001
INDEX OF SHEETS
SHEET SHEET TITLE DATE
X-01 COVER SHEET
G-01 PROJECT MAP
G-02 GENERAL NOTES
G-03 MATERIAL AND QUANTITIES
G-04 MATERIAL AND QUANTITIES
G-05 MATERIAL AND QUANTITIES
G-06 WORK LIST
C-01 DRAINAGE CONSTRUCTION
C-02 CMP TABLES
C-03 CMP BANDS
C-04 ROAD SURFACING
C-05 ROCK-ARMORED CROSSING
C-06 ROLLING DIP AND WATERBAR DETAIL
C-07 DITCH AND SWALE DETAIL
C-08 EROSION CONTROL
015
FROM THE AMADOR RANGER DISTRICT OFFICE, TURN RIGHT ONTO
STATE HIGHWAY 88 E. TRAVEL APPROXIMATELY 19 MILES TO BEAR
RIVER ROAD. PROJECT AREA BOUNDED BY HWY 88 ON THE NORTH,
MOKELUMNE WILDERNESS ON THE EAST, SALT SPRINGS ROAD
(08N50) ON THE SOUTH AND PANTHER CREEK ROAD (08N05) ON THE
WEST.
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
FOREST SUPERVISOR
DATE
DATE
DATE
DATE
12/10
/18 14
:58 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\FS_
COVE
R.DW
G;
CULVERT REPLACEMENT AND
MAINTENANCE
CALIFORNIA
AMADOR
ELDORADO NATIONAL FOREST
PACIFIC SOUTHWEST
AMADOR DISTRICT OFFICE
26820 SILVER DRIVE
PIONEER, CA 95666
M o k e l umneM o k e l umneW i l d e rnessW i l d e rness
08N18B
08N93
08N5
0D
08N20A
08N50J
08N42D
08N75C
09N24
09N2
5F
08N1
6FA
08N50F
08N5
0N
08N50E
08N42F
08N50A
08N21A
08N50G
08N50K
08N29C
08N0
9A
08N81
08N33B
09N17V
08N09B
09N24B
08N7
1B
08N68B
08N9708N
05G
08N2
0F
08N29B
08N79
08N51
08N2
1B
08N44D
08N72C
08N84B
08N1
4F
08N77
08N3
8E
08N0
3B
09N17Z
08N0
1A
08N06A
09N17M
08N38A
08N75B
09N17L 08N03H
09N1
4
08N92A
07N0
3A
09N17E
09N25D
08N7
0B
08N1
0A
08N1
8A
08N0
8A
08N8
3B
08N05A
08N44B
09N24A
09N40B
08N6
5
08N03FS
08N16F
07N02F
08N35A
08N3
5C
08N14D
08N27
08N32A
08N30C
08N03C
08N1
6E
09N17P
08N15A
08N35B
08N07A
09N17R
07N0
4A
08N2
6C
08N03A
08N8
4A
08N3
3A
08N29E08
N30B
08N02A
09N17T
08N5
0P
08N2
5K08N26B
08N21E
08N25B
08N7
0A
09N25E
08N0
5J
08N75AW
08N65B
08N65A
08N33C
08N3
8B
08N82
08N3
1A
08N1
6B
08N8
3A
08N0
3FW
08N66A
08N12
09N25B
09N17F
08N83C
07N04
08N2
0H
08N05K
08N14A
09N7
6B 09N14H
08N20C
09N7
8A
08N25D
09N17G
08N65
08N75A
09N96
08N25G
09N17MS
08N22
08N03D
08N24A
09N76C
07N01
08N08
08N30A
08N16D
08N07
08N17
08N2
0J
09N8
2
08N5
0
08N45
08N14B
08N5
2A
09N25G
08N03J
08N24
08N68A
08N13
08N66
08N25A
07N0508
N20
08N28B
08N42C
08N37A
09N25A
08N25CA
08N14H
08N19B
09N41
08N83
08N14G
08N16A
08N31B
08N50C
08N23C
08N1
508N34 08N02
09N76
08N4
0
08N52
08N09
08N39
08N1
9
08N10
08N25C
08N21
08N1608N16C
AMA-245
08N05B
08N84
07N02
08N92
08N68
09N40
08N33
08N30
08N35
08N23A
AMA-
246
09N84
08N31
08N44
08N06
08N03F
08N3608N7508N14
09N13
08N28
08N23
08N38
08N80
08N26
07N03
08N11
08N23B
08N70
08N18
09N77
08N32
08N37
08N71
08N72
AMA-244
08N03
08N42
08N29
09N25
08N25
09N17CA-88
08N05
12
3
4
5 6
7
89
1011 12
13
14
15
16
17
18
19
20
21 22
2324
2526
27
28
29
30
31
32
33 34
35 3638
39
40
41
424344
45
46
47
48
49 5051
52
53
54
55
56
57
58
59
60
61
62
63
0 1.5 30.75Miles
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 15
:13 R
ESPI
NOZA
02 D:\T
RANS
PORT
ATIO
N\PO
WERF
IRE\
CULV
ERTI
MPRO
VEME
NTS\D
RAWI
NGS\C
ULVE
RTIMP
ROVE
MENT
TYPIC
ALS.D
WG;
R5PACIFIC SOUTHWEST
CULVERTRECONSTRUCTIONAND MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
