    ESTABLISHMENT OF NEPRA

    In order to reform the Pakistan power sector a strategic plan forrestructuring, reforming and privatization of WAPDA was developed by

    .

    Council of Common Interests (CCI) in 1993.The strategic plan recommended corporatisation and privatization of

    n o separa e enera on an s r u on ompan es.

    The Prime Minister directed the implementation of the strategic plan for

    WAPDA as approved by the CCI through P.Ms directive dated 24-10-1998. The directive of the P.M included the following.

    ,sector, which meets the requirements of the consumers in thecheapest and the most efficient manner. Ensure that the

    vision.

  • 8/13/2019 Pakistan Regulation Overview

    4/32

    ESTABLISHMENT OF NEPRA

    The strategic Plan included the creation of an Independent

    regulatory Authority to provide a level playing field to all the stake

    holders and to assure prospective investors that an independent

    agency would be objectively deciding on regulatory matters of power

    NEPRA was established by the Government of Pakistan in January.

    NEPRA was formally notified through promulgation of the

    Regulation of generation, Transmission and Distribution of ElectricPower, as Act No. XL of 1997 on 13th December 1997.

  • 8/13/2019 Pakistan Regulation Overview

    5/32

    Constitution of the Authority

    The Authority comprises of a Chairman,appointed by the Federal Government, and fourmem ers a so appo n e y e e eraGovernment on the recommendations of the

    .

    The Chairman and the members are appointed

    similar term provided that a member other than

    already attained the age of sixty five years.(Section 3 of the NEPRA Act)

    5

  • 8/13/2019 Pakistan Regulation Overview

    6/32

    Organogram of NEPRA

    Chairman

    Member

    Standards

    Member

    Licensing

    Member

    Tariff

    Member

    Privatization

    Tariff Consumer

    cens ngWing & ITWing

    Affairs, Coord& Legal

    an ar sWing r va zaTion/Wing m n s ration & HReg s rar

    6

  • 8/13/2019 Pakistan Regulation Overview

    7/32

    Powers and functions of NEPRA under the Act

    a) Grant licenses to Generation, Transmission or Distribution

    services.

    , , .

    c) Prescribe and enforce performance and investment standards.

    .

    e) Ensure continuous, efficient and affordable supply of electric

    7

  • 8/13/2019 Pakistan Regulation Overview

    8/32

    Act/Rules/Procedures

    (Framed by NEPRA)

    ,Power Act (XL of 1997). Enacted by Parliament in December 1997.

    Tariff Standards and Procedure Rules, 1998.

    , ,

    Licensing (Distribution) Rules, 1999. Licensing (Generation) Rules, 2000.

    Fees and Fines Rules, 2002.

    Consumer Eligibility Criteria (Regulations), 2003.

    Resolution of Dis utes between IPPs & other Licensees 2003

    Performance Standards Distribution Rules 2005

    Performance Standards Transmission Rules 2005

    2005

    Grid Code, Distribution code 2005

    8

    onsumer erv ce anua

  • 8/13/2019 Pakistan Regulation Overview

    9/32

    Players in the Power Sector

    ,Privatization

    Commission

    Companies

    Regulator,

    Chambers of

    Commerce &

    Industry.

    Public Bodies,

    Representatives,

    9

    IFIs-

    Area residents

  • 8/13/2019 Pakistan Regulation Overview

    10/32

    Present Status

    a) Formation of Rules, Regulations, Procedures

    b) Grant Licenses

    c) Tariff-----MYT( KESC, FESCO), IPPs , GENCOs,Wind.

    p ront tar .----- or erma n s

    e) Standards ---- Monitoring of Standards. -

    g) Tribunals

    .

    SAFIR, SARI, USAID, World Bank, USEA,

    PURC, NARUC, Of em, TERI/CERC,

    10

    South Africa, China

  • 8/13/2019 Pakistan Regulation Overview

    11/32

    PAKISTAN Power System

    MARDANWARSAK

    TARBELA(240)

    (3408)GAZI BAROTHA

    BANNU

    DAUDKHEL

    NEW RAWAT

    I.S.P.R

    MANGLA

    GAKHAR

    SAHOWALA

    SABA

    (1000)CHEP(184)

    CHASNUPPGATTI

    BURHAN

    (132)

    . .

