiventoconcretesurfaces.
Form–atemporaryreceptaclewhichreceivesconcreteanddictatesaunit’sshape.Itcanbemadeofwoodorsteel,butrequiresnotpatternorpositive.
Formliner–moldedsheetwhichwhenaffixedtoaformgivesthepanelaspecialfinishtreatment;linersaremadeofrubber,plastic,wood,etc.
Formreleaseagent–asubstanceappliedtotheformsforthepurposeofpreventingbondbetweentheformandtheconcretecastinit.
G
Galvanize-tocoatwithrustresistantzincbyspraying,dipping,orelectrolyticdisposition.
Gradation–thesizingofgranularmaterials.Forconcretematerials,usuallyexpressedintermsofcumulativepercentageslargerorsmallerthaneachofaseriesofsieveopeningsorthepercentagesbetweencertainrangesofsieveopenings.
Grout–amortartypemixturewhichishandpackedorappliedunderpressureinsuchaconsistencyastoensurecompletefillingofallvoids.Theusualproportionsofagroutmixareone(1)partofcementtothree(3)partsofwell-gradedsandbyweightwithwatercontentadjustedsothatamassofgroutsqueezedinthehandremainsitsshape.
H
Hardware–acollectivetermappliedtoitemsusedinconnectingprecastunitsorattachingoraccommodatingadjacentmaterialsorequipment.Hardwareisnormallydividedintothreecategories:
Contractor’sHardware–itemstobeplacedonorinthestructureinordertoreceivetheprecastconcreteunits:e.g.,anchorbolts,angels,orplateswithsuitableanchors.
PlantHardware–itemstobeembeddedintheconcreteunitsthemselves,eitherforconnectionsandprecasterector’swork,orforothertrades,suchasmechanical,plumbing,glazing,miscellaneousiron,masonry,orroofingtrades.
ErectionHardware–allloosehardwarenecessaryfortheinstallationoftheprecastconcreteunits.
Honeycomb–acoarsestonyconcretesurfacewithvoidslackinginfines;someprobablecausesarecongestedreinforcement,narrowsection,insufficientfines,lossofmortar,andinadequateconsolidation.
I
Insert–aconnectingorhandlingdevicecastintoprecastunits.Insertsaremachineorcoil-threadedtoreceiveaboltorslottedtoreceiveabolthead.
J
Joint–Thespacebetweentwoadjacenterectedpanels.
k
Key–acontinuousorsemi-continuousslotinconcretetoreceivegrout,levelingblocks,ordowels.
L
Liftingdevice–anassemblyusedinhandlingorerectionofprecastpanels.
Liftpoint–predeterminedpointsfromwhichapanelistobelifted.
Loadbearing–supportingthedeadandliveloadofothermembers.
![Page 87: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/87.jpg)
Load-bearingprecastunits–precastunitswhichformanintegralpartofthebuildingstructureandwhichareessentialtoitsstability.
M
MarkNumber–theindividualidentifyingmarkassignedtoeachprecastunitpredeterminingitspositioninthebuilding.
MasterMold–amoldwhichallowsamaximumnumberofcastsperproject;unitscastinsuchmoldsneednottobeidentical,providedthechangesintheunitscanbeaccomplishedsimplyaspre-engineeredmoldmodifications.
Matrix–theportionoftheconcretemixcontainingonlythecementandfineaggregates(sand).
Maximumsizeaggregate–aggregatewhoselargestparticlesizeispresentinsufficientquantitytoaffectthephysicalpropertiesonconcrete;generallydesignedbythesievesizeonwhichthemaximumamountpermittedtoberetainedis5or10percentbyweight.
Mitre–theedgeofapanelthathasbeenbeveledtoanangleotherthan90degrees.
Mockup–asectionofawallorotherassemblybuiltfullsize,ortoscale,forpurposesoftestingperformance,studyingconstructiondetails,orjudgingappearance.
Module–arepeatingorreoccurringdimensionordetail.
Mold–thecavityorsurfaceagainstwhichfreshconcreteiscasttogiveitadesiredshape;sometimesusedinterchangeablywithformbutmadeoffiberglassorconcrete;apatternorpositiveisbuiltfirstandthemoldisoverlayed.
Mortar–amixtureofcement,sand,andwater;whenusedinmasonryconstruction,themixturemaycontainmasonrycement,orportlandcementwithlimeorotheradmixtureswhichmayproducegreaterdegreesofplasticityand/ordurability.
Mullion–averticalprecastunitappearingbetweenwindowsand/ordoors.
Muntin–horizontalprecastappearingbetweenwindowsand/ordoors.
n
Nailer–abeveledwoodenstripcastintoaprecastpanelforthepurposeofnailingflashingorroofingtoit.Theuseofsuchmaterialinconcreteisnotrecommended.
Neoprene–asyntheticrubberbearingpad.
