Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

45
Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014

Transcript of Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Page 1: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş.

January 2014

Page 2: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

2

Contents

I. Company & Operations 3II. Planned Investments

18III. Ownership Structure & Participation

22IV. Ciner Group 25V. Financial Structure 28VI. Evaluation of The Latest Financial Tables

37VII. Corporate Governance Rating

43

Park Elektrik January 2014Park Elektrik Madencilik

Page 3: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 3

I. Company & Operations

3January 2014Park Elektrik Madencilik

Page 4: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 4

Introduction

Initially offered to public in 1997, Park Elektrik is the sole copper mining company on the ISE. The company currently operates two mines namely; a copper mine in Siirt and an asphaltite (a kind of hydrocarbon) mine in Sırnak.

Making up 90% of total sales revenues, concentrated copper is the main product of the company. Park Elektrik’s end product is concentrated copper which involves around 20% copper content. Park Elektrik sells all of its concentrated copper production to international commodity brokers. Park Elektrik took over operational rights of copper mine in 2004 and commenced copper mining operations in late 2006.

In mid 2009, following its merger with ISE-listed Group company Ceytas, Park Elektrik added asphaltite mining into its operation line. Asphaltite is sold to a sister company with a long term cost plus contract.

As of YE2013, employees working in copper and asphaltite mines are 430 and 87, respectively. With remaining administrative staff, company’s total work force is 577 as of year end 2013.

4January 2014Park Elektrik Madencilik

Page 5: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

5

Park Elektrik’s Existing & Planned Facilities

Asphaltite Mine

Sırnak

Natural Gas Power Plant

Adana

Copper Mine

Siirt

HPP

Diyarbakır

Natural Gas Power Plant

Edirne

January 2014Park Elektrik Madencilik

Page 6: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

6

I) Madenköy Copper Zone

Park Elektrik acquired operation license of Madenkoy copper mine in 2004 from Eti Holding, a state-owned entity engaged in mining businesses, for TL9.4 mn.

Mine operations started in late 2006 in the copper zone. So far, around 7 mn tons of ore was extracted in the copper zone.

According to initial reports, proven reserves in the zone was determined as 13 mn tons of ore. However, according to a reserve report issued by Micromine Consulting Services in November 2011, total reserves in the zone was determined as 39.8 mn tons of ore, 31.2 mn tons of which was measured.

The company has a concentration facility and it produces and sells concentrated copper that includes copper content of around 20% level.

Park Elektrik exports all of its concentrated copper production to an international commodity broker namely Traxys, while the end customer is China.

January 2014Park Elektrik Madencilik

Page 7: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 7

Micromine Reserve Report Based On JORC

According to a JORC (Joint Ore Resources Code) compliant reserve report issued by Micromine Consulting Services in November 2011, based on the drilling and sampling works done by different companies since 1981, the total reserves of Madenköy project was determined as 39,821,000 tons of ore, 31,182,000 tons of which was measured.

According to the same report, average grade in Madenkoy copper mine is 2.4% for the whole zone. Current grade in the zone is lower, at 1.8-1.9% levels in average.

Source: JORC Resource Estimate Report by Micromine

Resource Category Tonnes Cu (%)

Measured 31,182,000 2.26Indicated 6,433,000 2.79Total Measured & Indicated 37,615,000 2.34Inferred 2,206,000 3.38Project's Total Resources 39,821,000 2.40

7January 2014Park Elektrik Madencilik

Page 8: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 8

Capacity Expansion & Condemnation

In parallel with growing reserves in the Madenkoy copper zone, the company increased its concentration facility’s capacity from 750k to 1.2 mn tons of ore processing as of October 2011. Total capex for this investment was Euro 3.5mn.

Furthermore, Park Elektrik has completed it’s second phase of capacity expansion project to 1.8 mn tons of ore processing by December 2012 with an investment amount of Euro 3.5 mn.

Condemnation process due to expanding area of open pit mine continued in 2013 in line with the mine’s developmental needs. Company paid TL12mn in 2012 and TL11mn in 2013 for condemnation expenses.

8January 2014Park Elektrik Madencilik

Concentration Facility 2011 2012 2013

Ore Processing Capacity (ton) 750,000 1,200,000 1,800,000* Capacity increase to 1,2 mn tons was realized in October 2011.

Page 9: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 9

Production Volumes & Targets

9January 2014Park Elektrik Madencilik

2011 2012 2013E 2014 E 2015E

Ore (tons, wet) 973,628 1,213,013 1,500,000 1,600,000 1,500,000

Growth %96 25% 24% %7 -%6

Concentrated Copper (wmt) 77,510 89,253 105,000 105,000 115,000

Growth 107% 15% 18% - %10

Page 10: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 10

Shift To Open Pit Mining & Stripping Expenses

Having being operated underground mining since the beginning of operations in the Madenköy copper zone, Park Elektrik recently shifted its copper mining operations from underground to open-pit mining by the mid of 2013.

