Page: 1 FY - FY - 2018 2024 THRU Plan... · six year highway plan page: 2 fy - fy - 2018 2024 thru...

141
KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - THRU 2018 2024 COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION 12 JAN 2018 ADDRESS DEFICIENCIES OF BRIDGE ON KY 704 (11.909) OVER PETTY'S FORK. (001B00078N)(SD) ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 43.02 TO MILEPOINT 57.79 ADDRESS DEFICIENCIES OF BRIDGE OVER BAYS FORK ON MITCHELL WEAVER ROAD (CR 1328) 2.1 MI W OF KY 1332 (002C00063N)(16CCN) IMPROVE KY-100 (OLD GALLATIN ROAD) FROM SOUTH OF KY-2160 TO KY-980. (06CCN) ADDRESS DEFICIENCIES OF KY-3499 BRIDGE OVER BAYS FORK. (002B00004N) ADDRESS DEFICIENCIES OF KY 585 BRIDGE OVER MIDDLE FORK DRAKES CREEK. (002B00021N) ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 58.3 TO MILEPOINT 61.84 PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHEL CHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10) (06CCR)(12CCR)(14CCR). PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHEL CHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10) (06CCR)(12CCR)(14CCR). .020 .341 3.700 3.700 ADAIR ADAIR ALLEN ALLEN ALLEN ALLEN ANDERSON BALLARD BALLARD KY-704 LN-9008 CR-1328 KY-100 KY-3499 KY-585 BG-9002 US-60 US-60 $665,000 $4,400,000 $1,596,000 $1,250,000 $700,000 $1,067,500 $1,650,000 $6,000,000 $2,500,000 Total Total Total Total Total Total Total Total Total D C D C D C C D C D C D C R U R PHASE PHASE PHASE PHASE PHASE PHASE PHASE PHASE PHASE 2019 2020 2023 2023 2019 2020 2018 2019 2020 2019 2020 2024 2024 2022 2023 2024 YEAR YEAR YEAR YEAR YEAR YEAR YEAR YEAR YEAR BR BR PM PM BR BR SPP BR BR BR BR PM PM NH NH NH FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING $175,000 $490,000 $400,000 $4,000,000 $280,000 $1,316,000 $1,250,000 $175,000 $525,000 $245,000 $822,500 $150,000 $1,500,000 $2,500,000 $3,500,000 $2,500,000 AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT 08 08 03 03 03 03 07 01 01 1068.00 20000.00 1088.00 8305.00 10000.00 10011.00 20001.00 115.00 115.01 - - - - - - - - - Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: SIMPSON MCCRACKEN MCCRACKEN 08 08 03 03 03 03 07 01 01 1068.00 20000.00 1088.00 8305.00 10000.00 10011.00 20001.00 115.00 115.00 - - - - - - - - - Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: 2018 2018 2018 2006 2018 2018 2018 1998 2006 2018 2018 2018 2006 2018 2018 2018 1998 1998 11.905 43.02 .35 14.1 1.412 0 58.3 13.62 13.62 11.913 48.15 .39 14.441 1.422 .002 61.84 16.937 16.937 Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: To: To: To: To: To: To: To: To: To: From: From: From: From: From: From: From: From: From: ASSET MANAGEMENT / AM-BRIDGE (P) ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P) ASSET MANAGEMENT / AM-BRIDGE (P) RELIABILITY / RECONSTRUCTION(O) ASSET MANAGEMENT / AM-BRIDGE (P) ASSET MANAGEMENT / AM-BRIDGE (P) ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P) RELIABILITY / MAJOR WIDENING(O) 8.326 0 0 8.354 .385 .385 Milepoints: Milepoints: Milepoints: To: To: To: From: From: From:

Transcript of Page: 1 FY - FY - 2018 2024 THRU Plan... · six year highway plan page: 2 fy - fy - 2018 2024 thru...

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 1

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE ON KY 704 (11.909) OVER PETTY'S FORK.(001B00078N)(SD)

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 43.02 TO MILEPOINT 57.79

ADDRESS DEFICIENCIES OF BRIDGE OVER BAYS FORK ON MITCHELL WEAVERROAD (CR 1328) 2.1 MI W OF KY 1332 (002C00063N)(16CCN)

IMPROVE KY-100 (OLD GALLATIN ROAD) FROM SOUTH OF KY-2160 TO KY-980.(06CCN)

ADDRESS DEFICIENCIES OF KY-3499 BRIDGE OVER BAYS FORK. (002B00004N)

ADDRESS DEFICIENCIES OF KY 585 BRIDGE OVER MIDDLE FORK DRAKESCREEK. (002B00021N)

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 58.3 TO MILEPOINT 61.84

PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHELCHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10)(06CCR)(12CCR)(14CCR).

PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHELCHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10)(06CCR)(12CCR)(14CCR).

.020

.341

3.700

3.700

ADAIR

ADAIR

ALLEN

ALLEN

ALLEN

ALLEN

ANDERSON

BALLARD

BALLARD

KY-704

LN-9008

CR-1328

KY-100

KY-3499

KY-585

BG-9002

US-60

US-60

$665,000

$4,400,000

$1,596,000

$1,250,000

$700,000

$1,067,500

$1,650,000

$6,000,000

$2,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

C

D

C

D

C

D

C

R

U

R

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2023

2023

2019

2020

2018

2019

2020

2019

2020

2024

2024

2022

2023

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

BR

BR

SPP

BR

BR

BR

BR

PM

PM

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$490,000

$400,000

$4,000,000

$280,000

$1,316,000

$1,250,000

$175,000

$525,000

$245,000

$822,500

$150,000

$1,500,000

$2,500,000

$3,500,000

$2,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

03

03

03

03

07

01

01

1068.00

20000.00

1088.00

8305.00

10000.00

10011.00

20001.00

115.00

115.01

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

SIMPSON

MCCRACKEN

MCCRACKEN

08

08

03

03

03

03

07

01

01

1068.00

20000.00

1088.00

8305.00

10000.00

10011.00

20001.00

115.00

115.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2006

2018

2018

2018

1998

2006

2018

2018

2018

2006

2018

2018

2018

1998

1998

11.905

43.02

.35

14.1

1.412

0

58.3

13.62

13.62

11.913

48.15

.39

14.441

1.422

.002

61.84

16.937

16.937

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

RELIABILITY / MAJOR WIDENING(O)

8.326

0

0

8.354

.385

.385

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 2

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE US-60 FROM PROPOSED SOUTHERN BYPASS OF LA CENTER TO EAST OFDENIS JONES ROAD. (02CCR)

PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION. (004B00021N)(SD)

PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.(SD)

PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PRIORITY SECTION 3: IMPROVE KY-90 EAST OF GLASGOW FROM BRIDGE OVERFALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)

PRIORITY SECTION 3: IMPROVE KY-90 EAST OF GLASGOW FROM BRIDGE OVERFALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)

LOUIE B NUNN PKWY (LN-9008) BRIDGE PAINTING, CLEANING, AND MINORREPAIRS ON BRIDGE OVER I-65 IN BARREN CO. KY. 005B00067R, 005B00067L(2016BOP)

IMPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E (ROGER WELLS),AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM KY-1297 TO US-68 IN GLASGOW.(14CCN) (16CCN)

1.800

.970

.970

4.217

4.217

.100

1.721

BALLARD

BALLARD

BALLARD

BALLARD

BALLARD

BARREN

BARREN

BARREN

BARREN

US-60

US-51

US-51

US-51

US-51

KY-90

KY-90

LN-9008

KY-1297

$4,270,000

$53,100,000

$56,000,000

$20,000,000

$3,025,000

$3,950,000

$9,210,000

$500,000

$4,250,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

D

R

U

C

D

C

D

D

C

C

C

C

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2024

2024

2019

2023

2023

2023

2020

2024

2021

2020

2020

2022

2023

2018

2022

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

BR

BR

BR

BR

BR

BR

BR

PM

PM

STP

STP

NH

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,370,000

$1,900,000

$2,500,000

$1,000,000

$100,000

$49,500,000

$6,500,000

$49,500,000

$20,000,000

$275,000

$2,750,000

$3,950,000

$9,210,000

$500,000

$2,250,000

$2,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

03

03

03

03

118.00

1140.01

1140.02

1140.03

20000.00

108.50

108.51

195.00

8821.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

01

01

03

03

03

03

118.00

1140.00

1140.02

1140.03

20000.00

108.00

108.51

195.00

8821.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2018

2018

2018

2018

2000

2018

2016

2016

2000

2018

2018

2018

2018

2000

2018

2016

2016

11.815

7.327

7.327

7.327

4.873

17.758

17.758

0

11.085

13.615

8.297

8.297

8.297

7.3

21.975

21.975

.1

12.806

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(P)

ASSET MANAGEMENT / AM-BRG PAINTING(P)

RELIABILITY / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 3

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E (ROGER WELLS),AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM KY-1297 TO US-68 IN GLASGOW.(14CCN) (16CCN)

ADDRESS DEFICIENCIES OF US 31EX BRIDGE OVER WATER STREET. (005B00058N)

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROMMILEPOINT 42.89 TO MILEPOINT 43.307

ADDRESS PAVEMENT CONDITION OF I-065 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 45.935 TO MILEPOINT 46.881

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 16.117 TO MILEPOINT 20.1

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 20.1 TO MILEPOINT 22.357

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 9.375 TO MILEPOINT 14.85

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION ON US-68 FROM MILEPOINT 0.00 TO MILEPOINT9.70

1.721

9.700

BARREN

BARREN

BARREN

BARREN

BARREN

BARREN

BARREN

BARREN

BARREN

KY-1297

US-31EX

I-65

I-65

LN-9008

LN-9008

LN-9008

US-68X

US-68

$4,250,000

$1,190,000

$550,000

$550,000

$3,520,000

$1,980,000

$4,840,000

$4,400,000

$1,180,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

D

C

D

C

D

C

D

C

D

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2023

2019

2020

2019

2019

2024

2024

2019

2019

2021

2021

2021

2021

2021

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

BR

BR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,250,000

$2,000,000

$245,000

$945,000

$50,000

$500,000

$50,000

$500,000

$320,000

$3,200,000

$180,000

$1,800,000

$440,000

$4,400,000

$400,000

$4,000,000

$1,180,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

03

8821.01

10001.00

20000.00

20001.00

20003.00

20004.00

20005.00

20006.00

20020.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

03

03

03

8821.00

10001.00

20000.00

20001.00

20003.00

20004.00

20005.00

20006.00

20020.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2016

2018

2018

2018

2018

2018

2018

2018

2018

11.085

1.582

42.89

45.935

16.117

20.1

9.375

1.692

0

12.806

1.586

43.307

46.881

20.1

22.357

14.85

2.523

9.7

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 4

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION ON US-68 FROM MILEPOINT 16.95 TOMILEPOINT 23.16

IMPROVE SAFETY AND EFFICIENCY AT THE KY-211 AND US-60 INTERSECTION INSALT LICK. (14CCN)

ADDRESS DEFICIENCIES OF KY-1106 BRIDGE OVER FLAT CREEK. (006B00069N)

ADDRESS DEFICIENCIES OF KY-1944 BRIDGE OVER WHITE OAK CREEK.(006B00076N)

ADDRESS DEFICIENCIES OF KY 211 BRIDGE OVER COW CREEK. (006B00043N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRD CREEK.(007B00071N)

ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRD CREEK.(007B00072N)

ADDRESS DEFICIENCIES OF CR-1041 BRIDGE OVER YORK BRANCH. (007C00003N)

6.210

.200

BARREN

BATH

BATH

BATH

BATH

BATH

BELL

BELL

BELL

US-68

US-60

KY-1106

KY-1944

KY-211

US-60

KY-2011

KY-2011

CR-1041

$920,000

$1,000,000

$2,853,000

$1,488,000

$1,032,500

$410,000

$616,000

$966,000

$788,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

C

D

C

D

C

D

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2020

2019

2020

2019

2020

2019

2020

2019

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

STP

BR

BR

BR

BR

BR

BR

PM

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$920,000

$1,000,000

$595,000

$2,258,000

$473,000

$1,015,000

$315,000

$717,500

$410,000

$175,000

$441,000

$175,000

$791,000

$193,000

$595,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

09

09

09

09

09

11

11

11

20021.00

8813.00

10000.00

10001.00

10017.00

20001.00

10000.00

10001.00

10002.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

09

09

09

09

09

11

11

11

20021.00

8813.00

10000.00

10001.00

10017.00

20001.00

10000.00

10001.00

10002.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2014

2018

2018

2018

2018

2018

2018

2018

2018

2014

2018

2018

2018

2018

2018

2018

2018

16.95

16.3

3.291

2.701

8.166

6.35

6.395

7.534

.091

23.16

16.5

3.327

2.715

8.178

7.724

6.399

7.54

.097

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 5

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY 92 BRIDGE OVER GREASY CREEK. (007B00040N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION ON US-25E FROM MILEPOINT 0.90 TOMILEPOINT 2.86

IMPROVE THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)

IMPROVE THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)

ADD AUXILIARY LANES ON I-71/75 FROM KY-536 TO US-42 (NB & SB) AS PER THEINTERCHANGE JUSTIFICATION STUDY (IJS).(10CCR)(12CCR)

IMPROVE FREIGHT MOBILITY AT I-275 AND GRAVES ROAD (CONTINUATION OF 6-8953: INTERCHANGE JUSTIFICATION STUDY ON I-275/GRAVES RD).

IMPROVE FREIGHT MOBILITY AT I-275 AND GRAVES ROAD (CONTINUATION OF 6-8953: INTERCHANGE JUSTIFICATION STUDY ON I-275/GRAVES RD).

IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THEJUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS.

1.960

.686

.686

2.067

BELL

BELL

BELL

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

KY-92

KY-2012

US-25E

I-75

I-75

I-75

I-275

I-275

I-75

$665,000

$671,000

$1,391,000

$10,430,000

$17,080,000

$11,060,000

$30,000,000

$15,000,000

$2,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

U

C

C

U

C

D

R

U

C

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2021

2022

2018

2022

2023

2018

2024

2019

2020

2020

2022

2023

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

PM

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$490,000

$61,000

$610,000

$1,391,000

$5,430,000

$5,000,000

$17,080,000

$1,060,000

$10,000,000

$4,000,000

$8,000,000

$3,000,000

$15,000,000

$15,000,000

$2,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

06

06

06

06

06

06

10038.00

20000.00

20021.00

14.00

14.02

14.50

78.00

78.01

79.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

06

06

06

06

06

06

10038.00

20000.00

20021.00

14.00

14.02

14.01

78.00

78.01

79.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2004

2008

2008

2018

2018

2018

2018

2018

2018

2004

2008

2006

2018

2018

2018

3.142

0

.9

177.659

178.033

178.039

7.2

7.2

184.148

3.148

1.95

2.86

178.345

178.133

180.106

8.9

8.9

185.34

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)

RELIABILITY / MINOR WIDENING(O)

ECONOMIC DEVELOPMENT / NEW INTERCHANGE(O)

ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)

RELIABILITY / CONGESTION MITIGTN(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 6

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

REDUCE CONGESTION AND IMPROVE TRAFFIC MOBILITY AT THEINTERCHANGE OF I-75 AND KY-14 IN WALTON.

MINOR WIDENING AND CONSTRUCT A SOUTHBOUND LEFT TURN LANE ON US-25(DRY RIDGE-FLORENCE ROAD) AT MUBEA.

IMPROVE MOBILITY AT THE INTERSECTION OF KY-842 AND US-42.(12CCR)(16CCN)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

.374

.263

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

I-75

US-25

US-42

-

-

-

-

-

$500,000

$1,100,000

$2,500,000

$414,000

$44,000

$44,000

$44,000

$44,000

Total

Total

Total

Total

Total

Total

Total

Total

P

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2019

2018

2018

2019

2020

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

SPP

STP

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$1,100,000

$2,500,000

$414,000

$44,000

$44,000

$44,000

$44,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

80.00

351.45

367.00

400.03

400.14

400.15

400.16

400.17

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

06

06

06

06

06

80.00

351.00

367.00

400.03

400.14

400.15

400.16

400.17

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2016

2016

2004

2014

2014

2016

2016

2018

1996

2016

2004

2014

2014

2016

2016

171

8.468

12.803

171.8

8.842

13.066

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

From:From:

From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 7

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

N KY PLANNING FY18 AIR QUALITY, FIAM, LAND USE, RIDESHARE. (2016BOP)

N KY PLANNING FY 2019 AIR QUALITY, FIAM, LAND USE, RIDESHARE. (2016BOP)

N KY PLANNING FY 2020 AIR QUALITY, FIAM, LAND USE, RIDESHARE.

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

-

-

-

-

-

-

-

-

$280,000

$56,000

$56,000

$56,000

$56,000

$150,000

$150,000

$150,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

P

P

P

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2021

2022

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$280,000

$56,000

$56,000

$56,000

$56,000

$150,000

$150,000

$150,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

401.09

401.14

401.15

401.16

401.17

401.18

401.19

401.20

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

06

06

06

06

06

401.09

401.14

401.15

401.16

401.17

401.00

401.00

401.20

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2014

2014

2016

2016

2016

2016

2018

2008

2014

2014

2016

2016

2004

2004

2018

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 8

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

N KY PLANNING FY 2021 AIR QUALITY, FIAM, LAND USE, RIDESHARE.

INCREASE THROUGH LANE CAPACITY ON KY 237 FROM I-275 RAMPS TOCARDINAL WAY AND IMPROVE WORLDWIDE BLVD WITH TWO-WAY LEFT TURNAND ADDITIONAL RIGHT TURN TO SB KY 237. (2012BOP)(ADM. BY KYTC)

RECONSTRUCTION OF THE INTERSECTION OF CAMP ERNST ROAD ANDLONGBRANCH ROAD. WIDENING OF 1,900 FEET OF LONGBRANCH ROAD.(2012BOP)

CORRECT GEOMETRIC DEFICIENCIES AND ADD LEFT TURN LANES ONFROGTOWN ROAD AT TRIPLE CROWN BLVD AND CEDARWOOD.(2012BOP)(ADM.BY KYTC)

IMPROVE SAFETY ALONG KY 717 AT THE 90 DEGREE BEND NEAR THE CIN/NKYAIRPORT, 0.337 MI N OF KY 1017. (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP) (2014BOP)

WIDEN KY 3159 (TED BUSHELMAN BLVD) FROM DOERING DRIVE TO KY 1017(AERO PARKWAY) TO PROVIDE A TWO-WAY LEFT TURN LANE TO IMPROVETRAFFIC FLOW FOR FUTURE DEVELOPMENT (2016BOP)

CONSTRUCT A MULTI-MODAL PATH ALONG KY 237 FROM STEPHENSELEMENTARY SCHOOL NORTH TO KY 20/PETERSBURG ROAD (2016BOP).

CONSTRUCT NEW SIDEWALKS, DEDICATED BIKE LANES AND RETAINING WALLSALONG DOLWICK ROAD TO MINEOLA PIKE TO OLYMPIC BLVD IN THE CITY OFERLANGER. (2016 BOP)

.450

.558

.450

.300

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

-

KY-237

CR-1002

KY-3060

KY-717

KY-3159

KY-237

KY-3076

$150,000

$3,000,000

$524,640

$1,520,000

$2,750,000

$1,000,000

$1,786,400

$1,856,000

Total

Total

Total

Total

Total

Total

Total

Total

P

C

C

R

U

C

R

U

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$150,000

$3,000,000

$524,640

$200,000

$120,000

$1,200,000

$1,500,000

$250,000

$1,000,000

$1,000,000

$1,786,400

$80,000

$200,000

$1,576,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

401.21

415.00

422.00

423.00

433.00

439.00

440.00

441.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTON

06

06

06

06

06

06

06

06

401.21

966.02

966.02

966.02

966.04

966.05

966.05

966.05

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2012

2012

2012

2014

2016

2016

2016

2018

2004

2004

2004

2006

2008

2008

2008

10.9

2.1

1.5

.7

.119

6.617

.825

11.35

2.658

1.95

1

.652

9.418

1.554

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY(P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / BIKE/PED FACIL(O)0 .883

Milepoints:Milepoints:

Milepoints:

To:To:

To:

From:From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 9

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADD A LEFT TURN LANE ON SB CAMP ERNST ROAD AT LONGBRANCH ROAD(2016BOP).

IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY-236 (DONALDSONROAD) FROM KY-842 (HOUSTON ROAD) TO KY-3076 (MINEOLA PIKE).

IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON KY-3076 (MINEOLAPIKE) FROM KY-236 TO I-275.

PROVIDE EAST-WEST CONNECTIVITY AND IMPROVED MOBILITY FROM KY-237(PLEASANT VALLEY ROAD) THRU KY-842 (HOPEFUL CHURCH ROAD) TO MALLROAD/I-75 INTERCHANGE.

IMPROVE MOBILITY AND REDUCE CONGESTION ON US-25 FROM WINNINGCOLORS DRIVE TO THE NORFOLK SOUTHERN RAILROAD CROSSING SOUTH OFKY-1829 (INDUSTRIAL ROAD); EXCLUDES GRADE SEPARATION AT KY-536.

SPOT IMPROVEMENTS AND CONGESTION MITIGATION IN BOONE COUNTY FORAMAZON DEVELOPMENT.

SPOT IMPROVEMENTS AND CONGESTION MITIGATION IN BOONE COUNTY FORAMAZON DEVELOPMENT. (ADDITIONAL FUNDING FOR 6-937.00)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

1.594

1.050

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

CR-1001

KY-236

KY-3076

US-42

US-25

-

-

-

$931,080

$8,000,000

$6,250,000

$1,500,000

$3,300,000

$1,000,000

$1,000,000

$35,140,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

P

D

R

D

R

U

D

D

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2019

2021

2022

2023

2020

2022

2023

2023

2023

2018

2019

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

STP

STP

STP

STP

STP

STP

NH

STP

SPP

SPP

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$400,000

$69,271

$461,809

$2,000,000

$5,000,000

$1,000,000

$1,500,000

$4,000,000

$750,000

$1,500,000

$3,300,000

$1,000,000

$1,000,000

$35,140,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

442.00

444.00

445.00

446.00

447.00

937.00

937.01

966.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTON

KENTONCAMPBELL

06

06

06

06

06

06

06

06

966.05

444.00

445.00

446.00

447.00

937.00

937.00

966.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2018

2018

2018

2018

2018

2018

2002

2008

2018

2018

2018

2018

2018

2018

2002

2.168

0

0

12.508

5.085

2.169

1.594

1.05

13.489

9.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MATCHED FED FUNDS(O)

2.684 2.801

Milepoints:Milepoints:

Milepoints:

Milepoints:Milepoints:

To:To:

To:

To:To:

From:From:

From:

From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 10

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2019 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

ADDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON RICHARDSONROAD (KY 842) 0.14 MI E OF US 25 NEAR INDEPENDENCE (008B00092N)

PHASE II: IMPROVE INTERSECTION OPERATIONS AT THE INTERSECTIONS OFIDLEWILD RD. (KY-338)/JEFFERSON ST./TEMPERATE ST. AND IMPROVEPEDESTRIAN SAFETY ALONG IDLEWILD RD. AND JEFFERSON ST. (AS PERAGREEMENT WITH COUNTY) (SEE 6-3019.00 PHASE I) (2012BOP)

.074

.189

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

-

-

-

-

-

-

KY-842

KY-338

$9,100,000

$9,200,000

$9,200,000

$9,200,000

$9,200,000

$9,200,000

$7,130,000

$500,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2023

2024

2019

2020

2020

2022

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SNK

BR

BR

BR

BR

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$9,100,000

$9,200,000

$9,200,000

$9,200,000

$9,200,000

$9,200,000

$480,000

$2,800,000

$350,000

$3,500,000

$500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

966.07

966.08

966.09

966.10

966.11

966.12

1087.00

3019.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

06

06

06

06

06

966.07

966.08

966.09

966.10

966.11

966.12

1087.00

3019.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2018

2018

2018

2012

2014

2014

2016

2016

2018

2018

2018

2010

.094

26.661

.141

26.85

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 11

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE KY-237 FROM VALLEY VIEW DRIVE TO ROGERS LANE. (14CCR)

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROMMILEPOINT 69.89 TO MILEPOINT 77.724.

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 169.439 TO MILEPOINT 183.08

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-075 BOTHDIRECTION(S) FROM MILEPOINT 183.08 (182.9 NON-CARDINAL) TO MILEPOINT183.312

ADDRESS PAVEMENT CONDITION OF I-275 BOTH DIRECTION(S) FROMMILEPOINT 13.076 TO MILEPOINT 13.7

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 1.58 TO MILEPOINT 7.25

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 7.25 TO MILEPOINT 13.08 (13.56 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

3.119BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

KY-237

I-71

I-75

I-75

I-275

I-275

I-275

KY-18

KY-237

$22,180,000

$7,150,000

$23,980,000

$1,100,000

$550,000

$9,350,000

$7,150,000

$2,475,000

$3,520,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2024

2024

2020

2020

2021

2021

2021

2021

2021

2021

2024

2024

2019

2019

2021

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$22,180,000

$650,000

$6,500,000

$2,180,000

$21,800,000

$100,000

$1,000,000

$50,000

$500,000

$850,000

$8,500,000

$650,000

$6,500,000

$225,000

$2,250,000

$320,000

$3,200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

8001.21

20001.00

20002.00

20004.00

20005.00

20006.00

20007.00

20008.00

20009.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

06

8001.00

20001.00

20002.00

20004.00

20005.00

20006.00

20007.00

20008.00

20009.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2018

2018

2018

2018

2018

2018

2018

2018

2000

2018

2018

2018

2018

2018

2018

2018

2018

2.251

69.89

169.439

183.08

13.08

1.58

7.25

15.256

9.5

5.37

77.724

183.08

183.312

13.7

7.25

13.08

16.632

10.3

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 12

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION ON US-42 FROM MILEPOINT 8.71 TO MILEPOINT11.63

ADDRESS DEFICIENCIES OF STRUCTURE OVER SCOTTS CREEK ON KY 3364, 0.7MILE NORTH OF US 460 AT NORTH MIDDLETOWN (BRIDGE IMPROVEMENTS).(03KYDN)(2012BOP) (16CCN)

IMPROVE US-460 FROM RUSSELL CAVE ROAD TO US-27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)

IMPROVE US-460 FROM RUSSELL CAVE ROAD TO US-27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)

ADDRESS DEFICIENCIES OF HOUSTON ANTIOCH RO BRIDGE OVER HOUSTONCREEK. (009C00031N)

ADDRESS DEFICIENCIES OF PEACOCK ROAD BRIDGE OVER CSX RR. (009R00605N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2018.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

2.920

.100

6.302

6.302

BOONE

BOURBON

BOURBON

BOURBON

BOURBON

BOURBON

BOURBON

BOYD

US-42

KY-3364

US-460

US-460

CR-1205

CR-1320

US-68X

-

$438,000

$1,568,000

$7,620,000

$10,410,000

$469,000

$738,500

$2,750,000

$6,265,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

R

U

C

D

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2018

2019

2019

2021

2021

2021

2023

2019

2020

2019

2020

2019

2019

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

KYD

STP

STP

STP

STP

STP

STP

BR

BR

BR

BR

PM

PM

SAH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$438,000

$1,568,000

$1,000,000

$1,000,000

$5,620,000

$2,030,000

$1,500,000

$6,880,000

$143,500

$325,500

$220,500

$518,000

$250,000

$2,500,000

$6,265,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

07

07

07

07

07

07

09

20047.00

365.10

8705.00

8705.01

10007.00

10008.00

20002.00

208.04

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GREENUP

06

07

07

07

07

07

07

09

20047.00

365.00

8705.00

8705.00

10007.00

10008.00

20002.00

208.04

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2012

2016

2018

2018

2018

2014

2018

2002

2012

2012

2018

2018

2018

2014

8.71

5.389

1.394

1.394

1.566

4.983

0

11.63

5.489

7.696

7.696

1.574

4.99

2.772

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / MATCHED FED FUNDS(O)Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 13

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2019.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2020.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2021.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2022.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2023.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2024.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PLANNING STUDY/ENVIRONMENTAL ASSESSMENT FOR RUSH OFF ROAD(2016BOP)

IMPROVE US-60 FROM I-64 AT INTERCHANGE 181 TO THE KY-180 INTERSECTIONAT CANNONSBURG. (08CCN) (10CCR)(12CCR)

IMPROVE US-60 FROM I-64 AT INTERCHANGE 181 TO THE KY-180 INTERSECTIONAT CANNONSBURG. (08CCN) (10CCR)(12CCR)

3.820

3.820

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

-

-

-

-

-

-

-

US-60

US-60

$1,200,000

$1,200,000

$1,600,000

$1,600,000

$1,600,000

$1,600,000

$48,000

$5,000,000

$15,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2023

2024

2018

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SAH

SAH

SAH

SAH

SAH

SAH

SAH

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,200,000

$1,200,000

$1,600,000

$1,600,000

$1,600,000

$1,600,000

$48,000

$5,000,000

$15,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

09

09

208.05

208.06

208.07

208.08

208.09

208.10

404.00

8400.00

8400.01

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

09

09

09

09

09

09

09

09

09

208.05

208.06

208.07

208.08

208.09

208.10

208.02

8400.00

8400.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2018

2018

2016

2008

2018

2014

2014

2016

2016

2018

2018

2014

2008

2008

.2

.2

4.02

4.023

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 14

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

SAFETY UPGRADES AND CONSTRUCT TURN LANES ON US-23 AT 12TH STREET -CATLETTSBURG. (14CCN)

ADDRESS DEFICIENCIES ON 12TH STREET BRIDGE OVER THE OHIO RIVER.JOINT PROJECT WITH OHIO. (010B00040N)(BSBP)

PAINTING AND PREVENTIVE MAINTENANCE ON CATLETTSBURG KENOVABRIDGE ON 35TH ST. OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO.(010B00062N)(BSBP)

ADDRESS DEFICIENCIES ON PERRY GENTRY BRIDGES OVER THE BIG SANDYRIVER. JOINT PROJECT WITH WEST VIRGINIA. (010B00046L AND 010B00046R)(SD)

ADDRESS DEFICIENCIES OF KY 854 BRIDGE OVER GARNER CREEK. (010B00045N)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 180.812 TO MILEPOINT 183.95

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 183.95 TO MILEPOINT 191.507

ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 10.67 TOMILEPOINT 16.95

ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 2.92 TO MILEPOINT10.67

.100

6.280

7.760

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

US-23

US-23S

US-60

I-64

KY-854

I-64

I-64

US-23

US-23

$920,000

$1,750,000

$1,200,000

$1,500,000

$1,610,000

$2,750,000

$6,600,000

$2,365,000

$4,288,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

D

C

D

C

D

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2020

2020

2019

2020

2019

2019

2023

2023

2022

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BR

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$920,000

$1,750,000

$1,200,000

$1,500,000

$525,000

$1,085,000

$250,000

$2,500,000

$600,000

$6,000,000

$2,365,000

$4,288,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

09

09

8801.00

10014.00

10015.00

10016.00

10018.00

20002.00

20003.00

20015.00

20016.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

92

09

09

8801.00

10014.00

10015.00

10016.00

10018.00

20002.00

3.00

20015.00

20016.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2018

2018

2018

2018

2018

2018

2018

2018

2014

2018

2018

2018

2018

2018

2018

2018

14.458

.048

12.636

191.404

7.068

180.812

183.95

10.67

2.92

14.558

.48

12.88

191.507

7.076

183.95

191.507

16.95

10.67

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 15

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF US 68 AND US 150 BRIDGE OVER CHAPLIN RIVER,PERRYVILLE. (SEE 7-242.01 FOR HPP FUNDS)(2005HPP-KY134)(011B00042N)(SD)

REPLACE U.S. 68 AND U.S. 150 BRIDGE OVER CHAPLIN RIVER, PERRYVILLE.011B00042N (2005HPP-KY134)(EARMARK DOES NOT COVER TOTAL PROJECT COSTOF $1,790,000).(SD)

ADDRESS PAVEMENT CONDITION ON US-127B FROM MILEPOINT 0.00 TOMILEPOINT 5.27

OPERATION OF AUGUSTA FERRY FOR FY 2019.(12CCR)(14CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2020.(12CCR)(14CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2021.

OPERATION OF AUGUSTA FERRY FOR FY 2022.

OPERATION OF AUGUSTA FERRY FOR FY 2023.

OPERATION OF AUGUSTA FERRY FOR FY 2024.

ADDRESS DEFICIENCIES OF KY 8 BRIDGE OVER HOLTS CREEK AT FOSTER.(012B00004N)

5.270

BOYLE

BOYLE

BOYLE

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

US-68

US-68

US-127B

KY-8

KY-8

KY-8

KY-8

KY-8

KY-8

KY-8

$1,253,000

$487,797

$2,301,000

$190,000

$190,000

$190,000

$190,000

$190,000

$190,000

$3,780,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2018

2022

2019

2020

2021

2022

2023

2024

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

HPP

PM

SPP

SPP

SPP

SPP

SPP

SPP

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,253,000

$487,797

$2,301,000

$190,000

$190,000

$190,000

$190,000

$190,000

$190,000

$455,000

$3,325,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

06

06

06

06

06

06

06

242.00

242.01

20024.00

355.21

355.22

355.23

355.24

355.25

355.26

10008.00

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

06

06

06

06

06

06

06

242.00

242.01

20024.00

355.21

355.22

355.23

355.24

355.25

355.26

10008.00

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2010

2018

2014

2014

2016

2016

2018

2018

2018

2018

2010

2018

2014

2014

2016

2016

2018

2018

2018

6.4

6.4

0

13.1

13.1

13.1

13.1

13.1

13.1

1.202

6.418

6.418

5.27

13.2

13.2

13.2

13.2

13.2

13.2

1.25

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 16

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION ON KY-8 FROM MILEPOINT 13.95 TOMILEPOINT 18.99

IMPROVE KY-205 FROM NORTH OF KY-1812 TO SOUTH OF PEGGS FORK RD.

IMPROVE KY-15 FROM THE INTERSECTION OF NEW KY-15/30 TO INTERSECTIONOF KY-1812.

ADDRESS DEFICIENCIES OF BRIDGE OVER FROZEN CREEK ON KY 378 0.7 MI N OFKY 1812. (013B00050N)

ADDRESS DEFICIENCIES OF MORRIS FORK ROAD BRIDGE OVER BURTON FORK.(013C00050N)

ADDRESS DEFICIENCIES OF LITTLE BUCKHORN ROAD BRIDGE OVER BUCKHORNCREEK. (013C00016N)(SD)

ADDRESS DEFICIENCIES OF KY 1812 BRIDGE OVER JOHNSON FORK. (013B00007N)

ADDRESS DEFICIENCIES OF BIG BRANCH ROAD BRIDGE OVER BIG BRANCHCREEK. (013C00008N)

ADDRESS DEFICIENCIES OF BRIDGE OVER SINKING CREEK ON DENTS BRIDGEROAD (CR 1021) 1.4 MI W OF KY 333 (014C00003N)

5.040

2.150

1.150

.028

.020

BRACKEN

BREATHITT

BREATHITT

BREATHITT

BREATHITT

BREATHITT

BREATHITT

BREATHITT

BRECKINRIDGE

KY-8

KY-205

KY-15

KY-378

CR-1233

CR-1124

KY-1812

CR-1104

CR-1021

$552,000

$2,030,000

$13,050,000

$735,000

$455,000

$490,000

$682,500

$560,000

$406,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

D

R

U

C

C

D

C

D

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2024

2021

2023

2019

2021

2022

2023

2020

2019

2020

2019

2020

2019

2020

2019

2020

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

STP

STP

NH

NH

NH

NH

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$552,000

$1,000,000

$1,030,000

$1,500,000

$2,900,000

$1,150,000

$7,500,000

$735,000

$140,000

$315,000

$140,000

$350,000

$175,000

$507,500

$175,000

$385,000

$406,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

10

10

10

10

10

10

10

04

20048.00

375.00

376.00

1110.00

10000.00

10001.00

10010.00

10011.00

1090.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

10

10

10

10

10

10

10

04

20048.00

375.00

376.00

1110.00

10000.00

10001.00

10010.00

10011.00

1090.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2014

2018

2018

2018

2018

2014

2018

2018

2018

2014

2018

2018

2018

2018

2014

13.95

7.804

16.75

.672

.034

.779

14.28

.809

1.42

18.99

9.954

17.9

.7

.04

.787

14.286

.815

1.44

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 17

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 0.00 TO MILEPOINT2.78

ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 3.45 TO MILEPOINT12.74

SECTION 5 - FROM US-31EX TO US-31E BYPASS. (2008BOPC).

WIDEN CEDAR GROVE ROAD (KY-480) FROM CEDAR GROVE ELEMENTARYSCHOOL TO VALLEY VIEW DRIVE. (12CCR)(14CCR) (SEE 5-391.3 FORINTERCHANGE IMPROVEMENTS)

IMPROVE OPERATIONAL PERFORMANCE OF THE I-65/KY-480 INTERCHANGEINCLUDING RAMP IMPROVEMENTS AND TURNING LANES.(12CCR)(14CCR)(2014BOP)(16CCR)

CONSTRUCT NEW I-65 INTERCHANGE BETWEEN KY-480 AND KY-245.

INSTALLATION OF NEW SIDEWALKS AND REHABILITATION OF EXISTINGSIDEWALKS TO FIX GAPS IN THE PEDESTRIAN NETWORK ALONG KY 44 FROMFRANK E. SIMON DRIVE (CITY PARK DRIVE) EAST TO KY 61 IN SHEPHERDSVILLE. KY 44 MILEPOINTS FROM 11.75 TO 12.25.(2016BOP)

WIDEN I-65 FROM 6 TO 8 LANES FROM KY-61 (PRESTON HIGHWAY) IN LEBANONJUNCTION TO I-265 (GENE SNYDER FREEWAY)

STUDY NEW CONNECTION BETWEEN I-65 IN BULLITT COUNTY TO I-64 IN SHELBYCOUNTY TO I-71 IN OLDHAM COUNTY.

2.780

9.290

.500

.830

.500

.500

18.392

BRECKINRIDGE

BRECKINRIDGE

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

US-60

US-60

KY-44

KY-480

KY-480

I-65

KY-44

I-65

-

$642,000

$1,739,000

$3,100,000

$6,240,000

$5,970,000

$18,720,000

$340,000

$7,720,000

$2,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

R

U

C

C

C

R

U

C

P

D

P

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2022

2019

2024

2024

2022

2023

2018

2018

2018

2019

2020

2022

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

SPP

SPP

SPP

STP

NH

NH

SLO

SLO

SLO

NH

NH

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$642,000

$1,739,000

$1,000,000

$1,550,000

$550,000

$6,240,000

$5,970,000

$18,720,000

$60,000

$60,000

$220,000

$250,000

$7,470,000

$2,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

05

05

05

05

05

05

05

20025.00

20026.00

150.50

391.20

391.30

538.00

544.00

550.00

564.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

JEFFERSON

SPENCERSHELBYOLDHAM

04

04

05

05

05

05

05

05

05

20025.00

20026.00

150.01

391.00

391.20

538.00

965.15

550.00

564.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2008

2006

2014

2016

2016

2018

2018

2018

2018

2006

2006

2006

2016

2008

2018

2018

0

3.45

22.8

2.01

.8

113.5

11.75

104.788

2.78

12.74

23.25

2.84

1.3

115

12.25

123.18

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

SAFETY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW INTERCHANGE(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MAJOR WIDENING(O)123.18 124.7Milepoints:

Milepoints:Milepoints:Milepoints:

To:

To:To:To:

From:

From:From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 18

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

WIDEN KY-245 FROM BERNHEIM FOREST TO THE COMMUNITY COLLEGE.(08CCN)(10CCR)(14CCR)(16CCR)

ADDRESS PAVEMENT CONDITION ON KY-480 FROM MILEPOINT 0.00 TOMILEPOINT 5.14

ADDRESS PAVEMENT CONDITION ON KY-245 FROM MILEPOINT 0.00 TOMILEPOINT 7.18

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2019.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2020.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2021.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2022.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2023.

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2024.

