Initial Submission
Plan Resubmitted
ISBE Monitoring Completed
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 1 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
District Information
1. Contact Information
2. Mid-course Correction - During the course of annual review for e-Rate this plan was found to be in need of mid-course correction on:
3. Annual Review – The plan was reviewed and evaluated on:
District Improvement Team
District Name: Champaign CUSD 4 District Address: 703 S New St
City/State/Zip: Champaign, IL 61820 5818 RCDT Number: 090100040260000
Superintendent: Dr. Judy Wiegand Superintendent Email: [email protected]
District Phone: 2173513800 District Fax: 2173513871
District Technology Planning (DTP) Only
DTP Contact Name*: Roger Grinnip DTP Contact Email*: [email protected]
DTP Contact Phone*: 2173513801 DTP Contact Fax:
Name Association Phone Email
Elizabeth duGruy District Staff 2173513800 [email protected]
Judy Wiegand Superintendent 2173513800 [email protected]
Maria Alanis District Staff 2173513800 [email protected]
Orlando Thomas District Staff 2173513800 [email protected]
Roger Grinnip District Staff 2173513801 [email protected]
Trevor Nadrozny District Staff 2173513800 [email protected]
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 2 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Data & Analysis - Report Card Analysis
Summary - What do the District Report Card data tell you about student performance in your district? If appropriate, the district will consider grade-level and
subgroup performance.
Analysis - What areas of strength are indicated? What areas of weakness, if any, are indicated by these data? What factors are likely to have contributed to these
results? Consider both external and internal factors to the school that can be influenced or improved by the district.
Conclusions - What do these factors imply for next steps in continuous improvement planning? Address these improvement priorities in Assess Indicators (Step 2),
Create Plan (Step 3) and Monitor Plan (Step 4).
Current achievement in reading and mathematics for all students is below the 92.5% minimum standard required in 2012. Student sub-group achievement percentiles for Black,
Hispanic, Students with Disabilities, and Economically Disadvantaged students did not meet the necessary standard.
Students’ thinking processes to focus on important ideas and to juxtapose contrasting examples for different solution strategies need to be strengthened. Students need to be
able to share their work and critically respond to each other’s work and thinking. Students need to be able to manipulate, support, explain and test their conjectures. Lack of a
consistent model/practice to encourage collaboration and the lack of available technology to help support formative assessment practices have contributed to these results.
Technology must be more consciously targeted and integrated into the classroom to support best instructional practice and promote collaborative learning.
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 3 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
District Data — Local Assessments
Summary - What do the Local Assessment data tell you about student performance in your district?. If appropriate, the district will consider grade-level and subgroup
performance.
Analysis - What areas of strength are indicated? What areas of weakness, if any, are indicated by these data? What factors are likely to have contributed to these
results? Consider both external and internal factors to the school that can be influenced or improved by the district.
Conclusions - What do these factors imply for next steps in continuous improvement planning? Address these improvement priorities in Assess Indicators (Step 2),
Create Plan (Step 3) and Monitor Plan (Step 4).
District local assessment data in mathematics and reading reflect the District’s State Report Card data, including the student subgroup information previously indicated.
An analysis of the District’s local assessment data reflects similar learning concerns as identified in the District’s State Report Card in the areas of mathematics and reading.
Technology must be more consciously targeted and integrated into the classroom to support best instructional practice and promote collaborative learning.
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 4 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
District Information
Number Item
9516Number of K-12 self-contained regular classroom students. This includes any student that is counted for purposes of Average Daily Attendance(ADA). It also
refers to students that the district is responsible for in the Student Information System (SIS).
1321 Number of K-12 special education self-contained classroom students
0 Number of Teachers (FTE - this does not include teacher aides)
0 Number of Administrators
17 Number of instructional school buildings with high speed internet access
1 Number of instructional school buildings with low speed internet access
0 Number of instructional school buildings with no internet access
18 SubTotal
6 Number of non-instructional school buildings with high speed internet access
0 Number of non-instructional school buildings with low speed internet access
0 Number of non-instructional school buildings with no internet access
6 SubTotal
18 Total number of instructional school buildings
6 Total number of non-instructional buildings
94 Percentage of instructional school buildings with high speed internet access
5 Percentage of instructional school buildings with low speed internet access
0 Percentage of instructional school buildings with no internet access
100 Percentage of non-instructional school buildings with high speed internet access
0 Percentage of non-instructional school buildings with low speed internet access
0 Percentage of non-instructional school buildings with no internet access
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 5 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
District Information
Number Item
9516Number of K-12 self-contained regular classroom students. This includes any student that is counted for purposes of Average Daily Attendance(ADA). It also
refers to students that the district is responsible for in the Student Information System (SIS).
1321 Number of K-12 special education self-contained classroom students
0 Number of Teachers (FTE - this does not include teacher aides)
0 Number of Administrators
17 Number of instructional school buildings with high speed internet access
1 Number of instructional school buildings with low speed internet access
0 Number of instructional school buildings with no internet access
18 SubTotal
6 Number of non-instructional school buildings with high speed internet access
0 Number of non-instructional school buildings with low speed internet access
0 Number of non-instructional school buildings with no internet access
6 SubTotal
18 Total number of instructional school buildings
6 Total number of non-instructional buildings
94 Percentage of instructional school buildings with high speed internet access
5 Percentage of instructional school buildings with low speed internet access
0 Percentage of instructional school buildings with no internet access
100 Percentage of non-instructional school buildings with high speed internet access
0 Percentage of non-instructional school buildings with low speed internet access
0 Percentage of non-instructional school buildings with no internet access
Internet Access
Type of Internet Access
Locations
Total Number of
Administrative
Offices
10 mb Ethernet100+ mb
Ethernet
Dedicated
CableDSL Wireless
Other (Dial-up
modem, etc.)