PROJECT MAP
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX002
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 14
:35 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTREPLACEMENT AND
MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
GENERAL NOTES
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
G-02
15003
GENERAL NOTES
ABBREVIATIONS
*Not all abbreviations may apply to project*
C.M.P. = Corrugated Pipe
C.M.P.A. = Corrugated Metal Pipe Arch
DI = Drop Inlet
IB = Inlet Basin
CB = Catch Basin
AC = Asphalt Concrete
AB = Aggregate road base
C.Y. = Cubic yard
L.F. = Linear Foot
EXIST = Existing feature
EOP = End of Project
CONST = Construct or install feature
RECONST = Reconstruct existing feature
MAINT = Maintain existing feature
WB = Waterbar
MEIOC - Maintain existing inslope/outslope configuration
RR = RIPRAP - Class II
TS = Tree and stump removal
- If preceded by a number - indicates number of trees. Typically within 100 lf of station.
- If only TS displayed , DBH = 11" to 23" DBH tree
- If followed by a 'M' = 24" to 36" DBH tree to be removed
- If followed by a 'L' = Over 36" DBH tree
- If only TS displayed , DBH = 11" to 23" DBH tree
· Locations of work to be done will be staked on the ground by the Government prior to
implementation. Contractor shall provide 2 week notice prior to start of operations to ensure
timeliness of staking.
· Culvert lengths are approximate. Contractor shall verify necessary lengths prior to ordering.
· Existing culverts that are to be replaced shall be removed from government land at Contractor's
expense. Unless otherwise shown in the Schedule of Items, disposal is incidental to other Pay Items.
· Fill slopes are 1 1/2:1, back slopes are 1:1, unless otherwise SHOWN ON THE DRAWINGS.
· Suitable material removed from construction operations may be incorporated into culvert backfill.
· Unsuitable material shall be sidecast from the roadbed but not within 150 LF of any drainage.
· Commercial rock sources shall be obtained from an approved source, certified weed free and
certified to contain no more than 0.25% asbestos to be in compliance with California Health and
Safety Code Sections 93105 and 93106.
Rock Source include: Teichert Aggregates, George Reed, or other approved site.
· Rock source submittals are required. Weight tickets for material from commercial sources are
required for payment. Weight tickets shall specify which road the rock products were delivered to.
Failure to comply may lead to a delay in payment for rock and associated work.
· Forest Service will designate borrow sites as needed.
· Riprap, with advanced written approval, may be collected on site as long as it meets size
requirements. Units for riprap are in cubic yards (CY) and will be measured in place for payment.
· Contractor is responsible for resurfacing existing surfaced roads after replacement of culverts.
· Contractor is responsible for placing construction signs on roads when operating equipment on this
project. Signs shall be in accordance with the latest version of Manual on Uniform Traffic Control
Devices (MUTCD).