I-65 SPUR CORRIDOR; MODERNIZATION OF EXISTING NATCHER PARKWAYFROM I-65 INTERCHANGE (EXIT 2) EXTENDING NORTH TO THE BUTLER-OHIOCOUNTY LINE. (2016BOP)

1.990

5.140

7.180

BULLITT

BULLITT

BULLITT

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

KY-245

KY-480

KY-245

KY-269

KY-269

KY-269

KY-269

KY-269

KY-269

WN-9007

$12,640,000

$910,000

$1,094,000

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$18,250,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2022

2023

2019

2020

2021

2022

2023

2024

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

PM

PM

SPP

SPP

SPP

SPP

SPP

SPP

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$12,640,000

$910,000

$1,094,000

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$18,250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

03

03

03

03

03

03

03

8509.00

20036.00

20037.00

125.14

125.15

125.16

125.17

125.18

125.19

2042.10

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

WARREN

05

05

05

03

03

03

03

03

03

03

8509.00

20036.00

20037.00

125.14

125.15

125.16

125.17

125.18

125.19

2042.00

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2018

2018

2014

2014

2016

2016

2018

2018

2016

2008

2018

2018

2014

2014

2016

2016

2018

2018

2016

4.425

0

0

1.544

1.544

1.544

1.544

1.544

1.544

20.246

6.415

5.14

7.18

1.644

1.644

1.644

1.644

1.644

1.644

37.143

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MINOR WIDENING(O)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / RECONSTRUCTION(O)2.079 20.246Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 19

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

I-65 SPUR CORRIDOR: IMPROVE THE NATCHER PARKWAY/US-231 INTERCHANGE(EXIT 36). (2016BOP)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2019.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2020.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2021.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2022.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2023.

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2024.

ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER PANTHER CREEK. (016B00019N)

ADDRESS DEFICIENCIES OF WAVERLY SCHOOL ROAD BRIDGE OVER LITTLEBULL CREEK. (016C00031N)

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

WN-9007

KY-369

KY-369

KY-369

KY-369

KY-369

KY-369

KY-70

CR-1008

$6,750,000

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$1,134,000

$423,500

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2019

2020

2021

2022

2023

2024

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

SPP

SPP

SPP

SPP

SPP

SPP

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$6,750,000

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$245,000

$889,000

$157,500

$266,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

03

2042.30

8504.09

8504.10

8504.11

8504.12

8504.13

8504.14

10003.00

10004.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OHIO

OHIO

OHIO

OHIO

03

03

03

03

03

03

03

03

31

2042.00

8504.09

8504.10

8504.11

8504.12

8504.13

8504.14

10003.00

4.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2014

2014

2016

2016

2018

2018

2018

2018

2016

2014

2014

2016

2016

2018

2018

2018

35.7

.526

.526

.526

.526

.526

.526

4.19

3.903

36.1

.626

.626

.626

.626

.626

.626

4.204

3.909

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

0

0

0

0

.067

.067

.067

.067

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

From:

From:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 20

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 87.544 TO MILEPOINT 88.433

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 21.78 TO MILEPOINT 28.5 (26.42 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 28.50 (26.42 NON-CARDINAL) TO MILEPOINT34.72

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON WILLIAM H. NATCHERPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 34.724 TO MILEPOINT 37.143

ADDRESS DEFICIENCIES OF KY-126 BRIDGE OVER DREEN CREEK. (017B00023N)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-24 BOTHDIRECTION(S) FROM MILEPOINT 54.842 TO MILEPOINT 57.389

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROMMILEPOINT 82.934 TO MILEPOINT 86.344

MAJOR WIDENING FROM TENN. STATE LINE TO MURRAY PRIORITY SECTION 1;FROM CLARKS RIVER BRIDGE, NORTH 1.0 MILE TO EXISTING 4-LANE.(SEE 1-8852.00)(12CCR)

1.000

BUTLER

BUTLER

BUTLER

BUTLER

CALDWELL

CALDWELL

CALDWELL

CALLOWAY

WK-9001

WN-9007

WN-9007

WN-9007

KY-126

I-24

I-69

US-641

$770,000

$5,940,000

$7,425,000

$2,640,000

$1,557,500

$2,750,000

$4,400,000

$6,040,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2021

2022

2022

2024

2024

2019

2019

2019

2020

2022

2022

2021

2021

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

BR

BR

PM

PM

PM

PM

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$70,000

$700,000

$540,000

$5,400,000

$675,000

$6,750,000

$240,000

$2,400,000

$245,000

$1,312,500

$250,000

$2,500,000

$400,000

$4,000,000

$6,040,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

02

02

02

01

20007.00

20008.00

20009.00

20010.00

10000.00

20000.00

20004.00

314.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

02

02

02

01

20007.00

20008.00

20008.00

20010.00

10000.00

20000.00

20004.00

314.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2000

2018

2018

2018

2018

2018

2018

2018

1996

87.544

21.78

28.5

34.724

2.26

54.842

82.934

5.666

88.433

28.5

34.72

37.143

2.36

57.389

86.344

6.666

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

RELIABILITY / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 21

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE US-641 FROM THE TENNESSEE STATE LINE TO MURRAY PRIORITYSECTION 2; FROM TENN. STATE LINE TO CLARKS RIVER BRIDGE.(SEE 1-8852.00)

IMPROVE US-641 FROM THE TENNESSEE STATE LINE TO MURRAY PRIORITYSECTION 2; FROM TENN. STATE LINE TO CLARKS RIVER BRIDGE.(SEE 1-8852.00)

ADDRESS DEFICIENCIES OF KY 280 BRIDGE OVER PANTHER CREEK. (018B00054N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION ON KY-121 FROM MILEPOINT 10.51 TOMILEPOINT 14.08

ADDRESS PAVEMENT CONDITION ON KY-121 FROM MILEPOINT 0.00 TOMILEPOINT 10.51

ADDRESS PAVEMENT CONDITION ON KY-94 FROM MILEPOINT 13.11 TOMILEPOINT 24.21

REDUCE CONGESTION ALONG THE I-471 CORRIDOR FROM US-27 TO OHIO STATELINE.

STUDY AND REHABILITATE THE I-471 CORRIDOR, CAMPBELL COUNTY,KENTUCKY. (SEE ALSO 6-8104.00)(2005HPP-KY120)

5.700

5.700

3.570

10.510

11.100

5.016

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

CAMPBELL

CAMPBELL

US-641

US-641

KY-280

KY-1327

KY-121

KY-121

KY-94

I-471

I-471

$22,000,000

$10,000,000

$875,000

$1,925,000

$635,000

$1,872,000

$1,977,000

$4,500,000

$1,439,840

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

D

C

D

C

C

C

C

P

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2019

2021

2022

2019

2020

2019

2019

2023

2023

2023

2024

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

BR

BR

PM

PM

PM

PM

PM

NH

HPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,000,000

$2,000,000

$3,000,000

$15,000,000

$10,000,000

$140,000

$735,000

$175,000

$1,750,000

$635,000

$1,872,000

$1,977,000

$4,500,000

$1,439,840

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

01

01

06

06

314.20

314.21

10008.00

20001.00

20024.00

20025.00

20026.00

81.00

183.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

01

01

01

01

06

06

314.00

314.20

10008.00

20001.00

20024.00

20025.00

20026.00

81.00

183.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2018

2018

2018

2018

2018

2018

2018

2004

1996

2000

2018

2018

2018

2018

2018

2018

2004

0

0

11.015

0

10.51

0

13.11

0

0

5.666

5.666

11.027

2.035

14.08

10.51

24.21

5.016

5.016

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 22

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

BRIDGE REHABILITATION ON EXISTING COMBS HEHL BRIDGE CARRYING I-275OVER THE OHIO RIVER. 019B00040L/R (LET BY ODOT) (2016BOP)(BSBP)

ROADWAY REHABILITATION ON CAROTHERS ROAD FROM MONMOUTH STREET(US 27) TO RIGHT TURN LANE INTO NEWPORT SHOPPING CENTER.

NEWPORT RIVERFRONT COMMONS - CONSTRUCT TWO NEWPEDESTRIAN/BICYCLE BRIDGES TO CONNECT BOTH SIDES OF THE TAYLORSOUTHGATE BRIDGE TO THE TRAILS ON TOP OF THE LEVEE (2016BOP)

ADD LANE ON US 27 TO PROVIDE THREE CONTINUOUS SOUTHBOUND THROUGH-LANES FROM MARSHALL LANE TO JOHNS HILL ROAD (KY 3490). (2016BOP)

IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-275 INTERCHANGE WITHKY-9 (AA HWY.)

SOUTH MONMOUTH PHASE 1. IMPROVE/ADD SIDEWALKS, ACCESSMANAGEMENT, STREET LIGHTING, IMPROVE SAFETY FROMNEWPORT/SOUTHGATE CITY LIMITS TO CAROTHERS ROAD.

US 27 SOUTH MONMOUTH UNDERPASS. IMPROVE FOR PEDESTRIANS BYREPLACING OBSOLETE STAIRS/WALKWAY WITH 10' SIDEWALK, LIGHTING BUSSTOPS AT THE UNDERPASS OF THE CSX RAILROAD BRIDGE BETWEEN 11THSTREET AND 13TH STREET.

RIVERFRONT COMMONS. CONSTRUCT A 15' WIDE CONCRETEBICYCLE/PEDESTRIAN TRAIL AND CONDUIT FOR FUTURE LIGHTING FROMBERRY STREET TO FOURTH AVENUE. PART OF 11.5 MILE PROJECT.

.173

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

I-275

KY-1892

-

US-27

KY-9

US-27

US-27

-

$4,500,000

$1,005,052

$1,097,427

$800,000

$700,000

$3,212,560

$1,754,400

$886,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

R

U

C

P

D

R

U

C

D

R

U

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2018

2018

2018

2018

2019

2021

2018

2019

2019

2020

2020

2020

2020

2021

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

SNK

SNK

SNK

SNK

SNK

NH

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,500,000

$1,005,052

$1,097,427

$200,000

$100,000

$500,000

$700,000

$454,960

$61,600

$1,496,000

$1,200,000

$378,400

$32,000

$24,000

$1,320,000

$126,000

$760,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

369.00

427.00

434.00

443.00

448.00

451.00

452.00

453.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

369.00

427.00

966.04

966.05

448.00

451.00

452.00

453.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2014

2016

2016

2018

2018

2018

2018

2018

2014

2006

2008

2018

2018

2018

2018

73.557

2.395

16.333

17.525

20.623

21.32

73.061

2.568

16.507

17.978

21.209

21.463

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / BIKE/PED FACIL(O)

RELIABILITY / BIKE/PED FACIL(O)

RELIABILITY / BIKE/PED FACIL(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 23

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE OVER TWELVEMILE CREEK ON KY 8 0.1 MI NOF NEISES ROAD (CR 1009). (019B00003N)

ADDRESS DEFICIENCIES OF BRIDGE ON COVERT RUN PIKE (CR-1363) (0.048) OVERTRIBUTARY TO TAYLOR CREEK. 019C00069N

TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELLCOUNTY. (2005HPP-KY155)(SEE 6-8105.00 FOR "KYD" COMPONENT)(06CCR)(10CCR)

CONSTRUCT NEW TECHNOLOGY TRIANGLE ACCESS ROAD, CAMPBELL COUNTY,KENTUCKY. (2005HPP-KY126)(2006BOPC).(10CCR)

ADDRESS DEFICIENCIES OF GIBSON ROAD BRIDGE OVER THREEMILE CREEK.(019B00060N)

SAFETY CABLE REPAIR AND PREVENTIVE MAINTENANCE ON TAYLORSOUTHGATE BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO.(019B00076N)(BSBP)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 73.061 TO MILEPOINT 77.58

ADDRESS PAVEMENT CONDITION OF I-471 BOTH DIRECTION(S) FROMMILEPOINT 0 TO MILEPOINT 4.75

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

.054CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

KY-8

CR-1363

I-275

-

KY-2238

US-27

I-275

I-471

KY-8

$2,700,000

$752,500

$690,401

$1,439,840

$458,500

$250,000

$7,425,000

$6,325,000

$2,475,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

C

C

C

D

C

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2019

2020

2019

2020

2018

2018

2019

2020

2018

2024

2024

2024

2024

2021

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

HPP

HPP

BR

BR

BR

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$50,000

$150,000

$2,500,000

$122,500

$630,000

$690,401

$1,439,840

$140,000

$318,500

$250,000

$675,000

$6,750,000

$575,000

$5,750,000

$225,000

$2,250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

1085.00

1095.00

8105.01

8105.03

10000.00

10007.00

20010.00

20011.00

20012.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

06

1085.00

1095.00

8105.01

191.00

10000.00

10007.00

20010.00

20011.00

20012.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2004

2004

2018

2018

2018

2018

2018

2018

2018

2004

2004

2018

2018

2018

2018

2018

18.017

.045

1.682

22.363

73.061

0

5.033

18.071

.051

1.69

22.764

77.58

4.75

7.814

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 24

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION ON KY-8 FROM MILEPOINT 15.97 TOMILEPOINT 19.36

ADDRESS PAVEMENT CONDITION ON US-51 FROM MILEPOINT 7.86 TO MILEPOINT12.66

ADDRESS DEFICIENCIES OF BRIDGE OVER KENTUCKY RIVER ON US 42 INPRESTONSVILLE/CARROLLTON 0.13 MI E OF KY 55. (021B00043N)

3.390

4.800

.250

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CARLISLE

CARROLL

KY-9

KY-1892

US-27

US-27

US-27

KY-8

US-51

US-42

$2,475,000

$2,750,000

$3,025,000

$825,000

$825,000

$583,000

$746,000

$20,871,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2021

2021

2021

2021

2021

2019

2019

2021

2021

2024

2022

2019

2020

2020

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$225,000

$2,250,000

$250,000

$2,500,000

$275,000

$2,750,000

$75,000

$750,000

$75,000

$750,000

$583,000

$746,000

$1,460,000

$1,218,000

$476,000

$17,717,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

01

06

20013.00

20014.00

20015.00

20016.00

20017.00

20049.00

20027.00

1084.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

01

06

20013.00

20014.00

20015.00

20016.00

20017.00

20049.00

20027.00

1084.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

20.392

1.47

16.748

19.4

8.831

15.97

7.86

5.697

21.85

2.1

18.6

19.85

10.517

19.36

12.66

5.947

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 25

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY 55 BRIDGE OVER MAJORS RUN CREEK.(021B00019N)

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROMMILEPOINT 50.808 TO MILEPOINT 53.433

ADDRESS PAVEMENT CONDITION ON KY-467 FROM MILEPOINT 0.00 TOMILEPOINT 4.52

IMPROVE MOBILITY AND REDUCE CONGESTION AT THE KY 1/I-64 WESTBOUNDOFF-RAMP INTERSECTION.

IMPROVE KY-7/KY-1 (CAROL MALONE BLVD.) FROM LITTLE SANDY RIVERBRIDGE TO ACADEMIC PARKWAY. (08CCR)(12CCR)(16CCR)

SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FORINDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FORBRAIDY INDUSTRIES ALUMINUM PLANT DEVELOPMENT.

SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FORINDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FORBRAIDY INDUSTRIES ALUMINUM PLANT DEVELOPMENT. (ADDITIONAL FUNDINGFOR 9-397.00)

SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FORINDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FORBRAIDY INDUSTRIES ALUMINUM PLANT DEVELOPMENT. (ADDITIONAL FUNDINGFOR 9-397.00)

4.520

.200

.980

CARROLL

CARROLL

CARROLL

CARTER

CARTER

CARTER

CARTER

CARTER

KY-55

I-71

KY-467

I-64

KY-7

KY-67

KY-67

KY-67

$1,120,000

$3,025,000

$365,000

$740,000

$3,120,000

$9,000,000

$5,000,000

$5,000,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

D

R

U

C

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2024

2024

2022

2019

2019

2019

2019

2021

2018

2019

2019

2020

2021

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

PM

NH

NH

NH

NH

SPP

NH

NH

NH

NH

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$140,000

$980,000

$275,000

$2,750,000

$365,000

$80,000

$80,000

$80,000

$500,000

$3,120,000

$2,000,000

$2,500,000

$2,500,000

$2,000,000

$5,000,000

$5,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

09

09

09

09

09

10009.00

20020.00

20050.00

62.00

144.00

397.00

397.01

397.02

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GREENUPBOYD

GREENUPBOYD

GREENUPBOYD

06

06

06

09

09

09

09

09

10009.00

20020.00

20050.00

62.00

144.00

397.00

397.01

397.02

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

1998

2018

2018

2018

2018

2018

2018

2018

1998

2018

2018

2018

4.614

50.808

0

171.6

10.318

4.62

53.433

4.52

171.8

10.865

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

SAFETY / PREFINANCD CONVRSN(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:

To:To:

To:To:

To:

From:From:

From:From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 26

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE ON US-60 (MP 4.111) OVER TYGARTS CREEK;.75 MI E OF JCT KY 1662; 022B00037N

IMPROVE SAFETY AT THE EAST CARTER HIGH SCHOOL. (06CCN)(08CCR)(12CCR)

REPLACEMENT OF TWO TRUSS BRIDGES ON KY 773 OVER THE LITTLE SANDYRIVER. (022B00074N)(022B00075N)

ADDRESS DEFICIENCIES OF KY-1 BRIDGE OVER POWELL BRANCH. (022B00006N)

ADDRESS DEFICIENCIES OF KY-182 BRIDGE OVER SINKING CREEK. (022B00140N)

ADDRESS PAVEMENT CONDITION

ADDRESS PAVEMENT CONDITION

ADDRESS PAVEMENT CONDITION

REPLACE BRIDGE ON CR-1169 (0.059) OVER SOUTH FORK CREEK. (023C00029N)

.100

.410

CARTER

CARTER

CARTER

CARTER

CARTER

CARTER

CARTER

CARTER

CASEY

US-60

KY-1

KY-773

KY-1

KY-182

KY-9

KY-9

KY-9

CR-1169

$693,000

$3,210,000

$5,019,000

$1,540,000

$2,240,000

$3,520,000

$1,650,000

$3,850,000

$707,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2020

2021

2022

2019

2019

2020

2019

2020

2021

2021

2021

2021

2021

2021

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

SPP

SPP

SPP

BR

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$693,000

$720,000

$490,000

$2,000,000

$5,019,000

$525,000

$1,015,000

$490,000

$1,750,000

$320,000

$3,200,000

$150,000

$1,500,000

$350,000

$3,500,000

$175,000

$532,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

09

08

1075.00

8311.00

8506.00

10002.00

10003.00

20006.00

20007.00

20008.00

1067.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

09

09

08

1075.00

8311.00

8506.00

10002.00

10003.00

20006.00

20007.00

20008.00

1067.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2006

2008

2018

2018

2018

2018

2018

2018

2010

2006

2008

2018

2018

2018

2018

2018

2018

4.061

9.83

1

6.915

2.206

0

14.98

6.98

.051

4.161

10.24

1.3

6.919

2.22

6.98

18.262

14.985

.067

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

SAFETY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 27

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY-2310 BRIDGE OVER LUTTRELL CREEK.(023B00066N)

ADDRESS DEFICIENCIES OF KY 1552 BRIDGE OVER BR OF BRUSH CREEK.(023B00061N)

ADDRESS DEFICIENCIES OF KY 1552 BRIDGE OVER LONG BRANCH. (023B00062N)

ADDRESS DEFICIENCIES OF KY 3270 BRIDGE OVER HOWE BRANCH. (023B00077N)

ADDRESS PAVEMENT CONDITION

IMPROVE KY-911 FROM US-41A TO OAK GROVE.(12CCR).

IMPROVE KY-911 FROM US-41A TO OAK GROVE.(12CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON SUB STATION RD (CR 1116) OVER CSX RR0.04 MILE E OF US 41 024C00034N

ADDRESS DEFICIENCIES OF BRIDGE OVER CSX RR ON WALNUT STREET (US 41A)IN HOPKINSVILLE 475 FT NE OF EAST 21ST STREET (CS 1016) (024B00112N)

1.835

1.835

.032

CASEY

CASEY

CASEY

CASEY

CASEY

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

KY-2310

KY-1552

KY-1552

KY-3270

KY-70

KY-911

KY-911

CR-1116

US-41A

$1,120,000

$336,000

$336,000

$304,500

$4,125,000

$2,530,000

$5,910,000

$880,000

$2,387,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

C

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2019

2020

2019

2019

2020

2021

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

STP

STP

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$192,500

$927,500

$70,000

$266,000

$70,000

$266,000

$70,000

$234,500

$375,000

$3,750,000

$2,530,000

$5,910,000

$880,000

$385,000

$2,002,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

08

08

08

02

02

02

02

10000.00

10006.00

10007.00

10008.00

20001.00

180.00

180.01

1085.00

1089.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

08

08

08

02

02

02

02

10000.00

10006.00

10007.00

10008.00

20001.00

180.00

180.00

1085.00

1089.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2006

2018

2018

2018

2018

2018

2018

2018

2018

2006

2006

2018

2018

.178

.12

1.218

3.475

0

0

0

.019

15.386

.19

.126

1.224

3.479

4

1.835

1.835

.059

15.418

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 28

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE OVER N FORK LITTLE RIVER ONMILBROOKE DRIVE (CS 1262) 500 FT SW OF KAREN DRIVE (CS 1268) 024C00081N

IMPROVE KY-107 FROM GATEWAY LANE TO KY-380.(12CCN)(14CCR)

ADDRESS DEFICIENCIES OF KY-189 BRIDGE OVER BRANCH OF BUCK FORK.(024B00064N)

ADDRESS DEFICIENCIES OF US 41 BRIDGE OVER NORTH FORK LITTLE RIVER.(024B00005N)

ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILEPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 4.719

ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILEPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 12.13 TO MILEPOINT 16.5 (16.7NON-CARDINAL)

ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILEPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 4.719 TO MILEPOINT 6.77

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 CARDINALDIRECTION(S) FROM MILEPOINT 69.83 TO MILEPOINT 76.142

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINALDIRECTION(S) FROM MILEPOINT 69.83 TO MILEPOINT 81.83

.038

.346

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CS-1262

KY-107

KY-189

US-41

EB-9004

EB-9004

EB-9004

I-24

I-24

$1,470,000

$5,350,000

$1,277,500

$210,000

$4,400,000

$4,120,000

$1,925,000

$3,575,000

$6,600,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

D

C

D

C

D

C

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2022

2023

2024

2019

2020

2019

2020

2019

2020

2020

2023

2023

2022

2022

2024

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

SPP

SPP

SPP

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,470,000

$1,280,000

$1,530,000

$2,540,000

$245,000

$1,032,500

$35,000

$175,000

$400,000

$4,000,000

$4,120,000

$175,000

$1,750,000

$325,000

$3,250,000

$600,000

$6,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

02

1094.00

8703.00

10001.00

10022.00

20005.00

20006.00

20008.00

20010.00

20011.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

02

02

1094.00

8703.00

10001.00

10022.00

20005.00

20006.00

20008.00

20010.00

20011.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2012

2018

2018

2018

2018

2018

2018

2018

2018

2012

2018

2018

2018

2018

2018

2018

2018

.372

16.823

3.179

15.333

0

12.13

4.719

69.83

69.83

.41

17.169

3.187

15.347

4.719

16.5

6.77

76.142

81.83

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MINOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 29

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-024 CARDINAL DIRECTION(S) FROMMILEPOINT 76.142 TO MILEPOINT 85.563

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 BOTHDIRECTION(S) FROM MILEPOINT 85.563 TO MILEPOINT 92

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION ON US-41 FROM MILEPOINT 14.79 TOMILEPOINT 31.57

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 89.48 TO MILEPOINT 94.7

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 94.65 TO MILEPOINT 98.1

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 98.1 TO MILEPOINT 101.78

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 9.45 (5.311 NON-CARDINAL) TOMILEPOINT 11.913

ADDRESS DEFICIENCIES OF BRIDGE OVER OTTER CREEK ON OTTER CREEKROAD (CR 1160) AT JUNCTION WITH MAY FORK ROAD (CR 1158)(026C00031N)

16.780

.016

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CLARK

CLARK

CLARK

CLARK

CLAY

I-24

I-24

US-68

US-41

I-64

I-64

I-64

KY-9000

CR-1160

$5,225,000

$7,150,000

$825,000

$1,635,000

$6,930,000

$5,775,000

$4,730,000

$5,830,000

$469,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2023

2022

2022

2021

2021

2022

2022

2022

2022

2022

2020

2020

2021

2021

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$475,000

$4,750,000

$650,000

$6,500,000

$75,000

$750,000

$1,635,000

$630,000

$6,300,000

$525,000

$5,250,000

$430,000

$4,300,000

$530,000

$5,300,000

$105,000

$364,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

07

07

07

07

11

20012.00

20013.00

20016.00

20046.00

20004.00

20005.00

20006.00

20007.00

1099.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

07

07

07

07

11

20012.00

20013.00

20016.00

20046.00

20004.00

20005.00

20006.00

20007.00

1099.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2014

2018

2018

2018

2018

2018

2018

2018

2018

2014

76.142

85.563

10.93

14.79

89.48

94.65

98.1

9.45

2.01

85.563

92

11.563

31.57

94.7

98.1

101.78

11.913

2.026

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 30

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

RECONSTRUCT KY-2432 FROM SECOND STREET IN EAST MANCHESTER NORTHTO THE LEFT FORK OF COAL HOLLOW ROAD (MP 2.10)(00CCN)(06CCR)(08CCR)(10CCR)

IMPROVE US-421/KY-80 FROM KY-80 SOUTH TO KY-149 (LOCKARTS CREEKROAD). (00CCN)(10CCR)(12CCR)

ADDRESS DEFICIENCIES OF BRIDGE OVER CURRY BRANCH ROAD IN CLAYCOUNTY.(12CCN)

IMPROVE GEOMETRICS ON THE S-CURVE FROM NORTHEAST OF KY-3135(COLLEGE STREET) TO NORTHEAST OF PR-1006 (MULBERRY STREET).(14CCN)

ADDRESS DEFICIENCIES OF KY-1850 BRIDGE OVER PHILLIPS FORK. (026B00087N)

ADDRESS DEFICIENCIES OF KY-577 BRIDGE OVER LITTLE SEXTON CREEK.(026B00093N)

ADDRESS DEFICIENCIES OF CR-1055 BRIDGE OVER WILES BRANCH. (026C00010N)

ADDRESS DEFICIENCIES OF ARNETTS FORK ROAD BRIDGE OVER DOUBLECREEK. (026C00018N)

ADDRESS DEFICIENCIES OF OTTER CREEK ROAD BRIDGE OVER GOOSE CREEK.(026C00032N)

1.229

3.223

.040

.600

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

KY-2432

US-421

CR-1263

KY-66

KY-1850

KY-577

CR-1055

CR-1117

CR-1160

$16,540,000

$9,000,000

$960,000

$380,000

$770,000

$599,000

$575,000

$504,000

$770,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2024

2019

2021

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

SPP

BR

SPP

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$16,540,000

$9,000,000

$960,000

$380,000

$175,000

$595,000

$175,000

$424,000

$175,000

$400,000

$140,000

$364,000

$175,000

$595,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

11

8001.00

8003.00

8711.00

8856.00

10003.00

10004.00

10005.00

10006.00

10007.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

11

8001.00

8003.00

8711.00

8856.00

10003.00

10004.00

10005.00

10006.00

10007.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2000

2012

2014

2018

2018

2018

2018

2018

2000

2000

2012

2014

2018

2018

2018

2018

2018

.351

13.692

.281

32.9

2.754

6.991

.006

.073

.062

1.58

16.915

.321

33.5

2.764

6.999

.012

.079

.068

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 31

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF CR-1255 BRIDGE OVER HORSE CREEK. (026C00070N)

ADDRESS DEFICIENCIES OF OLD HIGHWAY 66 BRIDGE OVER RED BIRD RIVER.(026C00099N)

ADDRESS DEFICIENCIES OF US 421 BRIDGE OVER BRANCH OF ISLAND CREEK.(026B00002N)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 13.93 TO MILEPOINT 15.958

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 15.958 TO MILEPOINT 19.527

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 19.527 TO MILEPOINT 28.4

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 28.4 TO MILEPOINT 31

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 31 TO MILEPOINT 35.08

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CR-1255

CR-1118

US-421

HR-9006

HR-9006

HR-9006

HR-9006

HR-9006

$546,000

$2,527,000

$822,500

$880,000

$1,650,000

$3,850,000

$1,100,000

$1,760,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2022

2022

2023

2023

2019

2019

2019

2019

2019

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$371,000

$350,000

$2,177,000

$175,000

$647,500

$80,000

$800,000

$150,000

$1,500,000

$350,000

$3,500,000

$100,000

$1,000,000

$160,000

$1,600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

10008.00

10009.00

10039.00

20001.00

20002.00

20003.00

20004.00

20005.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

10008.00

10009.00

10039.00

20001.00

20002.00

20003.00

20004.00

20005.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

.074

.087

21.204

13.9

15.958

19.527

28.4

31

.08

.103

21.21

16

19.527

28.4

31

35.08

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 32

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 35.08 TO MILEPOINT 39

REPLACE BRIDGE OVER CLEAR FORK CREEK ON KY 738 0.2 MI S OF US 127X.(027B00011N)(SR=31.5)

RELOCATE US-127 FROM NORTH OF THE KY-3063 AND OLD US-127INTERSECTION, AND EXTENDING NORTHERLY TO EAST OF KY-1730 ANDMANTOWN INTERSECTION. (SEE 8-108 & 8-115 FOR PE&ENV)(12CCR)(14CCR)

RELOCATE US-127 FROM NORTH OF THE KY-3063 AND OLD US-127INTERSECTION, AND EXTENDING NORTHERLY TO EAST OF KY-1730 ANDMANTOWN INTERSECTION. (SEE 8-108 & 8-115 FOR PE&ENV)(12CCR)(14CCR)

RELOCATION OF US-127 FROM EAST OF THE AARON RIDGE RD AND OLD US-127INTERSECTION, EXTENDING NORTHERLY TO NORTH OF THE KY-3063 AND OLDUS-127 INTERSECTION. (SEE 8-108 AND 8-115 FOR PE&ENV)(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2019.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2020.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2021.

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2022.

.010

21.300

21.300

3.855

CLAY

CLINTON

CLINTON

CLINTON

CLINTON

CRITTENDEN

CRITTENDEN

CRITTENDEN

CRITTENDEN

HR-9006

KY-738

US-127

US-127

US-127

KY-91

KY-91

KY-91

KY-91

$1,650,000

$700,000

$10,060,000

$11,070,000

$1,600,000

$402,000

$402,000

$402,000

$402,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

C

D

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2022

2019

2020

2023

2024

2024

2019

2020

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

BR

BR

NH

NH

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$150,000

$1,500,000

$175,000

$525,000

$10,060,000

$11,070,000

$1,600,000

$402,000

$402,000

$402,000

$402,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

08

08

08

08

01

01

01

01

20006.00

1062.00

8601.26

8601.28

8601.30

326.16

326.17

326.18

326.19

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

RUSSELL

RUSSELL

11

08

08

08

08

01

01

01

01

20006.00

1062.00

8601.26

8601.26

8601.30

326.16

326.17

326.18

326.19

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2012

2014

2012

2014

2014

2016

2016

2018

2018

2012

2012

2012

2014

2014

2016

2016

35.08

6.478

11.017

11.017

16.135

11.162

11.162

11.162

11.162

39

6.488

20.967

20.967

19.99

11.262

11.262

11.262

11.262

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RELOCATION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

0

0

11.4

11.4

Milepoints:

Milepoints:

To:

To:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 33

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2023.

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2024.

ADDRESS DEFICIENCIES OF BRIDGE ON CR-1085 (0.048) OVER HUGHES BRANCH028C00053N

ADDRESS DEFICIENCIES OF KY-91 BRIDGE OVER CROOKED CREEK. (028B00021N)

ADDRESS DEFICIENCIES AND PAINTING OF BRIDGE OVER CUMBERLAND RIVERON KY 61 0.1 MI N OF COLD SPRINGS ROAD (CR 1204).(029B00012N)

ADDRESS DEFICIENCIES AND PAINTING OF BRIDGE OVER CUMBERLAND RIVERON KY 90 0.27 MI SE OF KY 61 AT THE SCL OF BURKESVILLE. (029B00027N)

IMPROVE KY-90 FROM NORRIS BRANCH ROAD EXTENDING WESTERLY TO PADUERSON ROAD NEAR MARROWBONE. (14CCN)

ADDRESS DEFICIENCIES OF WHETSTONE ROAD BRIDGE OVER BIG WHETSTONECREEK. (029C00057N)

ADDRESS DEFICIENCIES OF KY 379 BRIDGE OVER BIG WILLIS CREEK.(029B00005N)

.140

.360

5.250

CRITTENDEN

CRITTENDEN

CRITTENDEN

CRITTENDEN

CUMBERLAND

CUMBERLAND

CUMBERLAND

CUMBERLAND

CUMBERLAND

KY-91

KY-91

CR-1085

KY-91

KY-61

KY-90

KY-90

CR-1012

KY-379

$402,000

$402,000

$756,000

$1,225,000

$3,640,000

$5,200,000

$3,500,000

$731,500

$1,081,500

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

C

D

C

C

C

D

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2024

2019

2020

2019

2020

2020

2020

2024

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

BR

BR

BR

BR

BR

BR

SPP

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$402,000

$402,000

$210,000

$546,000

$245,000

$980,000

$3,640,000

$5,200,000

$3,500,000

$175,000

$556,500

$129,500

$952,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

08

08

08

08

08

326.20

326.21

1159.00

10000.00

1060.00

1061.00

8852.00

10001.00

10009.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

01

08

08

08

08

08

326.20

326.21

1159.00

10000.00

1060.00

1061.00

8852.00

10001.00

10009.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2014

2018

2018

2018

2018

2018

2018

2018

2018

2014

2018

2018

11.162

11.162

.044

.678

9.945

14.127

5.182

1.767

3.285

11.262

11.262

.052

.694

10.085

14.459

10.432

1.779

3.315

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 34

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

I-65 SPUR CORRIDOR; MODERNIZATION OF EXISTING NATCHER PARKWAYFROM THE OHIO-BUTLER COUNTY LINE (MP 37.143) TO THE US-60 INTERCHANGE(MP 72.264) IN OWENSBORO. (2016BOP)

IMPROVE KY-54 FROM WEST OF THE US-60 BYPASS TO CR-1021 (JACK HINTONROAD). (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

IMPROVE KY-54 FROM WEST OF THE US-60 BYPASS TO CR-1021 (JACK HINTONROAD). (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

RELOCATE US-60 BYPASS EAST OF OWENSBORO (EAST COUNTY CORRIDOR)PRIORITY SECTION: FROM REID ROAD EAST TO EXISTING US 60 EAST OFOWENSBORO. (98KYD) (2005HPP-KY158) (SEE 2-287.5 AND 2-287.51 FOR "FS"COMPONENTS)(08CCN)

GRAVES LANE BRIDGE REPLACEMENT-0.2 MI E JCT KY 405 (MM 1.005-1.009) OVERALLGOOD DITCH. (14CCN) 030C00016N

EXTEND THE CURRENT 4 LANES TO THE ROUNDABOUT AT KY-56/KY-81. (14CCN)

IMPROVE KY-3143 FROM KY-3335 TO KY 54. (14CCN)

ADDRESS DEFICIENCIES OF ROCKPORT FERRY RD BRIDGE OVER KELLY CREEK.(030C00021N)

5.580

5.580

.004

.636

1.129

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

WN-9007

KY-54

KY-54

US-60

CR-1053

KY-81

KY-3143

CR-1068

$4,950,000

$50,290,000

$17,940,000

$1,812,278

$619,500

$3,750,000

$6,790,000

$822,500

Total

Total

Total

Total

Total

Total

Total

Total

R

C

R

U

C

R

U

C

C

C

D

R

U

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2020

2019

2022

2024

2021

2023

2018

2020

2018

2021

2024

2024

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

SPP

SPP

SPP

SPP

SPP

HPP

BR

SPP

STP

STP

STP

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$4,750,000

$10,540,000

$5,750,000

$34,000,000

$4,520,000

$13,420,000

$1,812,278

$619,500

$3,750,000

$680,000

$2,730,000

$3,380,000

$175,000

$647,500

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

2092.10

8300.00

8300.01

8504.00

8813.00

8851.00

8854.00

10002.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OHIO 02

02

02

02

02

02

02

02

2092.00

8300.00

8300.01

8504.00

8813.00

8851.00

8854.00

10002.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2006

2018

2008

2018

2014

2014

2018

2016

2006

2018

2008

2018

2014

2014

2018

61.557

2.47

2.47

21.522

1

11.08

1.829

.073

72.264

8.003

8.003

23.6

1.014

11.716

2.958

.08

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ECONOMIC DEVELOPMENT / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RELOCATION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

37.143 61.557Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 35

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF OLD KY 54 BRIDGE OVER BR OF N FK PANTHERCREEK. (030C00029N)

ADDRESS DEFICIENCIES OF LYDANNE BRIDGE S BRIDGE OVER FLAT LICKCREEK. (030C00069N)

ADDRESS DEFICIENCIES WITH GLOVER CARY BRIDGE OVER OHIO RIVER. JOINTPROJECT WITH INDIANA. (030B00118N)(BSBP)

ADDRESS DEFICIENCIES WITH NATCHER BRIDGE OVER OHIO RIVER. JOINTPROJECT WITH INDIANA. (030B00164N)(BSBP)

ADDRESS DEFICIENCIES OF KY 764 BRIDGE OVER UNNAMED STREAM.(030B00111N)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC & AC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 61.553 TO MILEPOINT 66.08

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

CR-1129

CR-1257

KY-2262

US-231

KY-764

KY-81

KY-331

KY-2155

WN-9007

$822,500

$892,500

$2,450,000

$10,175,000

$420,000

$2,750,000

$550,000

$1,650,000

$4,238,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2022

2022

2021

2021

2019

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$647,500

$175,000

$717,500

$200,000

$2,250,000

$175,000

$10,000,000

$70,000

$350,000

$250,000

$2,500,000

$50,000

$500,000

$150,000

$1,500,000

$4,238,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

02

10003.00

10004.00

10020.00

10021.00

10023.00

20017.00

20018.00

20019.00

20020.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

02

02

10003.00

10004.00

10020.00

10021.00

10023.00

20017.00

20018.00

20019.00

20020.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

3.547

.703

.699

13.99

2.261

11.891

0

0

61.553

3.552

.709

1.494

14.844

2.271

13.32

.435

1.991

66.08

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 36

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 66.08 TO MILEPOINT 72.26

ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 23.77 TOMILEPOINT 27.54

ADDRESS DEFICIENCIES OF KY 743 BRIDGE OVER BEAVER DAM CREEK.(031B00004N)

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROMMILEPOINT 43.307 TO MILEPOINT 43.6

ADDRESS PAVEMENT CONDITION OF I-065 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 43.6 TO MILEPOINT 45.935.

ADDRESS PAVEMENT CONDITION ON US-31W FROM MILEPOINT 0.00 TOMILEPOINT 8.00

IMPROVE KY-32 FROM WEST OF STEGALL COLD SPRING ROAD TO KY-7 NEARNEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR)(10CCR)(12CCR)(14CCR)(16CCR)

IMPROVE KY-7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARD WRIGLEY.(12CCR)(16CCR)

ADDRESS DEFICIENCIES OF CR 1206 BRIDGE OVER OVER LITTLE SANDY.(030C00032N)

3.770

8.000

6.656

6.956

DAVIESS

DAVIESS

EDMONSON

EDMONSON

EDMONSON

EDMONSON

ELLIOTT

ELLIOTT

ELLIOTT

WN-9007

US-60

KY-743

I-65

I-65

US-31W

KY-32

KY-7

CR-1206

$5,768,000

$1,609,000

$560,000

$440,000

$1,100,000

$1,301,000

$15,000,000

$2,890,000

$2,118,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

C

D

C

D

C

C

C

D

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2022

2019

2020

2019

2019

2024

2024

2022

2024

2023

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

BR

BR

PM

PM

PM

PM

PM

STP

STP

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$5,768,000

$1,609,000

$157,500

$402,500

$40,000

$400,000

$100,000

$1,000,000

$1,301,000

$15,000,000

$2,890,000

$455,000

$1,663,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

03

03

03

03

09

09

09

20021.00

20047.00

10012.00

20011.00

20012.00

20022.00

192.01

228.00

10004.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MORGAN

02

02

03

03

03

03

09

09

09

20021.00

20047.00

10012.00

20011.00

20012.00

20022.00

192.00

228.00

10004.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2006

2012

2018

2018

2018

2018

2018

2018

2018

2006

2012

2018

66.08

23.77

7.028

43.307

43.6

0

2

0

.902

72.26

27.54

7.034

43.6

45.935

8

8.656

6.956

.942

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

7.887 11.121Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 37

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE LEVEL OF SERVICE, SAFETY, AND CONNECTIVITY ON KY-82 FROM KY-89 IN ESTILL CO. TO NEW CONSTRUCTION LOCATED NORTH OF HUDSON MILLROAD IN ESTILL COUNTY.

