Parker Drilling Rig 121 2,000 hp Land Drilling Rig · Parker Drilling Rig 121 2,000 hp Land...
Transcript of Parker Drilling Rig 121 2,000 hp Land Drilling Rig · Parker Drilling Rig 121 2,000 hp Land...
Parker Drilling Rig 1212,000 hp Land Drilling Rig
Year Modified: 2007
Rated Drilling Depth5 in. Drill Pipe: 18,000 ft (5,486 m)
MastMake: Pyramid Height: 142 ft (43.2 m)Max. Hookload: 1 million lbsRacking Capacity: 5 in. drill pipe - 18,000 ft (5,486 m)
DrawworksMake: Mid Continent 1220 EBRated Input: 2,000 hp (1,491 kW)Input Power: Two (2) GE-752 DC traction
motors, each rated 1,000 hp (746 kW)
Drilling Line: 1-3/8 in. (34.9 mm)
Traveling EquipmentTraveling Block: Gardner Denver BMax. Load: 1 million lbsSwivel: Continental Emsco LB 500Max. Load: 1 million lbs
SubstructureMake, Type: Pyramid, swing-upClear Working Height: 21.6 ft (6.6 m)Setback Load: 600,000 lbs
Rotary EquipmentTop Drive: Tesco TD-500HS, 500 tonInput Power: Detroit 16V-92, 1,100 hp (820 kW)Rotary Table: Oilwell 37-1/2 in. (952.5 mm)Input Power: Gulf Electroquip RSIA 752 electric
motor, 1,000 hp (746 kW) Static Load Rating: 1.2 million lbs
BOP SystemAnnular Preventers: One (1) 13-5/8 in. Hydril GK
5,000 psiOne (1) 21-1/4 in. Hydril MSP (or equivalent) 2,000 psi
Ram Preventers: One (1) 13-5/8 in. Cameron Type U 10,000 psi single ramOne (1) 13-5/8 in. Cameron Type U 10,000 psi double ram
GensetsEngines: Four (4) Caterpillar D-399 engines;
1,215 hp (906 kW) @ 1,200 rpm eachGenerators: Four (4) Kato SR4B generators; 1,030
kW (1,288 kVA) each
Power DistributionGen. Control: Four (4) Ross Hill Model 1400SCR: Four (4) Ross Hill Model 1400 SCR
baysMCC: 600 V, 480 V, 220:120 V
Mud PumpsPumps: Three (3) Gardner Denver PZ-10
triplex pumps; each rated 1,350 hp (1,007 kW)
Input Power: Each pump driven by two (2) 1,000 hp (746 kW) GE 752 DC traction motors
Mud Handling/Solids ControlActive Mud System: 1,700 bbls (270 m3)Shale Shakers: Three (3) Derrick FLC-503, 3-panel
shakers; each 560 gpm One (1) Derrick High-”G” Dryer; 560 gpm
Degasser: One (1) Derrick Vacu-Flo 1200; 1,200 gpm
5 Greenway Plaza, Suite 100Houston, Texas 77046 – U.S.A.
http://www.parkerdrilling.comTel: +281.406.2000 Fax +281.406.2001
Note: Equipment subject to client-specific requirements. No part of this document may be reproduced or transmitted without prior consent of Parker Drilling. Rev 08/08
5 Greenway Plaza, Suite 100Houston, Texas 77046 – U.S.A.
http://www.parkerdrilling.comTel: +281.406.2000 Fax +281.406.2001
Parker Drilling Rig 1212,000 hp Land Drilling Rig
Rig Plot Plan
Note: Equipment subject to client-specific requirements. No part of this document may be reproduced or transmitted without prior consent of Parker Drilling. Rev 08/08
SCALE IN METERS
SCALE IN FEET
0 5
0 2010
1510
504030
FUELTANK
CAT 3406
365KW GEN.
PANELTRANSFER
WELL CL
ACCUMULATOR
TOP DRIVEPOWER UNIT
TESCO
PYRAMID MAST
CHOKEMANIFOLD
AREA REQUIRED FORDRAWWORKS ELEVATOR
PYRAMID SWING-UP SUBSTRUCTUREWELL CL
DOG HOUSE(UP)
TRIPLEX MUD PUMPS(3) GARDNER-DENVER PZ-10
(2) 60 BBLTRIPTANKS
MUD/GAS SEPARATOR
CHARGING SKID
INTERMEDIATE PIT
PROCESS PIT
SUCTION PIT
MUDLAB
RESERVE PIT
WEL
DERS
SHO
P
PUM
PPA
RTS
MEC
HANI
C
TOP
DRIV
E
STOR
AGE
ELEC
TRIC
IAN
WAR
EHOU
SE
WELL C/L
WELL CL
WITHKATO 1030 KW GENERATORS(4)CAT D399 ENGINES
SCR
MCC
WAT
ERTA
NK
GENS
ET #
2
GENS
ET #
1
DIES
ELTA
NK
DIES
ELTA
NK GENS
ET #
4
GENS
ET #
3
CABLETRAY
WAT
ERTA
NK
AUX.
GEN.
FROM WELL CLTO PITWALL
199.00 FT [60.66 M] 154.61 FT
[47.13 M]
155.26 FT [47.32 M]
38.0
0 FT
[11.
58 M
]80
.00
FT [2
4.38
M]
353.61 FT [107.78 M]
68.2
1 FT
[20.
79 M
]
61.3
3 FT
[18.
69 M
]62
.00
FT [1
8.90
M]
158.
21 F
T [4
8.22
M]
18.00 FT [5.49 M]
9.00 FT [2.74 M]
1
B