Based on projections, the company plans to continue open pit mining between 2013-2030 for 17 years.

Regarding this shift, the company started pre-stripping in Madenköy copper zone by subcontractors. Pre-stripping of 13 mn m3 from mid of 2012 until mid of 2013 costed TL65 mn. Including pre-stripping, total planned stripping cost for 2013 is TL 82mn.

10January 2014Park Elektrik Madencilik

Page 11: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 11

2013 Estimated Expenses In Copper Zone

11January 2014Park Elektrik Madencilik

Expenses TL mn

ORE PRODUCTION 88

- Stripping 82

- Others 6

FACILITY 30

OTHER 26

TOTAL 144

Page 12: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

12January 2014Park Elektrik Madencilik

Open Pit Site View

Page 13: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

13January 2014Park Elektrik Madencilik

Main Ore Body

Topography

Open Pit Topographic View – I

Page 14: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

14January 2014Park Elektrik Madencilik

Open Pit Topographic View - II

Main Ore Body

Page 15: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

15January 2014Park Elektrik Madencilik

Open Pit Site Intersection

Page 16: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

16

II) Silopi Asphaltite Zone

Asphaltite is a petroleum-origin hydrocarbon with a thermal value of 5,500-5,800 kcal/kg.

Park Elektrik has the operational rights of Silopi asphaltite mine until 2033. Estimated asphaltite reserve in Silopi is around 35 mn tons based on Turkish Coal Enterprise (TKI) reports.

Operations in the asphaltite zone started in June 2009. The company provides asphaltite to Silopi Elektrik Üretim A.Ş., a group company which is involved in electricity production in Silopi with fluidized bed technology and has a starting capacity of 135MW.

Annual production amount in Silopi is around 450,000 tons and is subject to increase from 2014 onwards in line with capacity expansion of Silopi EUAS from 135MW to 405MW. With the expansion, annual asphaltite production of Park Elektrik is also estimated to be tripled.

Based on recently renewed contract by two companies, sale price of asphaltite is determined as “Costs + 15%”.

January 2014Park Elektrik Madencilik

Page 17: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

17

Open-Pit Mining in Silopi

January 2014Park Elektrik Madencilik

Page 18: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

18

II. Planned Investments

January 2014Park Elektrik Madencilik

Page 19: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

19

Diyarbakır HPP

January 2014Park Elektrik Madencilik

Installed capacity will be 50.5 MW.

Production license is valid for 49 years.

According to recent feasibility studies, estimated

investment amount is

US$ 100 mn.

The compay plans to start HPP investment in the second

half of 2013

with an estimated investment amount of TL27mn for 2013.

Page 20: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

20

Ceyhan Natural Gas Power Plant

Park Elektrik applied to Energy Market Regulatory Authority for a license to establish a NGPP in Ceyhan, Adana.

Installed capacity will be 423 MW*.

Production license will be valid for 49 years.

Estimated investment amount is Euro 250 mn.

January 2014Park Elektrik Madencilik

*The technological advances took place since the application to EMRA allow us to reach max. 570 MW in one unit.

Page 21: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 21

Edirne Natural Gas Power Plant

Park Elektrik applied to Energy Market Regulatory Authority for a license to establish a NGPP in Edirne.

Installed capacity will be 423 MW.

Estimated investment amount is Euro 250 mn.

21January 2014Park Elektrik Madencilik

Page 22: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

22

III. Ownership Structure & Participation

Park Elektrik January 2014Park Elektrik Madencilik

Page 23: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 23

Ownership Structure

Others32%

Turgay Ciner7%

Park Holding61%

23January 2014Park Elektrik Madencilik

Page 24: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 24

Participation, Park Termik

Park Elektrik has 10% stake in Park Termik Elektrik San. ve Tic. A.S., a Ciner Group company which is involved in thermal power generation in Çayırhan, Ankara.

Park Termik has operating rights of Çayırhan Thermal Power Plant which has a total production capacity of 620 MW, in four units.

The plant is an integrated power generator which procures coal through its own lignite mines.

In June 2012, Park Termik paid TL5.2 mn dividends to Park Elektrik & Madencilik.

