Pace University Land Use and Sustainable Development Conference “Tensions and Opportunities in Urban Revitalization” Ken Schwartz, Principal, VHB
December 6, 1013
Pace University Land Use and Sustainable Development Conference
Partnership for Sustainable Communities
Create strong, sustainable communities by connecting housing to jobs, fostering local innovation, and helping to build a clean energy economy.
Pace University Land Use and Sustainable Development Conference
HUD’s Six Livability Principles
Provide More Transportation Choices
Promote Equitable, Affordable Housing
Enhance Economic Competitiveness
Support Existing Communities
Coordinate Policies and Leverage Investment
Value Communities and Neighborhoods
Pace University Land Use and Sustainable Development Conference
HUD’s Sustainable Communities Program: Case Studies in Urban Revitalization
Barnum Station, Bridgeport, CT
Parramore Neighborhood, Orlando, FL
Barnum Station Feasibility Study
New York-Connecticut SCI Consortium
CONSORTIUM 9 Cities 2 Counties 5 MPOs 1 Nonprofit
ADVISORY BOARD 6 State Agencies 6 Nonprofits 3 NJ members
Barnum Station Overview
Project funded under the NY-CT Sustainable Communities Program
One of 14 projects conducted by Consortium – first one to be adopted
Feasibility study for the construction of a second rail station in Bridgeport to serve as a catalyst for revitalizing the East Side and East End neighborhoods
Anchor mixed-use development on adjacent vacant parcels
A key element of the City’s BGreen 2020 Plan
City Context
Along New Haven Main Rail Line
Within East End and East Side neighborhoods
One mile east of downtown station
Along Seaview Avenue development corridor
Neighborhood Context
Station to be located on city-owned vacant 7-acre parcel on Barnum Avenue
Core Study Area (1/4-mile radius)— focus of station activities
Study Area (1/2-mile radius)—development and related activities
Project Goals
Determine whether a new station can be physically constructed
Determine whether a new station is operationally compatible with existing MNR and Amtrak service
Assess the redevelopment potential on adjacent properties
Background/Context
Bridgeport – largest City in CT; only one commuter rail station (equity)
Neighborhood demographics – primarily Hispanic, loss of population, low levels of home ownership, high poverty, high crime rate
Strong anchors - Hospital, new elementary school, existing industry, open spaces
Available land – 2/3 of land within ¼ mile of station is vacant/underutilized
Proximity to regional highway and downtown station—Impact on ridership and rail operations, real estate market
Transit ridership—Potential local- and hospital-related demand; N-S connections
Neighborhood stabilization—Opportunities to stabilize, reinvest, and build upon neighborhood character
Market opportunities—New residential, retail, flex/office
Relationship to other on-going development—Steel Point, Bridgeport Housing Authority, Bridgeport Hospital, Lake Success
Three Underlying Questions
1. Is a new rail station operationally feasible?
2. Which configuration provides the best opportunities?
3. With a strong rail station hub, what are the opportunities for redevelopment?
Three Underlying Questions
1. Is a new rail station operationally feasible?
2. Which configuration provides the best opportunities?
3. With a strong rail station hub, what are the opportunities for redevelopment?
It is feasible to construct and operate a second commuter rail station in Bridgeport
The station will serve as a catalyst for redevelopment and revitalization in East Bridgeport
Rail Ridership Analysis
New station will provide enhanced regional mobility (better access to employment)
Some of the new riders will come from Stratford, some from Bridgeport
New riders are primarily short trips between Stratford, Barnum, and Bridgeport
Shift from bus to rail and walking Strongest new ridership potential - Bridgeport –
New Haven hospital connection, nursing school and other housing opportunities
Rail Operations Analysis
Analysis based on capacity of the existing system and schedule
Methodology reviewed and approved by ConnDOT
Results: Existing rail infrastructure is capable of accommodating a new
Barnum station Potential for express and partial express trains to serve Barnum
station, in addition to local service
Full train simulation to follow
Station Area Plans— Assumptions and Variables
Assumptions
Station platform length of 1,050 feet
No development within 100- and 500-year floodplain
Bus access restricted to north side of station area
Pedestrian passage beneath viaduct
Variables
Location of Station
Roadway alignment
Location of pedestrian passage
Station Design
Street Level
MNR Design Guidelines
Two stories
5,400 sf level
Ticket office
Enclosed waiting room
Restrooms
Limited retail
Underpass
Bus bays
Platform Level
Total 1,680 sf
Platform length 1,050 ft.
Width 12 ft.
