Page 1 of 13 - NFPA · BLD-SCM Richard J. Davis Alternate FM Global 1151 Boston-Providence Turnpike...
Transcript of Page 1 of 13 - NFPA · BLD-SCM Richard J. Davis Alternate FM Global 1151 Boston-Providence Turnpike...
AGENDA NFPA Technical Committee on Structures and Construction & Materials
NFPA 703 and NFPA 5000 Second Draft Meeting Tuesday, May 21, 2013
DoubleTree Hotel San Diego Downtown 1646 Front Street
San Diego, California
1. Call to Order. Call meeting to order by Chair, Peter Willse, at 8:00 a.m. on May 21, 2013 at the Double Tree Hotel, San Diego, California.
2. Self-introduction of Committee Members and Guests. For a current committee roster, pg. 2.
3. Approval of Previous Meeting Minutes. Approve the May 22-23, 2012 meeting minutes, pg. 4.
4. Staff’s report - T. Vecchiarelli – New Process PowerPoint Presentation, pg. 6.
5. NFPA 703 Second Draft (formerly ROC) Preparation. Public Comments to be
distributed before the meeting date.
6. NFPA 5000 Second Draft (formerly ROC) Preparation. Public Comments to be distributed before the meeting date.
7. Hazardous Areas, pg. 12.
8. Definitions Task Group, pg. 13.
9. Next Meeting.
10. Other Business.
11. Adjournment.
Page 1 of 13
Address List No PhoneStructures, Construction, and Materials BLD-SCM
Building Code
Tracy L. Vecchiarelli04/02/2013
BLD-SCMPeter J. WillseChairXL Global Asset Protection Services100 Constitution Plaza, 12th FloorHartford, CT 06103
I 3/21/2006BLD-SCM
Jesse J. BeitelPrincipalHughes Associates, Inc.3610 Commerce Drive, Suite 817Baltimore, MD 21227-1652
SE 3/21/2006
BLD-SCMPaul D. CoatsPrincipalAmerican Wood Council4695 Hannah DriveRock Hill, SC 29732Alternate: Dennis L. Pitts
M 3/1/2011BLD-SCM
David S. CollinsPrincipalThe Preview Group, Inc.632 Race StreetCincinnati, OH 45202American Institute of Architects
SE 3/21/2006
BLD-SCMRalph DorioPrincipalInsurance Services Office, Inc.545 Washington BoulevardJersey City, NJ 07310-1686
I 3/21/2006BLD-SCM
Jeffrey FeidPrincipalState Farm Insurance CompanyOne State Farm Plaza, D-1Bloomington, IL 61710-0001
I 3/21/2006
BLD-SCMWilliam E. FitchPrincipalPhyrefish.com31 SE 5th Street, Suite 3815Miami, FL 33131-2528
SE 3/1/2011BLD-SCM
Michael A. GardnerPrincipalGypsum Association6525 Belcrest Road, Suite 480Hyattsville, MD 20782Alternate: Robert A. Wessel
M 3/21/2006
BLD-SCMMark S. GrahamPrincipalNational Roofing Contractors Association10255 West Higgins Road, Suite 600Rosemont, IL 60018-5607
IM 10/4/2007BLD-SCM
J. C. HarringtonPrincipalFM Global1151 Boston Providence TurnpikePO Box 9102Norwood, MA 02062-9102Alternate: Richard J. Davis
I 3/21/2006
BLD-SCMJoseph T. HollandPrincipalHoover Treated Wood Products1225 North Halifax AvenueDaytona Beach, FL 32118Alternate: David G. Bueche
M 3/21/2006BLD-SCM
Karl D. HouserPrincipalEBL Engineers, LLCEBL Fire Engineering8005 Harford RoadBaltimore, MD 21234-5701Association of the Wall and Ceiling Industries International
IM 3/1/2011
BLD-SCMMoriel E. KaplanPrincipalAon Fire Protection Engineering6305 Ivy Lane, Suite 220Greenbelt, MD 20770
I 10/27/2009BLD-SCM
Bonnie E. ManleyPrincipalAmerican Iron and Steel Institute41 Tucker RoadNorfolk, MA 02056Alternate: Farid Alfawakhiri
M 3/21/2006
1Page 2 of 13
Address List No PhoneStructures, Construction, and Materials BLD-SCM
Building Code