None (no
internet
access)
Instructional Classroom 0 27 608 0 0 26 0 0
Dedicated Computer Lab 0 0 34 0 0 0 0 0
Media Center/Library 17 1 17 0 0 0 0 0
Mobile Computer Lab 0 0 0 0 0 8 0 0
Administrative Offices 69 2 67 0 0 0 0 0
Teacher Offices 0 16 0 0 0 0 0 0
Other Locations 0 0 8 0 0 0 0 0
Totals 86 46 734 0 0 34 0 0
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 6 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Computer Inventory
Desktop Computers
Desktop Computers
High Speed Access ≥56k Low Speed Access
-
Desktop Computers
Desktop Computers
High Speed Access ≥56k Low Speed Access
-
Laptop/Tablet/Netbook Computers
Laptop/Tablet/Netbook Computers
High Speed Access ≥56k Low Speed Access
-
Handheld Devices
Handheld Devices
High Speed Access ≥56k Low Speed Access
-
Servers
Servers
High Speed Access ≥56k Low Speed Access
-
Operating Systems
PC
Locations Windows 7 Windows VistaWindows XP (any
version)
Windows 2000 (any
version)Windows 95/98 Other PC
Instructional Classroom 2540 0 525 0 0 0
Dedicated Computer Lab 1140 0 60 0 0 0
Media Center/Library 8 0 146 0 0 0
Mobile Computer Lab 0 0 30 0 0 0
Administrative Offices 198 0 47 0 0 0
Teacher Offices 66 0 0 0 0 0
Other Locations/Off-site 47 0 20 0 0 0
Totals 3999 0 828 0 0 0
MACINTOSH
Locations MAC System 10.x MAC System 9.x MAC System 8.x MAC System 7.x Other MAC
Instructional Classroom 0 10 0 0 62
Dedicated Computer Lab 0 0 0 0 0
Media Center/Library 0 0 0 0 15
Mobile Computer Lab 0 25 0 0 0
Administrative Offices 0 0 0 0 19
Teacher Offices 0 0 0 0 0
Other Locations/Off-site 2 0 0 0 0
Totals 2 35 0 0 96
Other Operating Systems (Including Linux)
Location Operating System Number
Instructional Classroom 0
Dedicated Computer Lab 0
Media Center/Library 0
Mobile Computer Lab 0
Administrative Offices 0
Teacher Offices 0
Other Locations 0
Subtotal 0
Operating Systems - Totals
Administrative Other Total
Windows:
Windows 7 264 47 3999
Windows Vista 0 0 0
Windows XP (any version) 47 20 828
Windows 2000 (any version) 0 0 0
Windows 95/98 0 0 0
Other PC 0 0 0
Subtotal 311 67 4827
Macintosh:
MAC System 10.x 0 2 2
MAC System 9.x 0 0 35
MAC System 8.x 0 0 0
MAC System 7.x 0 0 0
Other MAC 19 0 96
Subtotal 19 2 133
Other Operating Systems:
SubTotal 0 0 0
Total 330 69 4960
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 12 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Operating Systems
PC
Locations Windows 7 Windows VistaWindows XP (any
version)
Windows 2000 (any
version)Windows 95/98 Other PC
Instructional Classroom 2540 0 525 0 0 0
Dedicated Computer Lab 1140 0 60 0 0 0
Media Center/Library 8 0 146 0 0 0
Mobile Computer Lab 0 0 30 0 0 0
Administrative Offices 198 0 47 0 0 0
Teacher Offices 66 0 0 0 0 0
Other Locations/Off-site 47 0 20 0 0 0
Totals 3999 0 828 0 0 0
MACINTOSH
Locations MAC System 10.x MAC System 9.x MAC System 8.x MAC System 7.x Other MAC
Instructional Classroom 0 10 0 0 62
Dedicated Computer Lab 0 0 0 0 0
Media Center/Library 0 0 0 0 15
Mobile Computer Lab 0 25 0 0 0
Administrative Offices 0 0 0 0 19
Teacher Offices 0 0 0 0 0
Other Locations/Off-site 2 0 0 0 0
Totals 2 35 0 0 96
Other Operating Systems (Including Linux)
Location Operating System Number
Instructional Classroom 0
Dedicated Computer Lab 0
Media Center/Library 0
Mobile Computer Lab 0
Administrative Offices 0
Teacher Offices 0
Other Locations 0
Subtotal 0
Operating Systems - Totals
Administrative Other Total
Windows:
Windows 7 264 47 3999
Windows Vista 0 0 0
Windows XP (any version) 47 20 828
Windows 2000 (any version) 0 0 0
Windows 95/98 0 0 0
Other PC 0 0 0
Subtotal 311 67 4827
Macintosh:
MAC System 10.x 0 2 2
MAC System 9.x 0 0 35
MAC System 8.x 0 0 0
MAC System 7.x 0 0 0
Other MAC 19 0 96
Subtotal 19 2 133
Other Operating Systems:
SubTotal 0 0 0
Total 330 69 4960
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 13 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Operating Systems
PC
Locations Windows 7 Windows VistaWindows XP (any
version)
Windows 2000 (any
version)Windows 95/98 Other PC
Instructional Classroom 2540 0 525 0 0 0
Dedicated Computer Lab 1140 0 60 0 0 0
Media Center/Library 8 0 146 0 0 0
Mobile Computer Lab 0 0 30 0 0 0
Administrative Offices 198 0 47 0 0 0
Teacher Offices 66 0 0 0 0 0
Other Locations/Off-site 47 0 20 0 0 0
Totals 3999 0 828 0 0 0
MACINTOSH
Locations MAC System 10.x MAC System 9.x MAC System 8.x MAC System 7.x Other MAC
Instructional Classroom 0 10 0 0 62
Dedicated Computer Lab 0 0 0 0 0
Media Center/Library 0 0 0 0 15
Mobile Computer Lab 0 25 0 0 0
Administrative Offices 0 0 0 0 19
Teacher Offices 0 0 0 0 0
Other Locations/Off-site 2 0 0 0 0
Totals 2 35 0 0 96
Other Operating Systems (Including Linux)
Location Operating System Number
Instructional Classroom 0
Dedicated Computer Lab 0
Media Center/Library 0
Mobile Computer Lab 0
Administrative Offices 0
Teacher Offices 0
Other Locations 0
Subtotal 0
Operating Systems - Totals
Administrative Other Total
Windows:
Windows 7 264 47 3999
Windows Vista 0 0 0
Windows XP (any version) 47 20 828
Windows 2000 (any version) 0 0 0
Windows 95/98 0 0 0
Other PC 0 0 0
Subtotal 311 67 4827
Macintosh:
MAC System 10.x 0 2 2
MAC System 9.x 0 0 35
MAC System 8.x 0 0 0
MAC System 7.x 0 0 0
Other MAC 19 0 96
Subtotal 19 2 133
Other Operating Systems:
SubTotal 0 0 0
Total 330 69 4960
Network Equipment
Type of Equipment
Locations Hubs Routers SwitchesWireless Access
PointsFirewall Spam Filter Content Filter
Intrusion
Detector
Instructional Classroom 25 0 236 64 0 0 0 0
Dedicated Computer Lab 0 0 146 0 0 0 0 0
Media Center/Library 0 0 44 0 0 0 0 0
Mobile Computer Lab 0 0 18 0 0 0 0 0
Administrative Offices 0 0 77 6 0 0 0 0
Teacher Offices 0 0 35 3 0 0 0 0
Other Locations 0 0 131 6 6 1 2 1
Totals 25 0 687 79 6 1 2 1
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 14 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Network Equipment
Type of Equipment
