winnipeg.ca/parkersrb Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm Retention Basin Project. 2. Asking questions and talking with the consultants and City of Winnipeg staff. 3. Providing feedback on an exit survey. Please parcipate today by: Welcome to the City of Winnipeg Parker Storm Retention Basin Public Information Session

Transcript of Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation...

Page 1: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

winnipeg.ca/parkersrb

Parker Storm Retention Basin

1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm Retention Basin Project.

2. Asking questions and talking with the consultants and City of Winnipeg staff.

3. Providing feedback on an exit survey.

Please participate today by:

Welcome to the City of Winnipeg Parker Storm Retention Basin

Public Information Session

Page 2: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

winnipeg.ca/parkersrb

Parker Storm Retention Basin

COCKBURN & CALROSSIE SEWER RELIEF PROJECT INTRODUCTION

• In River Heights - Fort Garry, changes to the Cockburn West & Calrossie sewer districts are required to reduce the impacts of combined sewers, namely basement flooding and the release of diluted wastewater into local waterways due to combined sewer overflows.

• Project includes:

- The complete sewer separation in several areas including: Cockburn West, Calrossie and Southeast Jessie Sewer Districts.

- The creation of the Parker Storm Retention Basin (SRB).

2

Cockburn & Calrossie Sewer Relief Project LimitsEBBY

WENTWORTH

GRANT PARK

PARKER

BEAUMONT

POINT ROAD

COCKBURN WEST

DISTRICT

SOUTHEAST JESSIE

DISTRICT

CALROSSIEDISTRICT

SOMERSET DISTRICT

Taylor Avenue

Parker Avenue

Nathaniel St.

Sparling Ave.

Harrow St.Wilton St.

Hector Ave.

Grant Avenue

CN Rail ROW

Wav

erle

y St

reet

Pem

bina

Hi

ghw

ayPe

mbi

na H

ighw

ay

PROJECT LIMITSLEGEND

SEWER DISTRICTS BOUNDARIES

Page 3: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

winnipeg.ca/parkersrb

Parker Storm Retention Basin

COMBINED SEWER SYSTEM• Combined sewers are a single system of pipes

that collect both wastewater from homes, businesses and industries as well as surface runoff from rainstorms and snow melt.

• During 'Dry Weather Operation' all combined flows are treated at one of the City’s three treatment plants.

• During 'Heavy Rain Operation' diluted sewage overflows to local waterways without treatment to protect property, as intended.

3

COMBINED SEWER SYSTEMCOMBINED SEWER SYSTEM

Page 4: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

winnipeg.ca/parkersrb

Parker Storm Retention Basin

SEPARATE SEWER SYSTEM• Separate sewer systems have two systems of

pipes:

- One pipe system carries sewage / wastewater to the wastewater treatment plant.

- The second pipe system carries land drainage and surface runoff from rainstorms and snow melt directly to the river.

• Separate sewers eliminate the possibility of sewage overflow to the river system.

4

SEPARATE SEWER SYSTEM

Page 5: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

winnipeg.ca/parkersrb

Parker Storm Retention Basin

COCKBURN & CALROSSIE SEWER RELIEF PROJECT BENEFITS

Overall Benefits of the Combined Sewer Separation Project include:

• Reducing combined sewer overflows from entering local waterways;

• Lowering water treatment costs by preventing rain water and snow melt from going to the treatment plant;

• Minimizing the risk of property damage due to basement flooding;

• Helping the City of Winnipeg meet requirements of Environment Act Licence No. 3042

5

Page 6: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

winnipeg.ca/parkersrb

Parker Storm Retention Basin

6

Phase 1 (2014 - 2018)• Toilers Park Outfall (Completed 2014)

• Underground LDS Pipe Installations (Ongoing 2016 - 2017)

• Parker SRB (2017-2018)

Phase 2 (Est. 2018)• Taylor Avenue Underground LDS

Pipe Installations

Future Phases (2018 - 2025)• Various Underground LDS Pipe

Installations

COCKBURN & CALROSSIE SEWER RELIEF PROJECT PHASING

PROJECT PHASING

Taylor Avenue

Parker Avenue

Nathaniel St. Sparling Ave.

Wilton St.

Weatherdon Ave.

Hector Ave.

Grant Avenue

CN Rail ROW

PARKER LANDS

SWRT

Wav

erle

y St

reet

Pem

bina

Hi

ghw

ay

Pem

bina

H

ighw

ay

Harrow St.

