Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

12
PROJECT NAME : PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106, OFFSHORE VIETNAM DOCUMENT TITLE : DATASHEET FOR POTABLE & SERVICE WATER PUMP P-5105 DOCUMENT NO. : TBDP-A-M-DS-0002 CONTRACT NO. : PCV/TBDP- A/2011/702 CTR NO. : D-ME-300 REV CODE ISSUE DATE DOC STATUS CONTRACTOR COMPANY ACCEPTANCE AUTHOR CHECKER APPROVER NAME NAME NAME NAME DATE A 27-01-14 IFR VT Long M Ross Andrew Hoang 0 03-03-14 AFC VT Long M Ross Andrew Hoang Document Class: B - Confidential (Should only be shared with staff or contractors who have a need-to-know)

Transcript of Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Page 1: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

PROJECT NAME : PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106, OFFSHORE VIETNAM

DOCUMENT TITLE : DATASHEET FOR POTABLE & SERVICE WATER PUMP P-5105

DOCUMENT NO. : TBDP-A-M-DS-0002

CONTRACT NO. : PCV/TBDP- A/2011/702

CTR NO. : D-ME-300

REV CODE ISSUE DATE DOC STATUS

CONTRACTOR COMPANY ACCEPTANCE AUTHOR CHECKER APPROVER

NAME NAME NAME NAME DATE

A 27-01-14 IFR VT Long M Ross Andrew Hoang

0 03-03-14 AFC VT Long M Ross Andrew Hoang

Document Class: B - Confidential (Should only be shared with staff or contractors who have a need-to-know)

Page 2: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.: 11-TBDP-A-B-1204-1/1

Project: Page No. : 1 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One1 Applicable To: Proposal Purchase As Built2 Number Required One (1x100%) Pump Size VTA Type Horizontal Centrifugal No. Stages VTA3 Desgin Code API 610 and PTS 31.29.02.30 (Dec. 2010)4 Manufacturer VTA Model VTA Serial No. VTA

56 No.7 Pump 18 Motor 29 Gear 3

10 Turbine 411 Applicable overlay standard(s): N/A12 Notes: Information below to be completed: By Purchaser By Manufacturer By Manufacturer Or Purchaser131415 Flow, Normal (m3/h) Rated (m3/h) Liquid Type Or Name Potable Water16 Other Hazardous Flammable Corrosive17 Suction Pressure Max./Rated (KPaa)18 Discharge Pressure required at discharge flange (KPaa) Pumping Temp (°C)19 Differential Pressure (KPaa) Vapour Press. (KPaa)20 Diff. Head at rated flow (m.liq) NPSHA at rated flow (m.liq) Relative Density (SG)21 Process Variations N/A Viscosity (cP)22 Starting Conditions N/A Specific Heat, Cp (kJ/kg·C)23 Service: Continuous (Note 3) Intermittent Chloride Concentration N/A (mg/kg)24 Parallel Operation Req'd H2S Concentration N/A (mol fraction) Wet 25 Starting method Local Manual Corrosive / Erosive agent N/A2627 Location: Casing Throttle Bushing28 Indoor Heated Outdoor Unheated Impeller Throat Bushing29 Electrical Area Classification Cover Bearing Housing30 Zone 2 Group Class Shaft Bearing Housing Adapter

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106, OFFSHORE

VIETNAM

12.632.0

SS 316SS 316

VTASS 316

SS 316SS 316

IIA T3

N/A

4501.56

0.999

3.0

318

(Min.)

AttachedAttached Item No. Item No.DATA SHEETS

MATERIALS

PUMPED LIQUIDOPERATING CONDITIONS

SITE DATA

Date By

(Nor.) (Max.)

PUMP DATASHEET

Item No. AttachedP-5105 (Note 4)

PM-5105

366.5

1.0161.007

VTA

0.70422.135

VTA

13214

0.8904 1.166

253.11

31 Winterization Req'd Tropicalization Req'd. Shaft Sleeve Bearing Housing End Seals32 Site Data Baseplate Coupling Guard Non-Sparking, VTA33 Altitude m above mean sea level Barometer (Bara) Casing Gasket Mechanical Seal Gland

Casing Fasteners VTA Mechanical Seal Gland Fasteners34 Impeller Gasket Others

35 Range Of Ambient Temps: Min./Max. / 36 (°C)36 Relative Humidity Min./Average/Max. (%) Proposal Curve No. VTA Pump speed r/min37 Unusual conditions: Dust Fumes Impeller Dia. Rated VTA Max. VTA Min. VTA (mm)38 Other Offshore Marine Salt Laden Environment Impeller Type VTA39 Rated Power VTA (kW) Efficiency at rated capacity VTA (%)40 Power absorbed at 120% BEP VTA (kW)41 Minimum Continuous Flow:42 Thermal VTA (m3/h) Stable VTA (m3/h)43 Induction Motor Steam Turbine Gear Preferred Oper. Region VTA To VTA (m3/h)44 Other Allowable Oper. Region VTA To VTA (m3/h)45 Max. Head @ Rated Impeller (m)46 Max. Power @ Rated Impeller (kW)47 Manufacturer VTA NPSHR At Rated Flow (m H20,max)48 VTA (kW) VTA (r/min) NPSHR from rated capacity to 120% rated capacity (m H20 max)49 Frame Enclosure IP 56 Max. Suction Specific Speed/Actual50 Horizontal Vertical Service Factor Max. Sound Press. Level Acceptable (dBA) 51 Volts/Phase/Hertz 400 / 3 / 50 Est. Max. Sound Press. Level (dBA) 52 Type Est. Max. Sound Power Level (dBA)