Locations Hubs Routers SwitchesWireless Access
PointsFirewall Spam Filter Content Filter
Intrusion
Detector
Instructional Classroom 25 0 236 64 0 0 0 0
Dedicated Computer Lab 0 0 146 0 0 0 0 0
Media Center/Library 0 0 44 0 0 0 0 0
Mobile Computer Lab 0 0 18 0 0 0 0 0
Administrative Offices 0 0 77 6 0 0 0 0
Teacher Offices 0 0 35 3 0 0 0 0
Other Locations 0 0 131 6 6 1 2 1
Totals 25 0 687 79 6 1 2 1
Licensed Software
Yes No Software Type
nmlkji nmlkj Networking
nmlkji nmlkj Personal Productivity Tools (Word Processing, Spreadsheet, Database, Communications)
nmlkji nmlkj Multimedia (Graphics, Desktop Publishing, Illustration, CAD, Animation, Video editing etc.)
nmlkji nmlkj Desktop Publishing
nmlkji nmlkj Business Software (Accounting, Mapping, Project Management, Desktop Organizers, etc.)
nmlkji nmlkj Programming packages (Computer Programming)
nmlkji nmlkj Student Information Management Systems
nmlkji nmlkj Filtering/Blocking Software
nmlkji nmlkj Anti-Virus
nmlkji nmlkj Other
Telecommunications
Instructional Administrative Total
Landline Service (How many phone numbers - this should reflect
phone service put into the E-Rate 471 application) 150 200 350
Mobile Phone Service (How many phone numbers - this should reflect
mobile phone service put into the E-Rate 471 application and
Blackberries)
0 110 110
Internet connected VOIP(Voice over IP) 125 18 143
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 15 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Telecommunications
Instructional Administrative Total
Landline Service (How many phone numbers - this should reflect
phone service put into the E-Rate 471 application) 150 200 350
Mobile Phone Service (How many phone numbers - this should reflect
mobile phone service put into the E-Rate 471 application and
Blackberries)
0 110 110
Internet connected VOIP(Voice over IP) 125 18 143
Distance Learning
Distance Learning Number of Access Points
Satellite 0
Cable/Broadcast 0
Internet Services for Distance Learning 2
Phone line/v-tel systems 0
Other 0
Analysis
Summary - Briefly describe the technology deployment data in all district and school facilities (refer to the District Summary Technology Report). Technology
deployment includes technology infrastructure, instructional technology integration, information technology, and telecommunications. What do these data tell you?
All data used to develop the action plan must be made available to ISBE, the United States Department of Education, the Universal Services Administrative Company, and
the local community upon request.
Analysis - In what ways, if any, has technology deployment including technology infrastructure, instructional technology integration, and information technology
contributed to student performance?
Conclusions - What do these factors imply for next steps in continuous improvement planning? Address these improvement priorities in Assess Indicators (Step 2) and
Create Plan (Step 3).
The District has increased the device counts on the cutting edge technologies while trying to maintain other resources. There is a need to upgrade infrastructure and install
wireless access capabilities. The District has begun this daunting and costly task as finances has allowed. Computer counts in the mobile device area is increasing due to the focus
on student performance. We now have two schools with 1 to 1 for 3rd through 5th grades. Wirekless is becoming more predominant with complete coverage in one school. The
District is staying with the most current operating systems for the PC machines and still phasing out the Apple platform for computers. The District is utilizing additional mobile
technologies such as the new tablet devices and handheld devices.
There have been gains in the lower grade levels where interactive whiteboards and handheld/mobile devices are available. The most significant increases have been in the area of
Special Education particularly in children with the most challenging issues. Although the data is mostly anecdotal, with the increasing deployment of these technologies the
District is hoping to gather significant hard data this year. The District is also looking fiorward to the results of our first 1 to 1 deployment results this year. Then analysis will be
done on the effectiveness and fidelity of the implementation.
CUrriculum must drive technology integration, deploying technology just to have technology will not drive achievement. The success of the technology intefgration plan will
become mainstream with the curriculum department being the driving force in implementation.
In anticipation of the data continuing to become available from our initiatives this year the District has put together a team of educators to evaluate the best methodology to
incorporate technology in the curriculum to accellerate achievement gains. The continued deployment of interactive whiteboards will be put in full swing with a completion goal
of 2014 SY. To continue the deployment of 1 to 1 computing the need for a complete wireless infrastructure is apparent. This is planned for a District wide deployment with a
completion date of 2014 SY. Continual professional development for educational staff in the use of technology is critical.
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 16 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Analysis
Summary - Briefly describe the technology deployment data in all district and school facilities (refer to the District Summary Technology Report). Technology
deployment includes technology infrastructure, instructional technology integration, information technology, and telecommunications. What do these data tell you?
All data used to develop the action plan must be made available to ISBE, the United States Department of Education, the Universal Services Administrative Company, and
the local community upon request.
