Parcel Presentation
Transcript of Parcel Presentation
11
PARCEL MANAGEMENT SYSTEM
(PMS)
22
Project PMS Implemented at 10 stations on New Delhi- Howrah corridor
NR---New Delhi, Delhi
NCR--Kanpur, Allahabad
ECR-- Gaya, Patna, Danapur, Mughalsarai
ER-Howrah,Sealdah
33
Main FeaturesMain Features
• Direct capture of parcel weight electronically
• Universal windows for all destinations for booking
• Single window for weigh-ment and cash payment
possible
• Advance unloading guidance about inward parcel from the
system at destination
• Tracking parcel with help of barcode technology and
through SMS
• Train Master entry along with scales by Railways
Unloading of packages
Loading of packages
Booking of packages
55
BenefitsBenefits Customer
• Track latest status of the parcel through internet and SMS• Reduction in time required for weighment and bookingReduction in time required for weighment and booking
Staff• Automatic freight calculation based on latest rules• Reduction in human errors.
Railways• Loading generally according to priority thereby curtailing
malpractices and complaints• Beneficial to Accounts for internal checkBeneficial to Accounts for internal check• Reduction in ClaimsReduction in Claims• Potential for revenue generation based on improvement in Potential for revenue generation based on improvement in
service.service.
66
What does PMS involveWhat does PMS involve
Centralized servers in CRISCentralized servers in CRIS Thin Clients/printers/switches/ups at booking Thin Clients/printers/switches/ups at booking
officesoffices Thin Clients/Electronic weighment machines/ Thin Clients/Electronic weighment machines/
switches/ups in godownsswitches/ups in godowns Barcode printers at common booking windowBarcode printers at common booking window Mobile Barcode scanners at platforms and Mobile Barcode scanners at platforms and
inward godowns with GPRS connectivityinward godowns with GPRS connectivity
Modules Forwarding note Booking-Parcel, luggage, lease, FSLA Loading-Loading guidance-Loading summary Unloading-Unloading guidance, Unloading
summary Delivery MIS System Administration and Master maintenance Bug reporting Data Warehouse
99
1414
1515
Above Barcode When read by scanner reads as below\09921101003980001HWH^099 Wt of package.2110100398 PRR No0001 Item NoHWH Destination Stn
Handheld Mobile devices at Parcel offices over Handheld Mobile devices at Parcel offices over GPRS ConnectivityGPRS Connectivity
Handheld mobile devices with barcode scanner facility, Handheld mobile devices with barcode scanner facility, will will be used for transmitting the PMS Data to the PMS server at be used for transmitting the PMS Data to the PMS server at CRIS New Delhi in Realtime fashion, through GPRS network. CRIS New Delhi in Realtime fashion, through GPRS network. The GPRS network will be from service providers as utilised in The GPRS network will be from service providers as utilised in HHT Project. Centralised server architecture must be used with HHT Project. Centralised server architecture must be used with central server at CRIS New Delhi and PDA’s parcel stations. central server at CRIS New Delhi and PDA’s parcel stations.
• The hardware and software requirement including VPN The hardware and software requirement including VPN application at server and VPN clients in PDA’s will be application at server and VPN clients in PDA’s will be addressed by PMS application group. addressed by PMS application group.
• The SIM required with GPRS facility for PDA’s will be The SIM required with GPRS facility for PDA’s will be finalised from service provider by CRIS on behalf of finalised from service provider by CRIS on behalf of Railways. However respective railway shall apply for SIM Railways. However respective railway shall apply for SIM and funds will be made available by railways from revenue. and funds will be made available by railways from revenue.
1717
VLAN Internal LAN
Handheld with VPN Client on MS Windows Mobile
Firewall to access internet and to protect application and persistence from internet
GPRS network
)
Cradle, Passthro
ughRouter
+Packet Filter
Firewall to protect applications and
persistence
DMZ Zone
Prot
ocol
Fire
wall
Dom
ain F
irewa
ll
Oracle RAC
External Storage (SAN)
PMS Web Server + Application server
VPN Deployment View
VPN software in load balance
mode(Hardware and software to be
installed by System Integrator)
PMS Load Balancer
VLAN1
VLAN2
1919
2020
Tracking of parcels through online information of parcels on internet site www.parcel.indianrail.gov.in
Customer can track its parcel against PRR no. on the parcel receipt. This tracking has been integrated with NTES system for expected time of arrival at destination.
MODULES (contd.)MODULES (contd.)
2222
FSLA (Freight Service & Ledger Account )This module is for daily Registered Newspapers &
magazines to be dispatched in train by paying some security in advance and pays the dues at the end of the month. This has been enhanced with generation of barcode, tracking and delivery.
MODULES (contd.)MODULES (contd.)
2424
MODULES (contd.)MODULES (contd.)
Lease This module covers the Leasing of Parcel Space in the passengers Trains to the private party. Testing is being done to provide online facility for customer to fill loading manifest and request for leave through internet.
2626
Training Audio visual help file installed at each terminal. This helps new user to listen and see how to use the modules in software.
Bug reporting For reporting defects in software user can log it in this module, which can be viewed by software engineer at CRIS and can send the corresponding reply in that module itself
MODULES (contd.)MODULES (contd.)
2828
Online database holds the data only for 3 months Online database holds the data only for 3 months after booking. Data more than 3 months old is sent to after booking. Data more than 3 months old is sent to another database capable of holding voluminous data, another database capable of holding voluminous data, which is called data warehouse. which is called data warehouse.
A separate application has been made to access this A separate application has been made to access this archived data. A person can at any moment of time archived data. A person can at any moment of time can fetch data from data-warehouse for various MIS can fetch data from data-warehouse for various MIS reports.reports.
Data WarehouseData Warehouse
3030
0
5000
10000
15000
20000
25000
30000
DLI
NDLS CNBALD MGS
GAYA
PNBEDNR
HWH
SDAH
JUL
AUG
JUL AUG
DLI 2892 0
NDLS 9647 0
CNB 2733 2340
ALD 2943 2760
MGS 5 969
GAYA 39 48
PNBE 0 820
DNR 0 32
HWH 23832 24668
SDAH 1034 2929
3434
Implementation strategy for Roll outImplementation strategy for Roll out
Amount sanctioned by Railway Board Amount sanctioned by Railway Board Rs.115.32 CroresRs.115.32 Crores
Phase-IPhase-I• Corridors proposedCorridors proposed 44• Stations proposedStations proposed 7676• Zones to be coveredZones to be covered 1111
Phase-IIPhase-II• Corridors proposedCorridors proposed 66• Stations proposedStations proposed 144144• Zones to be coveredZones to be covered 55
3535
Stations proposed in Ist phase Rly-wiseStations proposed in Ist phase Rly-wise Central RailwayCentral Railway 99 East Coast RailwayEast Coast Railway 1010 North Central RailwayNorth Central Railway 44 Northern RailwayNorthern Railway 33 South Central RailwaySouth Central Railway 1818 South-East Central RlySouth-East Central Rly 77 South-Eastern Railway South-Eastern Railway 88 Southern RailwaySouthern Railway 11 West Central RailwayWest Central Railway 66 Western RailwayWestern Railway 1010
3636
Thank You