Tracy L. Vecchiarelli04/02/2013
BLD-SCMJoseph J. Messersmith, Jr.Principal11479 Primose LaneRockville, VA 23146Portland Cement Association
M 3/21/2006BLD-SCM
Eugene M. Novak, Jr.PrincipalCommonwealth of MassachusettsDepartment of Public Safety19 Partridge RoadFramingham, MA 01701-4242
E 3/21/2006
BLD-SCMKristen L. OwenPrincipalLonza Wood ProtectionArch Wood Protection2852 Raystone DriveValparaiso, IN 46384Alternate: Stephen C. Shields
M 10/18/2011BLD-SCM
Robert A. SpeedPrincipalNorth Carolina Office of the State Fire MarshalEngineering Division, Evaluation Services Section322 Chapanoke RoadRaleigh, NC 27603Alternate: Helen DiPietro
E 03/05/2012
BLD-SCMJoseph H. VersteegPrincipalVersteeg Associates86 University DriveTorrington, CT 06790International Fire Marshals Association
E 3/21/2006BLD-SCM
Farid AlfawakhiriAlternateAmerican Iron and Steel Institute380 Cottonwood LaneNaperville, IL 60540Principal: Bonnie E. Manley
M 7/23/2008
BLD-SCMDavid G. BuecheAlternateHoover Treated Wood Products13768 West Asbury CircleLakewood, CO 80228Principal: Joseph T. Holland
M 7/28/2006BLD-SCM
Richard J. DavisAlternateFM Global1151 Boston-Providence TurnpikePO Box 9102Norwood, MA 02062-9102Principal: J. C. Harrington
I 3/21/2006
BLD-SCMHelen DiPietroAlternateNorth Carolina Department of InsuranceOffice of State Fire MarshalMail Service Center 1202Raleigh, NC 27699-1202Principal: Robert A. Speed
E 10/29/2012BLD-SCM
Dennis L. PittsAlternateAmerican Wood Council1721 West Plano Parkway, #224Plano, TX 75075Principal: Paul D. Coats
M 3/21/2006
BLD-SCMStephen C. ShieldsAlternateArch Wood Protection, Inc., A Lonza Company5660 New Northside DriveAtlanta, GA 30328Principal: Kristen L. Owen
M 08/09/2012BLD-SCM
Robert A. WesselAlternateGypsum Association6525 Belcrest Road, Suite 480Hyattsville, MD 20782Principal: Michael A. Gardner
M 10/29/2012
BLD-SCMTracy L. VecchiarelliStaff LiaisonNational Fire Protection Association1 Batterymarch ParkQuincy, MA 02169-7471
01/04/2010
2Page 3 of 13
BLDSCM 52012 FIRST DRAFT Meeting Minutes / Page 1
COMMITTEES ON NFPA BUILDING CODE Technical Committee on Structures, Construction and Materials
NFPA 703 and 5000 First Draft Meeting Minutes Tuesday-Wednesday, May 22-23, 2012
Indianapolis Convention Center Indianapolis, IN
1. Call to Order. The meeting was called to order by Chair Peter Willse at 1:00 p.m. on May 22, 2012 at the Indianapolis Convention Center, Indianapolis, IN.
2. Introduction of Committee Members and Guests. TECHNICAL COMMITTEE MEMBERS PRESENT
NAME COMPANY Peter J. Willse, Chair XL Global Asset Protection Services Tracy Golinveaux, (Staff-Nonvoting) National Fire Protection Association Paul D. Coats, Principal American Wood Council Jeffrey Feid, Principal State Farm Insurance Company William E. Fitch, Principal Phyrefish.com Mark S. Graham, Principal National Roofing Contractors Association J.C. Harrington, Principal FM Global Joseph T. Holland, Principal Hoover Treated Wood Products Kristen J. Owen, Principal Arch Wood Protection, Inc. A. Lonza
Company Robert A. Speed, Principal North Carolina Office of the State Fire
Marshal Joseph H. Versteeg, Principal Versteeg Associates
Rep: International Fire Marshals Assn. David G. Bueche Alt. to Joseph T. Holland
Hoover Treated Wood Products
Moriel E. Kaplan, Voting Alternate to AON Rep.
