Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads ›...

22
Parish Status “Our Shared Future” Presenters: Gerard Gregory – Chair Luke Reynolds – Vice Chair Presentation Date: Sunday, Dec.08-2013 Parish Council: Alice Hunt Mary Ann Sheehan Maureen Maher Patrick McCormick Bill Dobbin David Northcott Fr. Wm. Pearce

Transcript of Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads ›...

Page 1: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Parish Status “Our Shared Future”

Presenters: Gerard Gregory – Chair Luke Reynolds – Vice Chair Presentation Date: Sunday, Dec.08-2013

Parish Council: Alice Hunt Mary Ann Sheehan Maureen Maher Patrick McCormick Bill Dobbin David Northcott Fr. Wm. Pearce

Page 2: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Parish Status “Our Shared Future”

Presenter: Gerard Gregory – Chair Luke Reynolds – Vice Chair Presentation Date: Sunday, Dec. 08-2013

Agenda: 1.  Review of September meeting 2.  YTD financial as of October 31, 2013 3.  Engineering Report for Hr. Grace

Church including cost to restore 4.  Appraised value for Hr. Grace Church

Page 3: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Parish Status – “Our Shared Future”

Summary of our last meeting:

•  Reviewed the status of our parish; # parishioners, # attending mass, #

contributing envelopes and of the average contribution

•  Review of the income and expenses for the parish over the past

decade

•  Status on the properties owned by the Parish

•  Summary of where we felt we are as a Parish

•  Listed a number of initiatives in what we called “Our Shared Future”

•  Informed you that a “third party” had expressed an interest in

acquiring Hr. Grace church

Page 4: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Parish Status – “Our Shared Future”

YTD October Financial Statement 2012 2013 +/-

Revenue $134,277 $122,520 ($11,757) Sunday Collection $98,575 $100,503 $1,928 Expenses $152,316 $155,380 $3,064 Income (loss) -$18,039 - $32,860 ($14,821) Purchase of furnace ~$39,000 Donation $7,000 GIC Savings cashed $31,927 Bank Balance $17,496 $7,143

Page 5: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Parish Status – “Our Shared Future”

YTD October Financial Statement

2012 2013 +/-

Project Restoration $10,812 $8,645 ($2,167)

Page 6: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Parish Status – “Our Shared Future”

Parish assets as of October 2013:

Current act. $7,143 GIC $70,000 Buildings/Land: Hr. Grace Church Riverhead Church Spd’s Bay Church U.I. Cove Church School lands (St. Francis/Columba) $270,000 ? Ball Field – 99 yr. lease to Town Hr. Grace Convent Parish House Hart Path Riverhead Academy hall

Page 7: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Progress since our previous meeting November 9th through an attachment in the Sunday Bulletin we informed the parish of our progress:

o  We initiated, starting last weekend with having Mass on Saturday and Sunday in the one church on a rotational basis.

o  We instituted a music ministry for Sunday Mass regardless of which church is used for Mass that week.

o  We instituted a children liturgy for Sunday Mass. All with the hope of creating a greater sense of parish community.

Page 8: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Progress since our previous meeting

We as well informed you we were awaiting the

following reports: 1) A professional engineering report on the repairs and work to complete a restoration of the Hr. Grace Church.

2) A professional appraisal on the value of

the church/land.

Page 9: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Engineering Report for R.C. Church, Hr. Grace

Page 10: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Engineering Report for R.C. Church, Hr. Grace

•  Engineering report/Building Condition Report was performed by Stantec Consulting Ltd., St. John’s. Stantec are a National/International civil engineering company. Created in 1954 they provide professional consulting in planning, engineering, architecture, interior design, landscape architecture, surveying, environmental sciences, project management, and project economics.

•  Engineering report provided November 19, 2013

Page 11: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Engineering Report for R.C. Church, Hr. Grace

Scope of the report:

1)  Review of the building envelope - those elements of the

building that contribute to making the building weather

tight - the primary structural elements of the building:

foundation, walls, roof, windows, plaster, etc.

