Page 1 of 2 Sharyn Westlake From: [email protected] Sent: Friday, 28 September 2012 10:18 a.m. To: Sharyn Westlake Cc: Susan Borrer; [email protected] ; Jan Van Der Vliet Subject: Te Moana Floodway Information You have received 3 files. Use the secure links below to download. Hello Sharyn, Apologies for the delay in providing this information and we acknowledge that it may be too late to be accounted for in GW's evidence. Further to our meeting on 29 August, please follow the link provided to download the below documents (the mapping is a 17MB file): 1. Water level and flow long sections down the Waimeha Stream (not down the floodway where the majority of the breach flow passes) for the pre/post overflow scenario. 2. Flood mapping & difference plots. To clarify the title, breach flow is equivalent to Q200yr in the VVaikanae with the stopbank breaching at Chillingworth, and with a Q100yr storm in the Waimeha catchment. Please note that s ubsequent to the modelling, the stopbank has also been lengthened at the upstream end towards Te Moana Road to cut off the small flow bypassing the end of the stop bank that can be seen on the maps. The maps also do not include the mitigation proposed to address the increases at Puriri Road (bottom left on the difference map) and to Jonathan Smith's property (top right on the difference maps) as the maps were produced prior to addressing these issues. Regards lain Smith M2PP Stormwater Design Level 2, 17-21 Whitmore Street, PO Box 8044, Wellington 6143 Ph: 04 473 7551 Mobile: 027 296 3310 Email: [email protected] Download Files Available until: 28 October 2012 Dc w ' re: QCCC_' a +1.-- w_L 66.65 KB, Fingerprint: b363ea5053c48177543179cd7002c2ac Download File: QCCI )verflow Longsection.pdf 4/10/2012

Transcript of Page 1 of 2 - epa.govt.nz€¦ · Page 1 of 2 Sharyn Westlake From: [email protected] Sent:...

Page 1: Page 1 of 2 - epa.govt.nz€¦ · Page 1 of 2 Sharyn Westlake From: iain.smith@beca.com Sent: Friday, 28 September 2012 10:18 a.m. To: Sharyn Westlake Cc: Susan Borrer; graham.levy@beca.com;

Page 1 of 2

Sharyn Westlake

From: [email protected] Sent: Friday, 28 September 2012 10:18 a.m. To: Sharyn Westlake Cc: Susan Borrer; [email protected] ; Jan Van Der Vliet Subject: Te Moana Floodway Information

You have received 3 files. Use the secure links below to download.

Hello Sharyn,

Apologies for the delay in providing this information and we acknowledge that it may be too late to be accounted for in GW's evidence.

Further to our meeting on 29 August, please follow the link provided to download the below documents (the mapping is a 17MB file):

1.Water level and flow long sections down the Waimeha Stream (not down the floodway where the majority of the breach flow passes) for the pre/post overflow scenario.

2. Flood mapping & difference plots. To clarify the title, breach flow is equivalent to Q200yr in the VVaikanae with the stopbank breaching at Chillingworth, and with a Q100yr storm in the Waimeha catchment.

Please note that s ubsequent to the modelling, the stopbank has also been lengthened at the upstream end towards Te Moana Road to cut off the small flow bypassing the end of the stop bank that can be seen on the maps.

The maps also do not include the mitigation proposed to address the increases at Puriri Road (bottom left on the difference map) and to Jonathan Smith's property (top right on the difference maps) as the maps were produced prior to addressing these issues.

Regards

lain Smith M2PP Stormwater Design

Level 2, 17-21 Whitmore Street, PO Box 8044, Wellington 6143 Ph: 04 473 7551 Mobile: 027 296 3310 Email: [email protected]

Download Files

Available until: 28 October 2012

Dc w ' re: QCCC_' — a +1.-- w_L 66.65 KB, Fingerprint: b363ea5053c48177543179cd7002c2ac

Download File: QCCI )verflow Longsection.pdf

4/10/2012

Page 2: Page 1 of 2 - epa.govt.nz€¦ · Page 1 of 2 Sharyn Westlake From: iain.smith@beca.com Sent: Friday, 28 September 2012 10:18 a.m. To: Sharyn Westlake Cc: Susan Borrer; graham.levy@beca.com;

Page 2 of 2

67.59 KB, Fingerprint: 7dad83b048fb229f4f9777edd2d353c5

Download File: Q100CC&Chillii Vaimeha Results.pdf 17,470.02 KB, Fingerprint: ac77fc13ec9776917a35f3fd0b05cb4b

You have received attachment link(s) within this email sent via Beca Accellion Secure File Transfer. To retrieve the attachment(s), please click on the link(s) above.

NOTICE: This email, if it relates to a specific contract, is sent on behalf of the Beca company which entered into the contract. Please contact the sender if you are unsure of the contracting Beca company or visit our web page http://www.beca.com for further information on the Beca Group. If this email relates to a specific contract, by responding you agree that, regardless of its terms, this email and the response by you will be a valid communication for the purposes of that contract, and may bind the parties accordingly. This e-mail together with any attachments is confidential, may be subject to legal privilege and may contain proprietary information, including information protected by copyright. If you are not the intended recipient, please do not copy, use or disclose this e-mail; please notify us immediately by return e-mail and then delete this e-mail.