IMPROVE SAFETY ON KY-2459 (CARHARTT AVE.) FROM KY-89 TO THE RAILROADBRIDGE.

IMPROVE GEOMETRICS ON KY-89 IN ESTILL COUNTY FROM KY-1886 TO THEESTILL/CLARK COUNTY LINE.

IMPROVE SAFETY AND MOBILITY ON KY-1645 (KIRKLAND AVE) NEAR CR-1087(LOCK 12 ROAD).

ADDRESS DEFICIENCIES OF KY 794 BRIDGE OVER WHITE OAK CREEK.(033B00038N)

IMPROVE NEW CIRCLE ROAD FROM LEESTOWN ROAD TO NEAR GEORGETOWNROAD. (12CCR)(14CCR)

IMPROVE NEW CIRCLE ROAD FROM LEESTOWN ROAD TO NEAR GEORGETOWNROAD. (12CCR)(14CCR)

CLAYS MILL ROAD; WIDEN FROM HARRODSBURG ROAD TO NEW CIRCLE ROAD(SECTION 1) (LFUCG T.I.P.) (LOCAL MATCH) (ALL WORK BY LFUCG)(CONSTRUCTION SEQU. 2) (SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

4.100

.373

2.622

.400

1.000

1.000

1.900

ESTILL

ESTILL

ESTILL

ESTILL

ESTILL

FAYETTE

FAYETTE

FAYETTE

KY-82

KY-2459

KY-89

KY-1645

KY-794

KY-4

KY-4

CS-4174

$1,500,000

$750,000

$1,200,000

$570,000

$980,000

$14,580,000

$1,500,000

$12,900,000

Total

Total

Total

Total

Total

Total

Total

Total

D

D

R

U

D

D

R

U

C

D

C

R

U

C

U

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2021

2023

2023

2021

2019

2020

2020

2020

2019

2020

2019

2019

2024

2021

2019

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

STP

STP

STP

STP

STP

BR

BR

NH

NH

NH

NH

SLX

SLX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,500,000

$250,000

$250,000

$250,000

$1,200,000

$100,000

$100,000

$50,000

$320,000

$245,000

$735,000

$1,300,000

$1,500,000

$11,780,000

$1,500,000

$1,900,000

$11,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

07

07

07

205.00

206.00

207.00

208.00

10012.00

113.02

113.03

224.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

10

10

07

07

07

205.00

206.00

207.00

208.00

10012.00

113.00

113.02

224.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2014

2018

2000

2018

2018

2018

2018

2018

2006

2014

2000

0

0

19.806

1.7

.298

7.26

7.26

0

4.1

.373

22.428

2.1

.308

8.26

8.26

2.01

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SPOT IMPROVEMENTS(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MINOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 38

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL. (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP)

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2018. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2019. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2020. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

-

-

-

-

-

-

-

-

$49,200,000

$730,000

$756,000

$756,000

$12,400,000

$8,000,000

$8,200,000

$8,200,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2024

2018

2019

2020

2018

2019

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SLX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$49,200,000

$730,000

$756,000

$756,000

$12,400,000

$8,000,000

$8,200,000

$8,200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

227.00

227.07

227.08

227.09

227.10

227.13

227.14

227.15

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

07

07

07

07

07

07

07

07

227.00

227.07

227.08

227.09

227.10

227.13

227.14

227.15

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2004

2004

2004

2012

2014

2014

2016

2018

2004

2004

2004

2012

2014

2014

2016

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

From:

From:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 39

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2021. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2022. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2023. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2024. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)

SOUTH ELKHORN TRAIL IN LEXINGTON (PRIORITY SECTION 2); FROM JOSEPHBRYAN WAY THROUGH NS RAILROAD TUNNEL TO WAVELAND HISTORIC SITE(ALL WORK BY LFUCG). (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP).

SOUTH ELKHORN TRAIL(PRIORITY SECTION 3); FROM LOCHDALE TERRACE,EXTENDING NORTHERLY UNDER MAN O' WAR BOULEVARD TO SHILLITOPARK.(LOCAL MATCH)(DESIGN BY LFUCG)(ALL WORK BYLFUCG)(2004BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

.300

.300

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

-

-

-

-

-

-

-

-

-

$8,200,000

$756,000

$756,000

$756,000

$756,000

$8,200,000

$8,200,000

$400,000

$625,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2021

2022

2023

2024

2023

2024

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SLX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$8,200,000

$756,000

$756,000

$756,000

$756,000

$8,200,000

$8,200,000

$400,000

$625,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

227.16

227.17

227.18

227.19

227.20

227.21

227.22

229.20

229.30

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

07

227.16

227.17

227.18

227.19

227.20

227.21

227.22

229.00

229.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2018

2018

2018

2018

2018

2018

2002

2004

2016

2018

2018

2018

2018

2018

2018

2000

2000

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 40

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)

IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2019.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2020.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2021.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2022.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2023.

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2024.

WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE.(2002BOPC)(2004BOPP)(10CCR)(12CCR)(14CCR)

WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE. (ADDITIONAL C-FUNDS FOR 7-366.00)

1.750

1.750

1.300

1.300

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

KY-922

KY-922

KY-169

KY-169

KY-169

KY-169

KY-169

KY-169

KY-4

KY-4

$9,950,000

$10,050,000

$180,000

$180,000

$180,000

$180,000

$180,000

$180,000

$10,000,000

$22,300,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2019

2020

2021

2019

2020

2021

2022

2023

2024

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

SPP

SPP

SPP

SPP

SPP

SPP

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,000,000

$3,000,000

$4,950,000

$10,050,000

$180,000

$180,000

$180,000

$180,000

$180,000

$180,000

$10,000,000

$22,300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

07

252.00

252.02

357.16

357.17

357.18

357.19

357.20

357.21

366.00

366.02

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

07

07

07

07

07

07

07

07

07

07

252.00

252.00

357.16

357.17

357.18

357.19

357.20

357.21

996.08

366.00

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2018

2014

2014

2016

2012

2018

2018

2002

2016

2000

2000

2014

2014

2016

2012

2018

2018

1998

2002

1.47

1.47

0

0

0

0

0

0

8.731

8.731

3.22

3.22

.1

.1

.1

.1

1

1

10.015

10.015

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

12.411

12.411

12.411

12.411

12.411

12.411

12.449

12.449

12.449

12.449

12.449

12.449

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 41

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND RICHMOND ROAD (US-25).

REDUCE CONGESTION ON KY-4 (NEW CIRCLE RD) FROM TRADE CENTER DR TOWOODHILL DR.

NEW CIRCLE RD: IMPROVE SAFETY AND REDUCE CONGESTION FROM US-68(HARRODSBURG RD) TO US-60 (VERSAILLES RD). SEE SEGMENTS 2A & 2B INAUGUST, 1998 ADVANCE PLANNING STUDY.

ADDRESS DEFICIENCIES OF BRIDGE ON US 421 OVER FORK OF TOWN BRANCH ATINTERSECTION OF US 421 AND BRACKTOWN RD (CS 4008) (034B00018N)(SD)

ADDRESS DEFICIENCIES OF BRIDGE ON MALABU DRIVE (CS 3605) OVER BRANCHHICKMAN CREEK AT JCT WITH TATES CREEK ROAD (KY 1974) 034C00038N

ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF NORTH ELKHORN CREEKON HUME ROAD (CR 1001) 0.7 MI NW OF US 60 (034C00001N)

REPLACE DETERIORATED WEST BOUND LANE BRIDGE SECTION OF WILSONDOWNING ROAD BRIDGE ACROSS WEST HICKMAN CREEK.

COMPLETE CONSTRUCTION ON POLO CLUB BOULEVARD AT DEERHAVEN LANEAND TODDS ROAD. (08CCN)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)(LET BY CITY)

IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROADAND IMPROVE INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)

.100

1.313

2.111

.040

.040

1.145

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

CS-4524

KY-4

KY-4

US-421

CS-3605

CR-1001

CS-7038

CS-2548

KY-1927

$262,000

$2,000,000

$2,200,000

$800,000

$427,000

$945,000

$350,000

$1,600,000

$8,920,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

D

C

C

D

C

D

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2024

2024

2019

2018

2019

2020

2018

2018

2018

2020

2022

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLX

NH

NH

BR

BR

BR

BR

SLX

SLX

SLX

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$262,000

$2,000,000

$2,200,000

$800,000

$427,000

$210,000

$735,000

$75,000

$275,000

$1,600,000

$1,000,000

$1,730,000

$6,190,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

428.00

438.00

439.00

1129.00

1132.00

1141.00

1145.00

8507.00

8902.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

07

428.00

438.00

439.00

1129.00

1132.00

1141.00

1145.00

8507.00

8902.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2018

2018

2018

2018

2018

2018

2008

2016

2014

2018

2018

2018

2018

2018

2018

2008

2016

12.736

13.195

2.224

4.426

1.656

1.6

1.667

0

12.836

14.508

4.335

4.466

1.696

1.64

1.675

1.145

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / NEW ROUTE(O)

NEW ROUTES / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 42

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROADAND IMPROVE INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)

REDUCE CONGESTION ON I-64/I-75 FROM THE C&O RAILROAD BRIDGE TO THENORTHERN SPLIT (SECTION 1). (16CCN)

ADDRESS DEFICIENCIES OF MCCALLS MILL RD BRIDGE OVER BOGGS FORK.(034C00009N)

ADDRESS PAVEMENT CONDITION OF I-064 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 71 TO MILEPOINT 73.94

ADDRESS PAVEMENT CONDITION OF I-064 CARDINAL DIRECTION(S) FROMMILEPOINT 73.94 TO MILEPOINT 74.729

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-064 BOTHDIRECTION(S) FROM MILEPOINT 81.037 TO MILEPOINT 82.19

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 82.19 TO MILEPOINT 89.48

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 107.453 TO MILEPOINT 110.213

1.145

5.653

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

KY-1927

I-75

CR-1121

I-64

I-64

I-64

I-64

I-75

$5,900,000

$30,000,000

$518,000

$4,290,000

$3,030,000

$1,925,000

$9,570,000

$3,630,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

D

R

U

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2023

2019

2020

2020

2022

2019

2020

2022

2022

2019

2019

2023

2023

2019

2019

2021

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

NH

NH

NH

NH

BR

BR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,300,000

$2,600,000

$3,000,000

$1,000,000

$1,000,000

$25,000,000

$157,500

$360,500

$390,000

$3,900,000

$30,000

$3,000,000

$175,000

$1,750,000

$870,000

$8,700,000

$330,000

$3,300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

8902.01

8909.00

10009.00

20008.00

20009.00

20010.00

20011.00

20013.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

8902.01

8909.00

10009.00

20008.00

20009.00

20010.00

20011.00

20013.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2016

2018

2018

2018

2018

2018

2018

2018

2016

2018

2018

2018

2018

2018

2018

0

112.012

.708

71

73.94

81.037

82.19

107.453

1.145

117.665

.72

73.94

74.729

82.19

89.48

110.213

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

NEW ROUTES / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 43

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 110.264 TO MILEPOINT 111.82

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 111.82 TO MILEPOINT 120.792

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION ON US-25 FROM MILEPOINT 19.10 TOMILEPOINT 22.29

ADDRESS PAVEMENT CONDITION ON KY-1974 FROM MILEPOINT 7.50 TOMILEPOINT 11.55

ADDRESS DEFICIENCIES OF BRIDGE ON KY 32 OVER MUD LICK CREEK 0.2 MILESW OF CRAINTOWN RD (CR 1302)035B00038N

ADDRESS DEFICIENCIES OF BRIDGE OVER ALLISON CREEK ON KY 111 1.2 MI NOF KY 156. (035B00016N)(EBRP)

ADDRESS DEFICIENCIES OF BRIDGE OVER FLEMING CREEK ON MCINTIRE ROAD(CR 1240) AT THE JCT WITH PIKE BLUFF (CR 1305)(035C00065N)

ADDRESS DEFICIENCIES OF KY-111 BRIDGE OVER BR OF HILLSBORO CREEK.(035B00018N)

3.190

4.050

.040

.020

.024

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FLEMING

FLEMING

FLEMING

FLEMING

I-75

I-75

US-421

US-25

KY-1974

KY-32

KY-111

CR-1240

KY-111

$2,090,000

$11,880,000

$550,000

$1,440,000

$2,748,000

$560,000

$2,590,000

$725,000

$1,470,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

C

C

C

D

C

R

U

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2022

2020

2020

2019

2019

2022

2023

2020

2019

2020

2019

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$190,000

$1,900,000

$1,080,000

$10,800,000

$50,000

$500,000

$1,440,000

$2,748,000

$560,000

$455,000

$2,135,000

$75,000

$50,000

$600,000

$455,000

$1,015,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

09

09

09

09

20014.00

20015.00

20016.00

20025.00

20026.00

1084.00

1091.00

1092.00

10005.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

09

09

09

09

20014.00

20015.00

20016.00

20025.00

20026.00

1084.00

1091.00

1092.00

10005.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2016

2018

2018

2012

2014

2014

2018

2018

2018

2016

2018

2018

2012

2014

2014

2018

110.264

111.82

6.935

19.1

7.5

7.76

11.84

2.04

7.568

111.82

120.792

7.3

22.29

11.55

7.8

11.86

2.064

7.576

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 44

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY-367 BRIDGE OVER JOHNSON CREEK. (035B00074N)

ADDRESS DEFICIENCIES OF KY 2508 BRIDGE OVER TOWN BRANCH. (035B00030N)

ADDRESS DEFICIENCIES OF KY 111 BRIDGE OVER DAVIS BRANCH. (035B00075N)

ADDRESS DEFICIENCIES OF KY 681 BRIDGE OVER DELANEY CREEK. (035B00103N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

IMPROVE SAFETY AND ACCESS ON US-23 BETWEEN KY-80 AND KY-3384.(12CCR)

SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBOSCHOOL.(12CCR)(16CCR)

SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBOSCHOOL.(12CCR)(16CCR)

IMPROVE THE MINNIE-HAROLD CONNECTOR FROM LITTLE MUD CREEK RD TOTHE MOUTH OF TACKETT CREEK (ALT.3B SEC.2)(08CCN)(10CCR)(12CCR)(14CCR)

1.000

1.561

1.179

2.800

FLEMING

FLEMING

FLEMING

FLEMING

FLEMING

FLOYD

FLOYD

FLOYD

FLOYD

KY-367

KY-2508

KY-111

KY-681

KY-32

US-23

KY-979

KY-979

KY-680

$1,355,000

$1,190,000

$1,067,500

$1,137,500

$13,750,000

$2,820,000

$5,540,000

$2,370,000

$13,310,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2019

2020

2019

2019

2019

2019

2021

2022

2023

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

NH

NH

NH

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$375,000

$980,000

$315,000

$875,000

$315,000

$752,500

$315,000

$822,500

$1,250,000

$12,500,000

$420,000

$520,000

$1,880,000

$5,540,000

$2,370,000

$13,310,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

12

12

12

12

10006.00

10019.00

10020.00

10021.00

20009.00

191.00

195.00

195.01

301.20

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

12

12

12

12

10006.00

10019.00

10020.00

10021.00

20009.00

191.00

195.00

195.00

301.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2012

2012

2018

1998

2018

2018

2018

2018

2018

2012

2012

2012

1996

.999

.081

3.863

1.545

13

12.775

12.398

12.389

1.007

.087

3.866

1.555

28.29

13.775

13.95

13.95

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

SAFETY / SAFETY(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / NEW ROUTE(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 45

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE THE MINNIE-HAROLD CONNECTOR FROM LITTLE MUD CREEK RD TOTHE MOUTH OF TACKETT CREEK (ALT.3B SEC.2)(08CCN)(10CCR)(12CCR)(14CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON KY 1100 OVER LITTLE PAINT CREEKNEAR FLOYD/JOHNSON COUNTY LINE 036B00002N

ADDRESS DEFICIENCIES OF BRIDGE OVER LEVISA FORK ON KY 2557 AT JCT US 23IN JUSTELL. (036B00040N)

ADDRESS DEFICIENCIES OF BRIDGE OVER BRUSH CREEK ON KY 550 AT JCTWITH KY 850. (036B00015N)(EBRP)

ADDRESS DEFICIENCIES OF BRYANT BRANCH LEFT FORK OF CLEAR CREEKROAD BRIDGE OVER LEFT FK OF BEAVER CREEK. (036C00017N)

ADDRESS DEFICIENCIES OF KY 466 BRIDGE OVER LEFT FORK BEAVER CREEK.(036B00032N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 10.18 TOMILEPOINT 15.79

IMPROVE SAFETY, TRUCK MOBILITY, AND REDUCE CONGESTION ALONG I-64FROM DIRECTLY EAST OF US-127 TO US-60 SOUTH OF FRANKFORT.

2.800

.146

.040

5.610

4.750

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FRANKLIN

KY-680

KY-1100

KY-2557

KY-550

CR-1253Q3

KY-466

KY-80

US-23

I-64

$19,970,000

$322,000

$3,535,000

$1,260,000

$559,000

$414,750

$13,475,000

$2,557,000

$4,300,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

C

D

C

D

C

D

C

D

C

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2018

2019

2020

2019

2020

2019

2020

2019

2020

2019

2019

2023

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BR

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

PM

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$19,970,000

$322,000

$525,000

$3,010,000

$210,000

$1,050,000

$175,000

$384,000

$140,000

$274,750

$1,225,000

$12,250,000

$2,557,000

$4,300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

05

301.22

1111.00

1119.00

1121.00

10000.00

10014.00

20000.00

20004.00

551.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

05

301.20

1111.00

1119.00

1121.00

10000.00

10014.00

20000.00

20004.00

551.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2012

2014

2014

2018

2018

2018

2018

2018

1998

2012

2014

2014

2018

2018

2018

2018

2018

5.231

.152

2.03

.158

2.588

2.5

10.18

53.11

5.271

.298

2.07

.168

2.592

8.656

15.79

57.86

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 46

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

DEMOLITION OF THE CLOSED ROADWAY SECTION OF THE BROADWAY BRIDGEIN FRANKFORT.

ADDRESS DEFICIENCIES OF BRIDGE OVER BENSON CREEK ON CRAB ORCHARDROAD (CR 1230) 200 FT NW OF KY 151 NEAR I-64 EXIT 48 (037C00010N)(EBRP)(16CCR)

WIDEN I-64 TO 6 LANES FROM KY-151 TO WEST OF THE KY-420 BRIDGE.(2004BOPC)(DESIGN FUNDED UNDER 5-2035.40)(16CCN)

ADDRESS DEFICIENCIES OF KY 420 BRIDGE OVER CEDAR RUN CREEK.(037B00011N)

ADDRESS DEFICIENCIES OF KY 1689 BRIDGE OVER TRIB TO N. ELKHORN CREEK.(037B00034N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION ON US-127 FROM MILEPOINT 11.90 TOMILEPOINT 19.00

IMPROVE THE PURCHASE PARKWAY AT THE KENTUCKY/TENNESSEE LINE TOSOUTHWEST OF THE US-51 INTERCHANGE.(I-69 CORRIDORIMPROVEMENT)(2012BOP)

IMPROVE THE PURCHASE PARKWAY FROM SOUTHWEST OF THE US-51INTERCHANGE TO CARDINAL ROAD NEAR MAYFIELD INCLUDING THE KY-339INTERCHANGE IN WINGO, KY. (I-69 CORRIDOR IMPROVEMENT) (2012BOP)

.025

6.050

7.100

1.660

19.099

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FULTON

FULTON

KY-3506

CR-1230

I-64

KY-420

KY-1689

US-60

US-127

JC-9003

JC-9003

$300,000

$738,500

$20,570,000

$560,000

$542,500

$2,200,000

$1,228,000

$2,500,000

$1,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

R

U

C

D

C

D

C

D

C

C

R

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2018

2019

2022

2022

2024

2019

2020

2019

2020

2021

2021

2022

2024

2023

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

NH

NH

NH

BR

BR

BR

BR

PM

PM

PM

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$300,000

$105,000

$633,500

$120,000

$120,000

$20,330,000

$210,000

$350,000

$210,000

$332,500

$200,000

$2,000,000

$1,228,000

$2,500,000

$1,000,000

$500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

01

01

805.00

1078.00

2035.70

10000.00

10001.00

20001.00

20038.00

25.00

26.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

HICKMANGRAVES

05

05

05

05

05

05

05

01

01

805.00

1078.00

2035.00

10000.00

10001.00

20001.00

20038.00

25.00

26.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2014

2016

2018

2018

2018

2018

2012

2008

2016

2014

2004

2018

2018

2018

2018

2012

2008

.111

.04

47.7

1.948

3.581

8.475

11.9

0

1.2

.15

.065

53.75

1.956

3.587

10.667

19

1.66

3.434

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

3.4348.352

8.35220.299

Milepoints:Milepoints:

To:To:

From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 47

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2019.(12CCR)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2020.(12CCR)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2021.

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2022.

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2023.

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2024.

ADDRESS DEFICIENCIES OF KY 1909 BRIDGE OVER LITTLE BAYOU DE CHIEN CR.(038B00075N)

ADDRESS PAVEMENT CONDITION OF JULIAN M. CARROLL PURCHASE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 1.78

STUDY NEW CORRIDOR BETWEEN I-71 IN GALLATIN COUNTY AND AA HIGHWAYIN CAMPBELL COUNTY.

FULTON

FULTON

FULTON

FULTON

FULTON

FULTON

FULTON

FULTON

GALLATIN

KY-1354

KY-1354

KY-1354

KY-1354

KY-1354

KY-1354

KY-1909

JC-9003

-

$126,000

$126,000

$126,000

$126,000

$126,000

$126,000

$665,000

$1,925,000

$2,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

D

C

D

C

P

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2023

2024

2019

2020

2019

2019

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

BR

BR

PM

PM

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$126,000

$126,000

$126,000

$126,000

$126,000

$126,000

$175,000

$490,000

$175,000

$1,750,000

$2,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

01

01

01

06

320.16

320.17

320.18

320.19

320.20

320.21

10009.00

20002.00

458.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GRANTPENDLETONKENTONCAMPBELL

01

01

01

01

01

01

01

01

06

320.16

320.17

320.18

320.19

320.20

320.21

10009.00

20002.00

458.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2018

2018

2018

2018

2018

2014

2014

2016

2016

2018

2018

2018

2018

2018

0

0

0

0

0

0

.794

0

.1

.1

.1

.1

1

1

.802

1.78

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

NEW ROUTES / NEW ROUTE(O)

Milepoints:Milepoints:Milepoints:Milepoints:

To:To:To:To:

From:From:From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 48

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE GEOMETRICS ON I-71 FROM US-127 TO MP 64. (16CCN).

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROMMILEPOINT 53.433 TO MILEPOINT 56.763

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROMMILEPOINT 59.673 TO MILEPOINT 69.89

IMPROVE US-27 FROM WEST LANCASTER BYPASS TO KY-34. (2006BOPC) (16CCN)

ADDRESS DEFICIENCIES OF BRIDGE ON KY-563 (MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39; 040B00034N

ADDRESS DEFICIENCIES OF BRIDGE OVER GILBERTS CREEK ON KY 1972 1.4 MI EOF CRAB ORCHARD ROAD (CR 1226) AT SECL OF LANCASTER. (040B00024N)(EBRP)

ADDRESS DEFICIENCIES OF KY 1972 BRIDGE OVER BRANCH OF GILBERTSCREEK. (040B00025N)

ADDRESS DEFICIENCIES OF BRIDGE ON SOUTH END OF BLANCHET ROAD 0.3MILES NORTHEAST OF US 25. 041C00012N (12CCN)

ADDRESS DEFICIENCIES OF BRIDGE ON NORTH END OF BLANCHET ROAD 0.2MILES SOUTHEAST OF THE JUNCTION WITH US 25. 041C00014N (12CCN)

1.200

5.132

.100

.010

.050

.070

GALLATIN

GALLATIN

GALLATIN

GARRARD

GARRARD

GARRARD

GARRARD

GRANT

GRANT

I-71

I-71

I-71

US-27

KY-563

KY-1972

KY-1972

CR-1138

CR-1138

$4,200,000

$5,500,000

$11,275,000

$500,000

$406,000

$857,500

$591,500

$1,141,000

$2,604,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

D

C

D

C

D

C

D

C

D

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2022

2022

2024

2024

2022

2022

2024

2018

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

PM

PM

PM

PM

SPP

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,200,000

$1,500,000

$500,000

$500,000

$5,000,000

$1,025,000

$10,250,000

$500,000

$406,000

$210,000

$647,500

$175,000

$416,500

$1,141,000

$2,604,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

07

07

07

07

06

06

8910.00

20021.00

20022.00

196.30

1122.00

1138.00

10010.00

8714.00

8715.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

07

07

07

07

06

06

8910.00

20021.00

20022.00

196.01

1122.00

1138.00

10010.00

8714.00

8715.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2018

2018

2016

2018

2018

2018

2018

2018

2016

2018

2018

2004

2018

2018

2018

2018

2018

62.8

53.433

59.673

5.199

3.84

1.76

2.099

.28

1.95

64

56.763

69.89

10.331

3.915

1.77

2.105

.33

2.02

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

RELIABILITY / RELOCATION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 49

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE ON NORTH END OF DELANEY ROAD 0.1 MILENORTH OF THE JUNCTION WITH US 25. 041C00016N (12CCN)

ADDRESS DEFICIENCIES OF KY-22 BRIDGE OVER CLARKS CRK+BATON ROUGE R.(041B00011N)

ADDRESS DEFICIENCIES OF KY-22 BRIDGES OVER EAGLE CREEK (041B00014N)AND RATTLESNAKE CREEK (041B00013N).

ADDRESS DEFICIENCIES OF CYNTHIANA ROAD BRIDGE OVER COOPERTOWNCREEK. (041C00008N)

ADDRESS DEFICIENCIES OF KY 22 BRIDGE OVER CLARKS CRK+BATON ROUGE R.(041B00011N)

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 143.239 TO MILEPOINT 145.5

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 145.5 TO MILEPOINT 152.122

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 152.112 TO MILEPOINT 157.7

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 162.52 TO MILEPOINT 164.4

.050GRANT

GRANT

GRANT

GRANT

GRANT

GRANT

GRANT

GRANT

GRANT

CR-1142

KY-22

KY-22

CR-1108

KY-22

I-75

I-75

I-75

I-75

$2,240,000

$1,942,500

$4,742,500

$542,500

$3,360,000

$990,000

$3,025,000

$10,670,000

$2,420,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2019

2020

2019

2020

2019

2020

2019

2020

2020

2020

2022

2022

2019

2019

2019

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,240,000

$210,000

$1,732,500

$577,500

$4,165,000

$175,000

$367,500

$420,000

$2,940,000

$90,000

$900,000

$275,000

$2,750,000

$970,000

$9,700,000

$220,000

$2,200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

8716.00

10001.00

10002.00

10003.00

10010.00

20023.00

20024.00

20025.00

20027.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

06

8716.00

10001.00

10002.00

10003.00

10010.00

20023.00

20024.00

20025.00

20026.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

.02

6.594

3.371

3.007

6.594

143.239

145.5

152.112

162.52

.07

6.64

3.431

3.013

6.64

145.5

152.122

157.7

164.4

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 50

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 164.4 TO MILEPOINT 166.263

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY-303SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY(PURCHASE PARKWAY). (EXTENSION OF 1-181.30)(00CCR)(12CCR)(14CCR)

MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY-303SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY(PURCHASE PARKWAY). (EXTENSION OF 1-181.30)(00CCR)(12CCR)(14CCR)

ADDRESS DEFICIENCIES OF BRIDGE OVER PANTHER CREEK ON MCKENDREECHURCH RD (CR 1088) 0.3 MI E OF KY 301 042C00010N

REPLACE KY-1890 BRIDGE OVER LITTLE MAYFIELD CREEK. (042B00191N)

ADDRESS DEFICIENCIES OF MARTIN ROAD BRIDGE OVER BRANCH-OBIONCREEK. (042C00250N)

ADDRESS DEFICIENCIES OF KY 1485 BRIDGE OVER TERRAPIN CREEK.(042B00136N)

ADDRESS PAVEMENT CONDITION OF JULIAN M. CARROLL PURCHASE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 22 TO MILEPOINT 34.49

2.800

2.800

.100

GRANT

GRANT

GRAVES

GRAVES

GRAVES

GRAVES

GRAVES

GRAVES

GRAVES

I-75

KY-22

KY-80

KY-80

CR-1088

KY-1890

CR-1214

KY-1485

JC-9003

$1,375,000

$522,500

$7,280,000

$7,280,000

$833,000

$647,500

$623,500

$1,085,000

$2,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2023

2021

2021

2022

2023

2019

2022

2019

2020

2019

2021

2019

2020

2022

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

SPP

SPP

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$125,000

$1,250,000

$47,500

$475,000

$7,280,000

$7,280,000

$280,000

$553,000

$140,000

$507,500

$200,000

$423,500

$210,000

$875,000

$1,000,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

01

01

01

01

01

01

01

20028.00

20029.00

181.50

181.51

1157.00

10001.00

10002.00

10010.00

20004.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

01

01

01

01

01

01

01

20028.00

20029.00

181.30

181.50

1157.00

10001.00

10002.00

10010.00

20004.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2000

2018

2018

2018

2018

2018

2018

2018

2018

1998

2000

2018

2018

2018

2018

2018

164.4

10.748

.3

1.718

.555

2.532

22

166.236

11.544

.4

1.768

.563

2.519

34.49

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 51

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION ON KY-94 FROM MILEPOINT 10.49 TOMILEPOINT 15.78

ADDRESS PAVEMENT CONDITION ON KY-339 FROM MILEPOINT 6.04 TOMILEPOINT 13.40

IMPROVE US 62 FROM LEITCHFIELD BYPASS (KY3155) TO JUST EAST OF BEEHIVECURVE. CONSTRUCTION SEGMENT 1.

IMPROVE US 62 FROM LEITCHFIELD BYPASS (KY3155) TO JUST EAST OF BEEHIVECURVE. CONSTRUCTION SEGMENT 1.

IMPROVE US 62 FROM JUST EAST OF BEEHIVE CURVE TO KY224. CONSTRUCTIONSEGMENT 2.

ADDRESS DEFICIENCIES OF HORNTOWN RD BRIDGE OVER ROCK CREEK.(043C00011N)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 108.00 TO MILEPOINT 111.25(110.50 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 111.25 TO MILEPOINT112.48

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 112.4 TO MILEPOINT 114.8

5.300

7.360

GRAVES

GRAVES

GRAYSON

GRAYSON

GRAYSON

GRAYSON

GRAYSON

GRAYSON

GRAYSON

KY-94

KY-339

US-62

US-62

US-62

CR-1161

WK-9001

WK-9001

WK-9001

$825,000

$1,274,000

$2,000,000

$2,000,000

$5,000,000

$320,000

$2,530,000

$550,000

$2,090,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2023

2020

2021

2024

2019

2020

2020

2020

2022

2022

2021

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

STP

STP

STP

BR

BR

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$825,000

$1,274,000

$2,000,000

$2,000,000

$5,000,000

$100,000

$220,000

$230,000

$2,300,000

$50,000

$500,000

$190,000

$1,900,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

04

04

04

04

04

04

04

20028.00

20029.00

8502.10

8502.11

8502.20

10000.00

20000.00

20001.00

20002.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

04

04

04

04

04

04

04

20028.00

20029.00

8502.00

8502.00

8502.00

10000.00

20000.00

20001.00

20002.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2008

2008

2008

2018

2018

2018

2018

10.49

6.04

23

23

24.2

2.945

108

111.25

112.4

15.78

13.4

24.3

24.3

25.5

2.953

111.25

112.48

114.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MINOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 52

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 114.8 TO MILEPOINT116.95

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 88.433 TO MILEPOINT 91.2

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY NON-CARDINAL DIRECTION(S) FROM MILEPOINT 91.2 TO MILEPOINT95

ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 14.49 TOMILEPOINT 20.79

IMPROVE SAFETY AND GEOMETRICS ON US-68 BEGINNING AT THE RUSSELLCREEK BRIDGE EXTENDING THROUGH MICKEY VAUGHN CURVE TO 0.20 MILESWEST OF CLOVER LICK CREEK BRIDGE. (2016BOP)

IMPROVE SAFETY AND MOBILITY ON KY-61 FROM PITMAN CREEK BRIDGE TODOC WARD RD (CR 1314). (12CCN)(14CCR)(16CCR)

ADDRESS DEFICIENCIES OF JONES SCHOOL RD BRIDGE OVER BRUSH CREEK.(044C00023N)

ADDRESS DEFICIENCIES OF US 68 BRIDGE OVER GREASY CREEK. (044B00013N)

6.290

.805

2.980

GRAYSON

GRAYSON

GRAYSON

GRAYSON

GREEN

GREEN

GREEN

GREEN

WK-9001

WK-9001

WK-9001

US-62

US-68

KY-61

CR-1347

US-68

$1,100,000

$2,590,000

$1,650,000

$999,000

$2,250,000

$10,750,000

$303,000

$507,500

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

D

C

C

C

R

U

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2023

2020

2020

2020

2024

2018

2022

2023

2024

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

NH

SPP

SPP

SPP

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$100,000

$1,000,000

$2,590,000

$150,000

$1,500,000

$999,000

$2,250,000

$2,000,000

$2,750,000

$6,000,000

$100,000

$203,000

$105,000

$402,500

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

04

04

04

20003.00

20004.00

20006.00

20027.00

398.01

8712.00

10001.00

10009.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BUTLER

04

04

04

04

04

08

04

04

20003.00

20004.00

20006.00

20027.00

398.00

8712.00

10001.00

10009.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2016

2012

2018

2018

2018

2018

2018

2018

2012

2012

2018

2018

114.8

88.433

91.2

14.49

10.802

11.113

.045

2.995

116.95

91.2

95

20.79

11.544

14.093

.051

3.003

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

87.544 88.433Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 53

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

CONSTRUCT SIDEWALKS-PHASE B ALONG GESLING RD (CS-3060) FROMINTERSECTION OF CARDINAL RD (CS-3061) & SEATON DR (KY-750) TO KENWOODDR (CS-3054/KY-1093) & PHASE C ALONG KENWOOD DR BEGINNING AT GESLINGRD & ENDING AT CARDINAL RD. (2014BOP)

DESIGN AND CONSTRUCTION OF SIDEWALKS ALONG POWELL LANE (KY-750) INFLATWOODS, KY BEGINNING AT END OF THE EXISTING SIDEWALK AT MP 1.74AND EXTENDING APPROXIMATELY 0.7 MILES EAST TO THE INTERSECTION OFKY-750 WITH KY-1172 (RED DEVIL LANE).(2014BOP)

ADDRESS DEFICIENCIES OF BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD;.05 MI N.E. OF JCT US 23; 045B00039N (16CCR)

ADDRESS DEFICIENCIES OF BRIDGE OVER POND RUN ON WILLIAMS AVE (CS4041) IN RACELAND 250 FT NW OF POND RUN ROAD (CS 4001) (045C00119N)

IMPROVE KY-207 FROM THE INDUSTRIAL PARKWAY TO THE KY-693INTERSECTION IN FLATWOODS.(08CCN)(16CCR)

ADDRESS DEFICIENCIES OF KY-503 BRIDGE OVER INDIAN RUN CREEK.(045B00033N)

ADDRESS DEFICIENCIES OF SMITH BRANCH RD BRIDGE OVER LEFT FK SMITHBRANCH. (045C00114N)

ADDRESS DEFICIENCIES OF MUSKETEER DRIVE BRIDGE OVER SLASH BRANCH.(045C00150N)

.100

.016

4.948

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

CS-3060

KY-750

KY-244

CS-4041

KY-207

KY-503

CR-1018

LA-1000

$612,000

$466,000

$11,655,000

$1,085,000

$2,000,000

$998,000

$875,000

$545,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

C

D

C

D

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2019

2019

2018

2018

2018

2018

2019

2020

2024

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SAH

SAH

SAH

SAH

SAH

SAH

SAH

BR

BR

BR

STP

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$68,000

$20,000

$80,000

$444,000

$32,000

$64,000

$370,000

$11,655,000

$245,000

$840,000

$2,000,000

$245,000

$753,000

$280,000

$595,000

$245,000

$300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

09

401.00

402.00

1073.00

1094.00

8509.00

10007.00

10008.00

10009.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

09

09

208.02

208.02

1073.00

1094.00

8509.00

10007.00

10008.00

10009.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2010

2014

2008

2018

2018

2018

2014

2014

2010

2014

2008

2018

2018

2018

0

1.74

0

.05

10.932

5.328

2.221

.055

.225

1.81

.207

.066

15.88

5.336

2.227

.059

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MATCHED FED FUNDS(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / NEW ROUTE(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 54

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY 1 BRIDGE OVER LOST CREEK. (045B00006N)

IMPROVE THE WESTBOUND LANES OF US-60 FROM KY-1957 TO 0.2 MILE WEST OFKY-6106. (12CCR)(14CCR)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

KY 251 IMPROVEMENTS FROM KY 3005 TO KY 434.

