    Presentation to

    Steamboat Springs City Council

    Parking Analysis

    Scot Martin

    DESMAN Associates

    7900 E. Union Avenue, Suite 925

    Denver, CO 80237

    www.desman.com

    3037401700

    Architects Engineers Planners Parking Consultants Restoration Engineers

    Attachment 1

  • 8/10/2019 Parking Recommendations from Desman Associates

    2/11

    Architects Engineers Planners Parking Consultants Restoration Engineers

    1. Consider the installation of parking meters in the Central Downtown Area.

    Including: Lincoln Street, Yampa Street & Side Streets from 5th to 10th

    Estimated 580 onstreet spaces

    44 block faces

    4 of the 5 peer townsand cities have on

    street meters and the

    fifth one is

    considering meters

    Meters will:

    Discourage long

    term parking

    Increase turnover

    Aid in enforcement Generate revenue

    O N - S T R E E T PA R K I N G S Y S T E M R E C O M M E N D A T I O N S

  • 8/10/2019 Parking Recommendations from Desman Associates

    3/11

    Architects Engineers Planners Parking Consultants Restoration Engineers

    2. Further explore both singlespace smart meters and

    multispace meters.

    3. Charge a minimum hourly rate of $1.00 with 2 and 3

    hour maximums as currently signed.

    4. Enforce the meters Monday Saturday from 10:00

    AM to 8:00 PM.

    5. Set up pilot programs to test the meters prior to

    receiving bids.

    6. Survey users of the meters.

    O N - S T R E E T PA R K I N G S Y S T E M R E C O M M E N D A T I O N S

  • 8/10/2019 Parking Recommendations from Desman Associates

    4/11

    Architects Engineers Planners Parking Consultants Restoration Engineers

    Estimated Cost

    $472,700 for 580 smart single space meters by IPS Group

    $506,000 to $594,000 for 44 multispace meters by Digital Payment

    Technologies

    Estimated FirstYear Revenue

    $463,585

    580 spaces and 55% average occupancy

    Average turnover of 2.5

    302 days per year

    $1.75 average fee

    Plus limited citation revenue

    Estimated Net Revenue (less expenses)

    IPS Single Space Meters $280,192Digital MultiSpace Meters $324,919

    O N - S T R E E T PA R K I N G S Y S T E M R E C O M M E N D A T I O N S

  • 8/10/2019 Parking Recommendations from Desman Associates

    5/11

    Architects Engineers Planners Parking Consultants Restoration Engineers

    7. Also consider LPR for more effective and efficient enforcement of the

    remaining on and offstreet timelimited spaces.

    8. If LPR is implemented prior to the installation of meters, it is

    recommended to defer on the decision on meters for a few years for

    adequate time to assess the effectiveness of LPR.

    9. Have Genetec (AutoVu) and Tannery Creek Systems (autoChalk)

    demonstrate their systems to the city prior to receiving bids.

    O N - S T R E E T PA R K I N G S Y S T E M R E C O M M E N D A T I O N S

  • 8/10/2019 Parking Recommendations from Desman Associates

    6/11

    Architects Engineers Planners Parking Consultants Restoration Engineers

    1. Maintain free parking in the public lots to encourage their use.

    2. Consider converting the 2hour parking in the 8th & Oak lot to 8

    hour parking to accommodate displaced employees.

    O F F - S T R E E T PA R K I N G S Y S T E M R E C O M M E N D A T I O N S

  • 8/10/2019 Parking Recommendations from Desman Associates

    7/11

    Architects Engineers Planners Parking Consultants Restoration Engineers

    1. Consider restriping 10 wide onstreet spaces at 90 to add 35

    40 more spaces downtown.

    2. Reconfigure the 8th

    & Oak Lot to add 12 more spaces

    3. Parking Structure

    PA R K I N G I M P R O V E M E N T S

  • 8/10/2019 Parking Recommendations from Desman Associates

    8/11

    Architects Engineers Planners Parking Consultants Restoration Engineers

    8th Street Restripe and 8th & Oak Lot Reconfiguration

    PA R K I N G I M P R O V E M E N T S

  • 8/10/2019 Parking Recommendations from Desman Associates

    9/11

    Architects Engineers Planners Parking Consultants Restoration Engineers

    8th and Oak Lot Parking Structure

    162 spaces (Net

    gain of 112)

    Four levels Parking efficiency

    of 422 sq. ft. per

    space

    Not a viable

    location for a

    mixeduse project$4.6 Million

    $28,395/space

    PA R K I N G I M P R O V E M E N T S

  • 8/10/2019 Parking Recommendations from Desman Associates

    10/11

    PA R K I N G I M P R O V E M E N T S

    Architects Engineers Planners Parking Consultants Restoration Engineers

    Two sites south of Lincoln Avenue that are likely to become available

    are better sites for a mixeduse project with public parking:

    Yampa Valley Electric Associates (YVEA) SitePolice Services Building at 840 Yampa Street

  • 8/10/2019 Parking Recommendations from Desman Associates

    11/11

    C L O S I N G R E M A R K S

    Thank Youfor this opportunity.