Power ManagementTechnical Working Group
Structure and Goals
ARIES Project Meeting
14-15 June 2007
M. S. Tillack and A. R. Raffray
![Page 2: Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting 14-15 June 2007 M. S. Tillack and A. R. Raffray.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697c01d1a28abf838cd087e/html5/thumbnails/2.jpg)
page 2 of 9
The TWG’s play a key role in the ARIES Pathway Study
Tokamak line of R&D
ITER
Experimental power reactor
ARIES-AT
Non-nuclear tokamaks
Nucleartokamaks
Other R&D and facilities
R&D needs and priorities
Design requirement
s
TWG
Decision to commercialize fusion
ARIES Study Outcomes:1. Guidelines for fusion development2. Sensitivity study results3. R&D planning document4. Preconceptual design requirements5. Preconceptual design report
TWG’s:Power managementTritium managementPlant operations3 4
5
External advisory
committee
Parametric trade
studies 1 2
ARIES-AT Demo
![Page 3: Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting 14-15 June 2007 M. S. Tillack and A. R. Raffray.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697c01d1a28abf838cd087e/html5/thumbnails/3.jpg)
page 3 of 9
Our goal is to translate advisory committee recommendations into
design requirements and an R&D plan
Customer Needs
Mission
Present Database
Requirements
Reactor Conceptual
Design
Issues & R&D Needs
R&D Implementation
The “ARIES Process”
![Page 4: Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting 14-15 June 2007 M. S. Tillack and A. R. Raffray.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697c01d1a28abf838cd087e/html5/thumbnails/4.jpg)
page 4 of 9
The Power Management TWG
has been populated Mark Tillack (R&D plan leader)
René Raffray (design requirements leader)
Don Steiner
Said Abdel Khalik
Siegfried Malang
Plasma expert tbd
![Page 5: Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting 14-15 June 2007 M. S. Tillack and A. R. Raffray.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697c01d1a28abf838cd087e/html5/thumbnails/5.jpg)
page 5 of 9
Mission Statement
Demonstrate fusion energy production and utilization, including: power and particle handling extraction of power core high-grade heat power conversion nuclear performance of in-vessel and ancillary equipment
![Page 6: Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting 14-15 June 2007 M. S. Tillack and A. R. Raffray.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697c01d1a28abf838cd087e/html5/thumbnails/6.jpg)
page 6 of 9
1-frad,div
Pn
PDivertor
First wall, PFC’s
Prad,chamb
Pdiv
Pcond
Prad,div
frad
1-frad frad,div
Blanket Cooling
Plasma
Pinjected
In-vesselcomponents
Powerconversion
Systems approach to power management
Pfusion
Creating fusion energy… … for the production of electricity
![Page 7: Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting 14-15 June 2007 M. S. Tillack and A. R. Raffray.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697c01d1a28abf838cd087e/html5/thumbnails/7.jpg)
page 7 of 9
R&D Needs and Priorities Subgroup
– Approach and Tasks –
Document the current status of R&D In the US
Worldwide
Characterize the R&D gaps To a power plant
To a CTF/Experimental power reactor
Develop R&D plans and options
![Page 8: Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting 14-15 June 2007 M. S. Tillack and A. R. Raffray.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697c01d1a28abf838cd087e/html5/thumbnails/8.jpg)
page 8 of 9
Technical Design Requirements Subgroup
– Approach and Tasks –
Establish scaling metrics and goals
Define device characteristics
Define device parameters
Define operating scenarios and test program
Exploration of parameter space
Demonstration of controllability
Etc.
![Page 9: Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting 14-15 June 2007 M. S. Tillack and A. R. Raffray.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697c01d1a28abf838cd087e/html5/thumbnails/9.jpg)
page 9 of 9
TWG Schedule
Jun 2007 Sep 2007 Dec 2007 Mar 2008 Jun 2008 Sep 2008
TWG planning
Documentation
Conceptualdesign process
Conceptual design activity
UAC mtgs
Final reports
R&D planning
Definition of requirements
Formulation of requirements
R&D existing status and needs
R&D plans/options