Aon Schirmer Engineering Corporation
GUESTS
NAME COMPANY Jonathan Humble American Iron and Steel Institute
Page 4 of 13
BLDSCM 52012 FIRST DRAFT Meeting Minutes / Page 2
TECHNICAL COMMITTEE MEMBERS NOT PRESENT
NAME COMPANY Jesse J. Beitel, Principal Hughes Associates, Inc. David S. Collins, Principal The Preview Group, Inc.
Rep: American Institute of Architects Ralph Dorio, Principal Insurance Services Office, Inc. Michael A. Gardner, Principal Gypsum Association Karl D. Houser, Principal EBL Engineers, LLC
Rep: Association of the Wall and Ceiling Industries International
Bonnie E. Manley, Principal American Iron and Steel Institute Joseph J. Messersmith, Jr., Principal Rep: Portland Cement Association Eugene M. Novak, Jr., Principal Commonwealth of Massachusetts/Dept. of
Public Safety
3. Approval of Prior Meeting Minutes. The October 5, 2010 meeting minutes were approved as written and distributed.
4. The New Process Review and Staff Liaison Report. Allan Fraser presented the New
Process Review and Tracy Golinveaux reviewed the meeting actions and staff report.
5. NFPA 703 First Draft (formerly ROP) Preparation. The committee reviewed all of the submitted Public Inputs and developed First Revisions.
6. NFPA 5000 First Draft (formerly ROP) Preparation. The committee reviewed all of the submitted Public Inputs and developed First Revisions.
7. Suggested Editorial Revisions. The recommended editorial revisions were included in the agenda package and were reviewed as part of the First Draft Preparations.
8. Other Business.
9. Future Meetings. The proposed Second Draft meeting date is May 21, 2013. The location is TBD.
10. Adjournment. The meeting was adjourned at 6:00pm on May 22, 2012.
Page 5 of 13
4/2/2013
1
NFPA Second Draft MeetingNFPA Second Draft Meeting
NFPA 101/5000Structures, Construction,
Materials
May 20, 2013
San Diego, CA
1
NFPA Second Draft MeetingNFPA Second Draft Meeting
At this and all NFPA committee meetings we are concerned with your safety
If the fire alarm sounds, pleaseIf the fire alarm sounds, please proceed to an exit
2
NFPA Second Draft MeetingNFPA Second Draft Meeting
Members, please verify/update your contact information
Use of tape recorders or other means capable of reproducing verbatimcapable of reproducing verbatim transcriptions of this meeting is not permitted
3
NFPA Second Draft MeetingNFPA Second Draft Meeting
GuestsAll guests are asked to sign in and
identify their affiliations
Participation is limited to TC members or those individuals who have previously requested time to address the committee
Other participation is granted at the discretion of the Chair
Guest seating is located around the room
4
NFPA Second Draft MeetingNFPA Second Draft Meeting
Members categorized in ANY interest category who have been retained to represent the interests of ANOTHER interest category must declare those interests to the committee and refrain from voting, both in the meeting and on the ballot item
5
NFPA Second Draft MeetingNFPA Second Draft Meeting
General ProceduresFollow Robert’s Rules of Order
Di i i tiDiscussion requires a motion
6
Page 6 of 13
4/2/2013
2
NFPA Second Draft MeetingNFPA Second Draft Meeting
Motions for Ending Debate - Move Previous Question or “Call the Question”Not in order when another has the floor
Requires a second
This motion is not debatable and does not automatically stop debate
A 2/3 affirmative vote immediately closes debate and returns to the original motion on the floor
Less then 2/3 allows debate to continue
7
NFPA Second Draft MeetingNFPA Second Draft Meeting
Committee member actions:
Member addresses the chair Receives recognition from the chair I t d th ti Introduces the motion Another member seconds the
motion
8
NFPA Second Draft MeetingNFPA Second Draft Meeting
Committee chair actions:
States the motionCalls for discussionEnsures all issues have been heardTakes the voteAnnounces the result of the vote
9
NFPA Second Draft MeetingNFPA Second Draft Meeting
Technical Committee on Building ConstructionConsumer, 0 Member: 0%Enforcer, 3 Members: 16%Insurance 5 Member: 26%Insurance, 5 Member: 26%Manufacturer, 6 Members: 32%Research & Testing, 0 Member: 0%Special Expert, 3 Members: 16%User, 0 Members: 0%Installer/Maintainer, 2 Members: 11%Labor, 0 Members: 0%
10
NFPA Second Draft MeetingNFPA Second Draft Meeting
Timeline
Comment Stage (Second Draft):Public Comment Closing Date: 05/03/2013Second Draft Meeting: TodayPosting of Second Draft for TC Balloting: 08/23/2013Posting of Second Draft for TC Balloting: 08/23/2013Posting of Second Draft for NITMAM: 01/03/2014
Tech Session Preparation:NITMAM Closing Date: 02/07/2014NITMAM /CAM Posting Date: 04/04/2014NFPA Annual Meeting: 06/09-12/2014 (Las Vegas)
Standards Council Issuance: Issuance of Documents with CAM: 08/14/2014 edition date
11
NFPA Second Draft MeetingNFPA Second Draft MeetingNew Process New Process –– What’s New?What’s New?