2) Ascertain the anticipated costs and scope of work to: a)  Repair damaged building elements where worthy of repair

b)  Replace building elements that are beyond repair

c)  Ensure the integrity of the building structure

Page 12: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Engineering Report for R.C. Church, Hr. Grace

Recommendations:

1.  ~50% of ext. wall requires major repair/

reconstruction

2. Total re-roofing required

3. Total replacement of wood fascia and soffit

assemblies is required

4. Total replacement of all deteriorate windows

with new

Page 13: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Engineering Report for R.C. Church, Hr. Grace

Recommendations: 5. Major repair/reconstruction required at isolated locations of stone masonry foundation 6. Structural engineer to review existing main floor structure supporting stone walls/piers throughout the crawl space 7. Interior plaster – less an 50% of plaster finish is salvageable. Appears to be mold on finished surfaces throughout the structure. Majority will need major repair/replacement.

Page 14: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Engineering Report for R.C. Church, Hr. Grace

Preliminary Cost Estimate: Stone/masonry $3,479,200 Roof replacement $566,000 Windows $1,050,000 Scaffolding $55,000 Interior plastering $1,000,000 Foundation $250,000 Sub-Total $6,400,200 +20% OH&P $7,680,240 (HST Extra) Recommend 15% contingency

Total Recommended Budget $8,832,276 (HST Extra) Note: Anticipate a 5% increase in budget for each year delay.

Page 15: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Engineering Report for R.C. Church, Hr. Grace Report Summary:

“The Immaculate Conception Church, Hr. Grace requires considerable repair and restoration work at a significant cost. The building is best served if this work can be executed quickly and completely and if the building can once again be consistently occupied so that it’s interior environment can be steadily maintained and managed.”

Page 16: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Appraisal Report for R.C. Church, Hr. Grace

Page 17: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Appraisal Report for R.C. Church, Hr. Grace

•  Appraisal was performed by Altus Group Ltd, St.

John’s. They are a National/International

company. They are the largest and most

comprehensive independent real estate advisory

practice in Canada and have been for over 40

years.

•  Appraisal report provided November 21, 2013

Page 18: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Appraisal Report for R.C. Church, Hr. Grace “As described within the report, the subject property is an older, elegant structure

built in a Gothic Revival style constructed in 1892. The building was declared a

registered heritage structure by the Heritage Foundation of NL in 1990. Although,

the structure has undergone periodic maintenance and repairs, years of differed

maintenance, harsh winds, rain and freeze thaw cycles have taken a toll on the

structure. During the fall of 2013, consulting engineers from Stantec Inc. completed

a Building Condition Report on the property. This review focused mainly on the

building envelope, which included the exterior stone, roof, windows, foundation/

structural and interior plaster. Excerpts from the report and related costs to repair

the building envelope are attached at Appendix D

Page 19: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Appraisal Report for R.C. Church, Hr. Grace

Summary: “ It is our opinion that the costs to upgrade the

current structure to a reasonable standard exceed

any value currently in the property.”

“It is our opinion that the current market value of

the subject property, as of the effective date,

September 25, 2013, is: “$0” (No Value)”

Page 20: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Summary of both reports:

•  Church requires an estimated $9MM to

repair/replace the envelope of the building

•  The appraised value of the property is “O”

zero value

Page 21: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

“Interested third party”

•  The “interested third party” still has an interest in the property •  At this time there has been no formal offer put forth to be

considered by the Parish Council or by you, the parishioners, for the purchase of the structure

•  The “interested third party” has offered to hold a meeting with parishioners for them to discuss/address questions regarding their business proposal, interest in the building and plans to restore and maintain the building

•  If there is an offer at anytime in the future we will advise you of same and seek your input on any decision

Page 22: Parish Status “Our Shared Future”immaculate-conception-parish.com › wp-content › uploads › 2013 › ... · 2013-12-10 · Parish Status – “Our Shared Future” Summary

Questions/Comments