Analysis - In what ways, if any, has technology deployment including technology infrastructure, instructional technology integration, and information technology
contributed to student performance?
Conclusions - What do these factors imply for next steps in continuous improvement planning? Address these improvement priorities in Assess Indicators (Step 2) and
Create Plan (Step 3).
The District has increased the device counts on the cutting edge technologies while trying to maintain other resources. There is a need to upgrade infrastructure and install
wireless access capabilities. The District has begun this daunting and costly task as finances has allowed. Computer counts in the mobile device area is increasing due to the focus
on student performance. We now have two schools with 1 to 1 for 3rd through 5th grades. Wirekless is becoming more predominant with complete coverage in one school. The
District is staying with the most current operating systems for the PC machines and still phasing out the Apple platform for computers. The District is utilizing additional mobile
technologies such as the new tablet devices and handheld devices.
There have been gains in the lower grade levels where interactive whiteboards and handheld/mobile devices are available. The most significant increases have been in the area of
Special Education particularly in children with the most challenging issues. Although the data is mostly anecdotal, with the increasing deployment of these technologies the
District is hoping to gather significant hard data this year. The District is also looking fiorward to the results of our first 1 to 1 deployment results this year. Then analysis will be
done on the effectiveness and fidelity of the implementation.
CUrriculum must drive technology integration, deploying technology just to have technology will not drive achievement. The success of the technology intefgration plan will
become mainstream with the curriculum department being the driving force in implementation.
In anticipation of the data continuing to become available from our initiatives this year the District has put together a team of educators to evaluate the best methodology to
incorporate technology in the curriculum to accellerate achievement gains. The continued deployment of interactive whiteboards will be put in full swing with a completion goal
of 2014 SY. To continue the deployment of 1 to 1 computing the need for a complete wireless infrastructure is apparent. This is planned for a District wide deployment with a
completion date of 2014 SY. Continual professional development for educational staff in the use of technology is critical.
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 17 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Action Plan - Goals, Strategies, and Activities
Summary
FY 2013
FY 2014
FY 2015
Goal Number Title
1 Increase student achievement to meet AYP.
Goal Number Title
1 The District will increase its achievement levels in mathematics and reading for ALL students to 100% AYP.
Goal Number Title
1 The District will increase its achievement levels in mathematics and reading for ALL students to 100% AYP.
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 18 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Action Plan - Goals, Strategies, and Activities
FY 2013
Action Plan- Instruction
FY 2013
Action Plan- Professional Development
FY 2013
Action Plan- Technology Deployment Data
FY 2013
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
FY 2013 Goal 1 Description:
While our current student achievement in reading for the ALL catgorey is 72.8% meeting/exceeding, this group will make at least 92.5% AYP in 2013. Further, while our current
student achievement in mathematics for the ALL category is 80.9% meeting/exceeding, this group will make at least 92.5% AYP in 2013.
The District has student sub-groups for Blacks, Hispanics, Two or More Races, LEP, Students with Disabilities and the Economically Disadvantaged. For all the above-cited sub-
groups, the District did not meet the minimum 92.5% AYP standard in both mathematics and reading. Subsequently, the District is targeting its ALL student population for both of
these content areas.
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
The use of the LCD projector/whiteboard will provide opportunities for students to focus on important ideas and makes it
easier to juxtapose contrasting examples and misconception for different solution strategies. 07/01/2012 06/30/2014 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Increase the use of document cameras in the classroom to 25% of the district’s classrooms. This will provide opportunities
for students to share their work and the class to critically respond to each other’s work and thinking. 07/01/2012 06/30/2014
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 3 Start Date End Date Timeline
Increase the use of tablets in the district’s classroom to 10%. This will provide opportunities for students to share their
work and reinforce their learnings. 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
120,000 0 0 0 0 0 0 120,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
practices. So that data informs instructional decision making, increases student engagement, provides immediate feedback,
and promotes classroom interactivity. 07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
68,000 14,000 0 0 0 0 0 82,000
Activity 2 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Begin the 1 to 1 initiative for computer devices.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
3,400,000 0 0 0 0 0 0 3,400,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes (PURIA model – Play, Use, Recommend,
Incorporate, Assess)
Activity 1 Start Date End Date Timeline
Provide tiered professional development on use of electronic whiteboards and document cameras
08/15/2012 12/19/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Provide professional development for grade appropriate software that will help students form meaningful connections
between graphical and linguistic representations and to build conceptual connections. (ie. Conceptuamath, Explore
Learning Gizmos, Fathom, Tinkerplots, Geometer’s Sketchpad, Geogebra, NCTM Illuminations, or Smart board MathTools)
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 0 0 25,000
Activity 3 Start Date End Date Timeline
Provide tiered professional development for use of tablets.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 10,000 0 0 0 0 0 10,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Provide Professional Development on use of clicker systems and how to use the data for classroom decision making
09/10/2012 06/06/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
26,000 0 0 0 0 0 0 26,000
Activity 2 Start Date End Date Timeline
Build on district initiatives of Standards Based Grading, Gradual Release of Responsibility. Continue to support teacher’s use
of existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, as well as the Elementary Math adoption
component – Online Assessment Management systems and how this data will inform instruction.
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
30,000 0 0 0 0 0 0 30,000
Activity 3 Start Date End Date Timeline
Provide support to teachers as they begin to understand the PARCC assessment system and what tests will look like and
how that will drive instructional practices 09/01/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Enhancing collaborative learning
Activity 1 Start Date End Date Timeline
An existing timeline is in place as part of the high school restructuring plan for professional development on Gradual
Release. 01/08/2013 06/06/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
13,000 12,000 0 0 0 0 0 25,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
Interactive whiteboards in each classroom. This is critical especially at the High School level. 50-75% of classrooms will be
equipped with LCD projector, electronic whiteboards and document cameras 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
740,000 0 0 0 0 D 0 0 0 740,000
Activity 2 Start Date End Date Timeline
25-50% of classrooms will be equipped with document cameras.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
100,000 0 0 0 0 D 0 0 0 100,000
Activity 3 Start Date End Date Timeline
Improve wired infrastructure to allow the increased bandwidth requirements of the wireless devices and
numbers.Infrastructure built to support e-books, tablets and online technology.