· Any resource sensitive areas to avoid will be flagged by Government prior to implementation. Other
areas may require consultation with Specialists.
· An Erosion Control Plan will need to be submitted prior to start of work.
NOTES AND LEGEND
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 14
:35 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTRECONSTRUCTIONAND MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
MATERIALS ANDQUANTITIES
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
G-03
15004
SPECIFICATION DATA RD_NO 08N03D 08N03FW 08N08 08N10 08N11 08N14 08N14H 08N15 08N16 08N18B 08N19
Sub Total
SPEC. NO. ITEM DESCRIPTION UNITS QTY QTY QTY QTY QTY QTY QTY QTY QTY QTY QTY
151-1 Mobilization - Applies to Project LS 1 1
157-13 Soil Erosion and Pollution Control LS 1 1
203-3 Removal and Disposal of Culverts Each 2 1 2 1 1 10 3 1 6 1 1 29
204-5 Drainage Excavation, Type Inlet Basin Each 1 1 2
204-9 Drainage Excavation, Type Rocked Swale - IncludesRiprap(Class II) and Screened Aggregate (Grade N). Each 1 1 2
204-10 Drainage Excavation, Type Rock Armored Crossing - IncludesRiprap Each 1 1
204-11 Drainage Excavation, Type Rolling Dip Each 1 1
251-1 Placed Riprap, Class II CY 5 12 6 15 6 2 46
301-1 Aggregate Base, Gradation B, Compaction Method D Ton 168 18 120 306
301-2 Crushed Aggregate - 2"- 4"+ Crushed Rock Ton 12 12
406-1 Asphalt Pavement Patching -Overlay - Includes Site Prep andTack. SY 545 448 993
602-2 24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B.Includes De-Watering If Necessary. LF 80 40 210 180 40 240 790
602-3 30-Inch Corrugated MetalPipe, 0.064-Inch Thk FE, Method B.Includes De-Watering If Necessary. LF 60 60
602-4 36-Inch Corrugated Metal Pipe, 0.064-Inch Thk FE, Method B.Includes De-Watering If Necessary. LF 40 40
602-642-Inch Equivalent Diameter Corrugated Metal Arch Pipe,0.079-Inch Thk FE, Method B. Includes De-Watering IfNecessary.
LF 40 40
602-7 48-Inch Corrugated Metal Pipe, 0.064-Inch Thk FE, Method B.Includes De-Watering If Necessary. LF 40 70 80 190
602-966-Inch Equivalent Diameter Corrugated Metal Arch Pipe,0.079-Inch Thk FE, Method B. Includes De-Watering IfNecessary.
LF 40 40
602-11 Metal End Section for 66-Inch Diameter Equivalent Arch Pipe Each 1 1
607-1 Repair Existing Culvert Each 1 1
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 14
:35 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTRECONSTRUCTIONAND MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
MATERIALS ANDQUANTITIES
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
G-04
10005
SPECIFICATION DATA RD_NO 08N20C 08N20J 08N21 08N22 08N25A 08N28 08N29E 08N30 08N36 08N39 08N40
Sub TotalSPEC. NO. ITEM DESCRIPTION UNITS QTY QTY QTY QTY QTY QTY QTY QTY QTY QTY QTY
151-1 Mobilization - Applies to Project LS 1 1
157-13 Soil Erosion and Pollution Control LS 1 1
203-3 Removal and Disposal of Culverts Each 2 4 3 1 2 2 1 2 1 1 2 21
204-4 Drainage Excavation, Type Catch Basin Each 1 1
204-10 Drainage Excavation, Type RockArmored Crossing - Includes Riprap Each 3 1 1 5
251-1 Placed Riprap, Class II CY 5 12 10 6 33
301-1 Aggregate Base, Gradation B,Compaction Method D Ton 48 48 36 132
406-1 Asphalt Pavement Patching -Overlay -Includes Site Prep and Tack. SY 124 124
602-224-Inch Corrugated Metal Pipe,0.064-Inch thk FE, Method B. IncludesDe-Watering If Necessary.