Changes in Terms:New Term Old Term
Comment Stage ROC Stage
Public Comment Public Comment
Second Draft Meeting ROC Meeting
Second RevisionCommittee Comment or Accepted
Public Comment
Committee Comment(a Second Revision that failed
ballot)
(a Comment reported as Rejected due to failed ballot)
Second Draft Report ROC
Second Draft ROC Draft
12
Page 7 of 13
4/2/2013
3
NFPA Second Draft MeetingNFPA Second Draft Meeting
• Technical Committee Actions:
Resolving Public CommentsResolving Public Comments Committee Action and Committee Statement
Creating Second Revisions
13 14
NFPA Second Draft MeetingNFPA Second Draft Meeting
• Resolving Public Comments (See Regs §4.4.8.1)Committee develops a Committee Action Accept
Reject but see…
Reject
Reject but Hold
15
NFPA Second Draft MeetingNFPA Second Draft Meeting
• Committee StatementsCommittee must clearly indicate reasons for not
accepting the recommendation and/or point to a relevant Second RevisionAll Public Comments Actions must have a
Committee StatementCommittee StatementMust include a valid technical reasonNo vague references to “intent”Explain how the submitter’s substantiation is
inadequateNeither Public Comment Actions nor Committee
Statements get balloted
16
NFPA Second Draft MeetingNFPA Second Draft Meeting
• Create a Second Revision (SR)Committee wants to make a change (to
add, delete or modify) the First Draft
Committee develops a Committee Statement (CS) substantiating the change
Each SR gets balloted
17
NFPA Second Draft MeetingNFPA Second Draft Meeting
No “new material” after the Public Input Stage since it hasn’t had the benefit of public review
What constitutes new material is decided by th T h i l C itt C l tithe Technical Committee or Correlating Committee
Adding “new material” at the Comment Stage could successfully be challenged through appeal to the Standards Council
18
Page 8 of 13
4/2/2013
4
NFPA Second Draft MeetingNFPA Second Draft Meeting
Formal voting Voting during meeting is used to
establish a sense of agreement (simple majority)(simple majority)
Secured by letter ballot (2/3 agreement)Only the results of the formal ballot
determine the official position of the committee on the Second Draft
19
NFPA Second Draft MeetingNFPA Second Draft Meeting
Ballots are on the Second Revisions (SR) ONLYPublic Comment Actions and Committee
Statements not ballotedReference materials are available - Second Draft, Public Comments, First Draft Report
Ballot form allows you to vote: Ballot form allows you to vote: Affirmative on all SRAffirmative on all SR with exceptions specifically
noted Ballot form provides a column for affirmative
with commentNote: This box needs to be checked only if there
is an accompanying comment Reject or abstain requires a reason 20
NFPA Second Draft MeetingNFPA Second Draft Meeting
Initial ballot
Circulation of negatives and comments
Members may change votes during circulationcirculation
Second Revision that fails letter ballot is designated as a Committee Comment (in the 2nd Draft Report), marked as “Reject” and deleted from the Second Draft.