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
2,400,000 0 0 0 0 D 0 0 0 2,400,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Purchase in order to increase the number of classrooms that use response systems by 25%.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 D 0 0 0 25,000
Activity 2 Start Date End Date Timeline
Continue to use existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, and Curriculum Assessment
Management systems and technology hardware and software to support these programs 08/16/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Activity 3 Start Date End Date Timeline
Infrastructure for Common Core PARCC assessment system- preparation for online assessments.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 19 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Action Plan - Goals, Strategies, and Activities
FY 2013
Action Plan- Instruction
FY 2013
Action Plan- Professional Development
FY 2013
Action Plan- Technology Deployment Data
FY 2013
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
FY 2013 Goal 1 Description:
While our current student achievement in reading for the ALL catgorey is 72.8% meeting/exceeding, this group will make at least 92.5% AYP in 2013. Further, while our current
student achievement in mathematics for the ALL category is 80.9% meeting/exceeding, this group will make at least 92.5% AYP in 2013.
The District has student sub-groups for Blacks, Hispanics, Two or More Races, LEP, Students with Disabilities and the Economically Disadvantaged. For all the above-cited sub-
groups, the District did not meet the minimum 92.5% AYP standard in both mathematics and reading. Subsequently, the District is targeting its ALL student population for both of
these content areas.
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
The use of the LCD projector/whiteboard will provide opportunities for students to focus on important ideas and makes it
easier to juxtapose contrasting examples and misconception for different solution strategies. 07/01/2012 06/30/2014 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Increase the use of document cameras in the classroom to 25% of the district’s classrooms. This will provide opportunities
for students to share their work and the class to critically respond to each other’s work and thinking. 07/01/2012 06/30/2014
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 3 Start Date End Date Timeline
Increase the use of tablets in the district’s classroom to 10%. This will provide opportunities for students to share their
work and reinforce their learnings. 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
120,000 0 0 0 0 0 0 120,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
practices. So that data informs instructional decision making, increases student engagement, provides immediate feedback,
and promotes classroom interactivity. 07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
68,000 14,000 0 0 0 0 0 82,000
Activity 2 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Begin the 1 to 1 initiative for computer devices.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
3,400,000 0 0 0 0 0 0 3,400,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes (PURIA model – Play, Use, Recommend,
Incorporate, Assess)
Activity 1 Start Date End Date Timeline
Provide tiered professional development on use of electronic whiteboards and document cameras
08/15/2012 12/19/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Provide professional development for grade appropriate software that will help students form meaningful connections
between graphical and linguistic representations and to build conceptual connections. (ie. Conceptuamath, Explore
Learning Gizmos, Fathom, Tinkerplots, Geometer’s Sketchpad, Geogebra, NCTM Illuminations, or Smart board MathTools)
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 0 0 25,000
Activity 3 Start Date End Date Timeline
Provide tiered professional development for use of tablets.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 10,000 0 0 0 0 0 10,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Provide Professional Development on use of clicker systems and how to use the data for classroom decision making
09/10/2012 06/06/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
26,000 0 0 0 0 0 0 26,000
Activity 2 Start Date End Date Timeline
Build on district initiatives of Standards Based Grading, Gradual Release of Responsibility. Continue to support teacher’s use
of existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, as well as the Elementary Math adoption
component – Online Assessment Management systems and how this data will inform instruction.
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
30,000 0 0 0 0 0 0 30,000
Activity 3 Start Date End Date Timeline
Provide support to teachers as they begin to understand the PARCC assessment system and what tests will look like and
how that will drive instructional practices 09/01/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Enhancing collaborative learning
Activity 1 Start Date End Date Timeline
An existing timeline is in place as part of the high school restructuring plan for professional development on Gradual
Release. 01/08/2013 06/06/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
13,000 12,000 0 0 0 0 0 25,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
Interactive whiteboards in each classroom. This is critical especially at the High School level. 50-75% of classrooms will be
equipped with LCD projector, electronic whiteboards and document cameras 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
740,000 0 0 0 0 D 0 0 0 740,000
Activity 2 Start Date End Date Timeline
25-50% of classrooms will be equipped with document cameras.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
100,000 0 0 0 0 D 0 0 0 100,000
Activity 3 Start Date End Date Timeline
Improve wired infrastructure to allow the increased bandwidth requirements of the wireless devices and
numbers.Infrastructure built to support e-books, tablets and online technology.
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
2,400,000 0 0 0 0 D 0 0 0 2,400,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Purchase in order to increase the number of classrooms that use response systems by 25%.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 D 0 0 0 25,000
Activity 2 Start Date End Date Timeline
Continue to use existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, and Curriculum Assessment
Management systems and technology hardware and software to support these programs 08/16/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Activity 3 Start Date End Date Timeline
Infrastructure for Common Core PARCC assessment system- preparation for online assessments.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 20 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Action Plan - Goals, Strategies, and Activities
FY 2013
Action Plan- Instruction
FY 2013
Action Plan- Professional Development
FY 2013
Action Plan- Technology Deployment Data
FY 2013
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
FY 2013 Goal 1 Description:
While our current student achievement in reading for the ALL catgorey is 72.8% meeting/exceeding, this group will make at least 92.5% AYP in 2013. Further, while our current
student achievement in mathematics for the ALL category is 80.9% meeting/exceeding, this group will make at least 92.5% AYP in 2013.
The District has student sub-groups for Blacks, Hispanics, Two or More Races, LEP, Students with Disabilities and the Economically Disadvantaged. For all the above-cited sub-
groups, the District did not meet the minimum 92.5% AYP standard in both mathematics and reading. Subsequently, the District is targeting its ALL student population for both of
these content areas.