Wentworth St.

CN Rail ROW

PARKER LANDS

PARKERSRB

PHASE 1

PHASE 1

Wav

erle

y St

reet

Page 7: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

CONSTRUCTIO

N

ACCESS

winnipeg.ca/parkersrb

Parker Storm Retention Basin

PARKER STORM RETENTION BASIN (SRB) LOCATIONNorth

7

Page 8: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

winnipeg.ca/parkersrb

Parker Storm Retention Basin

HEATHERDALE AVE

PROPERTY LINE

FUTURE

MANITOBA HYDRO ROWFUTURE

MANITOBA HYDRO ROW

FUTUREMANITOBA HYDRO ROW

FUTURE MANITOBA HYDRO ROW

FUTURE TRANSITWAY (BY OTHERS)

PARKER SWRT STATION

(BY OTHERS)

FUTURE TRANSITWAY ACTIVE

TRANSPORTATION (BY OTHERS)

CN. RAIL ROW.

PARKER AVE

ROCKM

AN ST.

DEREK ST.

DANIEL ST.

NEW PARKER SRB

NORMAL WATER LEVEL

OUTLET INTO SRB

SRB INTAKE

0 25 50 100m

North

25 YEAR RAIN EVENT100 YEAR RAIN EVENT

NATIVE WETLAND SHORELINE PLANTING

INFORMAL MOWN GRASS PATH AROUND SRB

TOP OF SRB

NATIVE UPLAND TALL AND MEDIUM GRASS PLANTING

GRANULAR PARK PATH• ELM/ASPEN/OAK TREE

PLANTING• ROLLING LANDFORMS

BUTTERFLY HABITAT• NATIVE MILKWEED PLANTING• FLOWERING NATIVE PERENNIALS

SHADE CANOPY • BENCHES• INTERPRETIVE SIGNAGE

SHADE CANOPY • BENCHES• INTERPRETIVE SIGNAGE

PARK PATH CONNECTION• TO BEAUMONT

NEIGHBOURHOOD • THROUGH SWRT STATION

8

PARKER STORM RETENTION BASIN SITE PLAN

Page 9: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

PARKER STORM RETENTION BASIN BENEFITS

The storm retention basin will be a constructed wetland and will have numerous environmental benefits:

• Walking trails and shaded seating areas;

• Improved water quality of surrounding waterways due to the filtering out of impurities and pollutants in stormwater;

• The establishment of low maintenance native grasses can sequester significant amounts of atmospheric carbon (up to 15 times more compared to conventional sod);

• The planting of native perennials, including milkweed will provide an improved habitat for butterflies and other pollinator species.

The naturalized Parker SRB will result in no net loss of wetlands in the Parker Lands from the South West Rapid Transit and the Cockburn & Calrossie Sewer Relief projects combined, in accordance with environmental licensing requirements.

winnipeg.ca/parkersrb

Parker Storm Retention Basin

Scatliff+Miller+Murray Photo

Scatliff+Miller+Murray Photo

Scatliff+Miller+Murray Photo

9

Page 10: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

Wetland Planting and Habitat

• Wetlands and wetland vegetation slow the flow of surface water and improve water quality.

• Wetland systems can filter pollutants and impurities (such as phosphorus, nitrogen, pesticides and hydrocarbons) from the surface water, resulting in cleaner water being discharged into the rivers.

• Wetlands (both natural and constructed) also provide important habitat for many plants and animals.

• Naturalized wetland layout may reduce nesting urban goose population that is often associated with conventional storm water basins, while supporting a richer biodiversity.

PARKER STORM RETENTION BASIN FEATURES

winnipeg.ca/parkersrb

Parker Storm Retention Basin

Scatliff+Miller+Murray Photo

Scatliff+Miller+Murray Photo

Scatliff+Miller+Murray Photo

10

Page 11: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

Native Upland Grass and Butterfly Habitat

• Upland grass species planted around the SRB will be native to the region and well suited to the local climate and soils.

• These plant species develop deep root systems that allow them to withstand extended periods of drought and thrive without the input of fertilizer or irrigation.

• Native perennials, including milkweed, will be planted to attract butterflies and other pollinator insects.

• The habitat will attract pollinator insects, which are critical components of healthy plant communities. Their abundance and diversity can be an indicator of ecosystem health.

