Páginas de Curriculum inglés-12
-
Upload
estructuras-corellanas -
Category
Documents
-
view
218 -
download
2
description
Transcript of Páginas de Curriculum inglés-12
![Page 1: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/1.jpg)
RELIEF ROADS
Relief roads reduce traffic trough urban areas. It is a linear work, and are located at different points along various types of strcutures that provide solutions to the cross-roads, intersections, cross rivers, etc.
ESTRUCTURAS CORELLANAS serves running all these, each one in different typologies:
- Consolidation of land. Running “in situ” bearing-walls, walls of reinforced-earth, and other connected activities.
- Foundations of the various structures that are developed throughout the work.
- Underpasses, wild life crossings and fabric works.
- Overpasses. We make the total of such steps from the foundations and pile caps to the full implementation of the slab. througtheabutments and piles.
- Viaducts. Being able to construct as easy as very complex types of them.
- Cover tunnels and tunnels. Whe have specialist teams in lining-tunnels and associated-tasks.
- Drain an gutters.
- Urbanization works at cross-roads, roundabouts and finishes.
131
RELIEF ROADSRelief Roads
![Page 2: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/2.jpg)
11. RELIEF ROADS
Andoain Relief Road UTE BURUNTZA (Murias - Otaduy)
Sádaba-Uncastillo Relief Road MARIANO LÓPEZ NAVARRO
Urnieta Relief Road CONSTRUCCIONES AMENABAR
Igorre Relief Road UTE VARIANTE DE IGORRE (Sacyr - Construcciones Amenabar)
Casalarreina (La Rioja) Relief Road SACYR
Lardero Relief Road. Albelda Stretch ROVER ALCISA
Monzón Relief Road UTE VARIANTE DE MONZÓN (JOCA - FCC)
La Alegría Relief Road VIAS Y CONSTRUCCIONES
Barbastro Relief Road SACYR
Metropolitan Relief Road Phase I under structure construction. Ca-dagua junction Stretch UTE ENLACE CADAGUA (Sacyr - Exbasa)
132
![Page 3: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/3.jpg)
RELIEF ROADS
San Adrián-La Cava pedestrian overpass FERROVIAL AGROMAN
Espinal ditch in the PK-41+500 EMISA, S.A.
Alfajeria Access Road ESTRUCTURAS ARAGÓN
Miranda de Ebro underpass construction ROVER ALCISA
CP-3 Road Tauste-Luceni improvement MARIANO LÓPEZ NAVARRO
National Road I-Álava improvement UTE ARMIÑON (Acciona - Sols) (Para Ulma)
Completion of the third ring Road in Saragossa UTE IDECONSA-SACYR
A G44/2 P.G.O.U. development. Saragossa UTE IDECONSA-SACYR
Delicias station environment UTE IDECONSA-SACYR
Alcañiz N-232 Vinaroz-Santander Relief Road UTE CONSTRUCCIONES BEGAR-CEINSA (Para Ulma)
Valtierra-Arguedas Relief Road in the NA134 Road Eje del Ebro UTE HNV - IRUÑA CONSTRUCCIÓN
Irurita Elizondo (Navarre) Relief Road UTE HNV-OBENASA
133
![Page 4: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/4.jpg)
134
RELIEF ROADSRelief Roads
SAN ADRIAN-LA CAVA PEDESTRIAN OVERPASS-2006
![Page 5: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/5.jpg)
135
RELIEF ROADSRelief Roads
SAN ADRIAN-LA CAVA PEDESTRIAN OVERPASS-2006
![Page 6: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/6.jpg)
136
BARBASTRO RELIEF ROAD-2008
RELIEF ROADSRelief Roads
![Page 7: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/7.jpg)
137
RELIEF ROADSRelief Roads
ALCAÑIZ RELIEF ROAD-2008
![Page 8: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/8.jpg)
METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH138
RELIEF ROADSRelief Roads
ALCAÑIZ RELIEF ROAD-2008
![Page 9: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/9.jpg)
139
RELIEF ROADSRelief Roads
METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH
![Page 10: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/10.jpg)
140
RELIEF ROADSRelief Roads
METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH
![Page 11: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/11.jpg)
141
RELIEF ROADSRelief Roads
METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH
![Page 12: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/12.jpg)
142
RELIEF ROADSRelief Roads
METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH
![Page 13: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/13.jpg)
143
RELIEF ROADSRelief Roads
METROPOLITAN RELIEF ROAD. CADAGUA JUNCTION STRETCH
![Page 14: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/14.jpg)
144
IGORRE RELIEF ROAD-2008
RELIEF ROADSRelief Roads
![Page 15: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/15.jpg)
145
URNIETA RELIEF ROAD -2008
RELIEF ROADSRelief Roads
![Page 16: Páginas de Curriculum inglés-12](https://reader035.fdocuments.us/reader035/viewer/2022070505/568c51ef1a28ab4916b4aff4/html5/thumbnails/16.jpg)
146
RELIEF ROADSRelief Roads
URNIETA RELIEF ROAD -2008