53 Minimum Starting Voltage 54 Insulation Class F Temp. Rise Class B Electricity55 Full Load Amps VTA Drivers56 Locked Rotor Amps Heating57 Starting Method Direct On Line System Voltage Dip 80% Other58 Lube Steam59 Bearings (Type/Number): Drivers60 Radial VTA / VTA Heating61 Thrust VTA / VTA Cooling water: Source N/A62 Vertical Thrust Capacity Supply Temp. N/A (°C) Max. Return Temp. (oC)63 Up (N) Down (N) Norm. Press. N/A (MPag) Design Press. (Mpag)64 Min. Ret. Press. N/A (MPag) Max. Allow. D.P. (Mpa)65 Chloride Concentration: N/A

VTAVTA

VTA

SS 316SS 316

19.5

65 / 85 / 94

DRIVER TYPE

1.013VTASS

PERFORMANCE

UTILITY CONDITIONS

N/AN/A

11,000 US Unit / VTA85 @1m from pump surface

N/AN/A

MOTOR DRIVER (Refer to pages 8-11 of 11)

400

1.0

N/A

N/A N/A

Hertz

N/A3

N/A50

Min. Temp.

Phase

SS 316

ISSUE DATE

03-03-1427-01-14 IFR

DOC. STATUS

AFC

Max. Press. Max. Temp. Min. Press.

Voltage

N/A N/AN/A

VT Long

N/A

Andrew Hoang

N/A

REV

14

A VT Long0

COMPANY ACCEPTANCE ACCEPTANCE DATEAUTHOR

M RossM Ross

CHECKER APPROVERAndrew Hoang

ISSUE DATE DOC. STATUSREVCONTRACTOR

COMPANY ACCEPTANCE ACCEPTANCE DATE

Page 3: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.: 11-TBDP-A-B-1204-1/1

Project: Page No. : 2 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One123 Rotation: (viewed From Coupling End) CW CCW Manufacturer's Standard (Note 11) Other (see below)4 Pump Type: Specification No. PTS 30.48.00.315 OH2 OH3 OH6 Other Pump:6 Casing Mounting: Primer7 Centerline In-line Other Finish coat8 Casing Split: Axial Radial Base Plate:9 Casing Type: Primer

10 Single Volute Multiple Volute Diffuser Finish Coat11 Case Pressure Rating: Details Of Lifting Devices12 OH6 Pump Suction Region Designed For MAWP Shipment: 13 Max. Allowable Working Pressure (MAWP) (kPag) Domestic Export Export Boxing Required14 @ (°C) Outdoor Storage: 6 Months15 Hydrotest Pressure 1.5 x MAWP (kPag)16 Nozzle Connections: Horizontal Storage Vertical Storage17 Type Of Shipping Preparation18 Suction19 Discharge Heating Jacket Req'd. 20 Cooling Req'd.21 Pressure Casing Aux. Connections: (Note 5,16) Cooling Water (c.w.) Piping Plan22 No. C.W. Piping:23 Drain Pipe Tubing Fittings24 Vent C w Piping Materials:

150#

VTAVTA VTA

150# RF

TypeVTA

Size (DN)

HEATING AND COOLING (N/A)

SURFACE PREPARATION AND PAINTINGCONSTRUCTION

VTA

Flange PositionRF End

PUMP DATASHEET

VTA

SizeVTA

TopVTA

VTA

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106, OFFSHORE

VIETNAM

ASME Class

VTA24 Vent C.w. Piping Materials:25 Warm-up S. Steel C. Steel Galvanized26 Cooling Water Requirements:27 Machined And Studded Connections Bearing Housing (m3/h)28 Cylindrical Threads Required Heat Exchanger (m3/h)29 Rotor: Total Cooling Water (m3/h)30 Component Balance To ISO 1940 G1.0 Heat Medium: Steam Other31 Couplings: Heating Piping: Tubing Pipe32 Manufacturer Model33 Rating (kW per 100 r/min) Bearing (type/Number)34 Spacer Length (mm) Service factor Radial VTA / VTA35 Coupling Balanced To ISO 1940-1 G6.3 Thrust VTA / VTA36 Coupling With Proprietary Clamping Device Lubrication 37 Coupling Per ISO 14691 Grease Oil38 Coupling Per ISO 10441 Purge Oil Mist Pure Oil Mist39 Coupling Per API 671 ASME B15.1 Constant Level Oiler Preference40 Non-spark Coupling Guard Oil Viscosity ISO Grade41 Coupling Guard Standard Per42 Baseplates: Accelerometer43 API Baseplate Number Provision For Mounting Only44 Non-grout Construction Flat Surface Req'd 45 Anchor bolts supplied by VENDOR Temp. Gauges (with Thermowells) 46 Anti-vibration Equipment Pressure Gauge Type47 Other: • No vent holes. Remarks:

48 • With features to prevent liquid accumulation. 49 • VTA Pump VTA (Kg)50 Baseplate VTA (Kg)51 Driver VTA (Kg)52 Total VTA (Kg)

VTA VTA

1.5

VT LongVT Long

VTA

MASSES

INSTRUMENTATION

VTA

VTA BEARINGS AND LUBRICATION

Andrew Hoang

CHECKERM Ross

APPROVERAndrew Hoang

COMPANY ACCPETANCE

AFC0 03-03-14

ACEPTANCE DATEREV DOC STATUS AUTHORCONTRACTORISSUE DATE

A 27-01-14 IFR

N/A N/A N/A

M Ross

VTA

Page 4: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.: 11-TBDP-A-B-1204-1/1

Project: Page No. : 3 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One123 Supplied By Pump Manufacturer Purchaser Barrier Flush Plan4 Mounted By Pump Manufacturer Purchaser Barrier Flush Liquid5 Seal Classification Code VTA Temperature Min. / Max. / °C6 Manufacturer Specific Gravity7 Model Specific Heat kJ/kg °C8 Manufacturer Code Vapor Pressure (kPa abs) @ °C9 Seal Type Cartridge Component Pressure Required Min. / Max. / kPa

10 Seal Design Single Dual Dry gas MAWP of Secondary Seal System kPa11 Pressurised Unpressurised Temperature Required Min. / Max. / °C12 Seal Chamber Taper Bore Cylindrical Bore Secondary Seal Flush Piping Tubing Pipe13 Seal Chamber Size Oversized Standard Material 316SS Carbon Steel14 Sleeve Material SS 316 Other15 Pumping Ring Required Piping / Tubing Size mm16 Throat Bushing Required Materials SS 316 Piping Assembly17 Remarks Threaded Unions Flanged18 Tube Type FittingSocket Welded19 Remarks202122 Taps Required Quench Flush Drain Primary Seal Gauge Switches23 Other Flow24 Throttle Bushing Materials SS 316 Temperature

PUMP DATASHEETMECHANICAL SEAL (Note 10) BARRIER / BUFFER FLUSH SYSTEM (N/A)

SEAL SYSTEM INSTRUMENTATION (N/A)

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106, OFFSHORE

VIETNAM

SEAL GLAND

g p2526 Pressure27 Primary Flushing Plan No. Plan 11 Secondary Seal28 External Flush Liquid Flow29 Supply Temperature Min/Max / °C Pressure30 Specific Gravity Level31 Specific Heat kJ/kg °C Remarks32 Vapor Pressure (kPa abs) @ °C33 Flow Rate Required Min/Max m3/h34 Pressure Required Min/Max kPa35 Temperature Required Min/Max °C36 Primary Seal Flush Piping37 Tubing Pipe Other38 Material 316SS Carbon Steel39 Other40 Piping / Tubing Size mm41 Piping Assembly42 Threaded Unions Flanged43 Tube Type Fittings Socket Welded44 Remarks454647484950515253

0 03-03-14 AFC VT Long Andrew Hoang

DOC STATUSAUTHOR

Andrew HoangIFR VT Long M RossM Ross

REV ISSUE DATE

A

COMPANY ACCPETANCE

27-01-14

NOTES

ACEPTANCE DATECONTRACTOR

SEAL FLUSHING

CHECKER APPROVER

Page 5: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.: 11-TBDP-A-B-1204-1/1

Project: Page No. : 4 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One123 Commissioning and Start-up Test Non-witness Witness Observe4 Installation and Pre-commissioning (by Purchaser)5 Price List Of 2 Years Normal Operation Spares (Note 24) (Note 25, 26)6 Hydrostatic 7 Coordination Meeting Required Performance8 Maximum Discharge Pressure To Include Retest On Seal Leakage9 Max Relative Density NPSHR (Note 7)

10 Max Dia. Impellers And/or No. Of Stages True Peak Velocity Data11 Operation To Trip Speed Complete Unit Test (Note 8)12 OH3 Bearing HS6 Lifter Sound Level Test13 Connection Design Approval Cleanliness Prior To14 Torsional and Lateral Analysis Required Final Assembly15 Torsional and Lateral Analysis Report Nozzle Load Test 16 Progress Reports Check For Co-planar17 Outline Of Procedures For Optional Tests Mounting Pad Surfaces 18 Additional Data Requiring 10 Years Retention Mechanical Run Until Oil19 Temp. Stable 20 Manifold Piping To Single Connection 4 h Mechanical Run After21 Vent Drain Cooling Water Oil Temp. Stable22 Mount Seal Reservoir Off Baseplate 8 h Mech. Run Test23 Flanges Req'd In Place Of Socket Weld Unions True Peak Velocity Data24 Installation List In Proposal BRG HSG Resonance Test25 Connection Bolting Auxiliary Equipment Test26 PTFE Coating ASTM A 153 Galvanized Disassembly after Test

OTHER PURCHASER REQUIREMENTS

SPARE PARTS

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106, OFFSHORE

VIETNAM

QA INSPECTION AND TESTING (CONT.)

