Papers and documents require for a new project: 1. Update Trade License. 2. Update TIN 3. Update VAT. 4. Update Fire License. 5. Deed of land with mutation papers. 6. Mouza map of land. 7. NOC from local chairmen . ( No Objection Certificate ) 8. Combined NOC of department of forest and department of environment. (If required) 9. Factory master lay-out plan. 10. Process flow diagram. 11. Location map with details of the area. 12. List of machineries with origin. 13. List of raw materials and chemicals. 14. ETP's design, structural drawing and lay-outplan with dimension. 15. Drainage system of treated water outlet. 16. Zero discharge and 3R plan for re-cycle plant drawing for water re-use in factory. 17. Board of investment certificate. 18. Department of textiles registration for textile / washing plant / garments factory. 19. East. West, North and South side photo of the factory land. 20. On line application 21. Govt Fee chalan and 15% VAT chalan original copy. 22. IEE / EMP Format fill up. 23. Public consultation. 24. Project profile. For a new project – Red/Orange category:- ( a ) Site Clearance Certificate ( S.C.C ) ( b ) Environmental Impact Assessment ( E.I.A ) ( c ) Environmental clearance Certificate ( E.C.C)

Transcript of Papers and documents require for a new project8. Last Renew/ECC Certificate photocopy. 9. Treasury...

Page 1: Papers and documents require for a new project8. Last Renew/ECC Certificate photocopy. 9. Treasury Challan. 10.15% VAT Challan. 11.Online Application. 12.Application for ECC Renew.

Papers and documents require for a new project:

1. Update Trade License. 2. Update TIN 3. Update VAT. 4. Update Fire License. 5. Deed of land with mutation papers. 6. Mouza map of land. 7. NOC from local chairmen . ( No Objection Certificate ) 8. Combined NOC of department of forest and department of environment. (If required) 9. Factory master lay-out plan. 10. Process flow diagram. 11. Location map with details of the area. 12. List of machineries with origin. 13. List of raw materials and chemicals. 14. ETP's design, structural drawing and lay-outplan with dimension. 15. Drainage system of treated water outlet. 16. Zero discharge and 3R plan for re-cycle plant drawing for water re-use in factory.

17. Board of investment certificate.

18. Department of textiles registration for textile / washing plant / garments factory. 19. East. West, North and South side photo of the factory land. 20. On line application 21. Govt Fee chalan and 15% VAT chalan original copy. 22. IEE / EMP Format fill up.

23. Public consultation. 24. Project profile.

For a new project – Red/Orange category:-

( a ) Site Clearance Certificate ( S.C.C )

( b ) Environmental Impact Assessment ( E.I.A )

( c ) Environmental clearance Certificate ( E.C.C)

Page 2: Papers and documents require for a new project8. Last Renew/ECC Certificate photocopy. 9. Treasury Challan. 10.15% VAT Challan. 11.Online Application. 12.Application for ECC Renew.

Papers and documents require for running project:

1. Update Trade License. 2. Update TIN 3. Update VAT. 4. Update Fire License. 5. Deed of land with mutation papers. 6. Mouza map of land. 7. NOC from local chairmen . ( No Objection Certificate ) 8. Combined NOC of department of forest and department of environment. (If required) 9. Factory master lay-out plan. 10. Process flow diagram. 11. Location map with details of the area. 12. List of machineries with origin. 13. List of raw materials and chemicals. 14. ETP's design, structural drawing and lay-outplan with dimension. 15. Drainage system of treated water outlet. 16. Zero discharge and 3R plan for re-cycle plant drawing for water re-use in factory.

17. Board of investment certificate.

18. Department of textiles registration for textile / washing plant / garments factory. 19. East. West, North and South side photo of the factory land. 20. On line application 21. Govt Fee chalan and 15% VAT chalan original copy. 22. IEE / EMP Format fill up.

23. Public consultation. 24. Project profile.

For a new project – Red/Orange category:-

( a ) Environmental Management Plan (EMP)

( c ) Environmental clearance Certificate ( E.C.C)

Page 3: Papers and documents require for a new project8. Last Renew/ECC Certificate photocopy. 9. Treasury Challan. 10.15% VAT Challan. 11.Online Application. 12.Application for ECC Renew.

Papers required for ECC Renew:

1. Updated Trade License. 2. Updated TIN. 3. VAT. 4. Updated Fire License. 5. Updated Boiler License. 6. Updated Test Report (Water/Air/Sound). 7. Last lab test application (with due balance). 8. Last Renew/ECC Certificate photocopy. 9. Treasury Challan. 10. 15% VAT Challan. 11. Online Application. 12. Application for ECC Renew. 13. Under Taking for no operation of ETP for beginning to update.

All papers must be needed 2 copy.

Page 4: Papers and documents require for a new project8. Last Renew/ECC Certificate photocopy. 9. Treasury Challan. 10.15% VAT Challan. 11.Online Application. 12.Application for ECC Renew.

Papers and Documents Require for a Captive Power: 1. Trade License. 2. TIN / VAT. 3. Mouza map of land. 4. NOC from local chairmen. (No Objection Certificate) 5. Factory master lay-out plan. 6. Location map with details of the area. 7. Board of investment certificate. 8. East. West, North and South side photo of the factory land. 9. Form-3. 10. General Information. 11. EMP Format. 12. Earthling Layout. 13. Generator Manual. 14. Flow diagram. 15. Bangladesh Energy Regulatory Commission license copy. 14. Fire License. 15. Generator Picture.

16. Energy Regulatory Certificate.

Page 5: Papers and documents require for a new project8. Last Renew/ECC Certificate photocopy. 9. Treasury Challan. 10.15% VAT Challan. 11.Online Application. 12.Application for ECC Renew.

Papers and documents require for a new project:

1. Trade License. 2. TIN / VAT. 3. Deed of land with mutation papers. 4. Mouza map of land. 5. NOC from local chairmen. (No Objection Certificate) 6. Location map with details of the area. 7. List of machineries with origin. 8. List of raw materials and chemicals. 9. List of Doctors, Nurse and staff. 10. ETP's design, structural drawing and lay-out plan with dimension. 11. Drainage system of treated water outlet. 12. Water Re-cycle plant drawing for water re-use in Hospital. 13. Board of Investment certificate. 14. Department of DG health certificate. 15. East. West, North and South side photo of the factory land. 16. Hospital building design, drawing and bearing load certificate. 17. Project profile. 18. Project proponent details with picture. 19. DG health certificate. 20. West management system agreement copy. 21. Number of cars: , Total area: , Total bed: , OT room: ,

Dialysis: , 22. Contact parson number and mail:

Thanking you Yours Faithfully

Engr.Md.Golam Kibria Chief Executive 01552 360199

Page 6: Papers and documents require for a new project8. Last Renew/ECC Certificate photocopy. 9. Treasury Challan. 10.15% VAT Challan. 11.Online Application. 12.Application for ECC Renew.

Filename: Papers requiremants Directory: C:\Users\DOLPHIN\Desktop\Needfull docoments Template:

C:\Users\DOLPHIN\AppData\Roaming\Microsoft\Templates\Normal.dotm

Title: Subject: Author: getts Keywords: Comments: Creation Date: 3/6/2019 3:45:00 AM Change Number: 76 Last Saved On: 12/12/2019 2:09:00 PM Last Saved By: Windows User Total Editing Time: 132 Minutes Last Printed On: 12/12/2019 2:26:00 PM As of Last Complete Printing Number of Pages: 5 Number of Words: 656 (approx.) Number of Characters: 3,740 (approx.)