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
The use of the LCD projector/whiteboard will provide opportunities for students to focus on important ideas and makes it
easier to juxtapose contrasting examples and misconception for different solution strategies. 07/01/2012 06/30/2014 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Increase the use of document cameras in the classroom to 25% of the district’s classrooms. This will provide opportunities
for students to share their work and the class to critically respond to each other’s work and thinking. 07/01/2012 06/30/2014
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 3 Start Date End Date Timeline
Increase the use of tablets in the district’s classroom to 10%. This will provide opportunities for students to share their
work and reinforce their learnings. 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
120,000 0 0 0 0 0 0 120,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
practices. So that data informs instructional decision making, increases student engagement, provides immediate feedback,
and promotes classroom interactivity. 07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
68,000 14,000 0 0 0 0 0 82,000
Activity 2 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Begin the 1 to 1 initiative for computer devices.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
3,400,000 0 0 0 0 0 0 3,400,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes (PURIA model – Play, Use, Recommend,
Incorporate, Assess)
Activity 1 Start Date End Date Timeline
Provide tiered professional development on use of electronic whiteboards and document cameras
08/15/2012 12/19/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Provide professional development for grade appropriate software that will help students form meaningful connections
between graphical and linguistic representations and to build conceptual connections. (ie. Conceptuamath, Explore
Learning Gizmos, Fathom, Tinkerplots, Geometer’s Sketchpad, Geogebra, NCTM Illuminations, or Smart board MathTools)
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 0 0 25,000
Activity 3 Start Date End Date Timeline
Provide tiered professional development for use of tablets.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 10,000 0 0 0 0 0 10,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Provide Professional Development on use of clicker systems and how to use the data for classroom decision making
09/10/2012 06/06/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
26,000 0 0 0 0 0 0 26,000
Activity 2 Start Date End Date Timeline
Build on district initiatives of Standards Based Grading, Gradual Release of Responsibility. Continue to support teacher’s use
of existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, as well as the Elementary Math adoption
component – Online Assessment Management systems and how this data will inform instruction.
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
30,000 0 0 0 0 0 0 30,000
Activity 3 Start Date End Date Timeline
Provide support to teachers as they begin to understand the PARCC assessment system and what tests will look like and
how that will drive instructional practices 09/01/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Enhancing collaborative learning
Activity 1 Start Date End Date Timeline
An existing timeline is in place as part of the high school restructuring plan for professional development on Gradual
Release. 01/08/2013 06/06/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
13,000 12,000 0 0 0 0 0 25,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
Interactive whiteboards in each classroom. This is critical especially at the High School level. 50-75% of classrooms will be
equipped with LCD projector, electronic whiteboards and document cameras 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
740,000 0 0 0 0 D 0 0 0 740,000
Activity 2 Start Date End Date Timeline
25-50% of classrooms will be equipped with document cameras.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
100,000 0 0 0 0 D 0 0 0 100,000
Activity 3 Start Date End Date Timeline
Improve wired infrastructure to allow the increased bandwidth requirements of the wireless devices and
numbers.Infrastructure built to support e-books, tablets and online technology.
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
2,400,000 0 0 0 0 D 0 0 0 2,400,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Purchase in order to increase the number of classrooms that use response systems by 25%.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 D 0 0 0 25,000
Activity 2 Start Date End Date Timeline
Continue to use existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, and Curriculum Assessment
Management systems and technology hardware and software to support these programs 08/16/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Activity 3 Start Date End Date Timeline
Infrastructure for Common Core PARCC assessment system- preparation for online assessments.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 21 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Action Plan - Goals, Strategies, and Activities
FY 2013
Action Plan- Instruction
FY 2013
Action Plan- Professional Development
FY 2013
Action Plan- Technology Deployment Data
FY 2013
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
FY 2013 Goal 1 Description:
While our current student achievement in reading for the ALL catgorey is 72.8% meeting/exceeding, this group will make at least 92.5% AYP in 2013. Further, while our current
student achievement in mathematics for the ALL category is 80.9% meeting/exceeding, this group will make at least 92.5% AYP in 2013.
The District has student sub-groups for Blacks, Hispanics, Two or More Races, LEP, Students with Disabilities and the Economically Disadvantaged. For all the above-cited sub-
groups, the District did not meet the minimum 92.5% AYP standard in both mathematics and reading. Subsequently, the District is targeting its ALL student population for both of
these content areas.
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
The use of the LCD projector/whiteboard will provide opportunities for students to focus on important ideas and makes it
easier to juxtapose contrasting examples and misconception for different solution strategies. 07/01/2012 06/30/2014 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Increase the use of document cameras in the classroom to 25% of the district’s classrooms. This will provide opportunities
for students to share their work and the class to critically respond to each other’s work and thinking. 07/01/2012 06/30/2014
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 3 Start Date End Date Timeline
Increase the use of tablets in the district’s classroom to 10%. This will provide opportunities for students to share their
work and reinforce their learnings. 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
120,000 0 0 0 0 0 0 120,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
practices. So that data informs instructional decision making, increases student engagement, provides immediate feedback,
and promotes classroom interactivity. 07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
68,000 14,000 0 0 0 0 0 82,000
Activity 2 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Begin the 1 to 1 initiative for computer devices.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
3,400,000 0 0 0 0 0 0 3,400,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes (PURIA model – Play, Use, Recommend,
Incorporate, Assess)
Activity 1 Start Date End Date Timeline
Provide tiered professional development on use of electronic whiteboards and document cameras
08/15/2012 12/19/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Provide professional development for grade appropriate software that will help students form meaningful connections
between graphical and linguistic representations and to build conceptual connections. (ie. Conceptuamath, Explore
Learning Gizmos, Fathom, Tinkerplots, Geometer’s Sketchpad, Geogebra, NCTM Illuminations, or Smart board MathTools)
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 0 0 25,000
Activity 3 Start Date End Date Timeline
Provide tiered professional development for use of tablets.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 10,000 0 0 0 0 0 10,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Provide Professional Development on use of clicker systems and how to use the data for classroom decision making
09/10/2012 06/06/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
26,000 0 0 0 0 0 0 26,000
Activity 2 Start Date End Date Timeline
Build on district initiatives of Standards Based Grading, Gradual Release of Responsibility. Continue to support teacher’s use
of existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, as well as the Elementary Math adoption
component – Online Assessment Management systems and how this data will inform instruction.