LF 70 30 90 30 40 70 40 80 450
602-330-Inch Corrugated Metal Pipe,0.064-Inch Thk FE, Method B. IncludesDe-Watering If Necessary.
LF 40 40
602-542-Inch Corrugated Metal Pipe,0.064-Inch Thk FE, Method B. IncludesDe-Watering If Necessary.
LF 60 60
602-748-Inch Corrugated Metal Pipe,0.064-Inch Thk FE, Method B. IncludesDe-Watering If Necessary.
LF 50 50
602-12 Mitered End Section for 24-Inch Pipe Each 1 1
607-1 Repair Existing Culvert Each 1 1
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 14
:35 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTRECONSTRUCTIONAND MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
MATERIALS ANDQUANTITIES
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
G-05
10006
SPECIFICATION DATA RD_NO 08N50 08N50B 08N52 08N83 Non System
Sub TotalSPEC. NO. ITEM DESCRIPTION UNITS QTY QTY QTY QTY QTY QTY QTY QTY QTY QTY QTY
151-1 Mobilization - Applies to Project LS 1 1
157-13 Soil Erosion and Pollution Control LS 1 1
203-3 Removal and Disposal of Culverts Each 7 3 1 1 12
203-4 Removal and Disposal of Culverts.Includes Channel Restoration Work 1 1
251-1 Placed Riprap, Class II CY 8 11 19
301-1 Aggregate Base, Gradation B,Compaction Method D Ton 120 36 24 180
406-1 Asphalt Pavement Patching -Overlay -Includes Site Prep and Tack. SY 250 250
602-224-Inch Corrugated Metal Pipe,0.064-Inch thk FE, Method B. IncludesDe-Watering If Necessary.
LF 250 100 350
602-8
48-Inch Equivalent DiameterCorrugated Metal Arch Pipe,0.064-Inch Thk FE, Method B. IncludesDe-Watering If Necessary.
LF 50 50
602-10
78-Inch Equivalent Diameter ArchCorrugated Metal Arch Pipe,0.079-Inch Thk FE, Method B. IncludesDe-Watering If Necessary.
LF 40 40
602-11 Metal End Section for 78-InchDiameter Equivalent Arch Pipe Each 1 1
619-1 Earth and Log Barricade Each 1 1
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 15
:13 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTREPLACEMENT AND
MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
WORK LIST
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
G-06
015007
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 14
:35 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTREPLACEMENT AND
MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
DRAINAGECONSTRUCTION
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
C-01
15008
OUTLET DITCH
METAL PIPE BACKFILLING PIPE
5%
GR
AD
E M
INIM
UM
1V:1.5H
NOTE: MINIMUM COVER OVER CULVERT AT SHOULDER
SHALL BE 12 INCHES BELOW SUBGRADE FOR SURFACED
AND 18 INCHES BELOW SUBGRADE FOR UNSURFACED.
ROAD SURFACE
ORIGINAL
GROUND OR
STREAM BED
DO NOT RAISE OUTLET ABOVE
ORIGINAL GROUND OR STREAM BED.
INSTALL ENERGY DISSIPATOR OR
OUTLET DTICH WHEN SPECIFIED.
NOTE: BOTTOM WIDTH MAY VARY WHEN CATCH
BASIN IS CONSTRUCTED IN NATURAL DRAINAGE
NOTES:
· DITCH AND BERM SHALL BE SEEDED
· MATERIAL SHALL BE DEPOSITED UNIFORMILY ON BOTH SIDES OF DITCH
DITCH GRADE = CULVERT GRADE +1%
CULVERT
ROAD SURFACE
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 14
:35 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTREPLACEMENT AND
MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
CMP TABLES
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
C-02
15009
FILL HEIGHT & INCH (mm) SHEET THICKNESS TABLES
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 14
:35 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTREPLACEMENT AND
MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
CMP BANDS
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
C-03
15010
TYPE B
TYPE A
TYPE D
TYPE C
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 15
:13 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERT REPLACEMENT AND
MAINTENANCE
ELDORADO NATIONAL FOREST
AMADOR RANGER DISTRICT
ROAD SURFACING
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
C-04
15010
METHOD OF BACKFILLING PIPE ON CHIP SEAL / AC SURFACE TYP.