PIPING AND APPURTENANCES (NOTE 5, 9, 16)

PUMP DATASHEET

26 PTFE Coating ASTM A 153 Galvanized Disassembly after Test27 Painted SS Vibration Test28 Final/Site Acceptance Testing29 Shop Inspection Impact Testing30 Performance Curve Approval Per EN 1344531 Test With Substitute Seal Per ASME Sec VIII Div. 132 Material Certification Required Vendor Keeps Repair And HT Records 33 Casing Impeller Shaft Vendor Submit Test Procedures 34 Other Vendor Submit Test Data Within 24h35 Casting Repair Procedure Approval Req'd Include Plotted Vibration Spectra36 Inspection Required For Connection Welds Submit Completed Inspection Check List 37 Mag. Particle Liquid Penetrant Record Final Assembly Running Clearance38 Radiographic Ultrasonic39 Inspection Required For Castings40 Mag. Particle Liquid Penetrant41 Radiographic Ultrasonic42 Hardness Test Required:43 Additional Subsurface Examination 44 For45 Method4647484950515253545556

REVAUTHOR

IFR VT Long

ACEPTANCE DATE

M Ross Andrew HoangM Ross

COMPANY ACCPETANCEAPPROVER

A0

27-01-14Andrew Hoang

NOTES

QA, INSPECTION AND TESTING (NOTE 22)

DOC STATUSISSUE DATECHECKER

VT Long03-03-14 AFC

REV ACEPTANCE DATECOMPANY ACCPETANCEDOC STATUSISSUE DATECONTRACTOR

Page 6: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.: 11-TBDP-A-B-1204-1/1

Project: Page No. : 5 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One12 1.3 2. This data sheet shall be read and conformed conjunction with "Specification for Centrifugal Pumps", Doc. No.: TBDP-A-M-SP-00084 3. Pump and motor are intended for intermittent operation but shall be designed for continuous operation.5 4. Pump shall comply with API 610 & PTS 31.29.02.30-Centrifugal pumps (amendment/supplements to ISO 13709-Dec.2010)6 5. Pump shall be self venting type.7 6. VENDOR to provide NPSH calculation with the bid proposal.8 7. VENDOR shall ensure a design margin difference of 1m between NPSHA and NPSHR throughout the range from minimum continuous flow9 up to rated flow. NPSHR test shall be performed in the following cases:

10 + If the difference between NPSHA and NPSHR is less than 1 m throughout the range from minimum continuous flow up to rated flow..11 + For pumps with a suction specific speed above 11,000 US Unit.12 + If the NPSHA at 120% of rated flow exceeds the NPSHR by less than 0.3m .13 8. Complete unit test shall be carried out together with the pump motor.14 9. Design and external protection requirement for bolting shall be as per PTS 39.01.10.12 (Dec 2010) Table 11.15 10. VENDOR shall provide seal manufacturer's recommendation for the seal type/flush plan suitable for the specified service/duty.16 VENDOR shall furnish completely filled seal datasheet as per API 682, with bid proposal.17 11. Surface preparation and painting shall be as per Manufacturer's offshore standard (to be submitted with bid proposal for PURCHASER's review, 18 and approval), however colour scheme shall be as per PTS 30.48.00.31 (Sep 2012) & Supplementary to PTS 30.48.00.31-P (Oct. 2001, Rev.1)19 12. Flange facing shall be smooth finish with a roughness between 125-250 micro inch.20 13 Motor shall comply with Specification for LV Motors, Doc. No.: TBDP-A-E-SP-0105 21 14. Rated power (BkW) considered as the basis for sizing of motor and shall include positive tolerance (i.e margin 25%) over rated BkW 22 for driver sizing.23 15. Motor rating selected shall be suitable for open discharge valve start -up of pump.24 16. VENDOR shall provide the drain connection complete with isolation valve and blind flange.25 17. Motor shall be rated at 400V, 3 Phase, 50 Hz, to be connected with 400V AC, 3 ph, 50Hz system and shall be suitable for continuous operation.