IMPROVE MOBILITY AND REDUCE CONGESTION ON US-31W FROM US-31WB TOCS-2255 (WILSON ROAD). (10CCR)(12CCR)

WIDEN KY 313 TO 4 LANES BETWEEN PATRIOT PARKWAY (MP 10.598) AND THEBULLION BOULEVARD CONNECTOR (MP 14.534). (2016BOP)

ADDRESS DEFICIENCIES OF BRIDGE OVER P&L AND CSX RAILROADS (MP 36.4 TO36.8 IN WEST POINT) (047B00007N).(16CCR)

IMPROVE SAFETY, MOBILITY AND GEOMETRICS ON US-62 FROM I-65 TO UPPERCOLESBURG ROAD (CR-1038)

6.267

3.607

3.936

.400

3.247

GREENUP

HANCOCK

HANCOCK

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

KY-1

US-60

US-60

KY-251

US-31W

KY-313

US-31W

US-62

$1,365,000

$7,140,000

$5,775,000

$12,900,000

$11,500,000

$12,750,000

$10,500,000

$1,500,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

R

U

C

D

C

U

C

D

R

U

C

U

C

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2022

2022

2024

2022

2022

2019

2021

2021

2024

2024

2024

2019

2020

2019

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

SPP

SPP

SPP

PM

PM

BR2

BR2

SPP

SPP

SPP

SPP

BR2

BR2

BR

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$350,000

$1,015,000

$90,000

$960,000

$6,090,000

$525,000

$5,250,000

$4,200,000

$8,700,000

$500,000

$1,000,000

$1,000,000

$9,000,000

$750,000

$12,000,000

$10,500,000

$1,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

02

02

04

04

04

04

04

10022.00

226.00

20022.00

153.01

154.00

170.00

199.00

442.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

02

02

04

04

04

04

04

10022.00

226.00

20022.00

153.00

154.00

170.00

199.00

442.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2012

2018

2008

2008

2016

2012

2018

2018

2012

2018

2008

2008

2016

2012

2018

1.146

1.933

1.933

2.681

18.827

10.598

36.4

20.104

1.152

8.2

9.4

6.288

28.355

14.534

36.8

23.351

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MINOR WIDENING(O)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / PHASE I DESIGN(O)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 55

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE ON US 62 OVER ROLLING FORK AT THEHARDIN-NELSON CO LINE. 047B00023N

RELOCATE INTERSECTION OF WOODLAND DRIVE AT US-31W.(98CCN)(06CCR)(REMAINING FUNDS FOR AGREEMENT)(12CCR)(LET BY KYTC)

IMPROVE SAFETY, GEOMETRICS, DRAINAGE AND MAINTENANCE ISSUES ALONGKY-1357 (ST. JOHNS RD) FROM US-31W BYPASS TO KY-3005 (RING ROAD). (14CCN)

ADDRESS DEFICIENCIES OF KY 220 BRIDGE OVER MARTINS BRANCH CREEK.(047B00080N)

ADDRESS DEFICIENCIES OF KY 2212 BRIDGE OVER PAWLEY CREEK. (047B00134N)

ADDRESS DEFICIENCIES OF KY 2800 BRIDGE OVER SANDY CREEK. (047B00137N)

ADDRESS DEFICIENCIES OF BEWLEY HOLLOW RD BRIDGE OVER MILL CREEK.(047C00014N)

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 5.82 TO MILEPOINT 8.837

.139

.200

1.678

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

US-62

KY-361

KY-1357

KY-220

KY-2212

KY-2800

CR-1100

BG-9002

$3,381,000

$2,500,000

$14,500,000

$280,000

$297,500

$294,000

$318,500

$2,640,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2020

2020

2021

2024

2019

2020

2019

2020

2019

2020

2019

2020

2019

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR2

SPP

SPP

SPP

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,381,000

$2,500,000

$3,000,000

$2,500,000

$9,000,000

$87,500

$192,500

$91,000

$206,500

$87,500

$206,500

$91,000

$227,500

$240,000

$2,400,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

04

04

04

1093.00

7020.00

8801.00

10010.00

10011.00

10012.00

10013.00

20007.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

NELSON 04

04

04

04

04

04

04

04

1093.00

7020.00

8801.00

10010.00

10011.00

10012.00

10013.00

20007.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

1998

2014

2018

2018

2018

2018

2018

2016

1998

2014

2018

2018

2018

2018

2018

28.157

0

14.614

5.071

2.705

3.689

1.046

5.82

28.194

.5

16.292

5.077

2.711

3.695

1.052

8.837

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

0 .103Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 56

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION

ADDRESS PAVEMENT CONDITION

ADDRESS PAVEMENT CONDITION

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 119.649 TO MILEPOINT 120.649

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 120.93 (120.65 NON-CARDINAL)TO MILEPOINT 132.4 (130.95 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 132.4 TO MILEPOINT134.923

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 134.923 TO MILEPOINT 135.923

ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 9.57 TO MILEPOINT13.77

4.200

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

US-31W

US-31W

US-31W

US-31WB

WK-9001

WK-9001

WK-9001

WK-9001

US-62

$6,050,000

$2,750,000

$3,575,000

$275,000

$1,100,000

$10,120,000

$2,200,000

$1,100,000

$689,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2019

2019

2019

2021

2021

2020

2020

2024

2024

2021

2021

2019

2019

2024

2024

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$550,000

$5,500,000

$250,000

$2,500,000

$325,000

$3,250,000

$25,000

$250,000

$100,000

$1,000,000

$920,000

$9,200,000

$200,000

$2,000,000

$100,000

$1,000,000

$689,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

04

04

04

04

20011.00

20012.00

20013.00

20014.00

20015.00

20016.00

20018.00

20019.00

20028.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

04

04

04

04

04

20011.00

20012.00

20013.00

20014.00

20015.00

20016.00

20018.00

20019.00

20028.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

17.677

19.5

27.732

0

119.65

120.93

132.4

134.92

9.57

19.5

20.432

29.5

.25

120.65

132.4

134.92

135.92

13.77

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 57

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE OVER WALLINS CREEK ON KY 219 3.0 MILESOUTH OF SCL OF WALLINS CREEK. (048B00047N)

ADDRESS DEFICIENCIES OF BRIDGE ON US 119 OVER KY 160/MAIN ST IN HARLANCOUNTY, KY. 048B00126N

ADDRESS DEFICIENCIES OF BRIDGE ON SWEET BALL RD (CR-1328) (0.175) OVERAGES BRANCH. 048C00072N

ADDRESS DEFICIENCIES OF KY-219 BRIDGE OVER WALLINS CREEK. (048B00046N)

ADDRESS DEFICIENCIES OF KY-219 BRIDGE OVER WALLINS CREEK. (048B00048N)

ADDRESS DEFICIENCIES OF KY-72 BRIDGE OVER CLOVER FK CUMBERLAND RVR.(048B00095N)

ADDRESS DEFICIENCIES OF KY-179 BRIDGE OVER FUGETT CREEK. (048B00097N)

ADDRESS DEFICIENCIES OF KY-3451 BRIDGE OVER EWING CREEK. (048B00146N)

.020

.118

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

KY-219

US-119

CR-1328

KY-219

KY-219

KY-72

KY-179

KY-3451

$685,000

$6,020,000

$630,000

$665,000

$542,500

$1,155,000

$787,500

$700,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$510,000

$560,000

$5,460,000

$175,000

$455,000

$175,000

$490,000

$175,000

$367,500

$245,000

$910,000

$175,000

$612,500

$175,000

$525,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

1097.00

1101.00

1107.00

10010.00

10011.00

10012.00

10013.00

10014.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

1097.00

1101.00

1107.00

10010.00

10011.00

10012.00

10013.00

10014.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2016

2016

2018

2018

2018

2018

2018

2014

2016

2016

2018

2018

2018

2018

2018

1.033

34.787

.171

1.475

.325

11.773

.081

1.521

1.053

34.905

.179

1.485

.333

11.821

.087

1.527

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 58

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY-2007 BRIDGE OVER WALLINS CREEK. (048B00179N)

ADDRESS DEFICIENCIES OF RASNICK RD BRIDGE OVER POOR FK CUMBERLANDRVR. (048C00008N)

ADDRESS DEFICIENCIES OF BLUE LN BRIDGE OVER PATH FK OF PUCKETTCREEK. (048C00043N)

ADDRESS DEFICIENCIES OF KENTUCKY AV BRIDGE OVER MARTINS FKCUMBERLAND RV. (048C00067N)

ADDRESS DEFICIENCIES OF PRICE LN BRIDGE OVER CLOVER FK CUMBERLANDRVR. (048C00094N)

ADDRESS DEFICIENCIES OF BANNER FORK RD BRIDGE OVER WALLINS CREEK.(048C00138N)

ADDRESS DEFICIENCIES OF KY 1601 BRIDGE OVER JONES CREEK. (048B00073N)

IMPROVE US-62 FROM SALEM PIKE (CR-1005) TO APPROXIMATELY MP 12.3.(12CCN)(14CCR)

IMPROVE MOBILITY, CONNECTIVITY AND SAFETY BY ADDRESSINGCOMMERCIAL AND INDUSTRIAL TRAFFIC MOVEMENT FROM US-31W SOUTH OFKY-218 TO I-65. (16CCR)

.400

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARRISON

HART

KY-2007

CR-1020W

CR-1218U

CS-1041

CR-1082D

CR-1253

KY-1604

US-62

KY-335

$661,500

$822,500

$756,000

$822,500

$791,000

$602,000

$915,600

$2,920,000

$2,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

C

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2022

2024

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

SPP

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$192,500

$469,000

$192,500

$630,000

$175,000

$581,000

$175,000

$647,500

$192,500

$598,500

$175,000

$427,000

$175,000

$740,600

$2,920,000

$1,500,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

06

04

10015.00

10016.00

10017.00

10018.00

10019.00

10020.00

10040.00

8707.00

441.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

06

04

10015.00

10016.00

10017.00

10018.00

10019.00

10020.00

10040.00

8707.00

441.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2012

2016

2018

2018

2018

2018

2018

2018

2018

2012

2016

3.204

.012

.015

.126

.004

.03

1.984

11.9

1.2

3.214

.022

.019

.182

.02

.036

1.99

12.3

2.545

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

ECONOMIC DEVELOPMENT / ECONOMIC DEVEL(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 59

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION ON US-31E FROM MILEPOINT 13.18 TOMILEPOINT 21.58

WATHEN LANE: UPGRADE WITH WIDENED LANES, CURB, GUTTER ANDSIDEWALK FROM US 60 TO CITY LIMITS.

IMPROVE SAFETY AND REDUCE CONGESTION ON CS-1372 (WATSON LANE)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2023. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

US 41/KY 812 INTERSECTION UPGRADE: ADD RIGHT TURN AND LEFT TURN LANESINCLUDING SIGNAL PHASING. KYTC PROJECT WITH KYTC PROVIDING 20%MATCH.(TOLL CREDITS)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)

8.400

1.086

.140

HART

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

US-31E

US-60

CS-1372

-

-

-

-

-

-

US-41

$964,000

$304,000

$400,000

$1,176,000

$700,000

$700,000

$700,000

$700,000

$700,000

$1,100,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

D

C

C

C

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2018

2023

2018

2019

2020

2021

2022

2023

2018

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

SHN

STP

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$964,000

$304,000

$400,000

$1,176,000

$700,000

$700,000

$700,000

$700,000

$700,000

$50,000

$100,000

$950,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

02

02

02

02

02

02

02

02

02

20029.00

382.00

383.00

700.13

700.14

700.15

700.16

700.17

700.18

711.00

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

02

02

02

02

02

02

02

02

02

20029.00

382.00

383.00

700.13

700.14

700.15

700.16

700.17

700.18

700.07

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2012

2014

2014

2016

2016

2018

2006

2018

2018

2018

2012

2014

2014

2016

2016

2018

2006

13.18

0

.309

12.766

21.58

1.226

1.395

12.906

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 60

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

WATHEN BRIDGE REPLACEMENT: REPLACE EXISTING BRIDGE WITH 6FTPRECAST CONCRETE BOX CULVERT, PAVEMENT AND GUARDRAIL. LPAPROJECT. CITY TO PROVIDE MATCH.(FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)(051C00014)

KY 2183 / KY 1539 INTERSECTION AND UPGRADE: PROJECT WILL RECONSTRUCTTHE INTERSECTION AND MAKE IMPROVEMENTS TO THE SOUTHBOUNDAPPROACH. (2012BOP)

US 41/ WOLF HILLS ROAD INTERSECTION UPGRADE: PROJECT WILL ADDDEDICATED RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASINGTO BE MODIFIED OR ADDED TO EACH LEG OF THE INTERSECTION. (2012BOP)

ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER GREEN RIVER ATINTERSECTION WITH KY 1078 051B00015N.(12CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER GREEN RIVER ATINTERSECTION WITH KY 1078. (SR 39) 051B00015N (ADDITIONAL FUNDING FOR CPHASE)

DEVELOP ALIGNMENT FOR I-69 HENDERSON/EVANSVILLE OHIO RIVERCROSSING (TO BE DEVELOPED IN CONCERT WITH 2-1088.00).(16CCR)(C-COST=$1.0BILLION; KYTC SHARE $600 MILLION)

ADDRESS DEFICIENCIES AND PAINTING ON US 41 BRIDGES OVER OHIO RIVER.JOINT PROJECT WITH INDIANA. (051B0002R, 051B0007L)(BSBP)

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROMMILEPOINT 142.146 TO MILEPOINT 148.09 (150.142 NON-CARDINAL)

.100

.100

.208

.208

1.028

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

CS-1453

KY-2183

US-41

US-60

US-60

I-69

US-41

I-69

$180,000

$1,150,000

$650,000

$6,000,000

$6,000,000

$28,400,000

$21,200,000

$7,040,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

R

U

C

R

U

C

C

C

D

R

U

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2018

2018

2019

2018

2018

2019

2019

2020

2019

2021

2022

2022

2021

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

BR

BR

NH

NH

NH

BR

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$20,000

$160,000

$150,000

$400,000

$600,000

$50,000

$100,000

$500,000

$6,000,000

$6,000,000

$500,000

$19,900,000

$8,000,000

$21,200,000

$640,000

$6,400,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

713.00

714.00

715.00

1080.00

1080.01

1088.10

2091.10

20023.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

02

700.07

700.08

700.08

1080.00

1080.00

1088.10

2091.00

20023.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2012

2012

2018

2016

2016

2018

2018

2006

2008

2008

2018

2018

2016

2016

2018

.72

1.693

18.488

19.236

19.236

19.14

142.146

.77

1.793

18.588

19.444

19.444

20.168

148.09

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / AM-BRIDGE (P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / PREFINANCD CONVRSN(O)

RELIABILITY / NEW ROUTE(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 61

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM KY-53 TO KY-153.

MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY 153) TO LOST CREEK(1/2 MILE EAST OF SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO MILE POINT6.8. (06CCN)(08CCR)(10CCR)(12CCR)(14CCR)

MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY-153) TO LOST CREEK(1/2 MILE EAST OF SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO MILE POINT6.8. (06CCN)(08CCR)(10CCR)(12CCR)(14CCR)

ADDRESS DEFICIENCIES OF KY 997 BRIDGE OVER WHITE SULPHUR CREEK.(052B00060N)

ADDRESS DEFICIENCIES OF KY 3175 BRIDGE OVER WHITE SULPHUR FORK.(052B00064N)

ADDRESS DEFICIENCIES OF KY 3320 BRIDGE OVER TRIB OF HARRODS CREEK.(052B00070N)

ADDRESS DEFICIENCIES OF GULLION RUN RD BRIDGE OVER TRIB OF GULLIONRUN. (052C00045N)

ADDRESS DEFICIENCIES OF KY 1606 BRIDGE OVER WHITE SULPHUR FORK.(052B00048N)

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROMMILEPOINT 24.727 TO MILEPOINT 28.173.

3.273

4.631

4.631

HENRY

HENRY

HENRY

HENRY

HENRY

HENRY

HENRY

HENRY

HENRY

I-71

KY-146

KY-146

KY-997

KY-3175

KY-3320

CR-1027

KY-1606

I-71

$5,600,000

$6,930,000

$6,930,000

$458,500

$836,500

$497,000

$406,000

$1,267,000

$4,950,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2022

2023

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

SPP

SPP

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$5,600,000

$6,930,000

$6,930,000

$192,500

$266,000

$262,500

$574,000

$210,000

$287,000

$175,000

$231,000

$245,000

$1,022,000

$450,000

$4,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

552.00

8300.00

8300.01

10002.00

10003.00

10004.00

10006.00

10017.00

20002.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

JEFFERSON 05

05

05

05

05

05

05

05

05

552.00

8300.00

8300.00

10002.00

10003.00

10004.00

1006.00

10017.00

20002.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2006

2018

2018

2018

2018

2018

2018

2018

2018

2006

2006

2018

2018

2018

1996

2018

2018

24.727

2.169

2.169

1.9

.065

1.816

2.423

6.326

24.727

28

6.8

6.8

1.906

.081

1.822

2.429

6.354

28.173

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

22.033 24.727Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 62

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-071 CARDINAL DIRECTION(S) FROMMILEPOINT 37.183 TO MILEPOINT 38.086

ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON KY-1826 OVER TOWNCREEK (B79) IN CLINTON. (053B00079N)

ADDRESS DEFICIENCIES OF BRIDGE OVER IC RR ON BALTIMORE RD (CR 1011) 0.3MI NW OF HICKMAN/GRAVES CO LINE 053C00003N

ADDRESS DEFICIENCIES OF KY 2206 BRIDGE OVER CANE CR FK -OBION CRK.(053B00090N)

US 41A PHASE II DESIGN AND RIGHT-OF-WAY. (2005HPP-KY135)(SEE 2-137.01 FOR"STP" COMPONENT)

IMPROVE US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1)(2012BOP)(16CCR)

IMPROVE US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1)(2012BOP)(16CCR)

WIDEN US-41A FROM YORKWOOD PLACE TO US-41 / KY-281. (SECTION 2)(2012BOP)(16CCR)

IMPROVE KY-281 FROM ISLAND PARK DRIVE TO CARRIAGE LANE (KY-2281).

.100

.055

3.600

2.030

3.426

1.246

.736

HENRY

HICKMAN

HICKMAN

HICKMAN

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

I-71

KY-1826

CR-1011

KY-2206

US-41A

US-41A

US-41A

US-41A

KY-281

$440,000

$1,400,000

$1,879,500

$1,085,000

$2,879,680

$5,000,000

$5,000,000

$8,000,000

$2,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

D

C

D

C

C

C

C

C

D

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2020

2019

2019

2020

2019

2020

2018

2020

2021

2018

2023

2024

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

BR

BR

BR

BR

BR

HPP

SPP

SPP

SPP

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$40,000

$400,000

$1,400,000

$266,000

$1,613,500

$210,000

$875,000

$2,879,680

$5,000,000

$5,000,000

$8,000,000

$500,000

$1,000,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

01

01

01

02

02

02

02

02

20007.00

1062.00

1156.00

10011.00

137.02

137.10

137.11

137.20

384.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

01

01

01

02

02

02

02

02

20007.00

1062.00

1156.00

10011.00

137.02

137.00

137.10

137.00

384.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2004

2000

2018

2000

2018

2018

2018

2018

2018

2004

2000

2000

2000

2018

37.183

4.888

.25

.653

0

1.246

0

0

.996

38.086

4.988

.305

.671

3.426

3.275

3.426

1.246

1.759

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

SAFETY / AM-BRIDGE (P)

RELIABILITY / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 63

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE ON KY-260 (MP 2.14) OVER OTTER CREEK; .20MI EAST OF PENNYRILE PARKWAY; 054B00022N (14CCR)

IMPROVE NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY-281.(06CCN)(12CCR)

ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER SUGAR CREEK. (054B00088N)

ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER CLEAR CREEK. (054B00182N)

ADDRESS DEFICIENCIES OF KY 138 BRIDGE OVER POND RIVER. (054B00009N)

ADDRESS DEFICIENCIES OF KY 109 BRIDGE OVER TRADEWATER RIVER.(054B00079N)

ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILEPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 32.825 TO MILEPOINT 34.256

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROMMILEPOINT 114.254 TO MILEPOINT 117.936

.100

.600

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

KY-260

US-41

KY-70

KY-70

KY-138

KY-109

EB-9004

I-69

$1,085,000

$12,380,000

$1,452,500

$1,505,000

$280,000

$210,000

$1,870,000

$3,190,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2020

2021

2021

2024

2019

2020

2019

2020

2019

2020

2019

2020

2021

2021

2023

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

STP

STP

STP

STP

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,085,000

$900,000

$1,180,000

$1,440,000

$8,860,000

$210,000

$1,242,500

$210,000

$1,295,000

$35,000

$245,000

$35,000

$175,000

$170,000

$1,700,000

$290,000

$2,900,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

1072.00

8305.00

10005.00

10006.00

10024.00

10025.00

20025.00

20029.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

02

1072.00

8305.00

10005.00

10006.00

10024.00

10025.00

20025.00

20029.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2006

2018

2018

2018

2018

2018

2018

2018

2006

2018

2018

2018

2018

2018

2018

2.09

16.989

13.46

14.248

8.457

.092

32.825

114.254

2.19

17.548

13.474

14.272

8.493

.154

34.256

117.936

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 64

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROMMILEPOINT 124.946 TO MILEPOINT 133.677

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROMMILEPOINT 93.724 TO MILEPOINT 95.604

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROMMILEPOINT 95.604 TO MILEPOINT 105.046

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 42.807 TO MILEPOINT 43.424

ADDRESS PAVEMENT CONDITION ON US-41A FROM MILEPOINT 0.00 TOMILEPOINT 9.69

IMPROVE KY-30 FROM US-421 TO THE OWSLEY COUNTY LINE. (14CCR)(SEE 10-279.60 FOR PE & ENVIR)(16CCR)(TO BE LET WITH 10-279.61)

ADDRESS DEFICIENCIES OF KY 89 BRIDGE OVER HORSE LICK CREEK.(055B00028N)

ADDITION OF NB AND SB AUXILIARY LANES ON I-71 NEAR KENNEDY, INCLUDINGOPERATIONAL IMPROVEMENTS TO THE ZORN INTERCHANGE. (2004BOPC)

ADDITION OF NB AND SB AUX. LANES ON I-71 NEAR KENNEDY, INCLUDINGOPERATIONAL IMPROVEMENTS TO THE ZORN INTERCHANGE. (ADDITIONALFUNDING FOR C PHASE)

9.690

8.396

2.500

2.500

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

JACKSON

JACKSON

JEFFERSON

JEFFERSON

I-69

I-69

I-69

WK-9001

US-41A

KY-30

KY-89

I-71

I-71

$9,625,000

$1,650,000

$8,360,000

$550,000

$1,069,000

$18,500,000

$1,995,000

$15,680,000

$12,380,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

C

C

D

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2023

2022

2022

2021

2021

2023

2023

2023

2019

2019

2020

2019

2020

2020

2022

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

STP

BR

BR

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$875,000

$8,750,000

$150,000

$1,500,000

$760,000

$7,600,000

$50,000

$500,000

$1,069,000

$18,500,000

$175,000

$1,820,000

$800,000

$1,500,000

$1,000,000

$12,380,000

$12,380,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

11

11

05

05

20031.00

20033.00

20034.00

20035.00

20048.00

278.30

10041.00

48.10

48.11

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

11

11

05

05

20031.00

20033.00

20034.00

20035.00

20048.00

278.30

10041.00

48.02

48.10

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2014

2018

2004

2006

2018

2018

2018

2018

2018

2014

2018

2000

2004

124.946

93.724

95.604

42.807

0

9.121

0

0

0

133.677

95.604

105.046

43.424

9.69

17.517

.01

2.5

2.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 65

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)(BSBP)

ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)

ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)

ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)

ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)

WIDEN RIVER ROAD FROM 2 TO 4 LANES FROM EAST OF BEARGRASS CREEKNEAR POPE AVENUE TO ZORN AVENUE. TO INCLUDE BIKE LANES. PROJECTLENGTH 1.3 MILES.

EXTENSION OF RIVER ROAD, LOUISVILLE. (2006KYD)(SEE 5-512.00 FOR PROJECTINFORMATION)

CLEAN AND PAINT ALL STEEL BRIDGES AND STEEL BEARINGS ON THE GENESNYDER FREEWAY(10CCR)(SD)

IMPROVE RAMP CAPACITY OF THE I-64 WESTBOUND RAMP TO I-264 WESTBOUNDFROM ONE TO TWO LANES FOR ENTIRE LENGTH AND OTHER NEEDEDIMPROVEMENTS TO ADDRESS WEAVE ISSUES AT MERGE ON I-264.(2006BOPP)(12CCR)

.300

1.500

.500

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

I-64

I-64

I-64

I-64

I-64

CS-1001B

CS-1001B

I-265

I-64

$7,000,000

$10,000,000

$10,000,000

$10,000,000

$10,000,000

$11,500,000

$1,630,000

$3,790,000

$10,130,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

C

C

C

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2023

2024

2019

2018

2019

2020

2021

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

SLO

SLO

SLO

SLO

BR

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,000,000

$5,000,000

$10,000,000

$10,000,000

$10,000,000

$10,000,000

$11,500,000

$550,000

$540,000

$540,000

$3,790,000

$10,130,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

64.00

64.01

64.02

64.03

64.04

91.02

91.08

136.00

159.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

64.00

64.00

64.00

64.00

64.00

91.02

91.08

136.00

159.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2018

2018

2018

2018

2000

2004

2000

2000

2000

2000

2000

2000

2000

2000

2004

2000

2000

0

0

0

0

0

1.6

.232

.316

.316

.316

.316

.316

2.925

.779

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

ASSET MANAGEMENT / AM-BRG PAINTING(P)

RELIABILITY / RECONSTRUCTION(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 66

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.)(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)

WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.)(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)

WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)(10CCR)(12CCR)

WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)(10CCR)(12CCR)

WIDEN SOUTHBOUND HURSTBOURNE LANE TO 3 LANES FROM LINN STATION RD(CS-1004H) TO EDEN AVE (CS-1660H). (06CCR)(03KYD)(2006BOPP)(SEE 5-344.02 FORKYD C PHASE)(14CCR)(XCHNG UNDER 5-8953)

WIDEN ENGLISH STATION ROAD FROM 2 TO 3 LANES (3RD LANE WILL BE ACENTER TURN LANE) FROM AIKEN ROAD TO AVOCA ROAD.(FUNDING SUBJECTTO FISCAL CONSTRAINT PENDING MPO TIP).

RECONSTRUCT KY-22 AT SPRINGCREST DRIVE. (06CCN)(2004BOPC)(14CCR)(EMERGENCY CULVERT REPLACEMENT AWARDED UNDER 5-371.12)

RECONSTRUCT KY-22 AT GOOSE CREEK ROAD. (06CCN) (2004BOPC)(14CCR)

EXTEND AND RECONSTRUCT I-65 SB RAMP TO BROOK STREET AND FLOYDSTREET. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PHASE 3.EXTEND AND CONSTRUCT 2 LANE ROADWAY WITH CONTINUOUSCENTER-TURN LANE FROM KY 864 (BEULAH CHURCH RD) TO US 31E(BARDSTOWN RD) AT BARDSTOWN FALLS RD. PROJECT WILL INCORPORATESIDEWALKS AND 10' PAVED SHOULDERS.

1.669

1.669

2.600

2.600

1.343

.850

.357

.400

.100

2.700

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-1450

KY-1450

KY-1931

KY-1931

KY-1747

CR-1006C

KY-22

KY-22

I-65

-

$4,500,000

$6,500,000

$4,860,000

$4,860,000

$3,330,000

$6,408,000

$1,740,000

$1,320,000

$1,500,000

$4,700,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

D

U

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2021

2022

2023

2018

2020

2022

2022

2018

2019

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

SPP

SPP

SPP

SLO

STP

STP

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,500,000

$6,500,000

$4,860,000

$4,860,000

$3,330,000

$6,408,000

$1,740,000

$1,320,000

$750,000

$750,000

$3,200,000

$1,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

05

247.10

247.11

323.01

323.03

344.01

353.00

371.10

371.13

378.10

404.01

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

05

247.00

247.10

323.01

323.01

344.00

965.08

371.12

371.00

378.00

404.00

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2018

2000

2018

2000

2000

2014

2004

2000

2004

1996

2000

2000

2000

2000

1998

2004

1998

1998

2000

1.873

1.873

.54

.54

12.289

.457

1.432

2.537

0

3.542

3.542

3.148

3.148

13.632

1.232

1.789

2.937

.155

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 67

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ALIGN INTERSECTION OF BROADWAY AND 18TH STREET BY MOVING THESOUTH LEG OF 18TH STREET TO THE EAST. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

MT. WASHINGTON ROAD (KY-2053) SECTION 2; FROM MAPLE WAY TO CEDARCREEK RD. (KYTC MATCH)(2004BOPC)(FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAYTRAFFIC (MAIN,JEFFERSON,LIBERTY, MUHAMMAD ALI, CHESTNUT,3RDSTREETS). PHASE 1

CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAYTRAFFIC (8TH, 7TH, SHELBY, CAMPBELL STREETS). PHASE 2

DIXIE HIGHWAY ADDITIONAL DESIGN FUNDS. IMPROVE DIXIE HIGHWAYBETWEEN CRUMS LANE (KY 2049) AND ROCKFORD LANE (KY 2051)(12CCR)

WIDEN HUBBARDS LANE FROM 2 TO 3 LANES (3RD LANE WILL BE A CENTERTURN LANE) FROM US 60 (SHELBYVILLE ROAD) TO KY 1447 (WESTPORT ROAD).ADD BIKE LANES TO HUBBARDS LANE FROM KRESGE WAY TO KY 1447. PROJECTLENGTH IS 0.6 MI.(BOPC2010)

KY 864 - WIDEN BEULAH CHURCH ROAD FROM 2 TO 3 LANES FROM I-265 TOCEDAR CREEK ROAD.(2010BOP)

.100

2.460

1.503

.614

1.547

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

US-150

-

KY-2053

CS-1014B

CS-1049F

US-31W

CR-1005B

KY-864

$1,000,000

$100,000

$13,550,000

$4,195,000

$660,000

$4,000,000

$3,510,000

$4,925,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

D

C

D

C

C

R

U

C

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2023

2023

2023

2018

2018

2018

2019

2018

2018

2018

2019

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,000,000

$100,000

$2,500,000

$1,500,000

$9,550,000

$195,000

$4,000,000

$60,000

$600,000

$4,000,000

$260,000

$350,000

$2,900,000

$2,950,000

$1,975,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

413.00

439.05

443.20

470.00

470.10

478.00

479.00

481.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OLDHAMBULLITT

05

05

05

05

05

05

05

05

413.00

439.03

443.00

965.12

965.12

478.00

965.12

965.12

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2014

2004

2011

2014

2012

2010

2012

2004

2006

2004

2004

2004

2012

2004

2004

.97

.343

0

.047

13.837

0

1.818

1.18

2.804

.848

.58

15.34

.614

3.445

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

To:To:

From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 68

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)

SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)

SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)

GOOD SAMARITAN BICYCLE/PEDESTRIAN TRAIL CONNECTOR:CONSTRUCT AMULTI-USE BICYCLE & PEDESTRIAN TRAIL ALONG OLD TAYLORSVILLE ROAD &JEFFERSON ST IN DOWNTOWN JEFFERSONTOWN CONNECTING THEDOWNTOWN ST NETWORK TO THE GOOD SAMARITAN CENTER & BICYCLE/PEDTRAIL.

PRELIMINARY DESIGN & SCOPING STUDY TO DETERMINE LOCATION OF AMULTI-USE BICYCLE & PEDESTRIAN TRAIL PROJECT ALONG TAYLORSVILLEROAD FROM DOWNTOWN JEFFERSONTOWN TO 21ST CENTURY PARK.

DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEADFACILITIES THRU JEFFERSON MEMORIAL FOREST FROM NORTH END OF SANDQUARRY TUNNEL AT GENE SNYDER FWY TO WEST TERMINUS OF EXISTING MSDTRAIL APPROX. 2.7 MI WHICH WILL INCLUDE BRIDGE OVER POND CR.

MISCELLANEOUS SIDEWALKS AND HANDICAP RAMPS: CONSTRUCT ANDREPLACE VARIOUS SIDEWALKS AND HANDICAP RAMPS THROUGHOUT THE CITYON A REOCCURRING ANNUAL BASIS.

OLMSTED PARKWAYS MULTI-USE PATH SYSTEM-SOUTHERN PKWY:CONSTRUCTION OF A 2.5 MILE SHARED USE PATH SYSTEM ALONG SOUTHERNPARKWAY BETWEEN SOUTH 3RD AND NEW CUT ROAD.

5.000

5.000

5.000

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

I-71

I-71

I-71

-

-

-

-

KY-1020

$16,000,000

$15,000,000

$30,000,000

$1,300,000

$189,000

$2,155,000

$37,800

$5,172,877

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

C

P

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2019

2020

2021

2018

2018

2018

2018

2019

2018

2018

2019

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$500,000

$15,000,000

$15,000,000

$30,000,000

$1,300,000

$189,000

$100,000

$55,000

$2,000,000

$37,800

$400,000

$100,000

$4,672,877

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

483.00

483.01

483.02

486.00

487.00

489.00

493.00

495.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OLDHAM

OLDHAM

OLDHAM

05

05

05

05

05

05

05

05

483.00

483.00

483.00

965.12

965.12

965.12

965.12

965.12

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2018

2018

2014

2014

2014

2014

2014

2014

2014

2014

2004

2004

2004

2004

2004

9.1

9.1

9.1

7.837

11.315

11.315

11.315

9.15

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / SCOPING STUDY(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

11.315

11.315

11.315

14.1

14.1

14.1

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 69

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

CONSTRUCTION OF A 0.5 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN WILSON AVENUE AND CYPRESS STREET.

CONSTRUCTION OF A 0.45 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN CYPRESS STREET AND DIXIE HWY.

CONSTRUCTION OF A 1.2 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN DIXIE HIGHWAY AND SHARP AVE.

RIVER ROAD BICYCLE AND PEDESTRIAN IMPROVEMENTS FROM DOWNTOWNLOUISVILLE TO THE CITY OF PROSPECT (US 42), 8.5 MILES. (SEE 5-3036.00)

OHIO RIVER LEVEE TRAIL PHASE III. CONSTRUCT BICYCLE/PEDESTRIANFACILITIES ALONG CAMPGROUND ROAD FROM END OF SHARED USE PATH ATTHE RAILROAD CROSSING ON CAMPGROUND ROAD NEAR I-264 TO LEES LANEAND THE CONNECTION TO RIVERSIDE GARDENS PARK AT 2899 LEES LANE.

CONSTRUCT A SHARED USE PATH OF APPROXIMATELY 13,000 LINEAR FEETBETWEEN RIVERSIDE HISTORIC SITE AND THE MILL CREEK GENERATINGSTATION.

WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROM RUCKRIEGEL PARKWAYTO MAPLE ROAD, AND WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROMOLD TAYLORSVILLE ROAD TO RUCKRIEGEL PARKWAY. PROJECT TO INCLUDESTREETSCAPE ENHANCEMENTS TO IMPROVE THE CORRIDOR.

REPAIR DRAINAGE SYSTEM ON THE I-64 BRIDGE OVER N.S. RAILROAD AND THELEVEE AND REPAIR THE LEVEE.(056B00284N)(2014BOP)(SD)

.151

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-2054

KY-2054

KY-2054

CR-1001B

-

-

CR-1004H

I-64

$1,740,000

$1,388,945

$3,423,854

$200,000

$4,550,000

$687,500

$1,848,000

$400,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

R

U

C

D

R

U

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2018

2018

2019

2018

2019

2020

2020

2018

2019

2020

2023

2018

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$160,000

$80,000

$1,500,000

$160,000

$80,000

$1,148,945

$200,000

$160,000

$3,063,854

$200,000

$800,000

$750,000

$3,000,000

$687,500

$264,000

$352,000

$1,232,000

$400,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

496.00

497.00

498.00

499.00

505.00

514.00

518.00

521.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

99

965.12

965.12

965.12

965.12

505.00

965.12

965.12

65.11

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2014

2004

2004

2014

2014

2004

2004

2004

2004

2004

2004

2004

2008

.72

1.22

1.64

0

3.179

1.387

1.22

1.64

2.717

6.761

3.33

1.891

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MINOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 70

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOPTRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROMBLEVINS GAP ROAD TO NORTH END OF SAND QUARRY TUNNEL AT GENESNYDER FWY (THE TUNNEL WILL BE PART OF THIS SEGMENT) APPROXIMATELY2.5 MILES.

DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOPTRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROMPENDLETON RD AT MEDORA RD TO THE BEGINNING OF JEFFERSON MEMORIALFOREST PROPERTY ON BLEVINS GAP RD APPROXIMATELY 1.3 MILES

NORTHEAST LOUISVILLE LOOP SECTION II. CONSTRUCT A SHARED USE PATHALONG US 60 FROM EASTWOOD CUTOFF TO EASTWOOD RECREATION CENTER.(METRO PARKS PROJECT) (2014BOP)

CONST MULTIUSE PATH THRU AB SAWYER PK CONNECT TO SURROUNDINGNEIGHBORHOODS INCLUDE: UNDERPASS/BRIDGE/SITEAMENITIES/CONSTRUCTION OF PEDESTRIAN FACILITIES ALONG HURSTBOURNEPKWY FR MIDDLE FORK-BEARGRASS CRK BRIDGE TO ORMSBY STA/CONNECT-AB SAWYER PK GRWAY.

IMPROVE THE SAFETY AND CONGESTION OF KY 1932 (CHENOWETH LANE) FROMUS 60 (SHELBYVILLE ROAD) TO US 42 (BROWNSBORO ROAD) APPROXIMATELY1.07 MILES (2014BOP).

WIDEN KY 1931 (MANSLICK ROAD) FROM 2 TO 3 LANES FROM US 31W (DIXIEHWY) TO DOSS HIGH SCHOOL. 1.7 MILES (2014BOP)

SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71. 11.318

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

-

KY-2841

-

KY-1932

KY-1931

I-265

$2,115,000

$1,100,000

$1,028,333

$1,850,000

$865,000

$9,000,000

$24,460,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

U

C

R

U

C

R

U

C

D

R

R

U

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2019

2018

2019

2018

2018

2019

2018

2018

2019

2018

2018

2018

2019

2018

2020

2020

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$55,000

$60,000

$2,000,000

$100,000

$1,000,000

$533,333

$45,000

$450,000

$50,000

$300,000

$1,500,000

$650,000

$215,000

$3,000,000

$6,000,000

$5,800,000

$1,580,000

$2,080,000

$15,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

523.00

524.00

525.00

529.00

531.00

536.00

537.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

523.00

524.00

525.00

529.00

965.13

965.13

537.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2014

2006

2014

2014

2016

2012

2012

2014

2006

2006

2006

2016

.03

5.523

3.148

23.409

.4

6.59

4.887

34.727

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 71

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.

SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.

PROVIDE COLLECTOR-DISTRIBUTOR LANE ON SOUTHBOUND I-71 TOFACILITATE RAMP MOVEMENTS TO AND FROM I-265.

BLUEGRASS COMMERCE PARK BICYCLE/PEDESTRIAN TRAIL PROJECT PHASE IIALONG BLUEGRASS PARKWAY FROM WATTERSON TRAIL TO TUCKER STATIONROAD AND ALONG TUCKER STATION ROAD FROM BLUEGRASS PARKWAY TOPLANTSIDE DRIVE (2016BOP)

RECONSTRUCTION OF THE I-265/I-64 INTERCHANGE. (2016BOP)

RECONSTRUCTION OF THE I-265/I-64 INTERCHANGE. (2016BOP)

IMPROVEMENTS WITHIN THE I-64 CORRIDOR FROM THE KENNEDYINTERCHANGE TO I-264 (WATTERSON EXPRESSWAY) ADDRESSING SAFETY ANDCONGESTION ISSUES. THE IMPROVEMENTS MAY INCLUDE BUT ARE NOTLIMITED TO: CONSIDERATION OF ALTERNATIVE TRANSPORTATION MODES,DEPLOYMENT

IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM I-65 TO US-31E.

11.318

11.318

3.700

3.700

7.171

7.050

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

I-265

I-265

I-71

CS-1002H

I-265

I-265

I-64

I-265

$18,660,000

$25,000,000

$5,400,000

$1,300,000

$13,000,000

$15,000,000

$2,800,000

$4,000,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

C

D

R

U

C

C

P

D

P

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2021

2023

2024

2019

2018

2018

2019

2019

2020

2021

2019

2022

2021

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

SLO

NH

NH

NH

NH

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,580,000

$2,080,000

$15,000,000

$25,000,000

$5,400,000

$1,300,000

$1,000,000

$1,000,000

$1,000,000

$10,000,000

$15,000,000

$250,000

$2,550,000

$1,000,000

$3,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

537.01

537.02

539.00

543.00

549.00

549.01

553.00

554.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

537.00

537.00

539.00

965.15

21.00

549.00

553.00

554.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2016

2016

2016

2018

2018

2018

2016

2016

2016

2008

2016

2016

2018

2018

23.409

23.409

8.6

2.474

24.6

24.6

5.104

10.25

34.727

34.727

9.5

2.927

26.4

26.4

12.275

17.3

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 72

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

REDUCE CONGESTION AND IMPROVE SAFETY ALONG KY-1747 (HURSTBOURNEPARKWAY) FROM STONY BROOK DRIVE TO I-64.

IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM ZORN AVE TO I-264.

IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM I-264 TO I-265.

IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM US-31E(BARDSTOWN RD) TO KY-155 (TAYLORSVILLE RD).

IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264 (WATTERSONEXPRESSWAY) INTERCHANGE.

IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264 (WATTERSONEXPRESSWAY) INTERCHANGE.

IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-265 (GENE SNYDERFREEWAY) INTERCHANGE.

INTERSECTION RE-BUILD AT MAIN STREET/ STORY AVENUE / BAXTER AVENUEINCLUDING TRANSITIONS BETWEEN WENTZEL STREET TO THE WEST ANDJOHNSON STREET TO THE EAST.

