Transcript of PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard...
AIV 1
PACS IHDR MPE 12/13 November 2003
PACS IHDR
Integration, Qualification and Testing
Reinhard Katterloher
AIV 2
PACS IHDR MPE 12/13 November 2003
Approach to Instrument AIV: Integration, Qualification and Testing
•Integration of Instrument Subunits takes place at the individual manufactureres of the respective Subunit. Integration of PACS Units for Instrument testing takes place at MPE under it‘s responsibility.
• Qualification of Instrument Subunits and Units (performance and environmental qualification) is verified by the individual manufacturers before delivery of a Unit to MPE. Delivery reviews will be held.
• PACS Instrument Integration and Testing starts with the delivery of Units, acceptance of a Unit is based on a complete ADP and Incoming Inspection Plan.
•AIV program and updated flow charts (giving the status at the time of IHDR) will be included in AIV Plan PACS-ME-PL-018-issue1.
• Verification of PACS instrument performance is done by MPE and is based on Instrument Level Tests (ILTs) according to PACS-ME-PL-012-issue2. Test flows and schedules will be specified for all individual PACS models.
• Verification of PACS instrument performance requirements is assured by tracing the specifications listed in the PACS Calibration Document PACS-MA-GS-001 to the individual test steps carried out during ILT.
AIV 3
PACS IHDR MPE 12/13 November 2003
Content of Instrument Verification Documents
3 documents specify the PACS AIV activities on Instrument Level. The basic DDVP PACS-ME-PL-002 will not be updated any more as the general development programs are completed and remaining activities concentrate now on solving a few specific problems
• Instrument AIV Plan, describes general assembly organization, integration concept and integration sequences, but does not include the ILT related details; update to PACS-ME-PL-018 iss.1 is due
• Instrument Test Plan,covers all test activities and all test related AIV, shows the verification control matrix w.r.t. instrument models and instrument performance; update to PACS-ME-PL-012 iss.2 is due
• PACS Calibration Document, PACS-MA-GS-001 draft7 is getting permanently refined and will be used to relate instrument performance specifications to certain ILT test steps (verification control document),PCD requirements traceability matrix will be included in issue 2 of Test Plan
AIV 4
PACS IHDR MPE 12/13 November 2003
AVM WE Integration Sequence(no change since IIDR)
EGSE
Instrument Units and Simulatorsmanufactured by
PACS Consortium Partners(AIV on Unit level)
AVM-T01
Delivery Readiness Review(tests passed according tospecific unit test plans at
manufacturers site including testreports)
AVM-T02
Delivery of Units toMPE
AVM-T03
KIP
Integration with EGSEILT AVM
Replacement of simulators withfinal H/W units during AVM
AVM-T04
AVM Electronics Units; EGSE andTEI ready for
CQM + AVM Test Phase
AVM-T05
ADPs
CQM-FPUintegrated with
TC
Start CQM + AVM ILT
Test
Delivery
Action
AIV 5
PACS IHDR MPE 12/13 November 2003General Instrument AIV Sequence including ILTs
(sequence is different for individual PACS models, details see PACS-ME-PL-012 iss2)
Instrument Units manufactured byPACS Consortium Partners
AIV on Unit levelat manufacturer's site
GEN-AIV-T01
Delivery Readiness Review (acceptance tests passed
at manufacturers site)GEN-AIV-T02
Delivery of Units toMPE
GEN-AIV-T03
KIP
Integration and Instrument LevelTest (ILT-AVM +CQM / PFM / FS)
GEN-AIV-T04
Delivery toESA
GEN-AIV-T05
Cleaning andInspection
KIP
Cryovibration at CSL
ADPs
EIDPEMC at MPE
Functional and performancetests at MPE
Spectral calibrationat LENS
Test
Delivery
Action
EGSE
Delivery Readiness Review
GEN-AIV-T0X
AIV 6
PACS IHDR MPE 12/13 November 2003
Compatibility of CQM+AVM Test Program with current test time limitation
• Fairly comprehensive CQM characterisation program can be carried out
• CQM schedule is very tight because start date is dictated by late deliveries of subunits and a quite pressing delivery date of AVM and CQM to ESA
• Proposed 25 % shortening of CQM ILT program compared to PFM ILT program is achieved by reducing the test parameter space and not doing a perfect wavelength calibration with TUFIR facility
results in less information concerning calibration accuracy, e.g., linearity, wavelength accuracy, sample points in calibration curves etc.