PARKER STORM RETENTION BASIN FEATURES

winnipeg.ca/parkersrb

Parker Storm Retention Basin

Scatliff+Miller+Murray Photo

Scatliff+Miller+Murray Photo

Scatliff+Miller+Murray PhotoPHOTO COURTESY OF:http://ereimer.net/20090713/15953_erC720.htm

11

Page 12: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

PHOTO COURTESY OF:http://www.fleetwoodurban.com.au/inspiration

Scatliff+Miller+Murray PhotoScatliff+Miller+Murray Photo

Scatliff+Miller+Murray Photo

PARKER STORM RETENTION BASIN FEATURES

winnipeg.ca/parkersrb

Parker Storm Retention Basin

FUTURE

MANITOBA HYDRO ROW

FUTURE MANITOBA

HYDRO ROW

FUTU

RE MA

NITO

BA

HYD

RO RO

W

NEW PARKER SRB

GRANULAR PARK PATH• ELM/ASPEN/OAK TREE PLANTING• ROLLING LANDFORMS

BUTTERFLY HABITAT• NATIVE MILKWEED PLANTING• FLOWERING NATIVE PERENNIALS

SHADE CANOPY • BENCHES• INTERPRETIVE SIGNAGE

SHADE CANOPY • BENCHES• INTERPRETIVE SIGNAGE

PARK PATH CONNECTION• TO BEAUMONT NEIGHBOURHOOD • THROUGH SWRT STATION N

orth0 25 50

NORMAL WATER LEVEL

25 YEAR RAIN EVENT100 YEAR RAIN EVENT

TOP OF SRB

12

FREEBOARD231.01

MILKWEED/FLOWERING NATIVE

PERENNIALS

TOP

OF

SLO

PE

PATH5:1

6:1

4:1

UPLAND VEGETATION (TALL AND SHORT)TREES AND LOW NATIVE GRASS WETLANDZONE

100 YEAR RAIN EVENT 230.11

25 YEAR RAIN EVENT 229.69

NORMAL WATER LEVEL227.70

BOTTOM OF SRB225.00

TYPICAL SRB SECTION

WALKING PATHS SHADE CANOPIES AND SEATING

Page 13: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

SPRING / SUMMER 2018FALL 2017 / SPRING 2018SPRING 2017 2018 - 2020

REMOVAL OF EXISTING VEGETATION

BASIN EXCAVATIONWETLAND AND

NATIVE VEGETATION ESTABLISHMENT

(2 YEAR PROCESS)

INSTALLATION OF PUBLIC AMENITIES

(PATH, SHADE CANOPY AND SEATING)

HEAVY CONSTRUCTION TRAFFIC

LIGHT CONSTRUCTION TRAFFIC

LIGHT CONSTRUCTION TRAFFIC

PERIODIC CONSTRUCTION TRAFFIC

PARKER STORM RETENTION BASIN CONSTRUCTION TIMELINE

winnipeg.ca/parkersrb

Parker Storm Retention Basin

13

Page 14: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

STORM RETENTION BASIN NATIVE PLANT DEVELOPMENT

YEAR 2 YEAR 3 YEAR 4+YEAR 1UPLAND SITE PREPARATION AND

COVER CROP PLANTINGSEEDING OF UPLAND

NATIVE GRASSESUPLAND NATIVE GRASS

ESTABLISHMENTREMOVAL OF EXISTING VEGETATION

ON SRB SITE

BASIN EXCAVATION INSTALLATION OF WETLAND PLANT MATERIAL

WATER LEVEL MANIPULATION TO ENCOURAGE WETLAND PLANT

ESTABLISHMENT

ESTABLISHED WETLAND PLANT MATERIAL

Scatliff+Miller+Murray Photo

Scatliff+Miller+Murray PhotoScatliff+Miller+Murray Photo

KGS Photo

Scatliff+Miller+Murray Photo

Scatliff+Miller+Murray Photo Scatliff+Miller+Murray Photo

Scatliff+Miller+Murray Photo

winnipeg.ca/parkersrb

Parker Storm Retention Basin

14

Page 15: Parker Storm Retention Basin - Winnipeg · Parker Storm Retention Basin 1. Viewing the presentation boards for an update on the Cockburn & Calrossie Sewer Relief and Parker Storm

THANK YOUThank you for attending today's information session.

Please complete an exit survey before you leave.

For more information please visit:winnipeg.ca/parkersrb

winnipeg.ca/parkersrb

Parker Storm Retention Basin