Normalweightconcrete–concreteforwhichdensityisnotacontrollingattributeandusuallyhavingunitweightsintherangeof135to160lbs.percubicfoot.
Nosing–aprojectionsuchasthatofthetreadofastairovertheriser.
o
Overhang–theprojectingareaofarooforupperstorybeyondthewallofthelowerpart.
P
Panel–anindividualprecastunit
Parapet–thatpartofthewallthatextendsabletheroofline.
Patch–torepairasuperficiallydamagedpanelbyfillingthedamagedareawithconcreteofmatchingcolorandtexture.
Pier–ashortcolumnusedasafoundationmemberinbuildingconstruction.
Pilaster–columnpartiallyorcompletelyembeddedinawall,oraportionofawallenlargedtoserveasacolumn.
Plate–asheetofmetalhavingathicknessof1/8inchorgreater.
Platewasher–aspecialwasherprefabricatedfromsteelplate.
Pouredinplace–(seecast-in-place)
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM gloSSary 85
![Page 88: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/88.jpg)
86 gloSSary The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
Precastconcrete–aplainreinforcedorprestressedconcreteelementcastinotherthanitsfinalpositioninthestructure;precastconcretecanbearchitecturalorstructural.
Precastengineer–thestructuralengineerauthorizedbythemanufacturertoensuretheadequacyofthestructuralaspectsofthedrawings,manufacture,andinstallationforwhichthemanufacturerisresponsible.
Preliminary-notcompletelyfinalizedandreviewed.
Prestressedconcrete-concreteinwhichtherehavebeenintroducedinternalstressesofsuchmagnitudeanddistributionthatthestressesresultingfromloadsarecounteractedtoadesireddegree.
Prestressingbed-theplatformandabutmentsneededtosupporttheformsandmaintainthetendonsinastressedconditionduringplacingandcuringoftheconcrete.
Pretensioning–amethodofprestressingconcretewherebythetendonsareelongated,anchoredwhiletheconcreteinthememberiscast,andreleasedwhentheconcreteisstrongenoughtoreceivethestressesfromthetendonthroughbond.
Q
Quirkmitre–acornerformedbytwochamferedpanels.
r
Rebar–abbreviatedtermforreinforcingbar.
Reinforcedconcrete–concretecontainingreinforcement,includingprestressingsteel,anddesignedontheassumptionthatthetwomaterialsacttogetherinresistingforces.
Reinforcement–mesh,strand,orpost-tensioningcablesembeddedinconcreteandlocatedinsuchamannerthatthemetalandtheconcreteacttogetherinresistingloads.
Release–(1)thetimeatwhichtheprestressedstrandsareseveredpriorto
removingtheprestressedunitsfromtheforms;(2)submittalofdrawings;(3)strippingofprecastpanel
Releaseagent–(seeformreleaseagent)
Retarder–anadmixturewhichdelaysthesettingofcementpasteandthereforeofconcrete
Retarder,surface–amaterialusedtoretardorpreventthehardeningofthecementpasteonaconcretesurfacewithinatimeperiodandtoadepthtofacilitateremovalofthispasteaftertheconcreteelementisotherwisecured(amethodofproducingexposedaggregatefinish).
Return–aprojectionoflikecross-sectionwhichis90degreestoorsplayedfrommainfaceorplaneofview.
Reveal–(1)grooveinapanelfacegenerallyusedtocreateadesiredarchitecturaleffect;(2)theprojectionofthecoarseaggregatefromthematrixafterexposure.
Rib–(1)continuousverticalprojectiononawallpanelprojectingaminimumof6inchesfromthepanelface;(2)localthickeningprovidingstiffnessinconcretepanels.
Rustication–agrooveinapanelfaceforarchitecturalappearance;alsoreveal.
Rusticationstrip–astripofwoodorothermaterialattachedtoaformsurfacetoproduceagrooveorrusticationintheconcrete.
S
Sand-thatportionofanaggregatepassingtheNo.4(4.76mm)sieveandpredominantlyretainedontheNo.200(74micron)sieve.
Sandblast–asystemaabradingasurfacesuchasconcretebyastreamofsand,orotherabrasive,ejectedfromanozzleathighspeed,bywaterand/orcompressedair.
![Page 89: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/89.jpg)
Sandwichwallpanel–panelconsistingoftwolayers(wythes)ofconcretefullyorpartlyseparatedbyalayerofinsulation;inemployingthisdetail,metalshearconnectorsareusuallyrequiredtotiethetwolayersofconcretetogether.
Sealants–agroupofmaterialsusedtosealjointsbetweenprecastconcreteunitsandbetweensuchunitsandadjacentmaterials.
Sealersorprotectivecoatings–materialsusedtocoastprecastconcreteunitsforthepurposeofimprovingresistancetowaterpenetrationorforimprovingweatheringqualities.