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106,

OFFSHORE VIETNAM

PUMP DATASHEET VTA= VENDOR to advice and confirm, N/A = Not Applicable

25 17. Motor shall be rated at 400V, 3 Phase, 50 Hz, to be connected with 400V AC, 3 ph, 50Hz system and shall be suitable for continuous operation.26 18. Cable gland connection size for electrical and instrumentation for pump package to off-limit electrical and instrument interfaces shall be M20.27 VENDOR to confirm if different.28 19. Y type permanent strainer screen shall to be supplied by PURCHASER at pump suction line. VENDOR to advise if diffirent mesh is required and 29 advise the maximum allowable particle size to enter pump.30 20. Name plates shall be SS 316L and come with bracket (if any).31 21. VENDOR shall provide special tools required for erection, installation, removal, operation and maintenance.32 22. Material shall be furnished in accordance with BS EN ISO 10474 and the type indicated in PTS 31.29.02.30 Table I-1.33 Inspection and testing requirements shall be in accordance with PTS 31.29.02.30.34 23. Pump base plate shall be provided with two (2) earthing boss with grounding lugs, as per PTS standard drawing S68.004-H.35 24. VENDOR cannot carry out the specified activity inspection, and/or test without PURCHASER’s review and approval and/or attendance/witnessing.36 VENDOR must notify PURCHASER by fax of the specified activities at least 14 working days in advance. The VENDOR cannot deviate from this rule37 unless written approval has been given by COMPANY.38 25. VENDOR must notify the PURCHASER of the specified activity at least 14 working days in advance. PURCHASER’s witnessing is mandatory.39 If PURCHASER do not elect to be present, written approval will be given by PURCHASER to VENDOR. VENDOR may proceed with his own40 inspection/testing, provided controls and test records are made available to PURCHASER for review and shall be in the presence and witnessing of TPI41 Agency, if also specified.42 26. VENDOR shall submit to PURCHASER for comments the documents required prior to the performance of the specified activity, transmit or make43 available for the review of PURCHASER the results of the controls and tests conducted, as applicable. 4445464748495051525354

A

REVCONTRACTOR

27-01-14 IFR VT Long M Ross Andrew Hoang

ISSUE DATE DOC STATUSAUTHOR CHECKER APPROVER

Andrew HoangVT Long M Ross0 03-03-14 AFC

COMPANY ACCEPTANCEACEPPTANCE DATE

Page 7: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.: 11-TBDP-A-B-1204-1/1

Project: Page No. : 6 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One12 1. GENERAL3 This requisition cover the noise limits of equipment, given below. For definitions, method of measuring etc, reference is made to EEMUA 4 specification no. 140 : Noise procedure specification.5 2. NOISE LIMITS TO BE MET BY THE EQUIPMENT6 The noise generated by the equipment shall not exceed the more stringent of the noise limits given in the table below for any of the conditions 7 of operation for which the equipment may normally be expected to be used.8 Lp is the maximum (A-weighted) sound pressure level, dB re 20 uPa at any location at 1 m from the equipment surface.9 Lw is the maximum (A-weighted) sound power level. dB re 1 pW.

10 If the equipment generates noise with tonal or impulsive components the limits shall be taken 5 dB(A) more stringent.11 Noise levels will be verified according to the following standards: ISO 3740 series, ISO 11200 series or ISO 9614.12 3. INFORMATION TO BE SUBMITTED WITH THE TENDER13 This noise data sheet shall be returned with the tender and with guaranteed noise data filled in.14 Vendor shall state which silencing measures were taken to meet the noise requirements.15 Where applicable the completed silencer and / or acoustic enclosure data requisition sheet shall also be returned. (See PTS 31.10.00.96)1617 Equipment18 Items / Locations192021 Lp22 Lw23 Lp24 Lw25 Lp

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106,

OFFSHORE VIETNAM

b Noiselimit

Noise levels guaranteed by supplier in dB(A)(upper tolerance + 0 dB)

NOISE LIMITATION DATASHEET

Remarks

Total500Silencing measures

1Hz kHz kHz kHz kHz

Potable & Service Water Pump P-5105

Hz Hz Hz63 125 250

a

85

4 82dB(A)

1

26 Lw27 Lp28 Lw29 Lp30 Lw31 Lp32 Lw33 Lp34 Lw35 Lp36 Lw37 Lp38 Lw39 Lp40 Lw4142 The Purchaser shall indicate:43 - In column "b", the noise limit44 - In column "a", using the appropriate number, which of the following applies to the required noise levels:45 1) without acoustic provisions46 2) with acoustic provisions47 3) special low-noise design48 4) Vendor best estimate, not necessarily guaranteed49 5) Surge control valve noise levels at full recycle flow50 6) ……………………………………………………………………………………………………………………..5152535455

APPROVERA0 03-03-14

27-01-14 IFR VT Long M RossAUTHOR CHECKER

AFC VT Long M RossAndrew HoangAndrew Hoang

APPROVERREV ISSUE DATE DOC STATUS

AUTHOR CHECKERACEEPTANCE DATECOMPANY ACCEPTANCE

CONTRACTOR

Page 8: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.:11-TBDP-A-B-1204-1/1

Project: Page No. : 7 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One1234 Heaviest component to be handled during maintenance:- Tender est. *5 Design est. *6 Design update *7 Description * mass * kg As supplied *89 NOTES:

10 * VENDOR to complete for proposal .11 1) One sheet shall be completed for each separately installed skid or item.12 2) As supplied equipment shall be weighted by vendor and witnessed by Purchaser or nominee.13 3) Vendor shall provide current calibration certificate of weighing equipment. Calibration methods shall be to BS 1610.14 4) Vendor shall submit design update for significant changes in mass.1516 Dry * kg Operating * kg Test * kg171819 Other Description * * kg20 temporary21 masses222324 Certified final mass Date Name Company