provides a good information on design verification and instrument characterisation (but, search for spectral ghosts in the FPU spectrometer section is not possible).
maintains the chance of not missing a last feed-back to a PFM FPU improvement (e.g., baffling)
AIV 7
PACS IHDR MPE 12/13 November 2003
Overall Configuration of ILT Set-up during AVM+CQM, FM, FS
IFSI
CSL
CEA
MPE
SpacecraftSimulator
CDMS
DPU SPU DEC/MEC
BOLC
FPU
CVV16 connectorseach 128 pins
MPE
CEA
CSL
IAC
Power Supply 4x
EGSE(SCOS2000)
MPE/SRON
MPE TE I/F
PC (LabView) Test
Equipment
MPE (Ethernet)
cryoOGSE
Gas cell (MPE)for all models
MPE E:\input Testplan\ILT Set-up
Suppliespower 230 V 1 phasepower 400 V 3 phase
LNLHe
Data link
2
Test Cryostat MPECSL
MPE MPE
CEA
MPE
CSL
IFSICSL
MPE
RAL
MPE(Ethernet)
MPE
MPE
MPE or LENS
MPE TUFIR (LENS)for FM/FS only
AIV 8
PACS IHDR MPE 12/13 November 2003FPU STM Upgrade and Cryogenic Vibration
Sequence(STM cryovibration foreseen to replace CQM cryovibration, RFW-007
issued)
FPU STMcryovibrationqualification
FPU STMvisual inspection
electrical checkoutat room
temperature
FPU STMupgrade withSTM subunits
FPU STMwarm vibration
qualification
STM vibration sequence.vsd
FPU STMshipment to CSL
warm-upcool-down
AIV 9
PACS IHDR MPE 12/13 November 2003
CQM+AVM Instrument Integration and Test Sequence
FPU CQMverified
at KT
ILT1, ILT2functional test
perform ance test short spectral cal.
ILT3wavelengthcalibration
CQM
ILT EMC test
FPUdelivery to MPE
EGSE readyOGSE readyMGSE ready
KIP
AVM of
DECMECBOLC
DPU/SPU/W IHEM of QM1 of
cool-downwarm-up
cool-down
KIP
to Delivery
ESA
E :\input testp lan\CQ M tes t.cdr
IST(EQM)
warm-up
AIV 10
PACS IHDR MPE 12/13 November 2003
EMC Test Sequence during ILT
EMC Conducted Emission and Susceptibility Test (common mode) on Signal Reference - steady state & - transients
AIV 13
PACS IHDR MPE 12/13 November 2003
PFM Instrument Integration and Test Sequence
FPU PFMverified
at KT
FPUcryovibration
ILT3wavelength calibration
PFM
IST
FPU shipment
to external facilityat CSL
KIPdelivery
ESAto
PACS+EGSE+OGSEshipmentLENS Italy to
FPUshipment to MPE
EGSE readyOGSE ready
KIP
cool-down
warm-up
cool-down
warm-up
cool-down
warm-up
E :\input testp lan\P FM test.cdr
QM2 ofBOLC/
FM of DEC MEC/DPU/SPU/W IH
cool-down
warm-up
AIV 16
PACS IHDR MPE 12/13 November 2003
FS Instrument Integration and Test Sequence
cryovibrationof FPU FS
at CSL , CQMwas not cryovibr.
ILT1, ILT2functional test
performance test short spectral cal.
ILT3wavelengthcalibration
FS
PACS+EGSE+OGSEshipment LENS Italyto
FPU FSdelivery to MPE
KIPDelivery
ESA to
QM ofDECMEC/DPU/
BOLC / WIH/EM of SPU
cool-downwarm-up
E :\input testp lan\FS test.cdr
FPU FSassembly
at KT
remove+refurbishQM arrays to FS chopper, grating,
filter wheels
redelivery ofFPU CQM from ESA
delivery to KT
verification ofinternal and
external alignmentat KT
KIP
cool-downwarm-up
cool-downwarm-up