    RAVI

    JAPAN

    KEL

    N.ABAD

    YOUSAF WALA

    VEHARI

    KAPCO

    ROUSCH

    AES

    (132)

    (131)

    (355)

    (1348)

    (695)(140)

    BUND RD:

    HCPC

    SIBIQUETTA

    LAHORE

    K.LAKHPAT

    K.ADDU S:ROAD

    MULTAN

    SEPCOL (117)

    FKPC 157UCH

    N.G.P.S

    M.GARH

    GUDDU

    LIBERTY

    500 kV Grid Station

    500/220 kV Grid Station

    (195)(1350)(548)

    (1655)

    (229)

    GUDDU

    DADU

    HALA RD:

    LAKHRA

    KOTRI

    HUBCO

    220 kV Grid Station

    Hydel Power Station

    Thermal Power Station

    IPPs

    Power Station 500 kV

    (150)

    (850)

    (174)(1200)

    TAPALG.AHMAD

    11

    KDA-33(KESC)

    Power Station 220 kV

    Power Station 132 kV

    500 kV T/LINE

    220 kV T/LINE

  • 8/13/2019 Pakistan Regulation Overview

    12/32

    Overall Country System Installed Capacity and Units generatedOverall Country System Installed Capacity and Units generated

    (FY(FY 20052005--06)06)

    (KESC) Thermal

    1756 (KESC)

    (KESC)

    Thermal

    9066

    11%

    Installed apacity 19450 MW enera on

    (Wapda) Hydro

    Electric 6499

    34%

    Available from IPPs

    & Nuclear462

    2%

    9% Available from IPPs

    & Nuclear

    1876

    2%

    (Wapda)

    Hydro Electric30862

    34%

    (WAPDA) Availabe

    from IPPs &

    Nuclear

    5833

    30%

    (Wapda)

    Available from IPPs

    & Nuclear

    31090

    (Wapda) Thermal

    4900

    25%

    (Wapda)

    Thermal

    22508

    26%

    27%

    12

  • 8/13/2019 Pakistan Regulation Overview

    13/32

    HYDEL THERMAL MIX

    OilHydel

    6499 MW

    (34%)

    (34%)

    Nuclear

    Total 19450 MW

    452 MW(2%)

    Coal

    150 MWGas

    13

    (1%)5815 MW

    (30%)

  • 8/13/2019 Pakistan Regulation Overview

    14/32

    W PD s RESTRUCTURING

    N T D CT D C 1 )

    WAPDA HYDEL

    DISCOs

    POWER WING

    GENCOs( 9 )( 4 )

    TRANSMISSIONGENERATION DISTRIBUTION

    14

    Thermal Power

    Stations

    Grid Station/Trans. Lines

    Operation & MaintenanceDistribution Companies

  • 8/13/2019 Pakistan Regulation Overview

    15/32

    Generation Business in Pakistan

    a) Ex WAPDA GENCOS--- 4 Nos All Licensed

    b) WAPDA Hydel ----- 1 Comprehensive License

    ----.

    d) IPPs Pursuant to 2002 P.P----- 5 Nos all Licensed (COD not yet)e) KESC generation ------ Licensed

    ---------- os a cense

    g) Distributed generation---------- 7 Nos all Licensed

    h) Wind Energy --------------------4Nos (3 Licensed)

    15

  • 8/13/2019 Pakistan Regulation Overview

    16/32

    Transmission Business in Pakistan

    a) NTDC-------

    a) KESCTransmission-----

    Process

    16

  • 8/13/2019 Pakistan Regulation Overview

    17/32

    a) DISCOs-------- 8 Nos all Licensed with Individual tariffs.