MASS/CENTRE OF MASS DATASHEET

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106,

OFFSHORE VIETNAM

INFORMATION STATUS(Tick as necessary)

MASS DATA (KG)

25 Purchaser inspector26 Vendor272829 NOTES:30 1/ Equipment orientation on each skid or item to be indicated.31 2/ C of M Coordinates to be clearly shown on G.A. drawings.323334353637 OVERALL SIZES38 DIMENSION 'L' *39 DIMENSION 'W' *40 DIMENSION 'H' *41424344454647 CENTRE OF MASS48 Dimension Dry Operating49 'X' * *50 'Y' * *51 'Z' * *5253

A 27-01-14 IFR VT Long

COMPANY ACCEPTANCEACCEPTANCE DATECONTRACTOR

REV ISSUE DATE DOC STATUSAUTHOR CHECKER APPROVER

0 03-03-14 AFC VT Long M Ross Andrew HoangM Ross Andrew Hoang

DIMENSIONAL DATA (mm)

'W

'Y'

C of M

'L'

'X'

Plan

C of M

Elevation

'H'

'Z'

'W

'Y'

'L'

'X'

Plan

Elevation

'H'

'Z'

Page 9: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.: 11-TBDP-A-B-1204-1/1

Project: Page No. : 8 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One12 1.0 STANDARDS (Note 4) 6.0 CONSTRUCTION3 NEMA UL 6748 IEEE ANSI Enclosure Drip-proof Ex'd' Ex'e' X Ex'n'A4 BS X IEC X TEFC WP2 WP1 X IP 565 X OTHERS PTS 33.66.05.31 (Feb.2010)6 * Shaft X Horizontal Vertical Hollow7 2.0 CERTIFYING SCHEME W/Coupling W/Gear Train X Solid8 X IECEx UL FM9 Motor Type X Squirrel Cage Wound Rotor

10 3.0 AREA CLASSIFICATION Others11 NEC Class Div. Group12 X IEC Zone Group Temp Class T3 Fan X Anti Static X Non-ferrous13 SAFE Bi-directional X Uni-directional1415 4 ENVIRONMENTAL CONDITION Finish Factory Standard For Offshore16 X Offshore Onshore X Salt-laden X Others MID GREEN COLOR 17 Indoor X Outdoor X Tropical18 Frame Material X Cast Iron Aluminium Alloy19 Design Amb. Temp. 36 °C Max .Temp °C Min. Temp °C 20 Relative Humidity % Max Terminal Boxes X Rotatable In 90 Deg. Increments21 Altitude: Below 10m MSL X IP 5622 X Above 10m MSL X Ex'e'2324 5.0 RATING & PERFORMANCE 7.0 ACCESSORIES25 Supply Voltage Volts Phase Hz X Nameplate (316 Stainless Steel)26 Motor Rating VTA HP 1.1 (VTA) kW RPM Space Heater ( Power Supply V Ph Hz )27 System Short Circuit Rating kA Separate Space Heater Terminal Box (if any)28 Stator Thermistor (PTC Type) Qty Per Phase

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106, OFFSHORE

VIETNAM

94

400 3

2 IIA

36 14

501450(VTA)

LOW VOLTAGE MOTOR DATASHEET

501230

28 Stator Thermistor (PTC Type) Qty Per Phase29 Insulation Class: Thermistor Relay Volt PH30 B X F H Others Rtd Selector Switch-indicator And Alarm Contact31 Operating Temp Class/Rise: Bearing RTDs (type PT100 Ohm) Qty Per Bearing32 X B F H Others Stator RTDs (type PT 100 Ohm) Qty Per Phase33 Separate RTDs Terminal Box34 Duty Cycle X Continuous Intermittent Differential CTs35 Surge Protection36 Duty Type S1 (to IEC 60034-1) Vibration Detector37 X Terminal Block38 Starting Method Full Voltage (normal) X 10 M Tail At Discharge Head39 Reduced Volt.40 X 80 % Of Full Voltage Capability41 Others Remote Control Unit (RCU)42 Required Off/On Switch43 Max Starting Current: 7 x Full Load Current (to PTS: 33.66.05.31) Not Required Start Push-Button44 Stop Push-Button45 Method Of Cooling: IC 4A1A1 / IC 5A1A1 (to IEC 60034-6)4647 Performance To: IEC 60034484950 Main Power Cable CU/XLPE/SWB/PVC 3C x 2.5mm2 +E M205152 Space Heater N/A N/A N/A5354 Rtds/thermistor55

NOTES:1) Space Heaters Are Required For Motors Rated 3.7 Kw And Larger.2) * VENDOR To advise.3) Motor shall also comply with requirements as per Specs for LV motor Doc. No.