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
30,000 0 0 0 0 0 0 30,000
Activity 3 Start Date End Date Timeline
Provide support to teachers as they begin to understand the PARCC assessment system and what tests will look like and
how that will drive instructional practices 09/01/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Enhancing collaborative learning
Activity 1 Start Date End Date Timeline
An existing timeline is in place as part of the high school restructuring plan for professional development on Gradual
Release. 01/08/2013 06/06/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
13,000 12,000 0 0 0 0 0 25,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
Interactive whiteboards in each classroom. This is critical especially at the High School level. 50-75% of classrooms will be
equipped with LCD projector, electronic whiteboards and document cameras 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
740,000 0 0 0 0 D 0 0 0 740,000
Activity 2 Start Date End Date Timeline
25-50% of classrooms will be equipped with document cameras.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
100,000 0 0 0 0 D 0 0 0 100,000
Activity 3 Start Date End Date Timeline
Improve wired infrastructure to allow the increased bandwidth requirements of the wireless devices and
numbers.Infrastructure built to support e-books, tablets and online technology.
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
2,400,000 0 0 0 0 D 0 0 0 2,400,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Purchase in order to increase the number of classrooms that use response systems by 25%.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 D 0 0 0 25,000
Activity 2 Start Date End Date Timeline
Continue to use existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, and Curriculum Assessment
Management systems and technology hardware and software to support these programs 08/16/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Activity 3 Start Date End Date Timeline
Infrastructure for Common Core PARCC assessment system- preparation for online assessments.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 22 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Action Plan - Goals, Strategies, and Activities
FY 2013
Action Plan- Instruction
FY 2013
Action Plan- Professional Development
FY 2013
Action Plan- Technology Deployment Data
FY 2013
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
FY 2013 Goal 1 Description:
While our current student achievement in reading for the ALL catgorey is 72.8% meeting/exceeding, this group will make at least 92.5% AYP in 2013. Further, while our current
student achievement in mathematics for the ALL category is 80.9% meeting/exceeding, this group will make at least 92.5% AYP in 2013.
The District has student sub-groups for Blacks, Hispanics, Two or More Races, LEP, Students with Disabilities and the Economically Disadvantaged. For all the above-cited sub-
groups, the District did not meet the minimum 92.5% AYP standard in both mathematics and reading. Subsequently, the District is targeting its ALL student population for both of
these content areas.
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
The use of the LCD projector/whiteboard will provide opportunities for students to focus on important ideas and makes it
easier to juxtapose contrasting examples and misconception for different solution strategies. 07/01/2012 06/30/2014 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Increase the use of document cameras in the classroom to 25% of the district’s classrooms. This will provide opportunities
for students to share their work and the class to critically respond to each other’s work and thinking. 07/01/2012 06/30/2014
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 3 Start Date End Date Timeline
Increase the use of tablets in the district’s classroom to 10%. This will provide opportunities for students to share their
work and reinforce their learnings. 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
120,000 0 0 0 0 0 0 120,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
practices. So that data informs instructional decision making, increases student engagement, provides immediate feedback,
and promotes classroom interactivity. 07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
68,000 14,000 0 0 0 0 0 82,000
Activity 2 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Begin the 1 to 1 initiative for computer devices.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
3,400,000 0 0 0 0 0 0 3,400,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes (PURIA model – Play, Use, Recommend,
Incorporate, Assess)
Activity 1 Start Date End Date Timeline
Provide tiered professional development on use of electronic whiteboards and document cameras
08/15/2012 12/19/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Provide professional development for grade appropriate software that will help students form meaningful connections
between graphical and linguistic representations and to build conceptual connections. (ie. Conceptuamath, Explore
Learning Gizmos, Fathom, Tinkerplots, Geometer’s Sketchpad, Geogebra, NCTM Illuminations, or Smart board MathTools)
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 0 0 25,000
Activity 3 Start Date End Date Timeline
Provide tiered professional development for use of tablets.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 10,000 0 0 0 0 0 10,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Provide Professional Development on use of clicker systems and how to use the data for classroom decision making
09/10/2012 06/06/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
26,000 0 0 0 0 0 0 26,000
Activity 2 Start Date End Date Timeline
Build on district initiatives of Standards Based Grading, Gradual Release of Responsibility. Continue to support teacher’s use
of existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, as well as the Elementary Math adoption
component – Online Assessment Management systems and how this data will inform instruction.
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
30,000 0 0 0 0 0 0 30,000
Activity 3 Start Date End Date Timeline
Provide support to teachers as they begin to understand the PARCC assessment system and what tests will look like and
how that will drive instructional practices 09/01/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Enhancing collaborative learning
Activity 1 Start Date End Date Timeline
An existing timeline is in place as part of the high school restructuring plan for professional development on Gradual
Release. 01/08/2013 06/06/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
13,000 12,000 0 0 0 0 0 25,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
Interactive whiteboards in each classroom. This is critical especially at the High School level. 50-75% of classrooms will be
equipped with LCD projector, electronic whiteboards and document cameras 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
740,000 0 0 0 0 D 0 0 0 740,000
Activity 2 Start Date End Date Timeline
25-50% of classrooms will be equipped with document cameras.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
100,000 0 0 0 0 D 0 0 0 100,000
Activity 3 Start Date End Date Timeline
Improve wired infrastructure to allow the increased bandwidth requirements of the wireless devices and
numbers.Infrastructure built to support e-books, tablets and online technology.
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
2,400,000 0 0 0 0 D 0 0 0 2,400,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Purchase in order to increase the number of classrooms that use response systems by 25%.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 D 0 0 0 25,000
Activity 2 Start Date End Date Timeline
Continue to use existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, and Curriculum Assessment
Management systems and technology hardware and software to support these programs 08/16/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Activity 3 Start Date End Date Timeline
Infrastructure for Common Core PARCC assessment system- preparation for online assessments.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 23 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Action Plan - Goals, Strategies, and Activities
FY 2013
Action Plan- Instruction
FY 2013
Action Plan- Professional Development
FY 2013
Action Plan- Technology Deployment Data
FY 2013
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
FY 2013 Goal 1 Description:
While our current student achievement in reading for the ALL catgorey is 72.8% meeting/exceeding, this group will make at least 92.5% AYP in 2013. Further, while our current
student achievement in mathematics for the ALL category is 80.9% meeting/exceeding, this group will make at least 92.5% AYP in 2013.