24January 2014Park Elektrik Madencilik

Page 25: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

25

IV. Ciner Group

Park Elektrik January 2014Park Elektrik Madencilik

Page 26: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 26

Ciner Group, Main Line of Businesses

Energy & Mining Group

Ciner Group

MediaGroup

Commerce, Industry &

Services Group

Major Companies & Brands

Haberturk NewspaperHaberturk TV, Radio,Haberturk Web Site

Bloomberg HT, Aks TV (Show TV)

Major CompaniesCiner Marine,Ciner Aviation,

Lares Park Hotels,Park Insurance,

Denmar Logistics,UCZ Retail Chain

Park Holding Ciner Yayın Holding

Major CompaniesPark Elektrik, Park

Termik, Silopi Elektrik, Park Teknik, Park

Toptan, Eti Soda, Rio Tur Soda, Park Cam

26January 2014Park Elektrik Madencilik

Page 27: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

27

Ciner Group

Park Holding, the main shareholder of Park Elektrik with 61% share, is solely owned by Mr. Turgay Ciner.

Ranking among the largest Groups of Turkey, Ciner Group’s history goes back to 1978 when it was founded. The Group has a diversified business portfolio. However, the Group’s main line of businesses are mining and energy in which it has a wide expertise.

Ciner Group is a pioneering actor in energy and mining sector given its new and initial steps since early 1990s. In line with accelerated privatization efforts in 1990s, the Group successfully involved in mining and energy sectors which are the underlying sectors of the Group’s fast growth in recent years.

As of year-end 2012, Park Holding has TL1.4 bn of consolidated sales and TL5 bn of total assets. Total number of employees within the Group is 6,000.

January 2014Park Elektrik Madencilik

Page 28: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

28

V. Financial Structure

January 2014Park Elektrik Madencilik

Page 29: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 29

Annual Concentrated Copper Production (wmt)

* Annual production declined due to production halt of four-month in 2010.

29January 2014Park Elektrik Madencilik

2006 2007 2008 2009 2010 * 2011 2012 2013E

13,771

52,55464,371 63,138

37,426

77,510

89,253

105,000

Page 30: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

30

Annual Con. Copper (dmt) & Cathode (ton) Sales

* In 2010, there was a production halt of four months.

** 6,613 dmt of concentrated copper were used to produce 1,210 mt copper cathode. This pushes 2011 total sales up to 61,667 dmt.

*** 14,296 dmt of concentrated copper were used to produce 2,521 mt copper cathode, that is increasing 2012 total sales volume up to 87,663 dmt.

January 2014Park Elektrik Madencilik

2006 2007 2008 2009 2010 2011 2012

9,271

47,417

60,931 59,163

32,239

55,054

73,367

1,210 2,521

Page 31: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 31

Annual Asphaltite Sales (ton)

* Asphaltite operations started in mid 2009.

31January 2014Park Elektrik Madencilik

2009 2010 2011 2012

204,856*

476,899

434,333363,848

Page 32: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

32

Total Sales Revenues (TL)

January 2014Park Elektrik Madencilik

2007 2008 2009 2010 2011 2012

80

,04

0,6

45

11

0,7

13

,83

3

69

,85

7,0

81

64

,19

1,6

60

15

1,1

35

,66

4

22

9,2

64

,82

1

8,211,605 19,314,397

19,709,514

30,816,836

copper asphaltite

Page 33: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

Park Elektrik 33

Net Earnings (TL mn)

33January 2014Park Elektrik Madencilik

2007 2008 2009 2010 2011 2012

19.8

74.8

19.4

37.2

100.9107.3

Page 34: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

34

Breakdown of COGS, as of YE12

January 2014Park Elektrik Madencilik

Direct Labor Costs 24%

Materials & Machinery Replacement

15%

Fuel & Energy12%

Depreciation34%

Others10%

Rents4%

Page 35: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

35

Annual Margin Comparison

(TL mn) 2008 2009 2010 2011 2012

Sales 111 79 84 173 265

Gross Profit 73 32 44 107 134

Gross Margin 66% 41% 52% 62% 51%

EBITDA 62 24 42 112 165

EBITDA Margin 56% 30% 50% 65% 62%

Net Earnings 75 19 37 101 107

Net Margin 68% 25% 44% 58% 40%

January 2014Park Elektrik Madencilik

Page 36: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

36

Sources of Financing (TL mn)

* Park Elektrik has no financial debt.

January 2014Park Elektrik Madencilik

2004 2005 2006 2007 2008 2009 2010 2011 2012

88 100 130 143223

302 343443 450

814

66 53

60

3033

41 53

Shareholders' Equity Total Debt

Page 37: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

37

VI. Evaluation of 9M13 Financial Results

January 2014Park Elektrik Madencilik

Page 38: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

38

Evaluation of 9M13 Financial Results

In 9M13, total copper concentrate production has been realized as 75.084 wmt, indicating 10.3% increase compared to 9M13. In 9M13, copper concentrate sales increased by 37%, y-o-y. However, taking into account 2,521 mt ton of cathode copper sales in 9M12 period which corresonds roundly 14.000 DMT of concentrate sales, volume growth deteriorates to around 9%, y-o-y.