Gland SizeCable Type Cable Size

0 03-03-14 AFC VT Long M Ross Andrew HoangA 27-01-14 IFR VT Long M Ross Andrew Hoang

REV ISSUE DATE DOC STATUSAUTHOR CHECKER APPROVER

COMPANY ACCEPTANCE ACCEPTANCE DATECONTRACTOR

Page 10: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.: 11-TBDP-A-B-1204-1/1

Project: Page No. : 9 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One12 8.0 TESTING & INSPECTION3 8.1 TEST TO THE FOLLOWING CODES & STANDARDS4 X IEC/BS ANSI/NEMA/UL5 8.2 ROUTINE TESTS6 X Manufacturer's Type Tests ( See Notes)7 X No-load Losses, Current And Speed Measurement8 X High Potential Test9 Witness By PCOSB

10 Third Party Inspection11 X Testing Authority Certificates For Type Tests12 X Witnessing Not Required13 8.3 BASIC TEST14 X Winding Resistance Measurement (cold & Hot)15 X Locked Rotor Current/torque16 X Winding Temperature Rise17 X Bearing Temperature Rise18 Slip, Power Factor/efficiency Test19 X Vibration Measurement20 X Noise Measurement21 Witness By PCOSB22 Third Party Inspection23 Testing Authority Certificates24 Witnessing Not Required25 8.4 PERFORMANCE/SPECIAL TESTS26 Momentary Overload (Current/Torque)27 Overspeed

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106,

OFFSHORE VIETNAM

LOW VOLTAGE MOTOR DATASHEET

27 Overspeed28 Speed Vs Torque/Current/P.F29 Witness By PCOSB30 Third Party Inspection31 Testing Authority Certificates32 Witnessing Not Required33 NOTES:34 Type Tests Should Include Most Or All Of The Following;35 1 Winding Resistance Cold36 2 Full Load Heat Run37 3 Winding Resistance Hot38 4 Calculated Winding Temperature Rise39 5 Calculated Winding Temperature at 20oC40 6 Bearing Temperature Rise41 7 Slip At No, 1/2, 3/4 And Full Load42 8 Efficiency At 1/2, 3/4 And Full Load43 9 Motor Current Unbalance At Full Load44 10 Locked Rotor Current45 11 Locked Rotor Torque46 12 No Load Current47 13 No Load Losses48 14 Vibration At No Load And Full Load49 15 Noise At No Load And Full Load50 16 Insulation Resistance51 17 Torque-speed Curve52 18 Noise Level Test

NOTES:4) Motor Brand Shall Be ABB, LOHER, BROOK HANSEN or PCOSB Approved Equivalent.5) All Motors Shall Be Of Low Noise Type.7) The Space Heaters Shall Be Automatically Switched On When Motor Is Tripped Or Stopped.8) Rain Canopy Shall Be Provided For Motors With Vertical Shaft.

COMPANY ACCEPTANCE ACCEPTANCE DATE

VT Long M Ross

REV ISSUE DATE DOC STATUSAUTHOR CHECKER APPROVER

Andrew HoangIFR VT LongAndrew Hoang

REMARKS

M RossAFC0 03-03-14

A 27-01-14

COMPANY ACCEPTANCECONTRACTOR

ACCEPTANCE DATEREV ISSUE DATE DOC STATUS

Page 11: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.: 11-TBDP-A-B-1204-1/1

Project: Page No. : 10 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One123 Manufacturer4 Nameplate Rating kW5 Speed RPM6 Poles7 Frame Size8 Model No.9 Nominal Current A

10 Locked Rotor Current A11 Starting Inrush Current A12 Power Factor13 Full Load Torque14 Starting Torque15 Max Torque16 Acceleration Time Equip And Motor Sec17 Max Stall Time Sec18 Motor Inertia N-M2

19 No Of Consecutive Starts Hot Cold20 Total No Start Per Hour Hot Cold21 Rotation Facing Coupling End (CW/CCW)22 Bearing Type23 Lubrication24 Total Shaft End Float mm25 Method Of Cooling ( IC Code )26 Mounting Arrangement ( Im Code )

DATA TO BE FURNISHED BY VENDOR

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106,

OFFSHORE VIETNAM

LOW VOLTAGE MOTOR DATASHEET

g g ( )27 RTD Relay Setting : Bearing28 Stator29 Field Test Data Min Megger Reading OHMS30 Max Potential AC DC31 Enclosure Protection (IP/NEMA)32 Space Heater Rating W33 Rotor Weight kg34 Stator Weight kg35 Motor Net Weight kg36 Dimension (LX W X H) : (L) X (W) X (H) mm373839 Current(AMPS)40 Efficiency41 Power Factor42 Torque(Nm)43 Slip (%)44 Min Permissible Starting Voltage V45 Safe Locked Rotor Time: (HOT) Sec. (COLD) Sec46 Multi-speed Motor Type47 No Of Windings4849 OTHER SPECIAL FEATURES:5051 NOTE:52 The Above Information May Be Provided By The Manufacturer by Way of this Standard Data Sheets53 Provided All Relevant Information Is Provided.54