The District has student sub-groups for Blacks, Hispanics, Two or More Races, LEP, Students with Disabilities and the Economically Disadvantaged. For all the above-cited sub-
groups, the District did not meet the minimum 92.5% AYP standard in both mathematics and reading. Subsequently, the District is targeting its ALL student population for both of
these content areas.
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
The use of the LCD projector/whiteboard will provide opportunities for students to focus on important ideas and makes it
easier to juxtapose contrasting examples and misconception for different solution strategies. 07/01/2012 06/30/2014 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Increase the use of document cameras in the classroom to 25% of the district’s classrooms. This will provide opportunities
for students to share their work and the class to critically respond to each other’s work and thinking. 07/01/2012 06/30/2014
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 3 Start Date End Date Timeline
Increase the use of tablets in the district’s classroom to 10%. This will provide opportunities for students to share their
work and reinforce their learnings. 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
120,000 0 0 0 0 0 0 120,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
practices. So that data informs instructional decision making, increases student engagement, provides immediate feedback,
and promotes classroom interactivity. 07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
68,000 14,000 0 0 0 0 0 82,000
Activity 2 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Begin the 1 to 1 initiative for computer devices.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
3,400,000 0 0 0 0 0 0 3,400,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes (PURIA model – Play, Use, Recommend,
Incorporate, Assess)
Activity 1 Start Date End Date Timeline
Provide tiered professional development on use of electronic whiteboards and document cameras
08/15/2012 12/19/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Activity 2 Start Date End Date Timeline
Provide professional development for grade appropriate software that will help students form meaningful connections
between graphical and linguistic representations and to build conceptual connections. (ie. Conceptuamath, Explore
Learning Gizmos, Fathom, Tinkerplots, Geometer’s Sketchpad, Geogebra, NCTM Illuminations, or Smart board MathTools)
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 0 0 25,000
Activity 3 Start Date End Date Timeline
Provide tiered professional development for use of tablets.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 10,000 0 0 0 0 0 10,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Provide Professional Development on use of clicker systems and how to use the data for classroom decision making
09/10/2012 06/06/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
26,000 0 0 0 0 0 0 26,000
Activity 2 Start Date End Date Timeline
Build on district initiatives of Standards Based Grading, Gradual Release of Responsibility. Continue to support teacher’s use
of existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, as well as the Elementary Math adoption
component – Online Assessment Management systems and how this data will inform instruction.
07/01/2012 06/30/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
30,000 0 0 0 0 0 0 30,000
Activity 3 Start Date End Date Timeline
Provide support to teachers as they begin to understand the PARCC assessment system and what tests will look like and
how that will drive instructional practices 09/01/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 0 0 0
Strategy 3
Enhancing collaborative learning
Activity 1 Start Date End Date Timeline
An existing timeline is in place as part of the high school restructuring plan for professional development on Gradual
Release. 01/08/2013 06/06/2013 After School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
13,000 12,000 0 0 0 0 0 25,000
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strategy 1
Strengthening the display and presentation of student work enabling dynamic representations of students thinking processes
Activity 1 Start Date End Date Timeline
Interactive whiteboards in each classroom. This is critical especially at the High School level. 50-75% of classrooms will be
equipped with LCD projector, electronic whiteboards and document cameras 07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
740,000 0 0 0 0 D 0 0 0 740,000
Activity 2 Start Date End Date Timeline
25-50% of classrooms will be equipped with document cameras.
07/01/2012 06/30/2013
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
100,000 0 0 0 0 D 0 0 0 100,000
Activity 3 Start Date End Date Timeline
Improve wired infrastructure to allow the increased bandwidth requirements of the wireless devices and
numbers.Infrastructure built to support e-books, tablets and online technology.
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
2,400,000 0 0 0 0 D 0 0 0 2,400,000
Strategy 2
Supporting formative assessment practices
Activity 1 Start Date End Date Timeline
Purchase in order to increase the number of classrooms that use response systems by 25%.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
25,000 0 0 0 0 D 0 0 0 25,000
Activity 2 Start Date End Date Timeline
Continue to use existing district assessment systems – Mastery Manager, AIMSWEB, MAPS, and Curriculum Assessment
Management systems and technology hardware and software to support these programs 08/16/2012 05/30/2012 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Activity 3 Start Date End Date Timeline
Infrastructure for Common Core PARCC assessment system- preparation for online assessments.
07/01/2012 06/30/2013 During School
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Strategy 3
Activity 1 Start Date End Date Timeline
Budget & Funding Sources ($)
District Title I Title II-D Title III E-Rate R or D State Funds Grant Funds Other Funds Total
0 0 0 0 0 D 0 0 0 0
Champaign CUSD 4
2/24/2012 9:07:35 AM District Technology Plan Page 24 of 46
© 2012 Illinois Interactive Report Card, Northern Illinois University
-
Action Plan - Goals, Strategies, and Activities
FY 2013
Action Plan- Instruction
FY 2013
Action Plan- Professional Development
FY 2013
Action Plan- Technology Deployment Data
FY 2013
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
FY 2013 Goal 1 Description:
While our current student achievement in reading for the ALL catgorey is 72.8% meeting/exceeding, this group will make at least 92.5% AYP in 2013. Further, while our current
student achievement in mathematics for the ALL category is 80.9% meeting/exceeding, this group will make at least 92.5% AYP in 2013.
The District has student sub-groups for Blacks, Hispanics, Two or More Races, LEP, Students with Disabilities and the Economically Disadvantaged. For all the above-cited sub-
groups, the District did not meet the minimum 92.5% AYP standard in both mathematics and reading. Subsequently, the District is targeting its ALL student population for both of
these content areas.
FY 2013 Goal 1 Title:
Increase student achievement to meet AYP.
Strat