21
NFPA Second Draft MeetingNFPA Second Draft Meeting
If a Second Revision fails ballot and the subject text was a result of a First Draft change, a Supplementary Ballot is conducted
Ballot asks TC if it still favors the First Revision change reported in the First DraftIf Y h S d If Yes, same change appears as Second Revision and is shown in the Second Draft
If No, the change appears as a Committee Comment (rejected) and the text reverts to previous edition
See Regs §4.4.10.2.1
22
Electronic Balloting Electronic Balloting • Ballots will be an online format• Alternates are strongly encouraged
to return ballots
• Ballot session will time out after 90 minutes
• Use “submit” to save your work
23
Electronic Balloting Electronic Balloting
Click link on the ballot email received
Sign in with NFPA.org Committee Login and Password
24
Page 9 of 13
4/2/2013
5
Electronic Balloting Electronic Balloting
Select either Affirmative on All or Affirmative with Exception(s)
25
Electronic Balloting Electronic Balloting
Use “See FR/SR - #” link to review all First/Second Revisions
Use “Edit election” to change individual votes or to modify vote after submitting ballot
Choosing AFFIRMATIVE ON ALL
26
Electronic Balloting Electronic Balloting
Make selection: Affirmative with Comment, Negative, or Abstain
No selection made-defaults to affirmative Must include comment on each vote
Choosing AFFIRMATIVE WITH EXCEPTION(S)
27
Electronic Balloting Electronic Balloting
To complete ballot click Participant Consent and Submit
Return and edit any votes before ballot due date
28
TC Struggles with an Issue
• TC needs data on a new technology or
i
Code Fund Lends a Hand
• TC rep and/or staff liaison submits a C d F d
Research Project Carried Out
• Funding for project is provided by th C d F demerging
issue• Two opposing
views on an issue with no real data
• Data presented is not trusted by committee
Code Fund Request
• Requests are reviewed by a Panel and chosen based on need / feasibility
the Code Fund and/or industry sponsors
• Project is completed and data is available to TC
www.nfpa.org/codefund29
LegalLegal
Antitrust: the single most important provision- Federal law prohibits contracts, combinations, or conspiracies which unreasonably restrain trade or commerce Section 1 of the Sherman Act
Patent: Disclosures of essential patent claims should be made by the patent holder, but others may also notify NFPA if they believe that a proposed or existing NFPA standard includes an essential patent claim
30
Page 10 of 13
4/2/2013
6
LegalLegal
Activities Disapproved by the CourtsPacking meetings
Hiding commercial interest throwing the committees out of balance
No final decision-making authority to unbalanced Task Groups; include all interested parties
Hiding scientific or technical information from committees
31
Doc Info PagesDoc Info Pages
32
NFPA Second Draft MeetingNFPA Second Draft Meeting
Any questions?
33
Page 11 of 13
Hazardous Areas Attachment The Minutes item from the SAF-AAC Correlating Committee’s November 6, 2012 meeting follows:
• Hazardous Materials. Jeff Tubbs raised the issue of whether NFPA 101 should address hazardous materials (as done in NFPA 5000 Chapter 34). The committee noted that health hazards are not within the scope of NFPA 101. Conflicts exist among the NFPA codes. It was agreed to: o Add the subject of hazardous materials to the agenda for all NFPA 101 technical committee Second Draft meetings o Gather comments from each technical committee including whether it
wants to participate in a task group on the subject of hazardous materials o Report results to the Correlating Committee at its Second Draft review meeting o Ask the Standards Council, after the Correlating Committee’s Second Draft meeting, to establish a task group from the membership of the NFPA 1, 30, 101, 400 and 5000 committees to address conflicts and overlapping requirements related to hazardous materials
Page 12 of 13
1
Cote, Ron
From: Cote, RonSent: Wednesday, November 21, 2012 2:33 PMTo: Bigda, Kristin; Harrington, Greg; Fraser, Allan; Vecchiarelli, TracyCc: Solomon, RobertSubject: SAF Agenda Item for Second Draft Meetings
Please add the subject of Definitions to each SAF/BLD technical committee Second Draft meeting agenda for which you serve as staff liaison. Each Technical Committee chair is asked to identify a member to serve on the definitions task group. The Minutes item from the SAF-AAC Correlating Committee’s November 6, 2012 meeting follows:
Definitions. The committee agreed to have each defined term assigned to a specific technical committee so that committee would have responsibility for the maintenance and revision of such term. A task group is to be formed after the Second Draft meetings of the current revision cycle. The task group will report to the Correlating Committee (CC) its recommendations for the definitions assignments in time for the CC to review the recommendations at its first meeting of the 2018 revision cycle. Each Technical Committee chair is asked to identify a member to serve on the task group.
Allan and Tracy, the BLD-AAC Correlating Committee asked that same be done by the NFPA 5000 TCs. Ron Coté, P.E. Principal Life Safety Engineer NFPA - Quincy, MA USA
Page 13 of 13