REMARKS

A03-03-14 VT Long0 AFC27 01 14 IFR VT L M R A d H

M Ross Andrew Hoang

Full LoadStart 1/2 Load 3/4 Load

REV ISSUE DATE DOC STATUSAUTHOR CHECKER APPROVER

A

COMPANY ACCEPTANCE ACCEPTANCE DATECONTRACTOR

27-01-14 IFR VT Long M Ross Andrew Hoang

Page 12: Pages from TBDP-A-M-SP-0008_Rev 0 SPEC FOR CENTRIFUGAL PUMP.pdf

Client Name: PETRONAS Carigali Overseas Sdn Bhd (PCOSB)Datasheet No.: TBDP-A-M-DS-0002Revision No. : 0Specification No: TBDP-A-M-SP-0008 P&ID No.:11-TBDP-A-B-1204-1/1

Project: Page No. : 11 of 11Equipment Name: Potable & Service Water PumpEquipment Tag. No.: P-5105

Location: Thai Binh Drilling Wellhead Platform, i.e. TBDP-A, Offshore Vietnam Number Required: One12 9 SPECIFIC REQUIREMENT3 GENERAL4 - When motors are furnished with the driven equipment as a package, the torque characteristics and speed shall be the responsibility of the driven equipment 5 VENDOR. Motor design shall be based on IEC.6 - The cable entry size for terminal boxes shall be suitable for PURCHASER's cable termination. The cable entry size shall be approved by PURCHASER.7 - Motors and all individual items forming part of motors shall have an expected service life of 20 years. This includes heaters, wirings, terminals etc. but with8 the exception of the rolling element bearings.9 - Motor screens or louvres shall be corrosion resistant.

10 - Motors shall be provided with lifting eyes or other types of facilities to lift the motors.1112 WINDINGS13 - Stator windings shall be made of high quality enamelled copper wire with class F insulation which shall be resistant to high humidity, saline atmosphere, 14 chemical fumes, oil and grease.15 - The windings especially the end windings shall be adequately braced to prevent movement and cracking of the insulation at the slot exists during all 16 conditions of service.17 - The connections inside the motor shall not be mechanically overstressed during starting.18 - Winding insulation shall be based on full vacuum pressure impregnation (VPI) method.1920 BEARINGS21 - Bearings shall have a rated L10 lifetime in excess of 40,000 hours under the worst case operating conditions. The lifetime shall be calculated in accordance22 with ISO R 281-1. When the motor shaft is subjected to external forces a relaxation to 32,000 hours lifetime is permitted.23 - Motors with rated output upto 22 kW may be equipped with pre-lubricated non-rechargeable bearings. The rated L10 lifetime of these bearings shall be in 24 excess of 16,000 hours.2526 TERMINAL BOXES AND MOTOR TERMINALS

PROVISION OF DETAILED DESIGN SERVICES FOR THAI BINH DEVELOPMENT PROJECT, BLOCKS 102 & 106, OFFSHORE

VIETNAM

LOW VOLTAGE MOTOR DATASHEET

26 TERMINAL BOXES AND MOTOR TERMINALS27 - The main terminal box shall permit easy mounting and removal of the cable without breaking or stressing the cable.28 - Terminals and cable termination boxes shall provide sufficient space for segregating the cores and maintaining the minimum insulation clearances and 29 creepage distances.30 - Cable terminals, terminal leads, and associated fittings for motors controlled by conventional circuit breakers shall be able to withstand a maximum through 31 fault level.32 - The main cable terminals inside the cable box shall have the following characteristics :33 a) be non-loosening to prevent slackening of connection due to vibration.34 b) guaranteed sufficient contact pressure without damaging the cable conductor.35 c) guaranteed good contact, independent of temperature changes and other conditions mentioned in the specification.36 - An earthing clamp or bolt of adequate dimensions shall be provided inside the terminal box for connection of the cable earthing.37 - An earth stud terminal with nuts and washers and diameter not less than that of a line terminal shall be provided on the exterior of the motor frame for the 38 connection of an earthing cable.39 VENDOR DATA REQUIREMENTS40 The VENDOR shall supply as a minimum the following data for the purpose of evaluation, approval and records by PURCHASER :-41 - a) All physical drawings showing all dimensions, location of terminals boxes and size, connection diagrams, methods of terminations, couplings, keyways etc.42 b) A complete set of installation, operating and maintenance data.43 c) A list of recommended spares (separately priced).44 MOTOR NAMEPLATE45 Each motor shall be equipped with a stainless steel nameplate permanently attached to the motor. Information shall be impressed onto the nameplate and 46 shall include the following :-47 a) Manufacturer's name i) Locked rotor current48 b) Motor serial number j) Full load speed49 c) Bearing manufacturer's name and part numbers k) Enclosure (Index of Protection e.g. IP56)50 d) Kilowatt rating l) Type of explosion protection (e.g. Ex'n' IIA T3)51 e) Voltage m) Frame number52 f) Frequency n) Insulation class and temperature rise.53 g) Phase o) Space heater wattage and voltage (if applicable)54 h) Full load current

5556

03-03-14 AFC M Ross

REV ISSUE DATE DOC STATUSAUTHOR CHECKER APPROVER

M Ross Andrew HoangVT LongACCEPTANCE DATECOMPANY ACCEPTANCE

0A 27-01-14 IFR

Andrew HoangVT Long

REV ISSUE DATE DOC STATUSCONTRACTOR