    s r u on us ness n a s an

    a) PPP

    b) Distribution Margin

    c) Average Sale Rate

    b) KESC----------KESC Distribution License

    a) PPP--- KESC own Generation, NTDC, IPPs

    b) Distribution Margin

    c verage a e ate

    d) Consumer End Tariff

    c) SPPs-----------34 Nos Out of this only 9 Nos qualify for the grant of a distribution license.

    a Licence ranted.

    b) Consumer End Tariffs notified

    17

  • 8/13/2019 Pakistan Regulation Overview

    18/32

    Distribution Business in Pakistana BPC operat ve at t e t me o D stt L ce------

    All Such cases being identified and notices

    bein issued. 1st hearin of its kind held in

    May 2007 for grant of distribution License toBahria Town Housing Colony (an Inset H/S

    .

    a) Separate distribution License Prepared

    b) Will have a separate tariffc e requ re to meet a tan ar s

    Codes

    b) Policy on the Eligibility Criteria for such

    INSET entities being developed.a) This will include the Principle of

    18

    applications.

  • 8/13/2019 Pakistan Regulation Overview

    19/32

  • 8/13/2019 Pakistan Regulation Overview

    20/32

    Post Privatized DISCOs/KESC

    WAPDA Carporatized into EIGHT Discos (Distribution Companies) One Disco (FESCO) offered for privatization

    Individual Tariffs for each Disco notified in 2007 after three years of delay

    Can now plan their own development plans and sign loan agreements. Have the power to sing bi-lateral with any GENCO for meeting its excess capacity

    KESC

    Privatized in 2005 (taken over by the new management) KESC Distribution se arate licensed

    Has its own Consumer end tariff

    The total tariff including Generation plus Transmission and Distribution is a MultiYear Tariff for a control period of Seven Years.

    Control Period 7 years

    As per the mechanism KESC DISCO break even after three years with losses downfrom 40% to 25%

    20

    Privatized KESC will invest around US$ 500M in KESC Distribution only

    Any un notified amount above Consumer end tariff will be paid by the Govt assubsidy

  • 8/13/2019 Pakistan Regulation Overview

    21/32

    Consumer Class Wise Rates Cents/kWh (Previous )Consumer Class Wise Rates Cents/kWh (Previous )

    1-100 Units Residential

    Up to 50 Units (Residential)KESC

    Above 1000 Units (Residential)

    301-1000 Units (Residential)

    101-300 Units (Residential)

    WAPDA

    Bulk

    Industrial

    Commercial

    -

    Average Sale Rate

    KESC &WAPDA

    KESC 7 7 8 11 9 13 13 10 6 4 2

    Average

    Sale Rate

    KESC

    &WAPDA

    Agricultral

    Tubew ellsBulk Industrial Commercial

    Above 1000

    Units

    (Residential)

    301-1000

    Units

    (Residential)

    101-300

    Units

    (Residential)

    1-100 Units

    (Residential)

    Up to 50

    Units

    (Residential)

    21

    WAPDA 7 7 7 10 9 12 12 10 6 4 2

  • 8/13/2019 Pakistan Regulation Overview

    22/32

    ELECTRICITY TARIFF COMPARISON

    16

    12

    10

    Residential

    6Industrial

    2

    4

    0 Indones ia FRANCE INDIA Pak is tan Turk ey United States U.K

  • 8/13/2019 Pakistan Regulation Overview

    23/32

    LOSSES DISCOs/KESC

    Total Consumers Served 17.5MillionLosses

    2005

    Losses 2000--%S No

    10.49.5IESCO2

    10.210.5LESCO4

    1112.7GEPCO3

    2034MEPCO6

    12.813.7FESCO5

    15.322QESCO8

    39.539HESCO7

    23

    3436KESC9

  • 8/13/2019 Pakistan Regulation Overview

    24/32

    Year Wise Progress

    (TARIFF)

    07----041998

    TotalOthersDeterm nat on(WAPDA/KESC/GENCOS/NTDC/DISCO s)