Section–cutawayviewthroughageneralplanorelevationviewtoexplaindetails.
Segregation–thetendencyforthecoarseparticlestoseparatefromthefinerparticlesinhandling;inconcrete,thecoarseaggregateanddriermaterialremainsbehindandthemortarandwettermaterialflowsahead;thisalsooccursinaverticaldirectionwhenwetconcreteisoverbibratedordroppedverticallyintotheforms,themortarandwettermaterialrisingtothetop;inaggregate,thecoarseparticlesrolltotheoutsideedgesofthestockpile.
Selfstressingforms–equipmentwhichinadditiontoservingasformsforconcretealsoaccommodatesthepre-tensionedstrands(orwires)andsustainsthetotalprestressingforcebysuitableendbulkheadsandsufficientcross-sectionalstrength.
Set-up–theprocessofpreparingmoldsorformsforcasting,includinglocatingmaterials(reinforcementandhardware)priortotheactualplacingofconcrete.
Slab–precastorprestressedfloororroofmembers.
Spandrel¬–thatpartofawallbetweentheheadofawindowandthesillofthewindowaboveit.(Anupturnedspandrelcontinuesabovetherooforfloorline.)
Spandrelbeam–beaminabuildingframe
whichextendsbetweenexteriorcolumnsatafloorlevel.
Specifications–thetypeorprinteddirectionsissuedbyarchitectstoestablishgeneralconditions.Standardsanddetailedinstructionswhichareusedwiththecontractdrawings;contractedterm,specs.
Stoneanchor–ananchorcommonlyusedtofastencutstoneunits;suchanchorsareseldomsuitableforuseinprecastconcreteattachment.
Stress–intensityofforceperunitarea.
Stripping–theprocessofremovingaprecastconcreteelementfromtheforminwhichitwascast.
Strongback–asteelorwoodenplatewhichisattachedtoapanelforthepurposeofaddingstiffnessduringhandling,shipping,and/orerection.
Structural–aunitwhichcarriesliveloadoranotherunit’sweight.
Submitted–presentedtothearchitect/engineerforreview.
Systemsbuilding–essentiallytheorderlycombinationof“parts”intoan“entity”suchassub-systemsortheentirebuilding;systemsbuildingmakesfulluseofindustrializedproduction,transportation,andassembly.
T
Temperaturereinforcement–reinforcementdistributedthroughouttheconcretetominimizecracksduetotemperaturechangesandconcreteshrinkage.
Tie–aclosedloopofsmallsizereinforcingbarsthatencirclelongitudinalbarsincolumnsandbeams.(seestirrup)
Tolerance–specifiedpermissiblevariationfromstatedrequirementssuchasdimensions,strength,andair-entrainment.
Topping–concretecastonerected
The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM gloSSary 87
![Page 90: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/90.jpg)
88 gloSSary The Shockey PrecaST GrouP, WincheSTer, Va • WWW.ShockeyPrecaST.coM
prestressedunitstoachievealevelfloorortoaidtheunitsinuniformlycarryingloads.
V
Vibration-energeticagitationofconcretetoassistinitsconsolidation,producedbymechanicaloscillatingdevicesatmoderatelyhighfrequencies;externalvibrationemploysadeviceattachedtotheformsandisparticularlyapplicabletothemanufactureofprecastitems;internalvibrationemploysanelementwhichcanbeinsertedintotheconcrete,andismoregenerallyusedforcast-in-placeconstruction.
W
Wallpanel–acomponentofaprefabricatedwallwhichderivesitsstrengthanddimensionalstabilityfromaprecastconcreteelement;thecomponentincludesanynonconcreteitemsincorporatedintheelementatthetimeofmanufacture.
Warping–thebowingofaprecastunitintwoplanes.
Weephole–aholeprovidedfordrainagethroughprecastpaneljoints
Weld–tojoinmetalsbyapplyingheatwithafillermetalwhichhasahighmeltingpoint.
Weldedwirefabric–areinforcingmaterialcomposedofcolddrawnsteelwiresfabricatedintoasheetconsistingoflongitudinalandtransversewiresarrangedatrightanglesandweldedtogetheratallpointsofintersection.
Weldplate–aplatewithattachedanchorscastintoconcreteforthepurposeofmakingaweldedconnection.
Workability–theeasewithwhichagivensetofmaterialscanbemixedintoconcreteandsubsequentlyhandled,transported,placed,andfinishedwithaminimumlossofhomogeneity.
![Page 91: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/91.jpg)
![Page 92: parking structure design guide - Shockey · PDF fileThe Shockey Precast Group PARKING STRUCTURE 2008/2009 DESIGN GUIDE Edition](https://reader034.fdocuments.us/reader034/viewer/2022051320/5a7068187f8b9ac0538bf4eb/html5/thumbnails/92.jpg)