In 9M13, asphaltite production and sales were realized as 249.142 tons along with the demand by Silopi Elektrik, indicating %10 increase.

Despite increase in volume sales, total revenues increased by only 1.2% due to decline in the average copper prices. Profit margins of the company dropped significantly due to utilizing very low grade stockpile as well as low grade ore in the early stages of the open pit in the transition period.

January 2014Park Elektrik Madencilik

Page 39: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

39

Production & Sales Amount

Production 9M12 9M13 %

Concentrated Copper (wmt) 68.060 75.084 10.3%

Cathode Copper (MT) 902* - nm.

Asphaltite (ton) 226.256 249.142 10.1%

Sales 9M12 9M13 %

Concentrated Copper (dmt) 54.225 74.261 37%

Cathode Copper (MT) 2.521** - nm

Asphaltite (ton) 226.256 249.142 10.1%

January 2014Park Elektrik Madencilik

* 5,010 dmt of concentrated copper is used for production of 902 mt cathode. ** 14,000 dmt of concentrated copper is used for production of 2,521 mt of cathode.

Page 40: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

40

Sales Breakdown (TL) & Gross Margin by Products

9M12 9M13 %

Copper Sales 175.925.695 175.484.942 -0,3%

Gross Margin of Copper 57% 34%  

Asphaltite Sales 18.707.416 25.626.498 37,0%

Gross Margin of Asphaltite 14% 13%  

Other Sales 4.650.991 684.421 -85,3%

Total Sales Revenues 199.284.102 201.795.861 1,3%

Overall Gross Margin 52% 31%  

January 2014Park Elektrik Madencilik

Page 41: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

41

Income Statement (TL)

January 2014Park Elektrik Madencilik

9M12 9M13 Chg. Sales 199.284.102 201.795.861 1%COGS -95.927.254 -139.318.972 45%Gross Profit 103.356.848 62.476.889 -40%Gross Margin 52% 31%R&D Expenses 0 -58.550 -Marketing, Sales, Distribution Exp. -9.689.055 -10.399.602 7%General Adm. Expenses -11.790.410 -14.638.268 24%Other Operating Income 30.244.254 39.194.224 30%Other Operating Expenses -9.466.270 -11.393.362 20%Operating Income 102.655.367 65.181.331 -37%Operating Margin 52% 32%Financial Income 5.140.429 6.104.747 19%Financial Expenses -117.349 -437.276 273%Profit Before Tax 107.678.447 70.848.802 -34%Tax -19.988.158 -12.960.720 -35%Net Profit 87.690.289 57.888.082 -34%Net Margin 44% 29%EBITDA 140.001.432 118.106.163 -16%EBITDA Margin 70% 59%

Page 42: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

42

Summary Balance Sheets (TL)

2012 9M13

Current Assets 296,579,212 321,597,173

Fixed Assets 206,692,571 252,187,794

TOTAL ASSETS 503,271,783 573,784,967

Short Term Liabilities 32,226,892 43,756,302

Long Term Liabilities 20,574,734 21,168,700

Shareholders Equity 450,470,157 508,859,965

TOTAL LIABILITIES 503,271,783 573,784,967

January 2014Park Elektrik Madencilik

Page 43: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

43

VII. Corporate Governance Rating

January 2014Park Elektrik Madencilik

Page 44: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

44

Corporate Governance Rating

Park Elektrik’s corporate governance rating increased to 8.98 according to a recent report conducted by SAHA Corporate Rating Agency in June 2013. Based on the report, the rating means that the company performs “very good” in terms of Capital Markets Board’s corporate governance principles. It has, to varying degrees, identified and actively managed all significant corporate governance risks through comprehensive internal controls and management systems. The company’s performance is considered to represent best practice, and it had no deficiencies in any of the areas rated.

January 2014Park Elektrik Madencilik

Board of Directors

Stakeholders

Public Disclosure & Transparency

Shareholders

82 84 86 88 90 92 94 96 98

87.06

87.93

96.65

87.86

MAIN SECTORS AVERAGE: 89.80

Page 45: Park Elektrik Üretim Madencilik Sanayi ve Ticaret A.Ş. January 2014.

45

T H A N K Y O U.

CONTACTS

Yesim Bilginturan Selim Erdogan

IR Manager IR Manager

Phone: +90 216 531 25 33 +90 216 531 25 35

[email protected]@cinergroup.com.tr

www.parkelektrik.com.tr www.cinergroup.com.tr

January 2014Park Elektrik Madencilik