    Year

    030102200004----041999

    0701062002

    13----132001

    3303292004

    0801092003

    0501252006

    2419626170Total

  • 8/13/2019 Pakistan Regulation Overview

    25/32

    Year Wise Progress

    TOTALWAPD

    A

    HYDEL

    IPPs/

    Wind

    CHAS

    NUPP/

    kannu

    GENCOs

    & KESC

    NTDCDISCOsSPP

    s

    Year

    --------------------------------2000

    17------------040107052002

    --------------------

    180104----------------132004

    ----------------

    07072006-------------

    25

    442007

    7901300205010931Total

  • 8/13/2019 Pakistan Regulation Overview

    26/32

    Safeguarding interests of Consumers

    Unrestricted self Generation & Bilateral Contracts.

    Affordable tariff for all categories.

    Life line consumers

    Redressal of Complaints:i) Utility services obligation

    iii) Consumer Affair Division at NEPRA attended/rectified over

    1800 Nos complaints since inception.iv) Court of Law

    Representation through Consumer/human rights

    Education/Information throu h media/website.

    26

  • 8/13/2019 Pakistan Regulation Overview

    27/32

    Complaints Handling

    Complaints redressed through NEPRA ConsumerComplaints AddressedComplaintsYear

    Affairs Division under Complaint Redressal

    mechanism/ POI

    through Provincial

    Offices of

    Inspection/DISCOs

    Recieved

    65- Attock Cement Vs KESC1722372003

    361511872002

    116- Iftekhar Ahmed Vs IESCO, PWD H/s

    Vs IESCO, D.s Textile Mills Vs LESCO c

    2383542004

    217- PACE Lahore, Civilian Coop H/s85110982005

    193- Tayyab textile mills Vs FESCO, HDIP3555482006

    ,

    KESC Vs NTDC

    95-2413572007

    27

    Inspection and are functioning pursuant to Sec 38 of the NEPRA Act

    C ti P tt (2005 06)

  • 8/13/2019 Pakistan Regulation Overview

    28/32

    Consumption Pattern (2005-06)Units billed 67603 GWh Losses 24.9%

    Total Number of Consumers including KESC-17.24 M

    % of% ofTotalKESC NosEx-WAPDACatagory

    45.4%83%14.09M1.3512.74Domestic

    Consumptio

    n

    ConsumerMillionNos Million

    7%15%2.82M.402.42Commercial

    29.3%1.5%0.23M0.020.21Industrial

    17.3%.5%0.005M0.0010.004Bulk&

    others

    28

    100%17.24M1.82M15.42MTotal

  • 8/13/2019 Pakistan Regulation Overview

    29/32

    Projected ShortagesElectricity Growth rate assumed to be 9%

    Surplus/deficitPeak

    demand

    Installed

    Capacity

    Year

    30001400019226/160002005

    8001520019226/160002006

    (2100)1950019500+2009

    2960000+2030

  • 8/13/2019 Pakistan Regulation Overview

    30/32

    Pricing Mechanism

    a) Generation---- New IPPs--- Cost Plus return on Equity, Tariff Comprises of CPP&EPP with Provision of adjustments for

    currency fluctuations and inflation.

    x st ng s governe un er . . ot eterm ne y .

    b) Transmission--- Cost plus debt service plus Return on Equity.( Only transmission chargefor transporting Electricity) Cost CPP Plus EPP PLUS T. Char e transferred to Discos assed on the

    prescribed formula.

    Charging of CPP-------- on the basis of Max demand recorded by a DSICO

    during the montharg ng o --------- as per pr ce per un e vere o e as e ra e

    c) Discos Tariff --- Distribution Margin----cost plus return on assets (weighted average cost

    of capital ).

    Consumer end tariff is determined on the basis of CPP,EPP charged to a DISCO plus

    distribution margin with the provision of Cross subsidization within the variousconsumer classes.

    30

  • 8/13/2019 Pakistan Regulation Overview

    31/32

    Future Potential on indigenous resources

    Expected PotentialFuel/techNo

    y e

    20000MWCoal2

    enewa e

    700MWMini/Micro h del5

    uc ear

    31