Secured by Acce/IionTM

4/10/2012

Page 3: Page 1 of 2 - epa.govt.nz€¦ · Page 1 of 2 Sharyn Westlake From: iain.smith@beca.com Sent: Friday, 28 September 2012 10:18 a.m. To: Sharyn Westlake Cc: Susan Borrer; graham.levy@beca.com;

ELEVATION (M) i-, o )-, rsi LAJ 41. (-II 0) ,.1 00 l.0 0

100

200 300 400 500 600 700 800 900 E 0 0 m

r7,1000 2 N.100 m

-R- -1200 1300 1400 1500 1600 1700

1.11111 MEWED ,

low.— .

OnlitIL .

ir

: _ . !TM ..0111

1111111 I 1 ri 1 lid II

1 I

1 F_ . _ ___.= . I Tr. ...(it

II Ili I ri I

_41 !our'

I

II 1 i g i ploi p i 1 II 1 i-b 111141/11 I

0 0 -.0 m a) I 11

ill... c Ill I 90

(.1 3- * g m i- E - di ______L.-

111111111 161=-0

1 "

11 x y, o

rw..1 !V _ C5E- ld O ,..._ 1 1

3- o < fD

1, =="1"Milli IS M2PP Te Moan a Bridge 70111.12,:=MMMMMMMMIIMIMM

I 7 o

Mma■=a1 - I

111mr-; Moio- i

....- SRL —sm..- 111 I lit

ii — — OIl

d ii iS 1800

ii imE ig.

MINPZii. III I II 1900 i MILMIPII iii4011 ...El

II II II IIIIIII I 2000

imm_ ..mi 2100

Page 4: Page 1 of 2 - epa.govt.nz€¦ · Page 1 of 2 Sharyn Westlake From: iain.smith@beca.com Sent: Friday, 28 September 2012 10:18 a.m. To: Sharyn Westlake Cc: Susan Borrer; graham.levy@beca.com;

DISCHARGE (MVS) I-, i-- i- i-- I--+ o i- NJ LU 4,b Ul Cr) V CO (.0 0 NJ UJ .0. (.11

0

100 200 300 400 -

650000

m

800 900 g

0 0 p.000 I > R.3.00 m

-R 1200

1400

1500

II II Ili.. r

0 1 11111L

-mliraT

II q44fEll I „,1-7

1 IT 1111111rig 111 r

...4„

0 ..< m

I

1

I 1 I

ir - n fli- PIA 1

cu —

- -

------

CD '0 20 I 11005 mi-7am

I Ilir -

-

\

I

r'l -n -

rn F 0.Q5.

1300 r 1 CD =

— M2PP Te Moana Bridge 0 G (4) 0 EIIII 1-1::1711 m t

leit 1 *

aild1600 DA, IR. -iiimi ■

1700 1800 I

41 iiiiim

_ '6 0. r II I

d 1 IIIMii 1 I 1 1 1 1 1 1900

"all 17. 111 ill

ID CD E E 1° le le w 0° 8 8 11 2000

2100 NM •igall

-SI -1 1- 111111111111111

Page 5: Page 1 of 2 - epa.govt.nz€¦ · Page 1 of 2 Sharyn Westlake From: iain.smith@beca.com Sent: Friday, 28 September 2012 10:18 a.m. To: Sharyn Westlake Cc: Susan Borrer; graham.levy@beca.com;

Chillingworth Q100 Breach - Post -Pre Construction Difference Map

Q100CC & Chillingworth Q100 Breach Scenario

Breach Location

Depth Difference (m)

> -2

-1.0--0.5

-0.5 --0.25

-0.25 --0.05

I-- 7 -0.01 -0.01

0.01 - 0.05

0.05- 0.1

F-111 0 1 - 0 25 I

0.25 - 0.5

0.5 - 1

1.0- 2.0

> 2.0

A I

Page 6: Page 1 of 2 - epa.govt.nz€¦ · Page 1 of 2 Sharyn Westlake From: iain.smith@beca.com Sent: Friday, 28 September 2012 10:18 a.m. To: Sharyn Westlake Cc: Susan Borrer; graham.levy@beca.com;

Chillingworth Q100 Breach - Pre Construction Inundation

Q100CC Pre-Construction & Chillingworth Q100 Breach Scenario

7-1 0.05 — 0.1

0.1 — 0.25

- git , /19MIPIP

• • • 111 41, 1 114 41

Page 7: Page 1 of 2 - epa.govt.nz€¦ · Page 1 of 2 Sharyn Westlake From: iain.smith@beca.com Sent: Friday, 28 September 2012 10:18 a.m. To: Sharyn Westlake Cc: Susan Borrer; graham.levy@beca.com;

Chillingworth Q100 Breach - Post Construction Inundation

_ 3'11 .6!NVairneh a Bridges

:

4, 3 .• ■ •

• • ,4

r

'4,7* ••••••ad•

• •

Q100CC Post-Construction & Chillingworth Q100 Breach Scenario