A COMPREHENSIVE OPERATIONAL ANALYSIS (COA) TO ANALYZE ANDEVALUATE EXISTING TARC SERVICE IN COMPARISON WITH COMMUNITYGROWTH, ECONOMIC AND LAND USE DEVELOPMENT, AND CURRENT ANDFUTURE NEEDS OF PUBLIC TRANSIT USERS.

1.495

3.000

4.000

5.800

2.298

2.298

1.000

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-1747

I-71

I-71

I-265

I-65

I-65

I-65

-

-

$250,000

$2,000,000

$5,000,000

$7,500,000

$3,500,000

$3,000,000

$400,000

$3,666,319

$354,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

P

D

P

D

D

P

D

D

P

D

U

C

P

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2023

2019

2022

2023

2019

2021

2022

2021

2018

2019

2021

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

NH

NH

NH

NH

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$2,000,000

$2,000,000

$3,000,000

$7,500,000

$500,000

$3,000,000

$3,000,000

$400,000

$176,000

$176,000

$3,314,319

$354,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

555.00

556.00

557.00

558.00

559.00

559.01

560.00

561.00

562.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

555.00

556.00

557.00

558.00

559.00

559.01

560.00

561.00

562.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

10.5

2

5

17.3

129.289

129.289

124.7

11.995

5

9

23.1

131.587

131.587

125.7

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SCOPING STUDY DD (O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 73

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

PLANNING STUDY:EXAMINE NEED FOR BICYCLE/PED/VEHICULAR ACCESSIMPROVEMENTS TO PROPOSED DIXIE BRT IN CORRIDORS: KY 907 FR US 31W TOSTONESTREET RD, ROCKFORD LN FR CANE RUN RD TO US 31W, GAGEL AVE FRUS 31W TO MANSLICK RD & CRUMS LN FR I-264 TO MANSLICK RD.

RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORTROAD (KY-1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS ASPUI.(PROJECT INCLUDES 5-594) (12CCR)(14CCR)

SAFETY PROJECT FOR RECONSTRUCTION OF TAYLORSVILLE ROAD AND SOUTHPOPE LICK ROAD INTERSECTION AND BRIDGE OVER POPE LICK CREEK.(2016BOP)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

ADDRESS DEFICIENCIES OF BRIDGE ON CR-1038L OVER BEE LICK CREEK056C00104N

1.700

.600

.060

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

I-264

KY-155

-

-

-

-

-

CR-1038L

$352,000

$30,140,000

$2,130,000

$24,007,000

$11,670,000

$23,500,000

$9,262,000

$23,500,000

$231,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

P

R

U

C

R

U

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2021

2021

2024

2019

2019

2019

2018

2021

2022

2023

2024

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

NH

NH

NH

STP

STP

STP

SLO

SLO

SLO

SLO

SLO

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$352,000

$5,280,000

$1,270,000

$23,590,000

$180,000

$150,000

$1,800,000

$24,007,000

$11,670,000

$23,500,000

$9,262,000

$23,500,000

$231,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

563.00

804.00

808.00

965.16

965.19

965.20

965.21

965.22

1061.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

99

05

05

05

05

05

05

563.00

390.00

391.05

965.16

965.19

965.20

965.21

965.22

1061.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2010

2016

2008

2016

2016

2018

2018

2010

2018

2006

2012

2008

2016

2016

2018

2018

2010

20.9

4.4

0

22.6

5

.06

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SCOPING STUDY DD (O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / DESIGN ENGINEERING(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 74

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE ON E BROADWAY (US 150) OVER SOUTHFORK BEARGRASS CREEK AT INTERSECTION WITH BRENT STREET (CS1312G)056B00348N (SD)

ADDRESS DEFICIENCIES OF BRIDGE ON E KENTUCKY ST (CS 1017G) OVER SOUTHFORK BEARGRASS CREEK 0.01 MILE E OF SCHILLER AVE (CS 1138G) 056C00083N

ADDRESS DEFICIENCIES OF BRIDGE OVER NORTHERN DITCH ON GRADE LANE(CR 1001G) 0.34 MI S OF KY 1747 (FERN VALLEY ROAD) (056C00064N)

ADDRESS DEFICIENCIES OF BRIDGE OVER GOOSE CREEK ON RIVER ROAD (CR1001B) 0.2 MI N OF LIME KILN ROAD (CR 1002B) (056C00130N)

NORTHEAST LOUISVILLE LOOP MET SECTION 1 BECKLEY WOODS TO BECKLEYSTATION. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BECKLEYWOODS TO BECKLEY STATION, 0.5 MILE. (2016BOP)

NORTHEAST LOUISVILLE LOOP MET SECTION 2 BECKLEY STATION TOBIRCHAM ROAD. CONSTRUCT A SHARED USE PATH ALONG US 60 FROMBECKLEY STATION TO BIRCHAM ROAD. 0.7 MILE (2016BOP)

NORTHEAST LOUISVILLE LOOP MET SECTION 3 BIRCHAM ROAD TO BECKLEYCREEK PARK. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BIRCHAMROAD TO BECKLEY CREEK PARK, 0.5 MILE. (2016BOP)

NORTHEAST LOUISVILLE LOOP MET SECTION 4 BECKLEY CREEK PARK TOEASTWOOD CUTOFF. CONSTRUCT A SHARED USE PATH ALONG US 60 FROMBECKLEY CREEK PARK TO EASTWOOD CUT OFF, 0.6 MILE. (2016BOP)

.040

.040

.020

.070

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

US-150

CS-1017G

CR-1001G

CR-1001B

US-60

US-60

US-60

US-60

$850,000

$497,000

$920,000

$1,232,000

$750,000

$1,300,000

$2,125,000

$1,500,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

D

C

U

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2019

2019

2019

2020

2019

2020

2018

2018

2018

2019

2019

2018

2018

2019

2018

2019

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$850,000

$497,000

$20,000

$50,000

$850,000

$315,000

$917,000

$50,000

$700,000

$300,000

$200,000

$800,000

$50,000

$75,000

$2,000,000

$350,000

$150,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

1067.00

1070.00

1077.00

1079.00

3030.10

3030.20

3030.30

3030.40

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

1067.00

1070.00

1077.00

1079.00

3030.00

3030.00

3030.00

3030.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2014

2014

2016

2016

2010

2010

2012

2012

2014

2014

2010

2010

2010

2010

3.6

1.293

2.48

3.8

12.895

12.895

12.895

12.895

3.64

1.333

2.5

3.87

14.718

14.718

14.718

14.718

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 75

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

WATTERSON TRAIL PHASE I- IMPROVE STREETSCAPE, RECONSTRUCTSIDEWALKS AND ENHANCE LANDSCAPING FROM MAPLE ROAD TO OLDTAYLORSVILLE ROAD IN JEFFERSONTOWN. (BOPC2012)

CONSTRUCT SIDEWALKS ALONG KRATZ LANE FOR .35 MILES BETWEENSHELBYVILLE RD. AND OLD SHELBYVILLE RD./MAIN ST., INCLUDING SOMEDRAINAGE IMPROVEMENTS (2016BOP).

CONSTRUCT A SIDEWALK ALONG CANNONS LANE BETWEEN WILLIS AVE. ANDBOWMAN FIELD (SENECA LOOP), 1.0 MILES (2016BOP)

RECONSTRUCT BILLTOWN ROAD FROM NORTH OF COLONNADES PLACE TOSOUTH OF EASUM ROAD. (04CCN)(06CCN)(08CCR)(10CCR)(12CCR)

THREE LANE WIDENING ALONG KY-1931 FROM THE DOSS HIGH SCHOOLENTRANCE TO PALATKA ROAD, INCLUDING INTERSECTION IMPROVEMENTSWITH PALATKA ROAD AND TURN LANES. (14CCN)

WIDEN US-60 TO THREE LANES FROM EASTWOOD CUTOFF (MP 14.7) TOROCKCREST WAY (MP 15.1). (16CCN)

ADDRESS DEFICIENCIES OF CLARK STATION RD BRIDGE OVER S LONG RUN.(056C00091N)

ADDRESS DEFICIENCIES OF OLD WESTPORT RD BRIDGE OVER GOOSE CREEK.(056C00113N)

ADDRESS DEFICIENCIES OF PENDLETON RD BRIDGE OVER POND CREEK.(056C00118N)(SD)

.352

1.200

.599

.396

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

CS-1073H

CS-1367H

CS-2048

KY-1819

KY-1931

US-60

CR-1004J

CS-1079C

CR-1007L

$2,648,800

$234,382

$700,000

$2,700,000

$6,790,000

$330,000

$630,000

$476,000

$1,351,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

U

C

C

R

U

C

C

R

U

D

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2018

2018

2019

2021

2024

2022

2022

2022

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SPP

STP

STP

STP

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$792,000

$1,856,800

$234,382

$100,000

$100,000

$500,000

$2,700,000

$2,630,000

$4,160,000

$330,000

$280,000

$350,000

$175,000

$301,000

$245,000

$1,106,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

3031.00

3039.00

3212.00

8203.00

8810.00

8952.00

10007.00

10008.00

10009.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

3031.00

965.15

3212.00

8203.00

8810.00

8952.00

10007.00

10008.00

10009.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2016

2016

2004

2014

2016

2018

2018

2018

2012

2008

2016

2004

2014

2016

2018

2018

2018

0

0

1.09

6.9

4.561

14.718

.488

.03

.997

.352

.295

2.09

8.1

5.5

15.114

.498

.038

1.035

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / TRANSP ENHANCEMENT(P)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 76

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF S WATTERSON TRL BRIDGE OVER FERN CREEK.(056C00159N)

ADDRESS DEFICIENCIES OF STONEBRIDGE RD BRIDGE OVER TRIB MUDDY FKBEARGRASS. (056C00240N)

ADDRESS DEFICIENCIES ON I-64 RIVERSIDE EXPRESSWAY BRIDGES.(056B00298N,056B00299N,056B00300N,056B00301N,056B00302N,056B00285N,056B00292N,056B00293N,056B00142N)(SD)

BRIDGE PAINTING OF I-64 RIVERSIDE EXPRESSWAYBRIDGES.(056B00298N,056B00299N,056B00300N,056B00301N,056B00302N,056B00285N,056B00292N,056B00293N,056B00142N)

ADDRESS DEFICIENCIES OF US 31E BRIDGE OVER S FK BEARGRASS CREEK.(056B00137N)

ADDRESS DEFICIENCIES OF SCENIC LOOP BRIDGE OVER MID FK BEARGRASSCREEK. (056C00027N)

ADDRESS DEFICIENCIES OF PARK BOUNDARY RD BRIDGE OVER MID FKBEARGRASS CREEK. (056C00033N)

ADDRESS DEFICIENCIES OF CHAMPIONS TRACE LN BRIDGE OVER S FKBEARGRASS CREEK. (056C00096N)

ADDRESS DEFICIENCIES OF OLD CLARK STATION BRIDGE OVER BRUSH RUN.(056C00167N)

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

CR-1005H

CS-1096B

I-64

I-64

US-31E

CS-1003G

CS-3396

CR-1021

CS-1004J

$546,000

$476,000

$4,950,000

$30,000,000

$1,316,000

$546,000

$581,000

$1,470,000

$497,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2019

2021

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$245,000

$301,000

$210,000

$266,000

$350,000

$4,600,000

$30,000,000

$350,000

$966,000

$140,000

$406,000

$140,000

$441,000

$280,000

$1,190,000

$140,000

$357,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

10010.00

10011.00

10015.00

10016.00

10018.00

10019.00

10020.00

10021.00

10022.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

10010.00

10011.00

10015.00

10016.00

10018.00

10019.00

10020.00

10021.00

10022.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2108

2018

2018

2018

2018

2018

2018

2018

2018

2108

.685

.008

16.353

1.796

.01

.71

.006

.691

.022

16.361

1.808

.018

.728

.014

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRG PAINTING(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 77

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KIMBERLY WAY BRIDGE OVER LITTLE CEDARCREEK. (056C00182N)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 6 TO MILEPOINT 11.57

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-064 CARDINALDIRECTION(S) FROM MILEPOINT 0.65 TO MILEPOINT 0.828

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROMMILEPOINT 128.13 TO MILEPOINT 131.24

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROMMILEPOINT 0 TO MILEPOINT 11.32

ADDRESS PAVEMENT CONDITION OF I-264 CARDINAL DIRECTION(S) FROMMILEPOINT 0 TO MILEPOINT 0.46

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-264 BOTHDIRECTION(S) FROM MILEPOINT 12.7 TO MILEPOINT 18.41

ADDRESS PAVEMENT CONDITION OF I-264 BOTH DIRECTION(S) FROMMILEPOINT 20.7 TO MILEPOINT 22.927

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

CS-1325H

I-64

I-64

I-65

I-71

I-264

I-264

I-264

$357,000

$6,325,000

$110,000

$6,820,000

$12,650,000

$330,000

$12,650,000

$4,950,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2024

2024

2019

2019

2020

2020

2024

2024

2019

2019

2024

2024

2023

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$140,000

$217,000

$575,000

$5,750,000

$10,000

$100,000

$620,000

$6,200,000

$1,150,000

$11,500,000

$30,000

$300,000

$1,150,000

$11,500,000

$450,000

$4,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

10023.00

20009.00

20010.00

20012.00

20014.00

20015.00

20016.00

20017.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

10023.00

20009.00

20010.00

20012.00

20014.00

20015.00

20016.00

20017.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

.059

6

.65

128.13

0

0

12.7

20.7

.063

11.57

.828

131.24

11.32

.46

18.41

22.927

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 78

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-264 BOTHDIRECTION(S) FROM MILEPOINT 0.46 TO MILEPOINT 12.7

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-265 BOTHDIRECTION(S) FROM MILEPOINT 15.66 TO MILEPOINT 18.8

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-265 BOTHDIRECTION(S) FROM MILEPOINT 18.8 TO MILEPOINT 23.364

ADDRESS PAVEMENT CONDITION OF I-265 BOTH DIRECTION(S) FROMMILEPOINT 23.364 TO MILEPOINT 26.6

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

I-264

I-265

I-265

I-265

KY-841

KY-864

KY-913

KY-1020

$13,420,000

$3,575,000

$5,060,000

$3,850,000

$7,975,000

$3,575,000

$550,000

$825,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2020

2022

2022

2019

2019

2022

2022

2022

2022

2019

2019

2021

2021

2021

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,220,000

$12,200,000

$325,000

$3,250,000

$460,000

$4,600,000

$350,000

$3,500,000

$725,000

$7,250,000

$325,000

$3,250,000

$50,000

$500,000

$75,000

$750,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

20018.00

20019.00

20020.00

20021.00

20022.00

20023.00

20024.00

20025.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

20018.00

20019.00

20020.00

20021.00

20022.00

20023.00

20024.00

20025.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

.46

15.66

18.8

23.364

0

7.111

2.384

2.669

12.7

18.8

23.364

26.6

10.25

11.438

3.072

3.661

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 79

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION ON US-31W FROM MILEPOINT 0.00 TOMILEPOINT 7.25

EAST NICHOLASVILLE BYPASS SECTION IA: IMPROVE CONNECTIVITY ANDMOBILITY EAST AROUND NICHOLASVILLE FROM SOUTH OF KY-39 TO NORTH OFKY-169.

7.250

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JESSAMINE

KY-1065

KY-1932

KY-1934

KY-1934

KY-2048

KY-2052

US-31W

US-31W

-

$2,200,000

$550,000

$3,575,000

$4,125,000

$1,100,000

$3,300,000

$825,000

$965,000

$7,800,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2019

2021

2021

2021

2021

2022

2022

2022

2022

2021

2021

2020

2020

2022

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$2,000,000

$50,000

$500,000

$325,000

$3,250,000

$375,000

$3,750,000

$100,000

$1,000,000

$300,000

$3,000,000

$75,000

$750,000

$965,000

$7,800,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

07

20026.00

20027.00

20028.00

20029.00

20030.00

20031.00

20032.00

20039.00

87.20

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

07

20026.00

20027.00

20028.00

20029.00

20030.00

20031.00

20032.00

20039.00

87.10

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2014

2018

2018

2018

2018

2018

2018

2018

2018

2000

2.504

3.21

0

4.444

0

0

14.51

0

5.25

3.8

4.444

9.742

1.13

4.205

14.96

7.25

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / NEW ROUTE(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 80

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE INTERSECTION OF KY-29 NORTH OF WILMORE.(16CCR)

ADDRESS DEFICIENCIES OF BRIDGE OVER HICKMAN CREEK AT BLACK BRIDGEON KY 39 1.3 MI N OF KY 1268. (057B00002N)(EBRP)

ADDRESS DEFICIENCIES OF BRIDGE ON CR-1238 (0.88) OVER NS SYSTEM.057R00605N

ADDRESS DEFICIENCIES OF RAILROAD BRIDGE ON KY 169 (NORTH 3RD STREET)BETWEEN MEADOWLARK LANE & ILHARDT AVENUE.(057R00603N)(14CCN)(16CCR)(SD)

ADDRESS DEFICIENCIES OF KY 1268 BRIDGE OVER HICKMAN CREEK.(057B00022N)

FEDERAL HIGHWAY FUNDS DEDICATED TO RECONSTRUCT STONE COAL ROADIN JOHNSON COUNTY. ("KYD" FUNDS NOT AVAILABLE FOR ADDITIONALAMOUNT NEEDED TO COVER COST)

ADDRESS DEFICIENCIES OF BRIDGE ON KY 40 OVER BRANCH OF LITTLE PAINTCREEK 0.38 MILE NE OF JOHNSON/MAGOFFIN COUNTY LINE 058B00012N

KY 143 HPP EARMARK "ADDRESS DEFICIENCIES OF BRENT SPENCE BRIDGE,KENTON COUNTY, KENTUCKY". (2005HPP-KY143)(SEE 6-17.04 FOR ADDITIONAL2005HPP FUNDING)(SD)

BRENT SPENCE BRIDGE PROJECT (ADDITIONAL PROJECT FUNDS FORMAINTENANCE, REPAIR AND PAINTING). (10CCR)(12CCR)(SD)

.700

.036

.046

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JOHNSON

JOHNSON

KENTON

KENTON

US-68

KY-39

CR-1238

KY-169

KY-1268

KY-172

KY-40

I-75

I-75

$1,730,000

$1,715,000

$1,065,000

$1,500,000

$1,540,000

$203,005

$665,000

$1,439,840

$30,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

U

C

D

C

D

C

C

D

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2022

2019

2020

2019

2020

2020

2019

2020

2018

2018

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

BR

BR

BR

BR

BR

BR

BR

KYD

BR

HPP

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$650,000

$1,080,000

$350,000

$1,365,000

$260,000

$805,000

$1,500,000

$308,000

$1,232,000

$203,005

$665,000

$1,439,840

$30,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

12

12

06

06

915.00

1136.00

1144.00

8851.00

10011.00

134.02

1114.00

17.05

17.09

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

12

12

06

06

915.00

1136.00

1144.00

8851.00

10011.00

134.00

1114.00

17.05

17.09

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2018

2018

2018

2018

2008

2012

2018

2018

2010

2018

2018

2018

2018

2002

2012

2018

2018

4.1

3.74

.868

10.807

4.162

9.132

.372

191.277

191.277

4.8

3.776

.892

10.853

4.188

9.232

.412

191.777

191.777

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 81

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE SAFETY AND REDUCE CONGESTION ON KY-1303 FROM KY-536 TOBEECHGROVE ELEMENTARY (PRIORITY SECTION 1). DESIGN PHASE UNDERPARENT NO. 6-162.01. (2012BOP)(16CCR)

IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM THE WEST ENDOF THE NS RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY SECTION 2). DESIGNPHASE UNDER PARENT NO. 6-162.01. (16CCN)

IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM THE WEST ENDOF THE NS RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY SECTION 2). DESIGNPHASE UNDER PARENT NO. 6-162.01. (16CCN)

IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM WILLIAMSWOODROAD/CALVARY DRIVE TO KY-17 (PRIORITY SECTION 3). DESIGN PHASE UNDERPARENT NO. 6-162.01. (2012BOP)

PHASE I MULTI-USE PATH ALONG BROMLEY CRESCENT SPRINGS RD FROMANDERSON ROAD TO AMSTERDAM ROAD. (2012BOP)

PHASE 2 BROMLEY CRESCENT SPRINGS ROAD BETWEEN THE TWO SEGMENTSOF AMSTERDAM ROAD. RECONSTRUCT BROMLEY CRESCENT SPRINGS ROADAND IMPROVE INTERSECTION WITH ST. JOHNS ROAD.

RESURFACE & STABILIZE DUDLEY ROAD FROM WINDING TRAILS TO THOMASMORE PARKWAY (PHASE 1). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).

RESURFACE & STABILIZE DUDLEY ROAD FROM THOMAS MORE PARKWAY TOCATHERINE DRIVE (PHASE 2). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).

1.100

1.061

1.061

1.934

.275

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KY-1303

KY-536

KY-536

KY-536

CR-1316

CS-3806

CS-4128

CS-4128

$18,030,000

$12,710,000

$5,410,000

$13,640,000

$5,245,000

$1,609,600

$1,044,000

$924,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

C

R

U

R

U

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2021

2022

2021

2021

2023

2024

2024

2024

2018

2018

2019

2018

2019

2019

2020

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

STP

STP

STP

SPP

SPP

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,150,000

$3,640,000

$11,240,000

$5,630,000

$1,670,000

$5,410,000

$5,410,000

$12,080,000

$1,560,000

$400,000

$800,000

$4,045,000

$269,600

$504,000

$560,000

$276,000

$1,044,000

$924,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

162.10

162.20

162.21

162.40

419.00

419.01

428.10

428.20

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BOONE

06

06

06

06

06

06

06

06

162.01

162.01

162.20

162.01

966.02

419.01

428.00

428.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2016

2018

2012

2012

2018

2014

2014

2000

2000

2016

2000

2004

2018

2014

2014

0

0

0

2.542

0

.275

2.19

1.46

1.1

1.061

1.061

4.476

.275

.741

3.11

2.19

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / RESURFACING(P)

RELIABILITY / RESURFACING(P)

14.363 14.746Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 82

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

DUDLEY ROAD PHASE 3. ROADWAY RESURFACING AND STABILIZATION.CONSTRUCT CONSISTENT 11' TRAVEL LANE IN EACH DIRECTION FROMCATHERINE DRIVE TO THE SUMMIT HILLS COUNTRY CLUB ENTRANCE.

DUDLEY ROAD PHASE 4. ROADWAY RESURFACING AND STABILIZATION.CONSTRUCT CONSISTENT 11' TRAVEL LANE IN EACH DIRECTION FROM SUMMITHILLS COUNTRY CLUB ENTRANCE TO DIXIE HIGHWAY.

WIDEN SIDEWALK FOR ADA COMPLIANCE AND ROADWAY RECONSTRUCTIONON JOHNSON ST & W RIVERCENTER BLVD FROM 3RD STREET TO THE EXISTINGCONCRETE SECTION HEADING TOWARDS MADISON AVENUE IN COVINGTON.(2014BOP)

CONSTRUCT LEFT TURN LANE ON NB APPROACH AT THE INTERSECTION OF US25 AND BEECHWOOD RD JUST S OF I-75. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP) (2014BOP)

LUDLOW RIVERFRONT COMMONS TRAIL- CONSTRUCT A ONE-MILE MULTI-USEPATH ALONG THE OHIO RIVER FROM HOOPER STREET TO ASH STREET IN THECITY OF LUDLOW (2016BOP).

IMPROVE SAFETY, TRAFFIC FLOW AND DRAINAGE ISSUES ALONG BUTTERMILKPIKE (CS 6142) FROM ROGERS ROAD TO COLLINS ROAD IN THE CITY OF VILLAHILLS. A DISTANCE OF 0.527 MILES (2016BOP).

RECONSTRUCT AMSTERDAM ROAD FROM GENERAL DRIVE TO REDWOOD DRIVEWITH CURB, GUTTER, STORM SEWERS AND SIDEWALK (2016BOP).

IMPROVE SAFETY AND REDUCE CONGESTION ON KY-17 AT THE I-275INTERCHANGE.

.240

.500

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

CS-4128

CS-4128

CS-2023

US-25

-

CS-6142

CS-9004

KY-17

$1,258,000

$1,907,800

$677,800

$1,950,000

$245,133

$313,857

$2,168,000

$1,000,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

R

U

C

D

C

C

R

U

C

D

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2019

2020

2018

2018

2018

2018

2018

2018

2018

2018

2018

2019

2023

2024

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$178,000

$1,080,000

$271,000

$1,636,800

$677,800

$100,000

$250,000

$1,600,000

$5,000

$240,133

$313,857

$56,000

$32,000

$2,080,000

$450,000

$200,000

$350,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

428.30

428.40

430.00

432.00

435.00

437.00

438.00

449.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

428.30

428.40

966.04

966.04

966.04

966.09

966.04

449.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2014

2016

2016

2016

2016

2018

2018

2018

2006

2006

2006

2016

2006

2018

.879

0

0

9.34

0

.285

18.15

1.459

.879

.068

9.58

.527

.652

18.65

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RESURFACING(P)

RELIABILITY / RESURFACING(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / CONGESTION MITIGTN(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 83

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY-1303 (TURKEYFOOTRD) FROM DUDLEY RD TO US-25 (DIXIE HWY).

ADELA AVENUE. CURB-LINE MILLING, ASPHALT RESURFACING, REPLACESIDEWALK/CURBING AND NEW SIDEWALK AS NEEDED FROM KY 1072 (SLEEPYHOLLOW ROAD/DEVERILL STREET) TO KY 8 (ELM STREET).

CODY ROAD. REPLACE CULVERT FOR BANKLICK CREEK. MILL AND OVERLAYWITH NEW ASPHALT FROM BANKLICK CREEK TO INDEPENDENCE STATIONROAD.

MADISON AVENUE. UNDERGROUND UTILITIES, STREET TREES, MAST ARMPOLES, STREETLIGHTS, RESURFACING, SIGNAL IMPROVEMENTS FROM 11THSTREET TO 8TH STREET.

7TH STREET. SIDEWALK REPLACEMENT, UNDERGROUND UTILITIES, STREETTREES, MAST ARM TRAFFIC SIGNALS, LIGHTING, RESURFACING FROMWASHINGTON STREET TO GREENUP STREET.

WEST 15TH STREET; ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHESOVER CSX RR IN COVINGTON. (059C00029N)(12CCR)(SD)

EVALUATE BRIDGE ON KY-1120 (MP 0.621) OVER CSX RAILROAD; 11TH ST E OFRUSSELL ST; 059B00083N

1.238

.079

.100

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KY-1303

CS-1560

CS-1045

-

CS-2217

CS-2097

KY-1120

$4,500,000

$255,000

$523,000

$2,170,000

$2,970,000

$3,490,000

$520,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

D

R

C

D

U

C

D

U

C

D

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2023

2023

2018

2018

2018

2018

2019

2019

2018

2019

2019

2018

2019

2019

2018

2018

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,500,000

$2,000,000

$1,000,000

$35,000

$20,000

$200,000

$57,000

$120,000

$346,000

$280,000

$240,000

$1,650,000

$280,000

$240,000

$2,450,000

$830,000

$550,000

$2,110,000

$520,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

450.00

454.00

455.00

456.00

457.00

1070.00

1075.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

450.00

454.00

455.00

456.00

457.00

1070.00

1075.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

5.01

0

1.3

.033

.144

.59

6.248

.612

2.33

.12

.223

.65

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / RESURFACING(P)

RELIABILITY / DRAINAGE IMPROVE(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 84

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE OVER LICKING RIVER ON WEST 4TH STREET(KY 8) IN COVINGTON/NEWPORT AT KENTON/CAMPBELL CO LN. (059B00037N)*CAMPBELL CO MPS ARE 0.0-0.19

IMPROVE HANDS PIKE (KY-1501) FROM KY-17 TO CRYSTAL LAKEDRIVE.(12CCR)(14CCR)(16CCR)

ADDRESS DEFICIENCIES ON JOHN A. ROEBLING BRIDGE OVER OHIO RIVER.(059B00048N)(BSBP)

JOINT REPLACEMENT AND PREVENTIVE MAINTENANCE ON CLAY WADE BAILEYBRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (059B00049N)

ADDRESS DEFICIENCIES OF KY 177 BRIDGE OVER BOWMAN CREEK. (059B00011N)

ADDRESS DEFICIENCIES OF KY 2045 BRIDGE OVER BRUSHY CREEK. (059B00025N)

ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROMMILEPOINT 166.263 TO MILEPOINT 169.439

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 166.263 TO MILEPOINT 169.439

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-075 BOTHDIRECTION(S) FROM MILEPOINT 186.95 TO MILEPOINT 190.721

.062

1.032

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KY-8

KY-1501

KY-17

US-25

KY-177

KY-2045

I-75

I-75

I-75

$40,410,000

$8,010,000

$1,200,000

$350,000

$3,115,000

$3,955,000

$4,290,000

$4,290,000

$8,250,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2022

2022

2024

2019

2019

2018

2019

2020

2019

2020

2021

2021

2023

2023

2024

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

SPP

BR

BR

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,900,000

$2,440,000

$1,170,000

$32,900,000

$8,010,000

$1,200,000

$350,000

$420,000

$2,695,000

$350,000

$3,605,000

$390,000

$3,900,000

$390,000

$3,900,000

$750,000

$7,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

1086.00

8307.10

10005.00

10006.00

10011.00

10012.00

20030.00

20031.00

20032.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CAMPBELL 06

06

06

06

06

06

06

06

06

1086.00

8307.00

10005.00

10006.00

10011.00

10012.00

20030.00

20031.00

20032.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2006

2018

2018

2018

2018

2018

2018

2018

2018

2006

2018

2018

2018

2018

2018

2018

2018

7.6

0

23.949

13.587

7.319

.397

166.263

166.263

186.95

7.662

1.032

24.321

13.976

7.349

.403

169.439

169.439

190.7

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

0 .134Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 85

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 190.68 TO MILEPOINT 191.22

ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROMMILEPOINT 190.721 TO MILEPOINT 191.777

ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 1.582 (1.05 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 NON-CARDINALDIRECTION(S) FROM MILEPOINT 1.054 TO MILEPOINT 1.582

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 77.759 TO MILEPOINT 79.796

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 80.12 TO MILEPOINT 82.475

ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 82.475 TO MILEPOINT 83.78

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

I-75

I-75

I-275

I-275

I-275

I-275

I-275

KY-16

$330,000

$1,100,000

$15,620,000

$440,000

$3,300,000

$3,850,000

$2,200,000

$4,400,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2019

2022

2022

2019

2019

2021

2021

2024

2024

2024

2024

2019

2019

2021

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$30,000

$300,000

$100,000

$1,000,000

$1,420,000

$14,200,000

$40,000

$400,000

$300,000

$3,000,000

$350,000

$3,500,000

$200,000

$2,000,000

$400,000

$4,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

20033.00

20034.00

20035.00

20036.00

20037.00

20038.00

20039.00

20040.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

20033.00

20034.00

20035.00

20036.00

20037.00

20038.00

20039.00

20040.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

190.7

190.721

0

1.054

77.759

80.12

82.475

13.9

191.22

191.777

1.582

1.582

79.796

82.475

83.78

14.9

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 86

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION ON KY-177 FROM MILEPOINT 9.17 TOMILEPOINT 15.99

ADDRESS DEFICIENCIES OF BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOONCREEK AT INTERSECTION WITH COON CREEK (CR 1371) (060C00006N)

ADDRESS DEFICIENCIES OF BRIDGE OVER RIGHT FORK TROUBLESOME CREEKON FIELDWOOD DRIVE (CS1016) IN HINDMAN (060C00060N)

6.820

.012

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KNOTT

KNOTT

KY-16

KY-16

KY-17

KY-236

KY-1072

US-25

KY-177

CR-1008

CS-1016

$825,000

$550,000

$9,680,000

$330,000

$220,000

$3,575,000

$893,000

$420,000

$665,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2022

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$75,000

$750,000

$50,000

$500,000

$880,000

$8,800,000

$30,000

$300,000

$20,000

$200,000

$325,000

$3,250,000

$893,000

$420,000

$210,000

$455,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

12

12

20041.00

20042.00

20043.00

20044.00

20045.00

20046.00

20051.00

1116.00

1124.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

12

12

20041.00

20042.00

20043.00

20044.00

20045.00

20046.00

20051.00

1116.00

1124.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2012

2014

2018

2018

2018

2018

2018

2018

2018

2012

2014

14.9

15.69

16.2

2.131

2.489

8.65

9.17

0

.018

15.69

16.15

18.4

2.622

2.83

10.85

15.99

.04

.03

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 87

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE OVER BALLS FORK ON KY 3209. (16CCN)060B00053N

ADDRESS DEFICIENCIES OF KY-1098 BRIDGE OVER LAUREL FK OF QUICKSAND C.(060B00035N)

ADDRESS DEFICIENCIES OF COLLINS BRANCH RD BRIDGE OVER CARR FORK.(060C00029N)

ADDRESS DEFICIENCIES OF FRANKIE JANE DR BRIDGE OVER CANEY CREEK.(060C00071N)

IMPROVE SAFETY AND ACCESS MANAGEMENT, AND REDUCE CONGESTION ONUS-25E FROM CORBIN BYPASS TO KNOX/LAUREL COUNTY LINE.(12CCR)

IMPROVE SAFETY AND ACCESS MANAGEMENT, AND REDUCE CONGESTION ONUS-25E FROM CORBIN BYPASS TO KNOX/LAUREL COUNTY LINE.(12CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON OLD HWY 25 (CR 1325) JUST WEST OF US25E. 061C00063N

ADDRESS DEFICIENCIES OF SPIDER CREEK RD BRIDGE OVER EAST FORK LYNNCAMP CREEK. (061C00048N)

ADDRESS DEFICIENCIES OF DETHERAGE CEMETERY BRIDGE OVER BRUSHCREEK. (061C00056N)

1.976

1.976

.004

KNOTT

KNOTT

KNOTT

KNOTT

KNOX

KNOX

KNOX

KNOX

KNOX

KY-3209

KY-1098

CR-1130

CR-1565

US-25E

US-25E

CR-1325

CR-1353

CR-1162

$700,000

$855,000

$556,150

$512,890

$2,300,000

$6,920,000

$525,000

$661,500

$525,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

C

D

C

C

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2019

2020

2019

2020

2020

2021

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

NH

NH

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$700,000

$175,000

$680,000

$157,500

$398,650

$175,000

$337,890

$2,300,000

$6,920,000

$175,000

$350,000

$192,500

$469,000

$157,500

$367,500

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

11

11

11

11

11

8904.00

10001.00

10002.00

10015.00

188.00

188.01

1102.00

10021.00

10022.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

11

11

11

11

11

8904.00

10001.00

10002.00

10015.00

188.00

188.00

1102.00

10021.00

10022.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2018

2018

2018

2012

2018

2016

2018

2018

2016

2018

2018

2018

2012

2012

2016

2018

2018

.312

.032

.015

.028

24.221

24.221

.191

.396

.032

.328

.044

.021

.034

26.197

26.197

.195

.406

.036

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 88

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BURTON BRANCH RD BRIDGE OVER BURTONBRANCH. (061C00086N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION ON US-25E FROM MILEPOINT 21.72 TOMILEPOINT 26.20

ADDRESS DEFICIENCIES OF KY-61 BRIDGE OVER SOUTH FORK BRANCH.(062B00008N)

IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)

IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)

IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)

IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)

4.480

4.300

4.300

4.300

4.300

KNOX

KNOX

KNOX

KNOX

LARUE

LAUREL

LAUREL

LAUREL

LAUREL

CR-1065

KY-6

US-25E

US-25E

KY-61

I-75

I-75

I-75

I-75

$535,000

$330,000

$1,375,000

$2,267,000

$693,000

$10,120,000

$20,000,000

$18,500,000

$18,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

C

D

C

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2020

2020

2019

2019

2023

2019

2020

2019

2019

2020

2021

2022

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

PM

PM

PM

BR

BR

NH

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$360,000

$30,000

$300,000

$125,000

$1,250,000

$2,267,000

$87,500

$605,500

$70,000

$50,000

$10,000,000

$20,000,000

$18,500,000

$18,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

04

11

11

11

11

10023.00

20007.00

20008.00

20022.00

10002.00

9.10

9.14

9.15

9.16

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

04

11

11

11

11

10023.00

20007.00

20008.00

20022.00

10002.00

9.00

9.10

9.10

9.10

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2000

2018

2018

2018

2018

2018

2018

2018

2018

1996

2000

2000

2000

.038

13.714

9.438

21.72

4.045

28.9

28.85

28.85

28.85

.05

14.212

11.554

26.2

4.057

33.2

33.162

33.162

33.162

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 89

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE I-75 FROM KY 80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.

IMPROVE I-75 FROM KY-80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.

IMPROVE I-75 FROM KY-80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.

REDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069; IMPROVECONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229; IMPROVE KY-229 FROMTHE NEW CONNECTOR NORTH TO KY-192; AND IMPROVE ACCESS TO THESCHOOL FROM KY-192 BYPASS. (06CCR)(10CCR)(12CCR)(14CCR)

REDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069; IMPROVECONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229; IMPROVE KY-229 FROMTHE NEW CONNECTOR NORTH TO KY-192; AND IMPROVE ACCESS TO THESCHOOL FROM KY-192 BYPASS. (06CCR)(10CCR)(12CCR)(14CCR)

ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENT ON KY-363 FROM KY-1006 TO KY-192. (06CCR)(2006BOPC).(10CCR)(14CCR)

IMPROVE SAFETY, IMPROVE ACCESS MANAGEMENT, AND REDUCE CONGESTIONON US-25E FROM THE KNOX/LAUREL COUNTY LINE TO KY-770(12CCR)(16CCR)

IMPROVE SAFETY, IMPROVE ACCESS MANAGEMENT, AND REDUCE CONGESTIONON US-25E FROM THE KNOX/LAUREL COUNTY LINE TO KY-770(12CCR)(16CCR)

IMPROVE SAFETY, ACCESS MANAGEMENT, AND FREIGHT MOBILITY; ANDREDUCE CONGESTION ON KY-192 NEAR KY-1006 TO US-25 IN LONDON. (12CCR)

7.296

7.296

7.296

1.505

1.505

.467

2.024

2.024

2.070

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

I-75

I-75

I-75

US-25

US-25

KY-363

US-25E

US-25E

KY-192

$20,750,000

$20,750,000

$20,750,000

$10,000,000

$5,000,000

$3,000,000

$4,580,000

$6,860,000

$9,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2023

2024

2022

2023

2018

2020

2021

2018

2018

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

STP

STP

SPP

NH

NH

SPP

SPP

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$20,750,000

$20,750,000

$20,750,000

$10,000,000

$5,000,000

$3,000,000

$4,580,000

$6,860,000

$1,000,000

$2,500,000

$6,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

11

11.00

11.02

11.03

147.00

147.01

147.10

185.00

185.01

187.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

11

11.00

11.00

11.00

147.00

147.00

147.00

185.00

185.00

187.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1996

2018

2018

2006

2018

2006

2012

2018

2012

1996

1996

1996

2006

2006

2006

2012

2012

2012

40.704

40.704

40.704

9

9

9.187

0

0

18.35

48

48

48

10.505

10.505

9.654

2.024

2.024

20.42

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 90

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE SAFETY, ACCESS MANAGEMENT, AND FREIGHT MOBILITY; ANDREDUCE CONGESTION ON KY-192 NEAR KY-1006 TO US-25 IN LONDON. (12CCR)

REDUCE CONGESTION ON THE HAL ROGERS PARKWAY FROM RELOCATED KY-30 TO KY-192.

ADDRESS DEFICIENCIES OF BRIDGE ON DOG BRANCH SCHOOL RD (CR 1341)OVER SINKING CREEK 0.56 MILE NW OF SINKING CREEK RD (FD 781) 063C00025N

ADDRESS DEFICIENCIES OF BRIDGE OVER CRAIG CREEK ON KY 312 1.8 MILE SEOF KY 192. (063B00053N)(14CCR)(SD)

REHAB BRIDGE ON I-75 AT MILEPOST 30.5 OVER LAUREL RIVER (SR 34.1) (B00043RAND B00043L)(SD)

IMPROVE CONNECTIVITY BETWEEN CORBIN AND LONDON FROM KY-1006 TO US-25E. (08CCN)

IMPROVE THE HAL ROGERS PARKWAY TO INTERSTATE STANDARDS FROM 4.0MI EAST OF KY 192 TO LAUREL/CLAY CO. LINE. (I-75 TO HAZARD) (16CCN).