NOT TO SCALE
"D" "D" "D"
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 14
:35 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
(R5)PACIFIC SOUTHWEST
CULVERTREPLACEMENT AND
MAINTENACE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
ROCK-ARMOREDCROSSING
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
C-05
15011
PLAN VIEW
PROFILE A - A' VIEW
PROFILE B - B' VIEW
ROCK-ARMORED CROSSING DIMENSIONS
SITE
RIPRAP MEAN
DIAMETER (D50), FT
RIPRAP LAYER
THICKNESS, FT
MIN CHUTE
WIDTH, FT
MIN CHUTE
DEPTH, IN
08N14 - 3 6 6 18.00
08N20J 2.5
4.50 5 16.00
08N29E
1.50 3 3 10
08N36
1.50 3 4 12
IMAGES FROM Cafferata, Peter & Lindsay, Donald & Spittler, Thomas & Wopat, Michael & Bundros, Greg & Flanagan, Sam & Coe, Drew & Short, Bill. (2017). Designing Watercourse Crossings for Passage of 100-Year Flood Flows, Wood, and Sediment (Updated 2017).
NOTES:
· RIPRAP SHALL BE FROM COMMERCIAL SOURCE, COMPETENT, ANGULAR, NARROW TO
WELL-GRADED MATERIAL.
· FILTER LAYER SHALL BE CONSTRUCTED WITH 8 oz NON WOVEN GEOTEXTILE FABRIC OR 1.5" MINUS
AGGREGATE AT A MIN DEPTH OF 6 IN.
· CONSTRUCT FILLSLOPE IN SUCCESSIVE 12 IN THINK COMPACTED LIFTS.
· ALIGN BROAD DIP WITH ORIGINAL CHANNEL ENSURE FINISHED ROCK SURFACE BLENDS WITH THE
SURROUNDING ROAD GRADE. IF NOTED, PLACE CRUSHED AGGREGATE ACROSS RUNNING SURFACE
OF THE DIP.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 15
:01 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTREPLACEMENT AND
MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
ROLLING DIP ANDWATERBAR DETAIL
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
C-06
015012
Contractor shall construct
Lead Off Ditches as needed to
ensure proper drainage of
Dips. Lead-Off Ditches are
incidental to the construction
of Dip construction.
ORIGINAL ROAD
GRADIENT
GRADIENT
A
0 %-8 %
9 %-12 %
+3-5 %
+2-3 %
O
R
IG
IN
A
L
G
R
A
D
E
L
IN
E
NOTES:
OUTLET DIP ON LOWEST HEIGHT FILL SLOPE
O
R
IG
IN
A
L
G
R
A
D
E
L
IN
E
1. THE DESIGN VEHICLE OR CRITICAL
VEHICLE FOR THIS DIP DESIGN IS A MODEL 62
FIRE ENGINE.
2. ENTIRE LENGTH OF DIP SHALL BE
OUTSLOPED 3% TO 5%.
3. ROLLING DIP STATIONS ARE APPROXIMATE.
LOCATIONS OF THE DIPS SHALL BE STAKED
ON THE GROUND BEFORE CONSTRUCTION.
ROLLING DIP DETAIL
90°
3:1 MAX FOR VEHICLE CROSSING.
9"
18"
STABILIZED OUTLET
2
%
M
I
N
WATERBAR
D
O
W
N
G
R
A
D
E
SLO
PE
NOTES: WATERBARS
1. ALL WATER BARS SHALL BEGIN AT THE INTERSECTION OF THE ROAD BED
WITH THE BACK SLOPE AND RUN ACROSS THE ENTIRE WIDTH OF THE ROAD
BED.
2. ALL WATER BARS SHALL HAVE FREE FLOWING OUTLETS. CONSTRUCTION
OF LEAD-OFF DITCHES ARE INCIDENTAL TO WATER BAR CONSTRUCTION
3. WHEEL ROLL AND COMPACT ALL DRIVABLE WATERBARS. REMOVE ROCKS
AND OTHER OBSTRUCTIONS FROM FINISHED WATERBARS.
