Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

28
Papyrus Australia Walkamin Conversion Facility Status update Nov 2009

Transcript of Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Page 1: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Papyrus Australia

Walkamin Conversion Facility Status update Nov 2009

Page 2: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Entrance to Mt Uncle Plantation, Walkamin

Page 3: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

New Lady Finger Plantation near the Papyrus facility

Page 4: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Concrete foundation / floor being poured December 2008

Page 5: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Steel work being erected January 2009

Page 6: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Internal view of new shed January 2009

Page 7: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Road front view of new facility at Walkamin January 2009

Page 8: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Gas storage area view from back of the facility January 2009

Page 9: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Veneer dryer install in progress February 2009

Page 10: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Veneer dryer installation nearing completion February 2009

Page 11: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Beta veneering Unit in Situ March 2009

Page 12: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Beta veneering Unit being commissioned March 2009

Page 13: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Oil transfer thermal heating unit being installed March 2009

Page 14: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Trunk Billetiser / conveying system installation March 2009

Page 15: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Veneer exiting the BVU into the factory during commissioning May 2009

Page 16: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Veneer being conveyed and quality checked May 2009

Page 17: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Veneer ready for drying

Page 18: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Veneer tones post drying

Page 19: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Veneered coffee table on display during the Monaco Yacht show Sept 2009

Page 20: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Veneered Unit on display during the Monaco Yacht show Sept 2009

Page 21: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Veneered TV Unit on display during the Monaco Yacht show Sept 2009

Page 22: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Jaguar Airbag panel on display during the Monaco Yacht show Sept 2009

Page 23: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Jaguar Airbag panel on display during the Monaco Yacht show Sept 2009

Page 24: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Banana fibre board product displayed during the Monaco Yacht show Sept 2009

Page 25: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Banana fibre board product displayed during the Monaco Yacht show Sept 2009

Page 26: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Banana fibre board model boat filled with accelerant and set alight until it self extinguished (the burn time was approx 20mins) – it remained afloat and intact with only internal surface charring

Page 27: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Dried veneers with its deep tones and contrasting stripe engineered through process control

Page 28: Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Thank you for your attention