ADDRESS DEFICIENCIES OF KY-1223 BRIDGE OVER HORSE CREEK. (063B00007N)

ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER LICK FORK CREEK. (063B00013N)

2.070

2.788

.020

2.716

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

KY-192

HR-9006

CR-1341

KY-312

I-75

US-25

HR-9006

KY-1223

KY-80

$12,000,000

$9,710,000

$945,000

$1,200,000

$2,800,000

$3,500,000

$1,000,000

$553,000

$735,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

D

C

C

C

P

D

D

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2019

2023

2023

2024

2019

2020

2018

2018

2020

2022

2024

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

BR

BR

BR

BR

STP

STP

NH

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$12,000,000

$1,870,000

$2,080,000

$1,250,000

$4,510,000

$175,000

$770,000

$1,200,000

$2,800,000

$500,000

$3,000,000

$1,000,000

$175,000

$378,000

$210,000

$525,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

11

187.01

365.00

1094.00

1096.00

1105.01

8515.00

8909.00

10024.00

10025.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

11

187.00

365.00

1094.00

1096.00

1105.01

8515.00

8909.00

10024.00

10025.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2012

2014

2016

2008

2016

2018

2018

2012

2018

2012

2014

2016

2008

2016

2018

2018

18.35

1.089

1.071

1.737

30.55

0

7.877

1.241

17.706

20.42

3.877

1.111

1.757

30.65

10.475

10.593

1.245

17.71

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / DESIGN ENGINEERING(O)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 91

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER HOOPPOLE CREEK. (063B00017N)

ADDRESS DEFICIENCIES OF KY 490 BRIDGE OVER ROCKCASTLE RIVER.(063B00004N)

ADDRESS DEFICIENCIES OF KY 638 BRIDGE OVER BIG RACCOON CREEK.(063B00061N)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 3.877

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 29.39 TO MILEPOINT 32.49 (33.2 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-075 CARDINALDIRECTION(S) FROM MILEPOINT 32.485 TO MILEPOINT 32.9

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 41.4 TO MILEPOINT 50.524 (49.87 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 50.524 (49.87 NON-CARDINAL) TO MILEPOINT 50.714

ADDRESS PAVEMENT CONDITION ON KY-490 FROM MILEPOINT 0.00 TOMILEPOINT 6.14

6.140

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

KY-80

KY-490

KY-638

HR-9006

I-75

I-75

I-75

I-75

KY-490

$682,500

$2,737,000

$1,022,000

$3,410,000

$3,300,000

$1,320,000

$12,100,000

$1,100,000

$924,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2019

2019

2023

2023

2019

2019

2023

2023

2019

2019

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$507,500

$245,000

$2,492,000

$192,500

$829,500

$310,000

$3,100,000

$300,000

$3,000,000

$120,000

$1,200,000

$1,100,000

$11,000,000

$100,000

$1,000,000

$924,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

11

10026.00

10042.00

10043.00

20009.00

20010.00

20011.00

20012.00

20013.00

20023.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

11

10026.00

10042.00

10043.00

20009.00

20010.00

20011.00

20012.00

20013.00

20023.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

22.228

11.502

7.792

0

29.39

32.485

41.4

50.524

0

22.236

11.509

7.814

3.877

32.49

32.9

50.524

50.714

6.14

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 92

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

RECONSTRUCT KY 2565 FROM APPROX. 550' NW OF CR 1529/KY2565/KY2563INTERSECTION TO APPROX. 1150' SE OF THE INTERSECTION (SECTION 2).(2014BOP)

ADDRESS DEFICIENCIES OF MAXIE BRANCH RD BRIDGE OVER RT FORK-BLAINECREEK. (064C00076N)

ADDRESS DEFICIENCIES OF KY 644 BRIDGE OVER LEVISA FORK OF BIG SANDY.(064B00038N)

ADDRESS DEFICIENCIES OF GOOSE CREEK RD BRIDGE OVER CSX RAILROAD.(065R00604N)

ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON US-421 OVER STINNETCREEK 0.028 MILE SOUTH OF KY-406 NEAR STINNETT(10CCR)(066B00008N)

ADDRESS DEFICIENCIES OF BRIDGE OVER MUNCY CREEK ON US 421 0.5 MILESOUTH OF TAYLOR MORGAN ROAD (CR 1090).(066B00006N)

ADDRESS DEFICIENCIES OF BRIDGE OVER WOLF CREEK ON COON CREEK ROAD(CR 1528) AT JCT WITH KY 3427 (066C00039N) (EBRP)

ADDRESS DEFICIENCIES OF BRIDGE ON MILE BRANCH RD (CR 1219) (MP 0.022)OVER BEECH FORK. 066C00048N

ADDRESS DEFICIENCIES OF BRIDGE ON WILLIAMS BRANCH RD (CR-1207) (0.028)OVER MIDDLE FORK KENTUCKY RIVER. 066C00020N

.318

.100

.014

.012

.012

LAWRENCE

LAWRENCE

LAWRENCE

LEE

LESLIE

LESLIE

LESLIE

LESLIE

LESLIE

KY-2565

CR-1234

KY-644

CR-1124

US-421

US-421

CR-1528

CR-1219

CR-1207

$790,000

$618,000

$3,440,500

$1,015,000

$2,128,000

$612,500

$568,000

$858,000

$805,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

C

D

C

C

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$790,000

$140,000

$478,000

$560,000

$2,880,500

$245,000

$770,000

$2,128,000

$612,500

$123,000

$445,000

$245,000

$613,000

$245,000

$560,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

10

11

11

11

11

11

196.10

10003.00

10016.00

10013.00

1078.00

1095.00

1100.00

1104.00

1106.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

10

11

11

11

11

11

196.00

10003.00

10016.00

10013.00

1078.00

1095.00

1100.00

1104.00

1106.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2018

2018

2018

2008

2014

2014

2016

2016

2012

2018

2018

2018

2008

2014

2014

2016

2016

1.916

.04

1.468

0

15.137

18.423

0

.016

.022

2.234

.052

1.558

.013

15.177

18.437

.012

.028

.034

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 93

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY-1780 BRIDGE OVER BEECH FORK. (066B00027N)

ADDRESS DEFICIENCIES OF KY-699 BRIDGE OVER MAGGARDS BRANCH.(066B00031N)

ADDRESS DEFICIENCIES OF KY-2431 BRIDGE OVER MIDDLE FORK OF KY RIVER.(066B00039N)

ADDRESS DEFICIENCIES OF CR-1006 BRIDGE OVER RACCOON CREEK.(066C00002N)

ADDRESS DEFICIENCIES OF CR-1271 BRIDGE OVER MIDDLE FK KENTUCKY RVR.(066C00023N)

IMPROVE US-119 FROM NORTH OF KY-15 TO BRASS DRIVE (SOUTH).(16CCN)

IMPROVE US-119 FROM NORTH OF KY-15 TO THE KY 2034/COUGAR DRIVEINTERSECTION.(16CCN)(SEE 12-199.10 FOR D, R, U)

IMPROVE US-119 FROM KY 2034/COUGAR DRIVE TO BRASS DRIVE(SOUTH).(16CCN)(SEE 12-199.10 FOR D, R, U)

ADDRESS DEFICIENCIES OF BRIDGE ON KY 2034C OVER N FORK KY RIVER 0.02 EOF US 119 067B00121N

.750

.040

LESLIE

LESLIE

LESLIE

LESLIE

LESLIE

LETCHER

LETCHER

LETCHER

LETCHER

KY-1780

KY-699

KY-2431

CR-1006

CR-1271

US-119

US-119

US-119

KY-2034C

$1,067,500

$700,000

$1,655,000

$644,000

$735,000

$2,500,000

$1,000,000

$6,000,000

$973,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

R

U

C

D

C

D

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2021

2022

2022

2024

2019

2020

2019

2020

2018

2018

2018

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

NH

NH

NH

NH

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$210,000

$857,500

$175,000

$525,000

$300,000

$75,000

$180,000

$1,100,000

$192,500

$451,500

$210,000

$525,000

$1,300,000

$1,200,000

$1,000,000

$6,000,000

$973,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

12

12

12

12

10027.00

10028.00

10029.00

10030.00

10031.00

199.10

199.11

199.15

1113.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

12

12

12

12

10027.00

10028.00

10029.00

10030.00

10031.00

199.10

199.11

199.15

1113.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2016

2016

2016

2012

2018

2018

2018

2018

2018

2016

2016

2016

2012

14.276

8.134

.008

.006

.056

17.005

17.15

17.964

.006

14.288

8.138

.062

.016

.066

19.038

17.9

18.826

.046

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 94

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE OVER POOR FORK OF CUMBERLAND RIVERON KY 3404 100 FT SOUTH OF US 119. (067B00114N)

ADDRESS DEFICIENCIES OF BRIDGE ON HAMPTON BRANCH (CR 1226) (MP 0.01)OVER COWAN CREEK. 067C00021N

ADDRESS DEFICIENCIES OF BRIDGE ON CR-1225 (0.034) OVER COWAN CREEK.067C00020N

ADDRESS DEFICIENCIES OF KY-805 BRIDGE OVER POTTERS FORK. (067B00022N)

ADDRESS DEFICIENCIES OF KY-2034 BRIDGE OVER CRAFTS COLLY CREEK.(067B00069N)

ADDRESS DEFICIENCIES OF CORNFIELD DR BRIDGE OVER BOONE FORK.(067C00004N)

ADDRESS DEFICIENCIES OF TURKEY CRK BRIDGE OVER TURKEY CREEK.(067C00050N)(SD)

ADDRESS DEFICIENCIES OF KY 7 BRIDGE OVER CSX RR & N FK KY RIVER.(067B00038N)

ADDRESS DEFICIENCIES OF KY 343 BRIDGE OVER WRIGHT FORK. (067B00078N)

.012

.008

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

KY-3404

CR-1226

CR-1225

KY-805

KY-2034

CR-1433

CR-1386

KY-7

KY-343

$420,000

$385,000

$805,000

$826,840

$546,105

$567,840

$872,000

$5,425,000

$553,560

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$420,000

$385,000

$420,000

$385,000

$210,000

$616,840

$140,000

$406,105

$140,000

$427,840

$175,000

$697,000

$525,000

$4,900,000

$175,000

$378,560

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

12

1120.00

1125.00

1126.00

10004.00

10005.00

10006.00

10007.00

10017.00

10018.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

12

1120.00

1125.00

1126.00

10004.00

10005.00

10006.00

10007.00

10017.00

10018.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2016

2016

2018

2018

2018

2018

2018

2018

2014

2016

2016

2018

2018

2018

2018

2018

2018

.782

.006

.03

2.989

2.369

.005

.003

2.602

.458

.794

.014

.038

2.997

2.375

.015

.025

2.68

.464

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 95

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF E POTTER RD BRIDGE OVER YONTS FORK.(067C00007N)

ADDRESS DEFICIENCIES OF HOLBROOK TOWN BRIDGE OVER N.FK.KENTUCKYRVR. (067C00017N)

ADDRESS DEFICIENCIES OF PARADISE LN BRIDGE OVER KINGDOM COMECREEK. (067C00051N)

ADDRESS DEFICIENCIES OF ORCHARD RD BRIDGE OVER NORTH FORK KYRIVER. (067C00065N)

ADDRESS PAVEMENT CONDITION ON US-119 FROM MILEPOINT 17.00 TOMILEPOINT 22.63

ADDRESS DEFICIENCIES OF BRIDGE OVER LAUREL FORK ON KY 1068 30 FT S OFDEEP HOLE BRANCH ROAD (CR 1125).(068B00057N)(16CCR)(SD)

CONSTRUCT A NEW BRIDGE CROSSING THE NORTH FORK OF THE LICKINGRIVER AT THE LEWIS-FLEMING COUNTY LINE. (08CCN): (068B00027N)

ADDRESS DEFICIENCIES OF KY-344 BRIDGE OVER GRASSY BRANCH. (068B00015N)

5.630

.020

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LEWIS

LEWIS

LEWIS

CS-3000

CR-1149

CR-1799

CR-1737

US-119

KY-1068

KY-57

KY-344

$529,900

$726,810

$409,500

$865,900

$1,477,000

$1,050,000

$3,640,000

$1,890,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

C

R

U

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2019

2020

2022

2018

2018

2019

2019

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

PM

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$157,500

$372,400

$210,000

$516,810

$140,000

$269,500

$210,000

$655,900

$1,477,000

$75,000

$75,000

$900,000

$3,640,000

$350,000

$1,540,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

09

09

09

10019.00

10020.00

10021.00

10022.00

20005.00

1090.00

8507.00

10010.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

FLEMING

12

12

12

12

12

09

09

09

10019.00

10020.00

10021.00

10022.00

20005.00

1090.00

8507.00

10010.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2014

2008

2018

2018

2018

2018

2018

2018

2014

2008

2018

.03

.049

.006

.02

17

1.74

0

18.474

.038

.061

.012

.034

22.63

1.76

.031

18.488

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

8.952 9.012Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 96

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY 1021 BRIDGE OVER BRIERY CREEK. (068B00075N)

ADDRESS PAVEMENT CONDITION

ADDRESS PAVEMENT CONDITION ON KY-9 FROM MILEPOINT 15.77 TOMILEPOINT 21.03

US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY ANDREDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY.

US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY ANDREDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY.

IMPROVE US-27 FROM KY-590 TO BELL STREET IN STANFORD. (INCLUDES NEWGOSHEN CUT-OFF ROAD)(2005HPP-KY115)

IMPROVE US-27 FROM KY-590 TO BELL STREET IN STANFORD. (INCLUDES NEWGOSHEN CUT-OFF ROAD)(2005HPP-KY115)

REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH CREEK 0.044 S OF KY 78(SR 45.4)069B00055N

REPLACE BRIDGE ON CR-1043 (0.643) OVER LOGAN CREEK. (SR=20.2) 069C00008N

5.260

4.712

4.712

.700

.700

.040

LEWIS

LEWIS

LEWIS

LINCOLN

LINCOLN

LINCOLN

LINCOLN

LINCOLN

LINCOLN

KY-1021

KY-9

KY-9

US-27

US-27

US-27

US-27

KY-1247

CR-1043

$1,172,500

$2,310,000

$1,070,000

$7,720,000

$11,580,000

$5,750,000

$3,250,000

$567,000

$672,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

R

U

R

U

R

U

C

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2021

2022

2022

2022

2023

2023

2021

2022

2023

2024

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

PM

NH

NH

NH

NH

NH

NH

NH

NH

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$315,000

$857,500

$210,000

$2,100,000

$1,070,000

$4,720,000

$3,000,000

$7,080,000

$4,500,000

$1,400,000

$1,100,000

$3,250,000

$3,250,000

$567,000

$175,000

$497,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

08

08

08

08

08

08

10023.00

20010.00

20017.00

167.00

167.01

196.00

196.01

1055.00

1066.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

08

08

08

08

08

08

10023.00

20010.00

20017.00

167.00

167.00

196.00

196.00

1055.00

1066.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2012

2018

2014

2018

2012

2018

2018

2018

2018

2012

2012

2014

2014

2012

2018

3.648

21.027

15.77

11.169

11.169

18.155

18.2

17.67

.635

3.654

25.532

21.03

15.881

15.881

18.865

18.9

17.71

.651

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 97

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

PADUCAH-HENDERSON; RELOCATE US-60 FROM EAST OF THE TENNESSEE RIVERBRIDGE TO EAST OF RUDD-SPEES ROAD (00CCR)(12CCR)(14CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER THE CUMBERLAND RIVER0.27 MILE N OF KY 70 070B00017N.

ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER THE CUMBERLAND RIVER0.27 MILE N OF KY 70 (SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)

ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROMMILEPOINT 29.543 TO MILEPOINT 33.88

ADDRESS PAVEMENT CONDITION ON KY-453 FROM MILEPOINT 0.00 TOMILEPOINT 4.57

IMPROVE SAFETY AND BRIDGE CONDITION ON WHIPPORWILL CREEK BRIDGENEAR KY-1151. BRIDGE ID 071B00025 (SD)

ADD RESTROOM FACILITY TO I-24 EASTBOUND & WESTBOUND WEIGH STATIONSIN LYON COUNTY (DESIGN FUNDS AUTHORIZED UNDER ITEM NO. 99-44.00)

RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THELYON/CALDWELL COUNTY LINE.

3.300

.344

.344

4.570

.100

4.250

LIVINGSTON

LIVINGSTON

LIVINGSTON

LIVINGSTON

LIVINGSTON

LOGAN

LYON

LYON

US-60

US-60

US-60

I-24

KY-453

US-79

I-24

US-641

$3,140,000

$16,000,000

$16,000,000

$3,850,000

$879,000

$1,965,000

$1,900,000

$11,000,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

D

C

C

D

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2021

2019

2020

2023

2023

2022

2019

2020

2023

2019

2020

2020

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

BR

BR

PM

PM

PM

BR

BR

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,580,000

$1,560,000

$16,000,000

$16,000,000

$350,000

$3,500,000

$879,000

$250,000

$1,715,000

$1,900,000

$2,500,000

$2,000,000

$500,000

$6,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

03

01

01

330.00

1142.00

1142.01

20007.00

20030.00

10010.00

7.00

187.50

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

01

01

03

01

01

330.00

1142.00

1142.00

20007.00

20030.00

10010.00

7.00

187.50

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1998

2018

2016

2018

2018

2018

2000

2006

1998

2018

2018

2018

2018

2018

2000

2006

.891

12.524

12.524

29.543

0

4.35

35.8

0

4.2

12.868

12.868

33.88

4.57

4.85

35.9

4.548

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / WEIGH STA REHAB(P)

RELIABILITY / RELOCATION(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 98

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THELYON/CALDWELL COUNTY LINE.

RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THELYON/CALDWELL COUNTY LINE. (ADDITIONAL FUNDING FOR 1-187.50)

RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TOFREDONIA, 4.5 MILES.

RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TOFREDONIA, 4.5 MILES.

RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TOFREDONIA, 4.5 MILES. (ADDITIONAL FUNDING FOR 1-187.60)

ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROMMILEPOINT 33.988 TO MILEPOINT 45.133

ADDRESS PAVEMENT CONDITION OF I-024 CARDINAL DIRECTION(S) FROMMILEPOINT 45.133 TO MILEPOINT 51.886

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINALDIRECTION(S) FROM MILEPOINT 45.171 TO MILEPOINT 51

4.250

4.500

4.500

4.500

LYON

LYON

LYON

LYON

LYON

LYON

LYON

LYON

US-641

US-641

US-641

US-641

US-641

I-24

I-24

I-24

$8,500,000

$6,000,000

$12,100,000

$10,300,000

$7,500,000

$9,900,000

$2,970,000

$3,300,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

D

R

U

C

R

U

C

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2021

2023

2024

2019

2020

2020

2022

2021

2021

2023

2024

2024

2024

2020

2020

2024

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

NH

NH

STP

NH

NH

STP

STP

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,000,000

$500,000

$6,000,000

$6,000,000

$1,800,000

$2,000,000

$800,000

$7,500,000

$2,000,000

$800,000

$7,500,000

$7,500,000

$900,000

$9,000,000

$270,000

$2,700,000

$300,000

$3,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

01

01

01

187.51

187.52

187.60

187.61

187.62

20008.00

20009.00

20010.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CALDWELL

CALDWELL

CALDWELL

01

01

01

01

01

01

01

01

187.50

187.50

187.60

187.60

187.60

20008.00

20009.00

20010.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2016

2018

2018

2018

2018

2018

2006

2006

2016

2016

2016

2018

2018

2018

0

0

4.548

4.548

4.548

33.988

45.133

45.171

4.548

4.548

5.715

5.715

5.715

45.133

51.886

51

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

0

0

0

4.187

4.187

4.187

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 99

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 BOTHDIRECTION(S) FROM MILEPOINT 51.89 (51.0 NON-CARDINAL) TO MILEPOINT 54.862

IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THEDUNCANNON ROAD INTERCHANGE. (02CCR)(12CCN)(14CCR)(DESIGN/BUILD)(16CCR)

COMPREHENSIVE TRAFFIC STUDY FOR INTERSECTION OF MAIN STREET ANDBEREA COLLEGE CAMPUS, BEREA. (2005HPP-KY112)(MOA WITH BEREA).(16CCR)(LET BY CITY)

WIDEN US-25 FROM US-421 NORTH TO KY-876. STATE TO PROVIDE DESIGN ANDPLANS, AND FUNDS FOR THIS PROJECT ARE REQUESTED TO BE PAID TO THEMADISON COUNTY FISCAL COURT, WHICH SHALL COORDINATE THE PROJECT.(2005HPP-KY110)(06CCR)

PRIORITY SECTION II & III: WIDEN US-25 FROM US-421 TO PUMPKIN RUN.(SEE 7-251.10 FOR SEC III UTIL & CONST) (2006BOPC)(08CCR)(10CCR)(12CCR)(14CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON BATTLEFIELD MEMORIAL HWY (US 421)OVER COWBELL CREEK AT JCT WITH HIGHWAY 21 E (KY 21)076B00021

ADDRESS DEFICIENCIES OF BRIDGE ON OLD HAYS FORK LN (CR 1158) OVERBRANCH OF HAYS FORK 0.2 MILE SE OF BATTLEFIELD MEMORIAL HWY (US 421)076C00023N

ADDRESS DEFICIENCIES OF BRIDGE OVER TERRILL BRANCH ROAD ON KY 3376IN BEREA 200 FT N OF PEACHTREE DRIVE (CS 2072).(076B00085N)

6.845

3.500

2.980

.040

.020

LYON

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

I-24

KY-52

KY-595

US-25

US-25

US-421

CR-1158

KY-3376

$4,400,000

$8,860,000

$266,952

$719,921

$3,750,000

$805,000

$336,000

$1,067,500

Total

Total

Total

Total

Total

Total

Total

Total

D

C

U

C

C

C

C

R

U

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2024

2024

2021

2024

2018

2018

2024

2018

2018

2018

2019

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

SPP

SPP

HPP

HPP

NH

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$400,000

$4,000,000

$4,000,000

$4,860,000

$266,952

$719,921

$3,750,000

$90,000

$90,000

$625,000

$336,000

$210,000

$857,500

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

07

07

07

07

07

07

07

20011.00

235.00

236.00

251.01

251.40

1130.00

1131.00

1137.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

07

07

07

07

07

07

07

20011.00

235.00

236.00

251.01

251.50

1130.00

1131.00

1137.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2002

2004

2004

2006

2018

2018

2018

2018

2002

2004

2004

2004

2018

2018

2018

51.89

1.17

2.565

11.903

11.903

2.443

.252

.279

54.862

8.015

2.665

15.442

14.883

2.483

.292

.299

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 100

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE ON CR-1017 (3.405) OVER MUDDY CREEK.076C00004N (SD)

ADDRESS DEFICIENCIES OF BRIDGE ON CR-1044 (0.007) OVER BR OF MUDDYCREEK. 076C00066N

IMPROVE SAFETY AND REDUCE CONGESTION AT THE KY-627 BRIDGE OVER I-75.(INCLUDES 7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)

IMPROVE SAFETY AND REDUCE CONGESTION AT THE KY-627 BRIDGE OVER I-75.(INCLUDES 7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)

IMPROVE ROADWAY, SIDEWALKS, AND BIKE PATHS ON US-25 BETWEEN ELLIPSESTREET TO GLADES ROAD AND THEN CONTINUES ON TO THE BEREA BYPASS.(08CCN)(10CCR)(12CCR)(LET BY KYTC)

ADDRESS DEFICIENCIES OF KY-1984 BRIDGE OVER TATES CREEK. (076B00071N)

ADDRESS DEFICIENCIES OF PEACOCK ROAD BRIDGE OVER E. FK. OTTER CREEK.(076C00011N)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 73.408 TO MILEPOINT 83.4

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCR)

.120

.120

1.212

4.600

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

MAGOFFIN

CR-1017

CR-1044

KY-627

KY-627

US-25

KY-1984

CR-1056

I-75

KY-9009

$610,000

$665,000

$5,000,000

$5,000,000

$7,200,000

$875,000

$875,000

$13,200,000

$15,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

C

C

D

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2020

2021

2018

2019

2020

2019

2020

2021

2021

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

NH

NH

SPP

BR

BR

BR

BR

PM

PM

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$190,000

$420,000

$210,000

$455,000

$5,000,000

$5,000,000

$7,200,000

$210,000

$665,000

$210,000

$665,000

$1,200,000

$12,000,000

$15,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

10

1142.00

1143.00

8403.00

8403.01

8505.00

10001.00

10002.00

20017.00

126.40

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

10

1142.00

1143.00

8403.00

8403.00

8505.00

10001.00

10002.00

20017.00

126.03

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2008

2018

2008

2018

2018

2018

1998

2018

2018

2008

2008

2008

2018

2018

2018

1996

3.397

.003

.073

.073

4.644

2.029

1.775

73.408

65

3.413

.011

.193

.193

5.856

2.041

1.789

83.4

69.6

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

RELIABILITY / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 101

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)

IMPROVE US-460 IN MAGOFFIN COUNTY AT IVY POINT HILL WEST OFSALYERSVILLE. (16CCN)

ADDRESS DEFICIENCIES OF KY-1635 BRIDGE OVER OAKLEY CREEK. (077B00029N)

ADDRESS DEFICIENCIES OF KY-30 BRIDGE OVER LICKING RIVER. (077B00059N)

ADDRESS DEFICIENCIES OF KY 3049 BRIDGE OVER JOHNSON CREEK.(077B00069N)

ADDRESS DEFICIENCIES OF WHITE BRANCH BRIDGE OVER STATE ROAD FORK.(077C00036N)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 63.123 TO MILEPOINT 69.98

4.600

4.600

4.600

.700

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

KY-9009

KY-9009

KY-9009

US-460

KY-1635

KY-30

KY-3049

CR-1032

KY-9009

$10,000,000

$30,000,000

$25,000,000

$4,370,000

$735,000

$1,120,000

$577,500

$612,500

$4,400,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

R

U

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2021

2022

2022

2022

2024

2019

2020

2019

2020

2019

2020

2019

2020

2020

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

STP

STP

STP

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$10,000,000

$30,000,000

$25,000,000

$1,660,000

$220,000

$2,490,000

$140,000

$595,000

$175,000

$945,000

$175,000

$402,500

$175,000

$437,500

$400,000

$4,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

10

10

126.41

126.42

126.43

8901.00

10002.00

10003.00

10014.00

10015.00

20000.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

10

10

10

10

10

10

126.40

126.40

126.40

8901.00

10002.00

10003.00

10014.00

10015.00

20000.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2018

2016

2018

2018

2018

2018

2018

1998

1998

1998

2016

2018

2018

2018

2018

2018

65

65

65

10

5.613

10.91

.005

.022

63.123

69.6

69.6

69.6

10.7

5.621

10.944

.009

.026

69.98

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 102

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION ON US-460 FROM MILEPOINT 14.57 TOMILEPOINT 20.37

IMPROVE SAFETY, MOBILITY AND GEOMETRICS ON KY-49 NEAR SOUTHERN KY-52 INTERSECTION. (14CCN)

ADDRESS DEFICIENCIES OF BRIDGE ON KY 84 OVER HARDINS CREEK.(16CCN)(078B00025N)

HEARTLAND PARKWAY: IMPROVE MOBILITY FROM THE LEBANON BYPASS TOBOOKER ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)

HEARTLAND PARKWAY: IMPROVE MOBILITY FROM THE LEBANON BYPASS TOBOOKER ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)

ADDRESS DEFICIENCIES OF WHITE OAK CRK RD BRIDGE OVER WHITE OAKCREEK. (078C00035N)

IMPROVE ACCESS AND REDUCE CONGESTION ON US-62 FROM KY-95 TO THEEXISTING FOUR-LANE HIGHWAY AT LONE VALLEY RD NEAR I-24 INTERCHANGEAND FUTURE I-69 CONNECTION.

ADDRESS DEFICIENCIES OF KY-1949 BRIDGE OVER SMITH CREEK. (079B00110N)

5.800

1.630

MAGOFFIN

MARION

MARION

MARION

MARION

MARION

MARSHALL

MARSHALL

US-460

KY-49

KY-84

KY-55

KY-55

CR-1127

US-62

KY-1949

$1,485,000

$3,300,000

$710,500

$5,700,000

$4,000,000

$315,000

$5,000,000

$705,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

C

R

U

C

C

D

C

D

R

U

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2021

2018

2019

2019

2019

2022

2023

2019

2020

2021

2023

2023

2024

2019

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

SPP

BR

BR

NH

NH

NH

NH

BR

BR

STP

STP

STP

STP

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,485,000

$3,300,000

$94,500

$616,000

$350,000

$350,000

$5,000,000

$4,000,000

$98,000

$217,000

$750,000

$250,000

$500,000

$3,500,000

$250,000

$455,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

04

04

04

04

04

01

01

20013.00

8803.00

8914.00

8916.00

8916.01

10003.00

398.00

10003.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

WASHINGTON

10

04

04

04

04

04

01

01

20013.00

8803.00

8914.00

8916.00

8916.00

10003.00

398.00

10003.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2014

2016

2016

2018

2018

2018

2018

2018

2014

2016

2016

2016

2018

2018

2018

14.57

23.35

13.176

1.866

1.866

.149

7.2

7.319

20.37

24.98

13.192

4.669

4.669

.155

8.497

7.329

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

0 3.485Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 103

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROMMILEPOINT 17.32 TO MILEPOINT 29.14

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED JUSTBEFORE THE JUNCTION OF KY-2031 AND KY-40 TO .1 MILES BEFORE GORDONHOLLOW ROAD, AND IMPROVE THE CULVERT/SAFETY DESIGN TO INCREASEMOTORIST AND PEDESTRIAN SAFETY. (12CCR)

ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON PR-1015 OVERROCKCASTLE CREEK (C26) 275 FEET WEST JCT. KY-3 JUST SOUTH OF CROOKEDRUN ROAD. (080C00026N)

SETSER BRANCH ROAD BRIDGE AND APPROACHES OVER MIDDLE FORK OFROCKCASTLE CREEK (C43) (OFF NHS) (FD04) (2000BOP): (080C00043N)

ADDRESS DEFICIENCIES OF WILLIS DIALS RD BRIDGE OVER PIGEONROOSTFORK. (080C00053N)

ADDRESS PAVEMENT CONDITION ON KY-645 FROM MILEPOINT 0.00 TOMILEPOINT 6.11

REPAIR BRIDGE ON US 68 OVER LAWRENCE CREEK 0.13 MI SW OF KY 3056.(081B00067N)(16CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON KY 3056 OVER SOUTH FORK LAWRENCECREEK. (16CCN)(081B00020N)

.200

.100

6.110

.400

MARSHALL

MARSHALL

MARTIN

MARTIN

MARTIN

MARTIN

MARTIN

MASON

MASON

I-24

US-641

KY-40

CR-1324

CR-1215

CR-1120

KY-645

US-68

KY-3056

$10,450,000

$825,000

$1,460,000

$60,000

$350,000

$625,380

$2,015,000

$1,400,000

$1,120,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

C

C

D

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2023

2019

2019

2024

2018

2024

2019

2020

2022

2018

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

SPP

BR

SPP

BR

BR

PM

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$950,000

$9,500,000

$75,000

$750,000

$1,460,000

$60,000

$350,000

$157,500

$467,880

$2,015,000

$1,400,000

$1,120,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

12

12

12

12

12

09

09

20013.00

20016.00

192.00

1092.00

4093.00

10023.00

20006.00

1095.00

8906.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

12

12

99

12

12

09

09

20013.00

20016.00

192.00

1092.00

335.00

10023.00

20006.00

1095.00

8906.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2012

2008

2000

2018

2018

2016

2016

2018

2018

2012

2008

1998

2018

2018

2016

2016

17.32

7.981

18.2

0

.03

.091

0

16.8

3.679

29.14

8.824

18.4

.028

.07

.101

6.11

17.2

3.685

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 104

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF THE BRIDGE ON DAVIS LANE. (16CCN)(081C00022N)

ADDRESS DEFICIENCIES OF THE BRIDGE ON KENNEDY CREEK ROAD.(16CCN)(081C00009N)

REPAIR BRIDGE (081C00018N) ON DIXIE PIKE. (16CCN)(SD)

ADDRESS DEFICIENCIES ON WILLIAM HARSHA BRIDGE OVER THE OHIO RIVER.JOINT PROJECT WITH OHIO. (081B00069N)(BSBP)(SD)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH (B100); JOINT PROJECT WITHILLINOIS TO MITIGATE SCOUR (073B00100N)(BSBP)(SD)

PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM BETHEL CHURCH ROAD TO KY-1154 (MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)

PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM BETHEL CHURCH ROAD TO KY-1154 (MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)

MAJOR WIDENING OF US-62 FROM KY-998 TO PADUCAH INFORMATION AGEPARK. (12CCR)

1.000

1.600

1.600

.957

MASON

MASON

MASON

MASON

MASON

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

CR-1124

CR-1019

CR-1122

US-68

US-68

I-24

US-60

US-60

US-62

$875,000

$560,000

$60,000

$2,900,000

$9,075,000

$260,000

$4,030,000

$1,320,000

$8,080,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

D

C

D

C

C

R

U

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2020

2018

2019

2020

2020

2020

2020

2022

2023

2024

2019

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

PM

PM

BR

NH

NH

NH

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$875,000

$560,000

$60,000

$100,000

$2,800,000

$825,000

$8,250,000

$260,000

$1,320,000

$2,710,000

$1,320,000

$2,340,000

$5,740,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

01

01

01

01

8910.00

8911.00

8916.00

10013.00

20011.00

2.00

115.10

115.11

152.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

01

01

01

01

8910.00

8911.00

8916.00

10013.00

20011.00

2.00

115.10

115.10

152.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2018

2018

2018

1998

2018

2012

2016

2016

2016

2018

2018

2018

1998

1998

2012

.007

.189

1.576

18.045

0

0

.4

.4

7.851

.029

.197

1.594

18.457

10.3

1.067

1.968

1.968

8.808

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 105

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE KY-1286 (FRIENDSHIP ROAD) FROM MP 3.6 TO MP 6.4 IN PADUCAH.(PRELIMINARY ENGINEERING) (12CCR)(14CCR)(16CCN)

CONSTRUCT A DOUBLE-CROSSOVER DIAMOND INTERCHANGE ON US-60 AT THEI-24 INTERCHANGE NEAR KENTUCKY OAKS MALL.

ADDRESS DEFICIENCIES OF BRIDGE OVER BOTTOM DITCH ON KY 1954 0.7 MILENORTH OF KY 348 (073B00096N) .

ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF BOTTOM DITCH ON KY994 0.8 MI NW OF KY 348 (073B00015N)(EBRP)

ADDRESS DEFICIENCIES OF BROOKPORT-IRVIN COBB BRIDGE ON US 45 OVEROHIO RIVER. (073B00001N)(SD)

ADDRESS DEFICIENCIES ON I-24 BRIDGE OVER OHIO RIVER. JOINT PROJECTWITH ILLINOIS. (073B00100N)(BSBP)(SD)

ADDRESS DEFICIENCIES WITH BRIDGE LIGHTING ON I-24 BRIDGE OVER THEOHIO RIVER. JOINT PROJECT WITH ILLINOIS. (073B000100N)(BSBP)(SD)

ADDRESS DEFICIENCIES OF KY 339 BRIDGE OVER MASSAC CREEK. (073B00058N)

ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROMMILEPOINT 16.172 TO MILEPOINT 17.32

2.800

.407

.022

.038

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

KY-1286

US-60

KY-1954

KY-994

US-45

I-24

I-24

KY-339

I-24

$16,290,000

$3,960,000

$574,000

$959,000

$700,000

$2,000,000

$375,000

$1,102,500

$1,100,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

D

C

P

C

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2023

2024

2024

2019

2020

2019

2020

2019

2020

2019

2019

2020

2023

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

NH

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,500,000

$2,480,000

$2,310,000

$10,000,000

$3,960,000

$574,000

$168,000

$791,000

$700,000

$2,000,000

$375,000

$210,000

$892,500

$100,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

01

01

01

01

153.00

154.00

1152.00

1154.00

10004.00

10006.00

10007.00

10012.00

20017.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

01

01

01

01

01

01

153.00

154.00

1152.00

1154.00

10004.00

10006.00

10007.00

10012.00

20017.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2014

2018

2018

2018

2018

2018

2018

2018

2016

2014

2018

2018

2018

2018

2018

2018

2018

3.623

10.484

.768

2.27

12.923

0

0

5.387

16.172

6.423

10.891

.79

2.308

13.8

1

1

5.403

17.32

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 106

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 2.22 TO MILEPOINT7.70

IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARYCOUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)

IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARYCOUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)

IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARYCOUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)

BRIDGE OVER ROCK CREEK ON OLD FIDELITY-BELL FARM ROAD (CR 1239) 0.25MI W OF ROCK CREEK ROAD (CR 1236) (074C00008N)(SR=22)

ADDRESS DEFICIENCIES OF KY-1044 BRIDGE OVER MARSH CREEK. (074B00023N)

ADDRESS DEFICIENCIES OF KY-700 BRIDGE OVER INDIAN CREEK. (074B00026N)

ADDRESS DEFICIENCIES OF KY-478 BRIDGE OVER MARSH CREEK. (074B00027N)

5.480

4.566

4.566

.040

MCCRACKEN

MCCRACKEN

MCCREARY

MCCREARY

MCCREARY

MCCREARY

MCCREARY

MCCREARY

MCCREARY

US-45

US-60

KY-92

KY-92

KY-92

CR-1239

KY-1044

KY-700

KY-478

$1,100,000

$853,000

$8,000,000

$7,000,000

$9,000,000

$644,000

$626,500

$1,365,000

$696,500

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

C

C

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2019

2022

2019

2020

2021

2019

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

STP

STP

STP

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$100,000

$1,000,000

$853,000

$8,000,000

$7,000,000

$9,000,000

$196,000

$448,000

$175,000

$451,500

$210,000

$1,155,000

$175,000

$521,500

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

08

08

08

08

08

08

08

20019.00

20031.00

261.30

261.31

261.32

1065.00

10002.00

10003.00

10004.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

WHITLEY

01

01

11

08

08

08

08

08

08

20019.00

20031.00

184.20

261.31

261.32

1065.00

10002.00

10003.00

10004.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2014

2018

2018

2018

2018

2018

2018

2018

2018

2014

2018

2018

2018

2018

2018

2018

10.33

2.22

20.335

20.335

20.335

.25

4.385

14.059

8.388

10.806

7.7

24.835

24.835

24.835

.29

4.399

14.091

8.404

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RELOCATION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

0 .066Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 107

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF OVERFLOW STRUCTURE ON US-431 AT THEMUHLENBERG-MCLEAN CO LINE B00056N.

ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF POND DRAIN CREEK ONKY 2385 0.9 MI SW OF KY 81 (075B00066N)

ADDRESS DEFICIENCIES OF US-431 BRIDGE OVER DRAIN TO CYPRESS CREEK.(075B00019N)

ADDRESS DEFICIENCIES OF KY-81 BRIDGE OVER SLOUGH. (075B00026N)

ADDRESS DEFICIENCIES OF CULVERT OVER UNNAMED STREAM ON KY 823 0.5MILE WEST OF KY 2734.(082B00008N)

RESURFACING AND WIDENING EXISTING GRAVEL PARKING PULL-OFFS ANDINSTALLATION OF GUARDRAIL ALONG KY 77 AND KY 715 IN THE RED RIVERGORGE AREA IN MENIFEE, POWELL, AND WOLFE COUNTIES. (2016BOP)

ROCKFALL/SLOPE IMPROVEMENTS ALONG KY 1274 NORTH OF THE LONG BOWBOAT RAMP IN MENIFEE COUNTY. (2016BOP)

ROCKFALL/SLOPE IMPROVEMENTS ALONG KY 1274 SOUTH OF THEMENIFEE/ROWAN COUNTY LINE. (2016BOP)

.142

.080

.010

MCLEAN

MCLEAN

MCLEAN

MCLEAN

MEADE

MENIFEE

MENIFEE

MENIFEE

US-431

KY-2385

US-431

KY-81

KY-823

KY-77

KY-1274

KY-1274

$2,500,000

$1,092,000

$3,290,000

$1,137,500

$665,000

$765,000

$2,825,000

$4,510,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

C

D

C

D

C

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2019

2020

2019

2020

2019

2020

2018

2018

2018

2018

2018

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FH

FH

FH

FH

FH

FH

FH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,500,000

$308,000

$784,000

$280,000

$3,010,000

$245,000

$892,500

$105,000

$560,000

$765,000

$100,000

$100,000

$2,625,000

$250,000

$250,000

$4,010,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

04

10

10

10

1078.00

1090.00

10007.00

10008.00

1088.00

371.00

372.00

373.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MUHLENBERG

POWELLWOLFE

02

02

02

02

04

10

10

10

1078.00

1090.00

10007.00

10008.00

1088.00

371.00

372.00

373.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2014

2016

2016

2016

2018

2018

2018

2018

2014

2016

2016

2016

0

3.5

.743

5.655

.54

6.5

13.28

.071

3.58

.837

5.661

.55

8

13.378

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / FOREST HIGHWAY(P)

RELIABILITY / FOREST HIGHWAY(P)

RELIABILITY / FOREST HIGHWAY(P)

28.273 28.344Milepoints:

Milepoints:Milepoints:

To:

To:To:

From:

From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 108

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE SAFETY AND GEOMETRICS ON US-460 FROM THE END OF ROTHWELLHILL IMPROVEMENTS TO THE BRIDGE OVER BEAVER CREEK. (14CCN)(16CCR)

IMPROVE SAFETY AND GEOMETRICS ON US-460 FROM THE END OF ROTHWELLHILL IMPROVEMENTS TO THE BRIDGE OVER BEAVER CREEK. (14CCN)(16CCR)

ADDRESS DEFICIENCIES OF KY-1941 BRIDGE OVER CHAPLIN RIVER. (084B00030N)

ADDRESS DEFICIENCIES OF STRATTON RD BRIDGE OVER BRUSH CREEK.(084C00029N)

ADDRESS DEFICIENCIES OF BRIDGE OVER OIL WELL BRANCH ON KY 496 0.5MILE SE OF KY 533.(085B00025N) EBRP)(SD)

ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES OVER ROGERS CREEK ATMP 7.307. (DESIGN HANDLED UNDER 3-8506.00) 085B00010N (2014BOP)(SD)

ADDRESS DEFICIENCIES OF KY-1243 BRIDGE OVER KNOB LICK SPRINGS.(085B00034N)

ADDRESS DEFICIENCIES OF MOSBY RIDGE RD BRIDGE OVER E FORK LITTLEBARREN RVR. (085C00005N)

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 22.357 TO MILEPOINT 36.16

2.300

2.300

.020

.616

MENIFEE

MENIFEE

MERCER

MERCER

METCALFE

METCALFE

METCALFE

METCALFE

METCALFE

US-460

US-460

KY-1941

CR-1322

KY-496

KY-163

KY-1243

CR-1108

LN-9008

$9,200,000

$6,020,000

$982,000

$787,500

$462,000

$2,000,000

$420,000

$1,106,000

$12,100,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

D

C

D

C

D

C

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2021

2023

2024

2019

2020

2019

2020

2019

2020

2018

2019

2020

2019

2020

2021

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,180,000

$1,000,000

$6,020,000

$6,020,000

$300,000

$682,000

$192,500

$595,000

$175,000

$287,000

$2,000,000

$157,500

$262,500

$210,000

$896,000

$1,100,000

$11,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

07

07

03

03

03

03

03

8802.00

8802.01

10003.00

10004.00

1087.00

8506.20

10005.00

10006.00

20013.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

07

02

03

03

03

03

03

8802.00

8802.00

10003.00

10004.00

1087.00

8506.00

10005.00

10006.00

20013.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2018

2018

2018

2018

2014

2018

2018

2018

2014

2014

2018

2018

2018

2008

2018

2018

2018

6.2

6.2

3.515

.247

11.201

6.999

7.493

.181

22.357

8.5

8.5

3.531

.255

11.221

7.615

7.497

.209

36.16

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

SAFETY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 109

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2019.(12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2020.(12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2021.(12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2022.(12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2023.

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2024.

CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACINGONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)

CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACINGONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)

WIDEN KY 1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK,MONTGOMERY COUNTY (SEE 7-8501.00 FOR "SPB" FUNDS)(2005HPP-KY129)

IMPROVE US-460 AT LUCKY STOP HILL. (12CCR)

1.768

1.480

MONROE

MONROE

MONROE

MONROE

MONROE

MONROE

MONROE

MONROE

MONTGOMERY

MONTGOMERY

KY-214

KY-214

KY-214

KY-214

KY-214

KY-214

-

-

KY-1991

US-460

$444,000

$444,000

$444,000

$444,000

$444,000

$444,000

$730,000

$6,580,000

$559,899

$9,450,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2023

2024

2020

2021

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

STP

STP

HPP

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$444,000

$444,000

$444,000

$444,000

$444,000

$444,000

$730,000

$6,580,000

$559,899

$9,450,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

07

07

128.10

128.11

128.12

128.13

128.14

128.15

7020.17

7020.18

240.01

250.10

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

03

03

07

07

128.10

128.11

128.12

128.13

128.14

128.15

7020.01

7020.17

240.01

250.10

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2018

2018

2002

2018

2010

2010

2014

2014

2016

2016

2018

2018

2002

2002

2010

2010

1.737

1.737

1.737

1.737

1.737

1.737

0

18.125

1.837

1.837

1.837

1.837

1.837

1.837

1.768

19.6

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 110

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 104.26 TO MILEPOINT 112.1

RECONSTRUCT/WIDENING OF MAIN ST (KY 7) IN WEST LIBERTY BEGINNING ATRIVERSIDE DR. (CS 1058) AND EXTENDING NORTH TO 0.159 MILES NORTH OFINTERSECTION WITH CEDAR RD (CS 1053). (2014BOP)(D,R,U COMPLETED UNDER10-293)(CONSTRUCTION SEQ 2)(16CCR)

ADDRESS DEFICIENCIES OF BRIDGE OVER WHITE OAK CREEK ON US 460 0.5MILE NW OF KY 1000. (088B00021N)

IMPROVE KY-2498 FROM US-460 TO THE ARH HOSPITAL. (14CCN)(16CCN)

ADDRESS DEFICIENCIES OF BRIDGE ON KY 191 OVER CANEY CREEK .5 MILESWEST OF KY 1162. (16CCN)(SD)

ADDRESS DEFICIENCIES OF US 460 BRIDGE OVER BIG SPRING BRANCH.(088B00022N)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 57.72 TO MILEPOINT 63.08

ADDRESS PAVEMENT CONDITION ON KY-7 FROM MILEPOINT 3.90 TO MILEPOINT8.14

ADDRESS PAVEMENT CONDITION ON KY-519 FROM MILEPOINT 0.00 TOMILEPOINT 3.94

.366

.050

.519

.040

4.250

3.940

MONTGOMERY

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

I-64

KY-7

US-460

KY-2498

KY-191

US-460

KY-9009

KY-7

KY-519

$7,150,000

$3,300,000

$1,463,000

$4,490,000

$938,000

$647,500

$2,310,000

$1,207,000

$1,981,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

D

C

R

U

C

D

C

D

C

D

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2024

2024

2018

2019

2020

2022

2023

2024

2019

2020

2019

2020

2019

2019

2022

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

STP

BR

BR

SPP

SPP

SPP

BR

BR

BR

BR

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$650,000

$6,500,000

$3,300,000

$224,000

$1,239,000

$1,580,000

$350,000

$2,560,000

$182,000

$756,000

$175,000

$472,500

$210,000

$2,100,000

$1,207,000

$1,981,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

10

10

10

10

10

10

10

10

20018.00

293.10

1111.00

8804.00

8902.00

10016.00

20001.00

20014.00

20015.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

10

10

10

10

10

10

10

10

20018.00

293.00

1111.00

8804.00

8902.00

10016.00

20001.00

20014.00

20015.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2012

2014

2016

2016

2018

2018

2018

2018

2018

2012

2014

2016

2016

2018

2018

2018

2018

104.26

.134

25.74

7.2

7.813

27.809

57.72

3.9

0

112.1

.5

25.79

7.719

7.853

27.815

63.08

8.14

3.94

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 111

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

WIDEN US-62 FROM WAL-MART TO US-431.(08CCN)(10CCR)(12CCR)(14CCR)(INCLUDES 2-8301)

ADDRESS DEFICIENCIES OF UNION RIDGE RD BRIDGE OVER ROCKY CREEK.(089C00004N)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 43.424 TO MILEPOINT 45.95

IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US-150 FROM THEBLUEGRASS PARKWAY TO THE NELSON/WASHINGTON COUNTY LINE. (2016BOP)

ADDRESS DEFICIENCIES OF BRIDGES ON US 62 (HINKLE CREEK) AND KY 48 INBLOOMFIELD 090B00096N (SR 28.2) 090B00095N (12CCR)

ADDRESS DEFICIENCIES OF BRIDGE OVER FROMAN CREEK ON KY 509 0.9 MI WOF US 31E (090B00068N)

IMPROVE US-150 FROM WEST OF KY-245 THROUGH THE BLUEGRASS PARKWAYINTERCHANGE TO EAST OF LESLIE BALLARD LN (CR 1110).(06CCN)(2006BOPC)(12CCR)(14CCR)(16CCR)

ADDRESS DEFICIENCIES OF KY-52 BRIDGE OVER MONKS CREEK. (090B00033N)

ADDRESS DEFICIENCIES OF DEPOT ST BRIDGE OVER SIMPSON CREEK.(090C00045N)

1.500

5.474

.100

.018

.600

MUHLENBERG

MUHLENBERG

MUHLENBERG

NELSON

NELSON

NELSON

NELSON

NELSON

NELSON

US-62

CR-1141

WK-9001

US-150

US-62

KY-509

US-150

KY-52

CS-4003

$7,500,000

$822,500

$2,200,000

$3,650,000

$1,260,000

$861,000

$5,800,000

$1,120,000

$504,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

C

D

R

C

D

C

U

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2023

2023

2022

2024

2018

2019

2020

2020

2024

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BR

BR

PM

PM

STP

STP

BR

BR

BR

SPP

SPP

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$7,500,000

$175,000

$647,500

$200,000

$2,000,000

$1,200,000

$2,450,000

$1,260,000

$105,000

$756,000

$1,000,000

$4,800,000

$105,000

$1,015,000

$98,000

$406,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

04

04

04

04

04

04

8506.00

10009.00

20036.00

396.10

1078.00

1089.00

8309.10

10004.00

10005.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

04

04

04

04

04

04

8506.00

10009.00

20036.00

396.00

1078.00

1089.00

8309.00

10004.00

10005.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2018

2018

2016

2012

2014

2006

2018

2018

2008

2018

2018

2014

2012

2014

2006

2018

2018

16.471

2.415

43.424

1.952

27.278

3.61

1.697

12.591

.43

17.93

2.433

45.95

7.426

27.318

3.628

2.285

12.621

.444

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 112

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF POTTERSHOP LOOP BRIDGE OVER ROWAN CREEK.(090C00021N)

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 24.24 TO MILEPOINT 35.15

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 8.837 TO MILEPOINT 10.172

ADDRESS PAVEMENT CONDITION ON KY-49 FROM MILEPOINT 0.00 TOMILEPOINT 4.52

IMPROVE THE KY-36/KY-32 INTERSECTION NEAR THE NICHOLAS COUNTYSCHOOL PROPERTY. (12CCR)(16CCR)

ADDRESS DEFICIENCIES OF KY-36 BRIDGE OVER BRUSHY FORK. (091B00018N)

ADDRESS DEFICIENCIES OF DORSEY AVE BRIDGE OVER BRUSH FORK.(091C00029N)

ADDRESS DEFICIENCIES OF BRIDGE ON US 62 OVER BRANCH OF THREE LICKFORK 0.23 MILE E OF GREEN MEADOWS DR (CS 6068)092B00032 (SD)

ADDRESS DEFICIENCIES OF BRIDGE OVER THREELICK FORK ON US 62 0.4 MILE EOF GREEN MEADOWS DRIVE (CS 6068) IN BEAVER DAM. (092B00033N)

4.520

.183

.040

.074

NELSON

NELSON

NELSON

NELSON

NICHOLAS

NICHOLAS

NICHOLAS

OHIO

OHIO

CR-1128

BG-9002

BG-9002

KY-49

KY-36

KY-36

CS-1096

US-62

US-62

$318,500

$9,625,000

$1,210,000

$484,000

$2,270,000

$2,135,000

$875,000

$1,148,000

$1,337,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

C

R

U

D

C

D

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2022

2022

2019

2019

2022

2024

2024

2019

2020

2019

2020

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

PM

PM

PM

STP

STP

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$91,000

$227,500

$875,000

$8,750,000

$110,000

$1,100,000

$484,000

$1,380,000

$890,000

$525,000

$1,610,000

$280,000

$595,000

$1,148,000

$308,000

$1,029,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

09

09

09

02

02

10014.00

20022.00

20023.00

20030.00

205.00

10011.00

10012.00

1083.00

1091.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

09

09

09

02

02

10014.00

20022.00

20023.00

20030.00

205.00

10011.00

10012.00

1083.00

1091.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2012

2018

2018

2018

2018

2018

2018

2018

2018

2012

2018

2018

2018

2018

.027

24.24

8.837

0

3.1

2.96

.075

11.892

12

.033

35.15

10.172

4.52

3.283

2.972

.085

11.932

12.074

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

SAFETY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 113

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

I-65 SPUR CORRIDOR; RECONSTRUCT THE EXISTING NATCHER PARKWAY/KY-69INTERCHANGE (EXIT 50) IN OHIO COUNTY. (2016BOP)

REPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND ADDRESS SAFETYISSUES WITH BRIDGES ON KY-136 FROM KY-56 IN MCLEAN COUNTY TO US-231IN OHIO COUNTY. (14CCN)

ADDRESS DEFICIENCIES OF KY-85 BRIDGE OVER BR OF W FK LEWIS CREEK.(092B00053N)

ADDRESS DEFICIENCIES OF WEST HALLS CREEK R BRIDGE OVER BRANCH OFHALLS CREEK. (092C00001N)

ADDRESS DEFICIENCIES OF SUNNYDALE RD BRIDGE OVER BRANCH OF ROUGHRIVER. (092C00020N)

ADDRESS DEFICIENCIES OF RAILROAD BED RD BRIDGE OVER WFK ADAMSCREEK. (092C00067N)

ADDRESS DEFICIENCIES OF JOHNSON SCHOOL RD BRIDGE OVER BARASS DITCH.(092C00080N)

ADDRESS DEFICIENCIES OF ROCK CREEK LN BRIDGE OVER BR-S.FK PANTHERCK. (092C00097N)

32.218

OHIO

OHIO

OHIO

OHIO

OHIO

OHIO

OHIO

OHIO

WN-9007

KY-136

KY-85

CR-1003

CR-1067

CR-1036

CR-1414

CR-1083

$11,300,000

$8,240,000

$1,172,500

$805,000

$805,000

$945,000

$822,500

$1,050,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2019

2021

2022

2022

2024

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

SPP

SPP

SPP

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,350,000

$1,250,000

$8,700,000

$450,000

$1,250,000

$6,540,000

$210,000

$962,500

$175,000

$630,000

$175,000

$630,000

$210,000

$735,000

$175,000

$647,500

$210,000

$840,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

2092.20

8812.00

10010.00

10011.00

10012.00

10013.00

10014.00

10015.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MCLEAN

02

02

02

02

02

02

02

02

2092.00

8812.00

10010.00

10011.00

10012.00

10013.00

10014.00

10015.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2014

2018

2018

2018

2018

2018

2018

2016

2014

2018

2018

2018

2018

2018

2018

49.7

0

9.614

1.331

2.377

2.88

4.907

.007

50.1

9.6

9.627

1.338

2.386

2.892

4.92

.012

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

0 22.618Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 114

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF QUARTERHORSE LN BRIDGE OVER N FK PANTHERCREEK. (092C00133N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 65.68 TO MILEPOINT 83.3

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 83.3 TO MILEPOINT 87.544

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 49.8 TO MILEPOINT 59.86 (61.553 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION ON KY-136 FROM MILEPOINT 0.00 TOMILEPOINT 9.60

INTER-URBAN GREENWAY: CONSTRUCT A NON-MOTORIZED CORRIDOR FROMLAGRANGE TO JEFFERSON COUNTY LINE. (LOU T.I.P.)(LOCAL MATCH)(ALLWORK BY OLDHAM COUNTY)(2002BOPC) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).

OLDHAM COUNTY BICYCLE & PEDESTRIAN TRAIL - OLD LAGRANGE RD.CONSTRUCT A BICYCLE AND PEDESTRIAN TRAIL ALONG OLD LAGRANGE ROADFROM KY 146 TO THE INTERSECTION WITH KY 329 BYPASS.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP). (14CCR)

CONSTRUCT A 4-LANE UNINTERRUPTED RAIL UNDERPASS WEST OF LAGRANGE.(LOCAL MATCH)(ALL WORK BY OLDHAM COUNTY) (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP). (14CCR)

9.600

.750

OHIO

OHIO

OHIO

OHIO

OHIO

OHIO

OLDHAM

OLDHAM

OLDHAM

CR-1510

US-62

WK-9001

WK-9001

WN-9007

KY-136

-

-

CR-1002

$1,137,500

$5,500,000

$16,596,000

$4,282,000

$11,064,000

$1,177,000

$500,000

$750,000

$10,100,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

C

C

C

D

D

R

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2022

2022

2020

2020

2020

2022

2021

2019

2020

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

PM

PM

PM

PM

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$245,000

$892,500

$500,000

$5,000,000

$16,596,000

$4,282,000

$11,064,000

$1,177,000

$500,000

$250,000

$500,000

$100,000

$10,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

05

05

05

10016.00

20038.00

20039.00

20040.00

20041.00

20049.00

410.00

410.01

434.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

05

05

05

10016.00

20038.00

20039.00

20040.00

20041.00

20049.00

400.02

410.00

434.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2002

2004

2004

2018

2018

2018

2018

2018

2018

2000

2002

2004

.256

19.797

65.68

83.3

49.8

0

0

.269

25.95

83.3

87.544

59.86

9.6

.747

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / SAFETY(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 115

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

CONSTRUCT SIDEWALKS ON KY 1793 FROM RIDGEVIEW DRIVE TO SETTLERSPOINT TRAIL.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

RECONSTRUCT US 42 AND WIDEN FROM 2 LANES TO 3 LANES (3RD LANE WILL BEA CENTER TURN LANE) FROM JEFFERSON/OLDHAM COUNTY LINE TORIDGEMOOR DRIVE. PROJECT WILL INCLUDE THE CONSIDERATION OFIMPROVEMENTS TO THE HAYFIELD WAY INTERSECTION. (2004BOPC)

INTERSECTION IMPROVEMENT AT KY 22 AND KY 329 IN CRESTWOOD. (ALLWORK BY KYTC)(2006BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP)

CONSTRUCTION OF A PARK AND RIDE FACILITY INCLUDING A PARKING LOT,SHELTER, PLAYGROUND, BIKE LOCKERS, WALKWAYS, AND A 1000' ACCESSROAD LOCATED ON APPLE PATCH WAY OFF OF KY-329 NEAR I-71 EXIT 14 INCRESTWOOD.(2010BOPC)(ADDITIONAL FUNDING)(14CCN)

WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-329 (MP 14.1) TO KY-393 (MP18.0). (16CCN)

WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO KY-53 (MP 22.4).(16CCN)

WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO KY-53 (MP 22.4),INCLUDING A NEW INTERCHANGE AT MP 20.6. (16CCN)

CONSTRUCT NEW I-71 INTERCHANGE BETWEEN KY-393 AND KY-53 TO RELIEVECONGESTION IN LAGRANGE.

.286

.900

.200

.041

3.900

4.400

4.400

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

KY-1793

US-42

KY-22

CS-2102

I-71

I-71

I-71

I-71

$100,000

$5,320,000

$300,000

$1,174,800

$31,100,000

$2,750,000

$2,750,000

$12,400,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

D

R

U

C

D

D

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2018

2018

2019

2022

2022

2024

2023

2024

2018

2019

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$100,000

$5,320,000

$300,000

$1,174,800

$3,500,000

$1,900,000

$1,700,000

$24,000,000

$2,750,000

$2,750,000

$1,500,000

$3,000,000

$1,900,000

$6,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

440.10

441.01

449.00

468.10

483.10

483.20

483.21

483.30

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

440.01

441.00

965.12

468.10

483.10

483.20

483.20

483.20

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2004

2004

2014

2016

2016

2018

2018

2004

2004

2004

2014

2016

2016

2016

2016

1.542

0

3.15

0

14.1

18

18

20

1.828

.942

3.35

.041

18

22.4

22.4

21

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / NEW INTERCHANGE(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 116

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

CONSTRUCT NEW I-71 INTERCHANGE BETWEEN KY-393 AND KY-53 TO RELIEVECONGESTION IN LAGRANGE.

OLD FLOYDSBURG ROAD SAFETY IMPROVEMENTS: REPLACE NARROW ONE-LANE CULVERT CROSSING; CLEAR TREES AND VEGETATION OUT OF RIGHT-OF-WAY; ADD SHOULDER TO THE ROAD, AND ADD SIGNAGE FOR SAFETY.

INTERSECTION REALIGNMENT/RECONSTRUCTION AT KY 329 AND KY 329 BYPASS(2016BOP).

CONSTRUCTION OF A NEW CONNECTION FROM OLD LAGRANGE ROAD TO KY393 AT BUCKNER. LPA CONTRACT. (BOP2012)

CONSTRUCT 5' CONCRETE SIDEWALKS IN THE EXISTING RIGHT-OF-WAY ALONGBOTH SIDES OF SPRING HILL TRACE FROM KY 329 TO THE END OF THE EXISTINGSUBDIVISION, SLIGHTLY BEYOND SPRING HILL COURT (2014BOP).

ADDRESS DEFICIENCIES OF KY 1488 BRIDGE OVER ORGAN CREEK. (093B00048N)

IMPROVE SAFETY ON KY-22 FROM KY-227 TO KY-845.(06CCR)(08CCN)(12CCR)(14CCR)

IMPROVE SAFETY ON KY-22 FROM KY-227 TO KY-845.(06CCR)(08CCN)(12CCR)(14CCR)

ADDRESS DEFICIENCIES OF BRIDGE OVER CEDAR CREEK ON SAWDRIDGECREEK W ROAD (CR 1214) 0.2 MI N OF US 127 (094C00011N)

4.742

4.700

.040

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OWEN

OWEN

OWEN

I-71

CR-1209

KY-329

-

CS-2030

KY-1488

KY-22

KY-22

CR-1214

$6,000,000

$700,000

$320,000

$3,242,500

$520,000

$623,000

$3,500,000

$3,500,000

$672,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

R

U

R

U

C

U

C

D

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2018

2018

2019

2020

2018

2019

2019

2018

2019

2019

2020

2020

2021

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

BR

BR

SPP

SPP

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$6,000,000

$700,000

$120,000

$100,000

$100,000

$714,500

$228,000

$2,300,000

$75,000

$445,000

$280,000

$343,000

$3,500,000

$3,500,000

$672,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

06

06

06

483.31

494.00

542.00

754.00

757.00

10012.00

198.00

198.01

1088.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

06

06

06

483.30

965.12

965.14

754.00

517.00

10012.00

198.00

198.00

1088.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2014

2016

2012

2014

2018

2006

2018

2018

2018

2004

2006

2012

2014

2018

2006

2006

2018

20

1.43

7.226

0

2.031

11.315

11.315

.22

21

1.44

.45

2.037

16.057

16.057

.26

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / BIKE/PED FACIL(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 117

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY 3102 BRIDGE OVER BRUSH CREEK. (094B00034N)

ADDRESS PAVEMENT CONDITION ON KY-22 FROM MILEPOINT 11.33 TOMILEPOINT 18.56

IMPROVE KY-30 FROM KY-847 IN OWSLEY COUNTY TO JACKSON COUNTYLINE.(LET W/ JACKSON CO. SECTION UNDER 11-278.30)(SEE 10-279.60 FOR PE &ENVIR)(AR/W)(14CCR)(16CCR)

IMPROVE KY-30 FROM KY-847 IN OWSLEY COUNTY TO JACKSON COUNTYLINE.(LET W/ JACKSON CO. SECTION UNDER 11-278.30)(SEE 10-279.60 FOR PE &ENVIR)(AR/W)(14CCR)(16CCR)

IMPROVE SAFETY ON US-27 FROM BUTLER IN PENDLETON COUNTY TO SOUTHOF KY-154 IN CAMPBELL COUNTY.(12CCN)(14CCR)

ADDRESS DEFICIENCIES OF KY-159 BRIDGE OVER NORTH LITTLE KINCAID CRE.(096B00006N)

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY-15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY-15 BYPASS

IMPROVE KY-476 FROM KY-15X IN WALKERTOWN TO NORTH OF WALKERCORNETT ROAD IN WABACO.

ADDRESS DEFICIENCIES OF BRIDGE OVER NORTH FORK KENTUCKY RIVER ONKENMONT ROAD (CR 1114) 380 FT SE OF KY 7 (097C00005N)

7.230

13.562

13.562

3.340

1.243

.900

.047

OWEN

OWEN

OWSLEY

OWSLEY

PENDLETON

PENDLETON

PERRY

PERRY

PERRY

KY-3102

KY-22

KY-30

KY-30

US-27

KY-159

KY-15

KY-476

CR-1114

$2,222,500

$947,000

$14,500,000

$14,500,000

$5,000,000

$700,000

$47,000,000

$600,000

$1,624,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

C

C

C

D

C

C

D

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2022

2018

2019

2020

2019

2020

2018

2021

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

STP

STP

SPP

BR

BR

NH

STP

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$280,000

$1,942,500

$947,000

$14,500,000

$14,500,000

$5,000,000

$210,000

$490,000

$47,000,000

$600,000

$224,000

$1,400,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

10

10

06

06

10

10

10

10013.00

20052.00

279.61

279.62

8706.00

10004.00

158.00

209.00

1113.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CAMPBELL

06

06

10

10

06

06

10

10

10

10013.00

20052.00

279.60

279.62

8706.00

10004.00

158.00

209.00

1113.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2014

2016

2012

2018

2012

2018

2014

2018

2018

2014

2016

2012

2018

2012

2018

2014

3.005

11.33

0

0

17.9

4.658

13.269

0

.07

3.017

18.56

5.166

5.166

19.34

4.68

14.512

.9

.117

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(P)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

0 1.9Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 118

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE OVER STRAIGHT FORK ON LITTLELEATHERWOOD CREEK ROAD (CR 1140) AT JCT WITH KY 3348 (097C00013N)

SAFETY IMPROVEMENTS ON KY-80 FROM LESLIE COUNTY LINE TO KY-451.(16CCN)

ADDRESS DEFICIENCIES OF BRIDGE ON KY-1166 OVER RT. FK. MACES CREEK.(16CCN) 097B00110N

ADDRESS DEFICIENCIES OF BRIDGE ON KY 1166 OVER MACES CREEK. (16CCN)097B00072N (SD)

ADDRESS DEFICIENCIES OF BRIDGE OVER LEATHERWOOD CREEK. (16CCN) 097C00021N

ADDRESS DEFICIENCIES OF GEORGES BRANCH RD BRIDGE OVER GEORGESBRANCH. (097C00007N)

ADDRESS DEFICIENCIES OF OWENS BR RD BRIDGE OVER OWENS BRANCH.(097C00018N)

ADDRESS DEFICIENCIES OF HALL OLD HOME PLACE BRIDGE OVER BIG CREEK.(097C00084N)

.009

4.600

.040

.050

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

CR-1140

KY-80

KY-1166

KY-1166

CR-1150

CR-1115

CR-1145

CR-1083

$686,000

$6,730,000

$938,000

$1,000,000

$455,000

$530,000

$480,000

$788,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

R

U

C

C

R

U

C

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2020

2022

2020

2018

2019

2020

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

STP

STP

STP

STP

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$182,000

$504,000

$700,000

$350,000

$280,000

$5,400,000

$938,000

$155,000

$103,000

$742,000

$455,000

$140,000

$390,000

$140,000

$340,000

$175,000

$613,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

10

1114.00

8906.00

8910.00

8913.00

8915.00

10004.00

10005.00

10006.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

10

10

10

10

10

1114.00

8906.00

8910.00

8913.00

8915.00

10004.00

10005.00

10006.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2016

2016

2016

2016

2018

2018

2018

2014

2016

2016

2016

2016

2018

2018

2018

0

0

.64

4.283

0

.32

.121

.026

.009

4.6

.648

4.291

.05

.326

.127

.044

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 119

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY 476 BRIDGE OVER BALL FORK. (097B00007N)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 55.966 TO MILEPOINT 57.166

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

IMPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM (CR 1458) TONEAR DESKINS BRANCH CULVERT

IMPROVE KY-194 FROM US-119 RAMP NEAR SMITH FARMS BOTTOM (CR-1458) TONEAR DESKINS BRANCH CULVERT

PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARYHOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGEONLY.(14CCN)(16CCR)

PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-195 TO DUNLEARYHOLLOW. (SURFACING FOR SECTIONS 6A & 6B) (2000BOP)(14CCN)

PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARYHOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGEONLY.(14CCN)(16CCR)(ADDITIONAL FUNDING FOR C PHASE UNDER 12-263.67)

PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARYHOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGEONLY.(14CCN)(16CCR)(ADDITIONAL FUNDING FOR C PHASE UNDER 12-263.67)

3.049

2.049

.400

3.400

.400

PERRY

PERRY

PERRY

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

KY-476

HR-9006

KY-80

KY-194

KY-194

US-460

US-460

US-460

US-460

$1,050,000

$550,000

$200,000

$10,420,000

$6,760,000

$10,000,000

$9,000,000

$10,000,000

$10,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

R

U

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2024

2024

2019

2019

2020

2021

2023

2024

2021

2024

2022

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

PM

PM

SPP

SPP

SPP

SPP

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$210,000

$840,000

$50,000

$500,000

$100,000

$100,000

$2,100,000

$1,560,000

$6,760,000

$6,760,000

$10,000,000

$9,000,000

$10,000,000

$10,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

12

12

12

12

12

12

10017.00

20002.00

20003.00

198.00

198.01

263.67

263.69

263.95

263.96

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

12

12

12

12

12

12

10017.00

20002.00

20003.00

198.00

198.00

263.60

263.60

263.67

263.67

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2014

2018

2006

2000

2018

2018

2018

2018

2018

2014

2014

2000

2000

2006

2006

12.419

55.966

7.9

17.951

17.951

12.435

57.166

8.4

21

21

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / SURFACE(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 120

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARYHOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGEONLY.(14CCN)(16CCR)(ADDITIONAL FUNDING FOR C PHASE UNDER 12-263.67)

IMPROVE SAFETY AND REDUCE CONGESTION AT THE US-460 AND KY-1460INTERSECTION.

MARION BRANCH INDUSTRIAL PARK ACCESS ROAD.

MARION BRANCH INDUSTRIAL PARK ACCESS ROAD. (ADDITIONAL FUNDING FOR12-347.00)

ADDRESS DEFICIENCIES OF BRIDGE ON KY-610 (MP 8.146) OVER LONG FORK; .1MI S OF JCT KY-1469; (AR/W)098B00069N

ADDRESS DEFICIENCIES OF BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOONCREEK AT INTERSECTION WITH COON CREEK (CR 1371) 098B00093N

ADDRESS DEFICIENCIES OF BRIDGE OVER LEVISA FORK ON SOUTH RIVER ROADCONNECTOR (CR 1181-70) AT JCT WITH US 460 NEAR VIRGINIA STATE LN(098C00088N)

ADDRESS DEFICIENCIES OF BRIDGE OVER BLACKBERRY CREEK ON BIG BLUESPRINGS ROAD (CR 1801) AT JCT WITH KY 1056 (098C00028N)

IMPROVE CONNECTIVITY BETWEEN THOMPSON ROAD AND US-23 ATSTONECOAL.(12CCN)(14CCR)(16CCR)

.200

.100

.040

.038

.265

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

US-460

US-460

-

-

KY-610

KY-1441

CR-1181

CR-1801

CS-1215

$10,000,000

$2,270,000

$6,000,000

$6,000,000

$770,000

$665,000

$980,000

$210,000

$5,890,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

C

C

C

C

C

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2024

2021

2022

2022

2024

2019

2020

2018

2018

2019

2019

2024

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

SPP

SPP

BR

BR

BR

BR

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$10,000,000

$240,000

$400,000

$160,000

$1,470,000

$6,000,000

$6,000,000

$770,000

$665,000

$980,000

$210,000

$600,000

$5,290,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

12

263.97

346.00

347.00

347.01

1104.00

1115.00

1122.00

1123.00

8705.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

12

263.67

346.00

347.00

347.00

1104.00

1115.00

1122.00

1123.00

8705.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2010

2012

2014

2014

2012

2006

2018

2018

2018

2010

2012

2014

2014

2012

2.57

8.096

10.279

.04

.005

2.77

8.196

10.319

.078

.027

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MINOR WIDENING(O)

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / NEW ROUTE(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 121

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY-199 BRIDGE OVER PINSONS CREEK. (098B00032N)

ADDRESS DEFICIENCIES OF KY-199 BRIDGE OVER POND CREEK. (098B00036N)

ADDRESS DEFICIENCIES OF KY-3419 BRIDGE OVER LEFT FK BLACKBERRY CR.(098B00180N)

ADDRESS DEFICIENCIES OF PIGEON ROOST RD BRIDGE OVER BIG CREEK.(098C00005N)

ADDRESS DEFICIENCIES OF MULLEN FRK BRIDGE OVER POND CREEK.(098C00021N)

ADDRESS DEFICIENCIES OF BEEFHIDE CRK BRIDGE OVER BEEFHIDE CREEK.(098C00119N)

ADDRESS DEFICIENCIES OF ELWOOD RD BRIDGE OVER SHELBY CREEK.(098C00080N)

ADDRESS DEFICIENCIES OF RIGHT FORK OF BRUS BRIDGE OVER LEFTFK.BRUSHY FORK. (098C00091N)

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

KY-199

KY-199

KY-3419

CR-1517

CR-1545

CR-1906

CR-1789

CR-1360Q4

$659,400

$471,100

$828,450

$546,700

$707,280

$681,100

$1,123,080

$602,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$484,400

$140,000

$331,100

$210,000

$618,450

$157,500

$389,200

$140,000

$567,280

$175,000

$506,100

$192,500

$930,580

$157,500

$444,500

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

10008.00

10009.00

10010.00

10011.00

10012.00

10013.00

10024.00

10025.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

10008.00

10009.00

10010.00

10011.00

10012.00

10013.00

10024.00

10025.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

8.876

6.591

11.321

.083

.004

1.424

.024

.049

8.882

6.597

11.329

.089

.014

1.43

.04

.057

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 122

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF CANEY HWY #1 BRIDGE OVER CANEY CREEK.(098C00113N)

ADDRESS DEFICIENCIES OF DESKINS RD BRIDGE OVER JOHNS CREEK.(098C00170N)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

IMPROVE SAFETY AND GEOMETRICS, AND REDUCE CONGESTION KY-213 FROMKY-11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)

IMPROVE SAFETY AND GEOMETRICS, AND REDUCE CONGESTION KY-213 FROMKY-11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)

IMPROVE SAFETY AND LEVEL OF SERVICE ON KY-213 IN POWELL COUNTYFROM SONS ROAD TO REED COURT.

CORRECT FLOODING ISSUES ON KY-2026 FROM KY-11 TO THE RED RIVER INCLAY CITY.

3.676

3.676

.526

.336

PIKE

PIKE

PIKE

PIKE

POWELL

POWELL

POWELL

POWELL

CR-1911

CR-1460

US-23

US-119

KY-213

KY-213

KY-213

KY-2026

$670,250

$1,102,500

$5,775,000

$1,925,000

$7,100,000

$6,000,000

$520,000

$1,950,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

R

U

C

C

D

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2020

2020

2021

2021

2019

2019

2020

2021

2023

2019

2020

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

PM

PM

PM

PM

SPP

SPP

SPP

SPP

STP

STP

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$140,000

$530,250

$227,500

$875,000

$525,000

$5,250,000

$175,000

$1,750,000

$4,000,000

$1,100,000

$2,000,000

$6,000,000

$520,000

$500,000

$200,000

$150,000

$1,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

10

10

10

10

10026.00

10027.00

20002.00

20003.00

163.00

163.01

210.00

211.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

10

10

10

10

10026.00

10027.00

20002.00

20003.00

163.00

163.00

210.00

211.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2012

2018

2018

2018

2018

2018

2018

2018

2012

2012

2018

2018

.309

.03

29.5

10.4

7.595

7.595

6.371

0

.323

.058

32.78

12.4

11.271

11.271

6.897

.381

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

SAFETY / SAFETY(P)

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / RECONSTRUCTION(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 123

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY-599 BRIDGE OVER CANE CREEK. (099B00069N)

ADDRESS DEFICIENCIES OF KY-2026 BRIDGE OVER RED RIVER. (099B00090N)

ADDRESS DEFICIENCIES OF KY 3354 BRIDGE OVER CAT CREEK. (099B00081N)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 11.91 TO MILEPOINT 19.15

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 19.15 TO MILEPOINT 22.307

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 22.307 TO MILEPOINT 27.376

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 27.376 TO MILEPOINT 32.788

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 32.788 TO MILEPOINT 36

POWELL

POWELL

POWELL

POWELL

POWELL

POWELL

POWELL

POWELL

KY-599

KY-2026

KY-3354

KY-9000

KY-9000

KY-9000

KY-9000

KY-9000

$945,000

$1,330,000

$735,000

$6,380,000

$2,750,000

$4,510,000

$5,416,000

$3,025,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2022

2022

2023

2023

2019

2019

2020

2023

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

PM

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$770,000

$210,000

$1,120,000

$175,000

$560,000

$580,000

$5,800,000

$250,000

$2,500,000

$410,000

$4,100,000

$5,416,000

$275,000

$2,750,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

10

10007.00

10008.00

10018.00

20004.00

20005.00

20006.00

20007.00

20008.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

10

10

10

10

10

10007.00

10008.00

10018.00

20004.00

20005.00

20006.00

20007.00

20008.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

.908

.381

4.095

11.91

19.15

22.307

27.376

32.788

.926

.411

4.103

19.15

22.307

27.376

32.788

36

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 124

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE KY-461 FROM KY-80 TO BUCKCREEK BRIDGE, INCLUDING INTERCHANGEAT KY-80.

IMPROVE KY-461 FROM KY-80 TO BUCK CREEK BRIDGE, INCLUDINGINTERCHANGE AT KY-80.