FOR HIGH CLEARANCE VEHICLES
DRIVABLE WATERBARS
NON - DRIVABLE WATERBARS
TYPE I & II
B
STATION OR MILEPOST
LOCATION
P
R
O
F
IL
E
S
U
B
G
R
A
D
E
50'25''
40'TYPE I
TYPE II
25' 25' 25'
A
GR
AD
IEN
T A
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 15
:13 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
(R5)PACIFIC SOUTHWEST
CULVERTREPLACEMENT AND
MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
DITCH AND SWALEDETAIL
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
C-07
014014Lead-Off Ditches are considered incidental to other
Pay Items and will not be measured of paid for
seperately.
ROADWAY DITCH TYP 3'
DITCH
LEAD OFF DITCH
OUT SLOPE
3%
8'
8'
8" ROCK DEPTH
24" EXCAVATION DEPTH
16" FINISH DEPTH
12 TON - 2" - 4"
CRUSHED ROCK
NOTE: CONSTRUCTION OF A ROCKED SWALE INCLUDES:
THE PLACEMENT OF 12 TON CRUSHED ROCK AND 3 CY CLASS II RIP RAP.
CRUSHED ROCK IS A COMMERCIAL SOURCE.
CLASS II RIPRAP MAY BE COMMERCIAL OR LOCAL SOURCE.
ADDITIONAL ROCK OR AGG BASE, IF REQUIRED, SHALL BE PAID
SEPARATELY.
CONSTRUCT LEAD OFF DITCH (LOD) IF NECESSARY FOR DRAINAGE. LOD
CONSTRUCTION IS INCIDENTAL TO WORK.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of AgricultureForest Service
12/10
/18 14
:35 R
ESPI
NOZA
02 D
:\TRA
NSPO
RTAT
ION\
POW
ERFI
RE\C
ULVE
RTIM
PROV
EMEN
TS\D
RAW
INGS
\CUL
VERT
IMPR
OVEM
ENTT
YPIC
ALS.
DWG;
R5PACIFIC SOUTHWEST
CULVERTREPLACEMENT AND
MAINTENANCE
ELDORADO NATIONALFOREST
AMADOR RANGER DISTRICT
EROSION CONTROL
10/30/2018
FS090523_R102013_L1-002.dwg
R.ESPINOZA
R.ESPINOZA
X.XXX
C-08
015015
NOTES:
1. TIGHTLY WOVEN FIBER NETTING OR
SIMILAR MATERIAL SHALL NOT BE USED
WITHIN POTENTIAL SUITABLE HABITAT FOR
SENSITIVE SPECIES.
2. SILT FENCE SHALL BE PLACED ON SLOPE
CONTOURS TO MAXIMIZE PONDING
EFFICIENCY.
3. INSPECT AND REPAIR FENCE AFTER EACH
STORM EVENT AND REMOVE SEDIMENT
WHEN NECESSARY. 9" MAXIMUM
RECOMMENDED STORAGE HEIGHT.
4. REMOVED SEDIMENT SHALL BE DEPOSITED
TO AN AREA THAT WILL NOT CONTRIBUTE
SEDIMENT OFF-SITE AND CAN BE
PERMANENTLY STABILIZED.
5. NO WORK SHALL BEGIN ON THIS CONTRACT
UNTIL ALL NECESSARY POLLUTION
CONTROL EQUIPMENT AND MATERIALS ARE
ON SITE, AND IN PLACE.
6. COIR LOGS MAY BE SUBSTITUTED FOR
EROSION SILT FENCING
7. UPON COMPLETION OF THE PROJECT, ALL
TEMPORARY POLLUTION CONTROL
MEASURES SHALL BE REMOVED AND THE
SITE RESTORED IN ACCORDANCE WITH THE
CONTRACT SPECIFICATIONS.
SILT FENCE
NOT TO SCALE
COIR LOGS
NO SCALE
TRENCH
DETAIL
INSTALLATION WITHOUT
TRENCHING