SAFETY PROJECT TO RECONSTRUCT KY 635 TO ELIMINATE AT GRADERAILROAD CROSSING AND REPLACE WITH RAILROAD SEPARATION CROSSINGAT SCIENCE HILL, KENTUCKY IN PULASKI COUNTY. (2016BOP)

ADDRESS PAVEMENT CONDITION ON US-27 FROM MILEPOINT 0.00 TO MILEPOINT6.78

ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 0.00 TO MILEPOINT11.00

TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 6 LANES FROM 1MI N SAND HILLROAD UNDERPASS N TO 1.1 MILES N OF THE US-25 I-CHNG AT MT. VERNON.(16CCR)

IMPROVE KY-461 FROM US-150 TO THE EXISTING FOUR LANE APPROACH AT US-25.(16CCN)

IMPROVE KY-461 FROM US-150 TO THE EXISTING FOUR LANE APPROACH AT US-25.(16CCN)

3.879

3.879

1.286

6.780

11.000

4.355

PULASKI

PULASKI

PULASKI

PULASKI

ROBERTSON

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

KY-461

KY-461

KY-635

US-27

US-62

I-75

KY-461

KY-461

$17,500,000

$4,500,000

$9,600,000

$2,708,000

$863,000

$41,110,000

$4,880,000

$2,570,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

R

U

C

C

C

C

D

R

U

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2021

2024

2022

2022

2020

2020

2022

2022

2022

2018

2019

2022

2023

2023

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

RRS

RRS

RRS

PM

PM

NH

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,000,000

$1,500,000

$13,000,000

$3,000,000

$1,500,000

$1,800,000

$1,300,000

$6,500,000

$2,708,000

$863,000

$41,110,000

$1,200,000

$1,450,000

$2,230,000

$1,450,000

$1,120,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

08

08

06

08

08

08

59.25

59.26

9010.00

20008.00

20053.00

6.10

8952.00

8952.01

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

99

08

06

08

08

08

59.10

59.26

352.13

20008.00

20053.00

6.00

8952.00

8952.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2016

2018

2018

1998

2016

2018

2000

2018

2012

2018

2018

1998

2016

2018

0

0

6.9

0

0

55.745

7

7

3.879

3.879

8.186

6.78

11

60.1

9.404

9.404

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / SAFETY-RR SEPARATN(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 125

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY 1326 BRIDGE OVER LITTLE RENFRO CREEK.(102B00026N)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 52.05 TO MILEPOINT 55.295

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 71.668 TO MILEPOINT 73.408

ADDRESS PAVEMENT CONDITION

IMPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)

IMPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)

CONSTRUCT TURN LANES INTO LAKESIDE CHRISTIAN ACADEMY TO IMPROVESAFETY.(12CCR)

IMPROVE SAFETY AND CONNECTIVITY AND REDUCE CONGESTION ON KY-377FROM KY-32 TO NORTH OF KY-799. (08CCN)(10CCR)(16CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON LITTLE PERRY ROAD OVER TRIPLETTCREEK.(16CCN)

1.922

1.922

.300

8.200

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROWAN

ROWAN

ROWAN

ROWAN

ROWAN

KY-1326

I-75

I-75

US-25

KY-32

KY-32

US-60

KY-377

CR-1025

$280,000

$4,290,000

$2,310,000

$1,925,000

$10,000,000

$10,000,000

$520,000

$15,000,000

$822,500

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2019

2020

2020

2020

2020

2020

2021

2018

2024

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

PM

PM

PM

PM

PM

PM

SPP

SPP

SPP

STP

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$70,000

$210,000

$390,000

$3,900,000

$210,000

$2,100,000

$175,000

$1,750,000

$10,000,000

$10,000,000

$520,000

$15,000,000

$822,500

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

08

08

09

09

09

09

09

10010.00

20003.00

20004.00

20005.00

204.00

204.01

227.00

8406.00

8914.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

08

08

09

09

09

09

09

10010.00

20003.00

20004.00

20005.00

204.00

204.00

227.00

8406.00

8914.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2012

2018

2012

2008

2016

2018

2018

2018

2018

2012

2012

2012

2008

2016

3.584

52.05

52.05

20.404

2.235

2.235

5.25

0

.081

3.588

55.295

55.295

27.052

4.157

4.157

5.8

8.3

.089

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 126

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 128.96 TO MILEPOINT 134.75

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 141.5 TO MILEPOINT 147.95

CONSTRUCT A NEW INTERCHANGE AT THE CUMBERLAND PARKWAYINTERSECTION WITH KY-910 AT WINDSOR. (08CCN)(10CCR)

RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RDINTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OFCUMBERLAND RIVER (SEE 8-108&8-115 FOR PE/PH.2)(12CCR)(14CCR)

RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RDINTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OFCUMBERLAND RIVER (SEE 8-108&8-115 FOR PE/PH.2)(12CCR)(14CCR)

RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RDINTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OFCUMBERLAND RIVER (SEE 8-108&8-115 FOR PE/PH.2)(12CCR)(14CCR)

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 62.544 TO MILEPOINT 72.087

ADDRESS PAVEMENT CONDITION ON US-127 FROM MILEPOINT 19.03 TOMILEPOINT 26.21

GEORGETOWN NORTHWEST BYPASS: IMPROVE CONNECTIVITY AND MOBILITYNORTHWEST AROUND GEORGETOWN FROM KY-32 TO I-75.(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP" COMPONENT)(10CCR)(12CCR)(16CCR)

2.520

2.520

2.520

7.190

ROWAN

ROWAN

RUSSELL

RUSSELL

RUSSELL

RUSSELL

RUSSELL

RUSSELL

SCOTT

I-64

I-64

LN-9008

US-127

US-127

US-127

LN-9008

US-127

-

$5,225,000

$5,775,000

$6,740,000

$9,320,000

$8,280,000

$8,280,000

$8,525,000

$1,549,000

$5,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

C

C

C

D

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2023

2023

2022

2022

2018

2019

2020

2021

2023

2023

2022

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

SPP

NH

NH

NH

PM

PM

PM

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$475,000

$4,750,000

$525,000

$5,250,000

$6,740,000

$9,320,000

$8,280,000

$8,280,000

$775,000

$7,750,000

$1,549,000

$5,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

08

08

08

08

08

08

07

20012.00

20014.00

8502.00

8601.21

8601.23

8601.24

20007.00

20009.00

102.50

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

08

08

08

08

08

08

07

20012.00

20014.00

8502.00

8601.21

8601.21

8601.21

20007.00

20009.00

102.01

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2008

2012

2018

2018

2018

2018

2004

2018

2018

2008

2012

2012

2012

2018

2018

1996

128.96

141.5

70.3

0

0

0

62.544

19.03

134.75

147.95

71.24

2.5

2.5

2.5

72.087

26.21

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ECONOMIC DEVELOPMENT / NEW INTERCHANGE(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / BYPASS(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 127

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

GEORGETOWN NORTHWEST BYPASS: IMPROVE CONNECTIVITY AND MOBILITYNORTHWEST AROUND GEORGETOWN FROM KY-32 TO I-75.(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP" COMPONENT)(10CCR)(12CCR)(16CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON KY 1689 OVER LECOMPTES RUN 0.46MILE W OF KY 227105B00038N

ADDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON FIELDS ROAD (CR1022) AT SCOTT/HARRISON CO LINE (105R00607N) (EBRP)

RECONSTRUCT KY-227 FROM MP 2.98 TO MP 3.34 TO IMPROVE HORIZONTALCURVE. (16CCN)

ADDRESS DEFICIENCIES OF KY-620 BRIDGE OVER ROGERS GAP CREEK.(105B00095N)

ADDRESS DEFICIENCIES OF LEMONS MILL RD BRIDGE OVER NS (CNO&TP)SYSTEM. (105C00112N)

ADDRESS DEFICIENCIES OF KY 1689 BRIDGE OVER LOCUST FORK. (105B00039N)

ADDRESS DEFICIENCIES OF HINTON RD BRIDGE OVER NS (CNO&TP) SYSTEM.(105R00605N)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 120.792 TO MILEPOINT 121.117

.040

.020

.360

SCOTT

SCOTT

SCOTT

SCOTT

SCOTT

SCOTT

SCOTT

SCOTT

SCOTT

-

KY-1689

CR-1022

KY-227

KY-620

CS-1010

KY-1689

CR-1020

I-75

$10,000,000

$462,000

$1,330,000

$200,000

$875,000

$1,645,000

$441,000

$749,000

$440,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

C

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2018

2018

2019

2018

2019

2020

2019

2020

2019

2020

2019

2020

2020

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

BR

BR

BR

STP

BR

BR

BR

BR

BR

BR

BR

BR

PM

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$10,000,000

$462,000

$210,000

$1,120,000

$200,000

$210,000

$665,000

$350,000

$1,295,000

$133,000

$308,000

$238,000

$511,000

$40,000

$400,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

102.51

1127.00

1139.00

8907.00

10005.00

10006.00

10012.00

10013.00

20019.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

07

102.50

1127.00

1139.00

8907.00

10005.00

10006.00

10012.00

10013.00

20019.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2016

2018

2018

2018

2018

2018

2004

2018

2018

2016

2018

2018

2018

2018

2018

1.801

1.19

2.98

15.923

.025

2.219

0

120.792

1.841

1.21

3.34

15.939

.045

2.227

.021

121.117

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 128

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 138.424 TO MILEPOINT 143.24

WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY-55 INTERCHANGE TOTHE KY-1790 UNDERPASS. (2006BOPC)

WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY-55 INTERCHANGE TOTHE KY-1790 UNDERPASS. (2006BOPC)

WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY 55 INTERCHANGE TOTHE KY 1790 UNDERPASS. (2006BOPC)

WIDEN I-64 TO 6 LANES FROM KY-395 TO KY-151. (2004BOPC)(DESIGN FUNDINGCOVERS 5-2035.70 SECTION ALSO)

WIDEN I-64 TO 6 LANES FROM KY-395 TO KY-151. (2004BOPC)(DESIGN FUNDINGCOVERS 5-2035.70 SECTION ALSO)(ADDITIONAL FUNDING FOR C PHASE)

WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN)(12CCR)(14CCR)(16CCR)

WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN)(12CCR)(14CCR)(16CCR)

CONSTRUCT A THIRD LANE ON US-60 FROM THE MASONIC HOME TO ROCKETLANE. (12CCN)(14CCR)

3.600

3.600

3.600

4.370

4.370

1.900

1.900

1.378

SCOTT

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

I-75

I-64

I-64

I-64

I-64

I-64

KY-53

KY-53

US-60

$6,325,000

$23,800,000

$19,800,000

$19,800,000

$16,530,000

$16,330,000

$3,000,000

$7,700,000

$2,170,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

U

C

C

C

R

U

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2024

2024

2019

2020

2022

2023

2024

2021

2021

2023

2024

2020

2021

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

NH

NH

NH

NH

NH

NH

NH

NH

NH

STP

STP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$575,000

$5,750,000

$2,000,000

$2,000,000

$19,800,000

$19,800,000

$19,800,000

$100,000

$100,000

$16,330,000

$16,330,000

$3,000,000

$7,700,000

$2,170,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

05

05

05

05

05

05

05

05

20021.00

65.40

65.41

65.42

2035.40

2035.41

8511.00

8511.01

8713.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

FRANKLIN

FRANKLIN

07

05

05

05

05

05

08

05

05

20021.00

65.20

65.40

65.40

2035.02

2035.40

8511.00

8511.00

8713.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2006

2018

2018

2004

2006

2008

2018

2012

2018

2004

2006

2006

2004

2004

2008

2012

138.424

32.3

32.3

32.3

43.33

43.33

6.064

6.064

11.5

143.24

35.9

35.9

35.9

46.303

46.303

8.006

8.006

12.878

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

46.303

46.303

47.7

47.7

Milepoints:

Milepoints:

To:

To:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 129

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF MOODY PIKE BRIDGE OVER FOX RUN CREEK.(106C00004N)

ADDRESS DEFICIENCIES OF CLORE JACKSON RD BRIDGE OVER FOX RUN CREEK.(106C00007N)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 38.18 (38 NON-CARDINAL) TO MILEPOINT 43.33 (43.892 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION ON KY-53 FROM MILEPOINT 8.01 TOMILEPOINT 13.79

IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET. (14CCN)

IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET. (14CCN)

IMPROVE US-31W FROM KY-1008 TO KY-621. (14CCN)(16CCR)

ADDRESS DEFICIENCIES OF KY-621 BRIDGE OVER SINKING CREEK. (107B00018N)

ADDRESS DEFICIENCIES OF PLEASANT HILL ROAD BRIDGE OVER MAYSBRANCH. (107C00011N)

5.790

.645

.645

2.302

SHELBY

SHELBY

SHELBY

SHELBY

SIMPSON

SIMPSON

SIMPSON

SIMPSON

SIMPSON

CR-1007

CR-1009

I-64

KY-53

KY-1008

KY-1008

US-31W

KY-621

CR-1126

$357,000

$546,000

$8,525,000

$943,000

$5,640,000

$1,670,000

$3,000,000

$490,000

$437,500

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

C

R

U

C

U

D

R

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2022

2022

2023

2022

2022

2023

2023

2021

2023

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

PM

PM

PM

SPP

SPP

SPP

SPP

STP

STP

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$140,000

$217,000

$140,000

$406,000

$775,000

$7,750,000

$943,000

$1,880,000

$560,000

$3,200,000

$1,670,000

$1,000,000

$2,000,000

$157,500

$332,500

$157,500

$280,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

03

03

03

03

03

10024.00

10025.00

20033.00

20040.00

8855.00

8855.01

8856.00

10007.00

10008.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

03

03

03

03

03

10024.00

10025.00

20033.00

20040.00

8855.00

8855.00

8856.00

10007.00

10008.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2014

2018

2014

2018

2018

2018

2018

2018

2018

2014

2014

2014

2018

2018

1.394

2.738

38.18

8.01

3.688

3.688

8.477

6.68

1.453

1.398

2.75

43.33

13.79

4.333

4.333

10.799

6.686

1.459

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 130

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROMMILEPOINT 0 TO MILEPOINT 13.71

ADDRESS DEFICIENCIES OF BRIDGE OVER BUCK CREEK ON KY 1169 75 FT EASTOF YODER TIPTON ROAD (CR 1142). (108B00022N)(EBRP)

IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY-44 NEARDUTCHMAN CREEK ROAD. (16CCN)

ADDRESS DEFICIENCIES OF KY 1169 BRIDGE OVER ELK CREEK. (108B00040N)

ADDRESS DEFICIENCIES OF WASHBURN LANE BRIDGE OVER ELK CREEK.(108B00017N)(SD)

ADDRESS DEFICIENCIES OF FEATHERBED HOLW RD BRIDGE OVER LITTLE PLUMCREEK. (108C00019N)

ADDRESS PAVEMENT CONDITION ON KY-44 FROM MILEPOINT 9.93 TOMILEPOINT 14.89

HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEWCAMPBELLSVILLE BYPASS FROM KY-55 SOUTH OF CAMPBELLSVILLE TO KY-70.SECTION 1. (2010BOP)(14CCR)(16CCR)

HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEWCAMPBELLSVILLE BYPASS FROM KY-55 SOUTH OF CAMPBELLSVILLE TO KY-70.SECTION 1. (2010BOP)(14CCR)(16CCR)

.160

4.960

SIMPSON

SPENCER

SPENCER

SPENCER

SPENCER

SPENCER

SPENCER

TAYLOR

TAYLOR

I-65

KY-1169

KY-44

KY-1169

CR-1128

CR-1155

KY-44

KY-555

KY-555

$18,150,000

$742,000

$230,000

$700,000

$441,000

$777,000

$808,000

$7,600,000

$7,600,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

D

C

D

C

D

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2024

2024

2019

2020

2022

2019

2020

2019

2020

2019

2020

2023

2022

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

BR

BR

STP

BR

BR

BR

BR

BR

BR

PM

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,650,000

$16,500,000

$245,000

$497,000

$230,000

$210,000

$490,000

$192,500

$248,500

$210,000

$567,000

$808,000

$7,600,000

$7,600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

05

05

05

05

05

05

04

04

20014.00

1076.00

8955.00

10013.00

10014.00

10026.00

20041.00

142.20

142.21

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

05

05

05

05

05

05

04

04

20014.00

1076.00

8955.00

10013.00

10014.00

10026.00

20041.00

142.10

142.20

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2014

2016

2018

2018

2018

2018

2010

2018

2018

2014

2016

2018

2018

2018

2018

2006

2010

0

8.53

.28

4.639

.025

.088

9.93

13.711

8.552

.44

4.655

.033

.112

14.89

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

SAFETY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / PREFINANCD CONVRSN(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 131

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEWCAMPBELLSVILLE BYPASS FROM KY-70 TO US-68 EAST OF CAMPBELLSVILLE.SECTION 2. (2010BOP)(16CCR)

IMPROVE SAFETY, ACCESS, GEOMETRICS AND DRAINAGE ON KY-70 INCAMPBELLSVILLE FROM US-68 TO COUNTRY VIEW COURT (CS-1305)

HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY-55 FROM SOUTH OF THETAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS. (16CCN)

HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY-55 FROM SOUTH OF THETAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS. (16CCN)

ADDRESS DEFICIENCIES OF WEST MAIN STREET BRIDGE OVER BUCKHORNCRK.. (109B00051N)

ADDRESS DEFICIENCIES OF SOUTH JACKSON ST BRIDGE OVER BUCKHORNCREEK. (109C00028N)

ADDRESS DEFICIENCIES OF RATTLESNAKE RD BRIDGE OVER BUCK FORK.(110C00059N)

ADDRESS DEFICIENCIES OF ROGER Q MILL RD. BRIDGE OVER RED RIVER WFORK BRANCH. (110C00061N)

ADDRESS PAVEMENT CONDITION ON US-68 FROM MILEPOINT 0.00 TO MILEPOINT10.36

1.367

10.360

TAYLOR

TAYLOR

TAYLOR

TAYLOR

TAYLOR

TAYLOR

TODD

TODD

TODD

KY-555

KY-70

KY-55

KY-55

KY-323

CS-1241

CR-1333

CR-1233

US-68

$1,000,000

$700,000

$2,500,000

$7,000,000

$962,500

$472,500

$486,500

$542,500

$7,210,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

U

D

R

U

C

C

D

C

D

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2024

2019

2019

2020

2021

2019

2020

2019

2020

2019

2020

2019

2020

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

STP

NH

NH

NH

NH

BR

BR

BR

BR

BR

BR

BR

BR

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,000,000

$700,000

$500,000

$1,000,000

$1,000,000

$7,000,000

$157,500

$805,000

$105,000

$367,500

$192,500

$294,000

$157,500

$385,000

$7,210,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

04

03

03

03

142.30

443.00

8920.00

8920.01

10006.00

10007.00

10009.00

10013.00

20023.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

04

04

03

03

03

142.10

443.00

8920.00

8920.00

10006.00

10007.00

10009.00

10013.00

20023.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2018

2016

2018

2018

2018

2018

2018

2018

2006

2018

2016

2016

2018

2018

2018

2018

2018

0

0

0

8.731

.077

1.471

.028

0

1.367

8.003

8.003

8.737

.083

1.475

.032

10.36

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 132

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF BRIDGE ON CR-1380 (0.014) OVER DYERS CREEK111C00027N

OVERLAY BRIDGE DECK AND ADDRESS DEFICIENCIES OF EXPANSION JOINTS ONEASTBOUND I-24 BRIDGE OVER TRW RAILROAD EAST OF US 68 AT (MP 66.515).(111B00027R) (2012BOP)(SD)

ADDRESS DEFICIENCIES OF KY-139 BRIDGE OVER BURGE CREEK. (111B00012N)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 CARDINALDIRECTION(S) FROM MILEPOINT 57.39 TO MILEPOINT 69.83

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINALDIRECTION(S) FROM MILEPOINT 57.389 TO MILEPOINT 69.389

ADDRESS PAVEMENT CONDITION OF I-071 CARDINAL DIRECTION(S) FROMMILEPOINT 38.086 TO MILEPOINT 38.808

ADDRESS DEFICIENCIES OF BRIDGE ON KY-359 (MP 0.971) OVER LOST CREEK; .95MI N.E. OF JCT US-60; 113B00006N (LET W/ 2-1074)

ADDRESS DEFICIENCIES OF BRIDGE ON KY-359 (MP 1.193) OVER SINKING CREEK;1.1 MI N.E. OF JCT US-60; 113B00007N (LET W/ 2-1073)

.100

.100

TRIGG

TRIGG

TRIGG

TRIGG

TRIGG

TRIMBLE

UNION

UNION

CR-1380

I-24

KY-139

I-24

I-24

I-71

KY-359

KY-359

$521,500

$250,000

$1,277,500

$13,420,000

$13,420,000

$330,000

$434,000

$511,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

D

C

D

C

D

C

D

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2018

2019

2020

2024

2024

2024

2024

2020

2020

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$140,000

$381,500

$250,000

$280,000

$997,500

$1,220,000

$12,200,000

$1,220,000

$12,200,000

$30,000

$300,000

$434,000

$511,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

05

02

02

1160.00

2039.00

10005.00

20020.00

20022.00

20034.00

1073.00

1074.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

99

01

01

01

05

02

02

1160.00

65.10

10005.00

20020.00

20022.00

20034.00

1073.00

1074.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2008

2018

2018

2018

2018

2018

2018

.011

66.5

13.386

57.389

57.39

38.086

.921

1.143

.017

66.53

13.422

69.389

69.83

38.808

1.021

1.243

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 133

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE ROADWAY TO REDUCE FLOODING ON US-60 FROM EAST OF HOUSEBRIDGE ROAD (CR-1027) TO UNION/HENDERSON COUNTY LINE. (16CCN)

ADDRESS DEFICIENCIES OF KY-359 BRIDGE OVER LITTLE MASON CREEK.(113B00008N)

ADDRESS DEFICIENCIES OF KY 492 BRIDGE OVER WASH CREEK. (113B00054N)

IMPROVE KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEARRICHARDSVILLE TO THE BUTLER COUNTY LINE.(02CCR)(04CCR)(06CCR)(10CCR)(14CCR)

IMPROVE KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEARRICHARDSVILLE TO THE BUTLER COUNTY LINE.(02CCR)(04CCR)(06CCR)(10CCR)(14CCR)

IMPROVE US-31W FROM SOUTH OF KY-242 TO DILLARD ROAD.(12CCR)

IMPROVE US-31W FROM SOUTH OF KY-242 TO DILLARD ROAD.(12CCR)

CONSTRUCT A PEDESTRIAN UNDERPASS UNDER US-31W CONNECTINGBUCHANON PARK TRAIL TO CHANEY'S DAIRY BARN.(16CCN)

1.400

5.623

5.623

2.600

2.600

UNION

UNION

UNION

WARREN

WARREN

WARREN

WARREN

WARREN

US-60

KY-359

KY-492

KY-185

KY-185

US-31W

US-31W

US-31W

$2,700,000

$892,500

$420,000

$5,000,000

$5,000,000

$2,880,000

$6,730,000

$450,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

C

D

C

C

C

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2023

2023

2024

2019

2020

2019

2020

2022

2023

2022

2023

2022

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

BR

BR

BR

BR

STP

STP

SPP

SPP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$300,000

$150,000

$250,000

$2,000,000

$210,000

$682,500

$70,000

$350,000

$5,000,000

$5,000,000

$2,880,000

$6,730,000

$50,000

$400,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

03

03

03

03

03

8955.00

10017.00

10026.00

110.00

110.01

199.00

199.01

199.99

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

03

03

03

03

03

8955.00

10017.00

10026.00

110.00

110.00

199.00

199.00

199.99

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2018

2018

2000

2018

2012

2018

2016

2016

2018

2018

2000

2000

2012

2012

2016

23.8

6.147

6.096

6.29

6.29

4.1

4.1

4.1

25.2

6.166

6.104

11.913

11.913

6.7

6.7

4.258

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / BIKE/PED FACIL(O)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 134

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE KY-526 FROM NEAR KY-2630 TO US-31W. (2014BOP)

I-65 SPUR CORRIDOR SIGNING; EXISTING NATCHER PARKWAY FROM I-65INTERCHANGE (EXIT 2) IN WARREN CO. EXTENDING NORTH TO THE US 60INTERCHANGE IN DAVIESS CO. TO MEET INTERSTATE STANDARDS. (2016BOP)

I-65 SPUR CORRIDOR: IMPROVE THE NATCHER PARKWAY/US-231 INTERCHANGE(EXIT 9) ON THE WEST SIDE OF BOWLING GREEN. (SEE ITEM NO. 3-202 FORDESIGN) (2016BOP)

IMPROVE US-231 FROM PASCOE BLVD. TO NORTH OF CAVE MILL ROAD. (12CCN)

IMPROVE US-231 FROM PASCOE BLVD. TO NORTH OF CAVE MILL ROAD. (12CCN)

IMPROVE US-31W FROM CAMPBELL LANE (US-231) TO UNIVERSITY BOULEVARD(US-231X). (14CCN)(16CCR)

IMPROVE US-31W FROM CEMETERY ROAD (KY-234) TO US-68 IN BOWLINGGREEN, AND IMPROVE SAFETY AT THE INTERSECTION OF US-31W BYPASS ANDKY-234. (16CCN)

.183

70.185

.998

.998

1.256

.971

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

KY-526

WN-9007

WN-9007

US-231

US-231

US-31W

US-31W

$410,000

$2,150,000

$8,200,000

$5,100,000

$870,000

$8,000,000

$14,100,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

U

C

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2019

2020

2019

2021

2018

2019

2021

2019

2019

2024

2019

2021

2021

2023

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

NH

NH

NH

NH

NH

SPP

SPP

SPP

STP

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$70,000

$180,000

$160,000

$2,150,000

$8,200,000

$2,500,000

$2,600,000

$870,000

$1,750,000

$2,000,000

$4,250,000

$800,000

$2,500,000

$3,000,000

$7,800,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

322.00

2042.11

2042.20

8702.00

8702.01

8857.00

8904.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BUTLEROHIODAVIESS

99

03

03

03

03

03

03

86.12

2042.10

2042.00

8702.00

8702.00

8857.00

8904.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2016

2016

2012

2018

2014

2016

2002

2016

2016

2012

2012

2014

2016

6.2

2.473

9.4

9.455

9.455

10.561

13.698

6.383

20.246

9.6

10.453

10.453

11.817

14.669

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MINOR WIDENING(O)

ECONOMIC DEVELOPMENT / SIGNING(P)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

20.24637.14361.557

37.14361.55772.264

Milepoints:Milepoints:Milepoints:

To:To:To:

From:From:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 135

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE MOBILITY AND REDUCE CONGESTION ON US-31W FROM US-68 TOMIZPAH. (16CCN)

ADDRESS DEFICIENCIES OF HAMMET HILL ROAD BRIDGE OVER SALT LICKCREEK. (114B00071N)

ADDRESS DEFICIENCIES OF KY 1435 BRIDGE OVER GASPER RIVER. (114B00074N)

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROMMILEPOINT 13.711 TO MILEPOINT 25

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROMMILEPOINT 35.616 TO MILEPOINT 42.89

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 2.473

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 9.2 TO MILEPOINT 20.246

IMPROVE US-150 FROM SPRINGFIELD TO BARDSTOWN.

1.586

.360

12.178

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

WASHINGTON

US-31W

KY-2632

KY-1435

I-65

I-65

WN-9007

WN-9007

US-150

$4,900,000

$507,500

$1,452,500

$14,850,000

$9,570,000

$2,200,000

$11,083,000

$3,000,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

C

D

C

D

C

D

C

D

C

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2020

2020

2022

2019

2020

2019

2020

2023

2023

2019

2019

2019

2020

2020

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

BR

BR

BR

BR

PM

PM

PM

PM

PM

PM

PM

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$800,000

$900,000

$400,000

$2,800,000

$157,500

$350,000

$280,000

$1,172,500

$1,350,000

$13,500,000

$870,000

$8,700,000

$200,000

$2,000,000

$11,083,000

$3,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

04

8905.00

10014.00

10015.00

20016.00

20017.00

20018.00

20019.00

396.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

NELSON

03

03

03

03

03

03

03

04

8905.00

10018.00

10015.00

20016.00

20017.00

20018.00

20019.00

396.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2018

2018

2018

2018

2018

2018

2014

2016

2018

2018

2018

2018

2018

2014

20.904

4.96

9.445

13.711

35.616

0

9.2

0

22.49

4.966

9.481

25

42.89

2.473

20.246

6.557

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

SAFETY / RECONSTRUCTION(O)2.032 7.653Milepoints: To:From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 136

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ALONG US-150 FROM WEST OFOLD FREDERICKTOWN-BARDSTOWN ROAD (KY-1872) THROUGH GRUNDY HOMECURVE TO MAYFIELD LN (CR-1336). (2016BOP)

ADDRESS DEFICIENCIES OF BRIDGE ON KY 528 (MP 1.437) OVER ROAD RUNBRANCH.(115B00043N)

ADDRESS DEFICIENCIES OF BRIDGE ON TEXAS-MACKVILLE ROAD (CR 1140) ATMP 0.349 OVER LONG LICK CREEK.(115C00039) (16CCN)(SD)

ADDRESS DEFICIENCIES OF KY-55 BRIDGE OVER SEIBERT CREEK. (115B00026N)

ADDRESS DEFICIENCIES OF KY 1920 BRIDGE OVER DEEP CREEK. (115B00061N)

IMPROVE KY-90 FROM OLD MILL SPRINGS ROAD TO THE BRIDGE AT MP 19.5.(12CCR)(16CCR)

ADDRESS DEFICIENCIES OF BRIDGE ON CR-1136 (MP 0.225) OVER LITTLE SOUTHFORK RIVER; 0.25 MI SE OF JCT CR-5137; 116C00007N

ADDRESS DEFICIENCIES OF DODSON HOLLOW RD BRIDGE OVER MEADOWCREEK. (116C00028N)

ADDRESS PAVEMENT CONDITION ON KY-90X FROM MILEPOINT 0.00 TOMILEPOINT 3.54

2.074

1.809

.100

3.540

WASHINGTON

WASHINGTON

WASHINGTON

WASHINGTON

WASHINGTON

WAYNE

WAYNE

WAYNE

WAYNE

US-150

KY-528

CR-1140

KY-55

KY-1920

KY-90

CR-1136

CR-1016

KY-90X

$5,750,000

$1,477,000

$175,000

$598,500

$350,000

$8,440,000

$455,000

$641,000

$1,623,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

C

C

D

C

D

C

C

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2022

2022

2024

2019

2020

2020

2019

2020

2019

2020

2024

2019

2019

2020

2024

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

BR

BR

BR

BR

BR

BR

BR

SPP

BR

BR

BR

PM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$500,000

$750,000

$4,000,000

$175,000

$1,302,000

$175,000

$87,500

$511,000

$87,500

$262,500

$8,440,000

$455,000

$175,000

$466,000

$1,623,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

08

08

08

08

396.20

1094.00

8957.00

10008.00

10015.00

109.10

1050.00

10005.00

20010.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

04

08

08

08

08

396.00

1094.00

8957.00

10008.00

10015.00

109.00

1050.00

10005.00

20010.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2018

2018

2004

2018

2018

2018

2014

2016

2016

2018

2018

2000

2018

2018

2018

.426

1.433

.344

8.669

.017

17.691

.175

.216

0

2.5

1.441

.354

8.679

.025

19.5

.275

.224

3.54

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

SAFETY / SAFETY(P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 137

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY-1835 BRIDGE OVER SUGAR CAMP CREEK.(117B00023N)

ADDRESS DEFICIENCIES OF KY-132 BRIDGE OVER NALL DITCH. (117B00064N)

TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 INWHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN (C-COST=$87,500,000)

TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 INWHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN.

RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTYLINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1)(14CCR)

RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTYLINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1) (ADDITIONALFUNDING FOR 11-184.10)

IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON US-25W FROM KY-727 TO KY-3041. (12CCR)(16CCR)

IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON US-25W FROM KY-727 TO KY-3041. (12CCR)(16CCR)

REHAB BRIDGE ON I-75 AT MILEPOINT 27.9 OVER LYNN CAMP CREEK (SR 34.1)(B00063R AND B00063L)(SD)

8.650

8.650

4.172

4.172

2.325

2.325

WEBSTER

WEBSTER

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

KY-1835

KY-132

I-75

I-75

KY-92

KY-92

US-25W

US-25W

I-75

$875,000

$1,347,500

$19,750,000

$18,750,000

$10,000,000

$6,000,000

$10,260,000

$6,670,000

$2,800,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

R

U

C

C

C

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2021

2021

2023

2024

2019

2021

2021

2021

2022

2023

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

NH

NH

NH

NH

STP

STP

NH

NH

NH

NH

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$210,000

$665,000

$245,000

$1,102,500

$500,000

$500,000

$18,750,000

$18,750,000

$10,000,000

$6,000,000

$2,770,000

$4,160,000

$3,330,000

$6,670,000

$2,800,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

11

11

11

11

11

11

11

10018.00

10019.00

14.80

14.81

184.10

184.11

186.00

186.01

1105.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

LAUREL

LAUREL

MCCREARY

LAUREL

02

02

11

11

11

11

11

11

11

10018.00

10019.00

14.00

14.01

184.00

184.10

186.00

186.00

1105.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2000

1998

2014

2018

2012

2018

2016

2018

2018

1998

1998

2010

2014

2012

2012

2016

.385

12.304

20.2

20.2

0

0

28.1

28.1

27.85

.406

12.314

27.943

27.943

4.172

4.172

30.425

30.425

27.943

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

27.943

27.943

24.74

27.943

28.851

28.851

24.835

27.994

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

From:

From:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 138

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS DEFICIENCIES OF KY-904 BRIDGE OVER TYES FK OF BENNETTS BR.(118B00070N)

ADDRESS DEFICIENCIES OF KY-779 BRIDGE OVER BROWNS CREEK. (118B00079N)

ADDRESS DEFICIENCIES OF KY-204 BRIDGE OVER YOUNGS CREEK. (118B00084N)

ADDRESS DEFICIENCIES OF KY-2996 BRIDGE OVER WOLF CREEK. (118B00101N)

ADDRESS DEFICIENCIES OF BETHEL ROAD BRIDGE OVER PATTERSON CREEK.(118C00029N)

ADDRESS DEFICIENCIES OF RIVER ROAD BRIDGE OVER SANDERS CREEK.(118C00039N)

ADDRESS DEFICIENCIES OF US 25W BRIDGE OVER CLEAR FORK RVR.(118B00041N)

ADDRESS DEFICIENCIES OF US 25W BRIDGE OVER CLEAR FORK RIVER.(118B00042N)

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

KY-904

KY-779

KY-204

KY-2996

CR-1275

CR-1461

US-25W

US-25W

$668,500

$623,000

$1,172,500

$630,000

$455,000

$581,000

$2,135,000

$1,890,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

D

C

D

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$493,500

$175,000

$448,000

$262,500

$910,000

$175,000

$455,000

$140,000

$315,000

$175,000

$406,000

$245,000

$1,890,000

$245,000

$1,645,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

10032.00

10033.00

10034.00

10035.00

10036.00

10037.00

10044.00

10045.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

10032.00

10033.00

10034.00

10035.00

10036.00

10037.00

10044.00

10045.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

8.153

2.342

10.146

3.548

.479

.091

5.045

6.205

8.157

2.346

10.156

3.554

.487

.097

5.117

6.277

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 139

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 0 TO MILEPOINT 11.27

ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROMMILEPOINT 20.2 TO MILEPOINT 24.645

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 23.0 (25.26 NON-CARDINAL) TO MILEPOINT 28.872

ADDRESS PAVEMENT CONDITION ON KY-26 FROM MILEPOINT 5.46 TOMILEPOINT 13.33

ADDRESS PAVEMENT CONDITION ON KY-90 FROM MILEPOINT 2.78 TOMILEPOINT 8.33

ADDRESS PAVEMENT CONDITION ON US-25W FROM MILEPOINT 26.17 TOMILEPOINT 32.43

IMPROVE THE KY-191 AND KY-1812 INTERSECTION.

ADDRESS DEFICIENCIES OF KY-191 BRIDGE OVER LACEY CREEK. (119B00001N)

ADDRESS DEFICIENCIES OF KY 2491 BRIDGE OVER SWANGO FORK. (119B00058N)

7.870

5.550

6.260

.200

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WOLFE

WOLFE

WOLFE

I-75

I-75

I-75

KY-26

KY-90

US-25W

KY-191

KY-191

KY-2491

$9,900,000

$2,200,000

$3,740,000

$1,313,000

$926,000

$2,135,000

$1,240,000

$714,000

$700,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

C

C

C

D

R

U

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2022

2022

2022

2019

2019

2022

2022

2024

2023

2023

2023

2024

2019

2020

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

STP

STP

STP

STP

BR

BR

BR

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$900,000

$9,000,000

$200,000

$2,000,000

$340,000

$3,400,000

$1,313,000

$926,000

$2,135,000

$260,000

$80,000

$100,000

$800,000

$150,000

$564,000

$175,000

$525,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

10

10

10

20015.00

20018.00

20019.00

20024.00

20025.00

20026.00

212.00

10009.00

10019.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

10

10

10

20015.00

20018.00

20019.00

20024.00

20025.00

20026.00

212.00

10009.00

10019.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

2018

0

20.2

23

5.46

2.78

26.17

4.765

9.456

4.899

11.27

24.645

28.872

13.33

8.33

32.43

4.965

9.47

4.905

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

ASSET MANAGEMENT / AM-BRIDGE (P)

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 140

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 36 TO MILEPOINT 42.85

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 42.853 TO MILEPOINT 46.208

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 46.208 TO MILEPOINT 55.434

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 55.434 TO MILEPOINT 57.72

ADDRESS PAVEMENT CONDITION ON KY-15S FROM MILEPOINT 0.00 TOMILEPOINT 0.93

ADDRESS PAVEMENT CONDITION ON KY-11 FROM MILEPOINT 0.35 TOMILEPOINT 5.32

IMPROVE US 60 (VERSAILLES ROAD) FROM THE BLUEGRASSPARKWAY/HUNTERTOWN PIKE TO PISGAH PIKE.

IMPROVE KY-169 FROM NORTH OF CLEAR CREEK RD IN JESSAMINE COUNTY TONORTH OF KY-1967 IN WOODFORD COUNTY.

ADDRESS DEFICIENCIES OF THE WEISENBURG MILL ROAD BRIDGE AT THEWOODFORD/SCOTT COUNTY LINE. (10CCN)(120C00006N)

.930

4.970

1.374

3.000

.023

WOLFE

WOLFE

WOLFE

WOLFE

WOLFE

WOLFE

WOODFORD

WOODFORD

WOODFORD

KY-9000

KY-9009

KY-9009

KY-9009

KY-15S

KY-11

US-60

KY-169

CR-1015

$6,050,000

$3,025,000

$4,070,000

$990,000

$896,000

$1,228,000

$500,000

$800,000

$966,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

C

D

C

C

C

D

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2021

2022

2022

2021

2021

2019

2019

2022

2024

2019

2023

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

NH

STP

BR

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$550,000

$5,500,000

$275,000

$2,750,000

$370,000

$3,700,000

$90,000

$900,000

$896,000

$1,228,000

$500,000

$800,000

$966,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

07

07

07

20009.00

20010.00

20011.00

20012.00

20016.00

20017.00

117.00

440.00

8642.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

JESSAMINE

SCOTT

10

10

10

10

10

10

07

07

07

20009.00

20010.00

20011.00

20012.00

20016.00

20017.00

117.00

440.00

8642.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2018

2018

2018

2018

2018

2018

2006

2018

2018

2018

2018

2018

2018

2018

2018

2006

2018

2018

36

42.853

46.208

55.434

0

.35

11.238

0

2.499

41.373

46.208

55.434

57.72

.93

5.32

12.612

3

2.522

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

ASSET MANAGEMENT / AM-BRIDGE (P)

18.64

.536

19.18

.559

Milepoints:

Milepoints:

To:

To:

From:

From:

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 141

FY - FY - THRU2018 2024

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

12 JAN 2018

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 61.95 (62.05 NON-CARDINAL)TO MILEPOINT 70.70 (70.91 NON-CARDINAL)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

WOODFORD

WOODFORD

BG-9002

US-60

$7,700,000

$3,850,000

Total

Total

D

C

D

C

PHASE

PHASE

2019

2019

2020

2020

YEAR

YEAR

PM

PM

PM

PM

FUNDING

FUNDING

$700,000

$7,000,000

$350,000

$3,500,000

AMOUNT

AMOUNT

07

07

20022.00

20023.00

-

-

Purpose and Need:

Purpose and Need:

07

07

20022.00

20023.00

-

-

Parent No.:

Parent No.:

2018

2018

2018

2018

61.95

7.345

70.7

9.305

Milepoints:

Milepoints:

To:

To:

From:

From:

ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)

ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)