17 ft. island width
Canopies 9 ft. from platforms
Circulation outside of platforms
Option 1—Church St. Realignment Option 2—E. Washington Ave. Extension
Option 3—Waterview Ave. Extension Option 4—Helen St. Extension
Station Area Options
Station Area Plans—Pros and Cons
Option Pros Cons
Church Street
• Limited flood zone encroachment • Least amount of new road construction • Full block TOD potential • Large dwell space for buses
• Least integration with road network • No new vehicular/bus access through viaduct
E. Washington
Avenue
• Closer station location to Hospital • Improved connection to downtown • Potential for east/west bus route service • Noise/open space buffer
• Extensive floodplain encroachment • High infrastructure costs: new road construction full length of site • No new vehicular/bus access
Waterview Avenue
• Closer station location to Hospital • Better vehicular connections • Potential for north/south bus route service
• Extensive floodplain encroachment • High infrastructure costs • Two tunnels, higher infrastructure development costs
Helen Street
• Connection to US 1/Boston Ave • Full blocks available for future TOD • Largest greenway/open space allowances • No encroachment on floodplain zone • Station location near midpoint of platform • Improved pedestrian safety and visibility
• Higher infrastructure costs due to second vehicular tunnel
Cost Estimate
Element Cost Station Infrastructure $7.9 million Parking and Roadways $11 million Platforms $7.4 million Catenary $1.2 million Engineering Services $6.7 million Construction Contingency $13.8 million
TOTAL $48 million
What are the development opportunities?
What is the market?
Station area as gateway to East Bridgeport Development Corridor
Connections to Bridgeport Hospital
Mixed-use employment and residential center
Relationship to other development initiatives
What is the Market?
Evaluate current market variables and conditions
Review proposed and planned developments
Coordinate with: • Bridgeport Housing Authority • Bridgeport Hospital • Lake Success Eco Business Park/Vita Nuova
Determine short-term demand for residential, office/flex, and retail space
Evaluate similar projects nationwide
Apply long-term vision for East Bridgeport
Supportable Uses
Through 2020 2020+
Residential 950 units Additional 2,000 units
Office/Flex 100,000-175,000 sf Additional 340,000-580,000 sf
Retail 40,000 sf Additional 80,000 sf
Vacant/Underutilized Parcels
2/3 of the inner core area is vacant or underutilized
Most in public ownership
Large parcels in inner core
Significant opportunities for infill and TOD development
TOD Plan
Major land use goals
Consistent with:
Existing land use patterns
Infrastructure improvements
Projects in the pipeline
Next Steps
Plan was adopted by SCI Consortium
Coordination with Regional Pilot TOD Project, Hospital expansion, Bridgeport Housing Authority, and other regional planning and development efforts
Additional technical studies to advance the project Full train operations analysis Refined rail ridership model Detailed programming of station and station area Additional environmental analyses
Parramore Neighborhood Revitalization
Overview
Orlando, FL – partner in the East Central Florida Communities Consortium
Received a HUD grant to develop implementation plans around the SunRail commuter rail system
Goal: transform Parramore neighborhood into a vital, mixed use, sustainable community while preserving, restoring and enhancing valued community assets and characteristics
Demographics
Median household income - $13,613
73% of households living at or below poverty limit
47% of adults have no high school diploma
Zip code with highest reports of child abuse/neglect
Juvenile arrest rate is 2.5 times that of the City
Teen birth rate is 6 times the County rate
Survey Findings
86% of families run out of money
32% of children lost a loved one in the past year
87% say tutoring assistance is the most needed
78% of parents need more help with their children
41% of children have chronic health problems
Understanding the Community
The Neighborhood as the Basic Building Block
Understanding the Community
The Neighborhood as the Basic Building Block
Community Centers and Parks as active gathering places
Understanding the Community
The Neighborhood as the Basic Building Block
Community Centers and Parks as active gathering places
Accessibility and gaps to Community Centers
Understanding the Community
The Neighborhood as the Basic Building Block
Community Centers and Parks as active gathering places
Accessibility and gaps to Community Centers
Improved mobility options
Replication of Harlem Children’s Zone
Partnerships (institutions, businesses, non-profits)
Cradle-to-Career (pre-K through college)
Covers key aspects of children’s lives Academic performance Health/wellness Economic security
Goal is to “Move the Needle” on child well-being
Parramore Kidz Zone – Investing in Children
Collective Impact
Success in “Moving the Needle”
70% of youth were served by PKZ in 2012
To-date, 112 parents have attended parenting sessions (80 have graduated including 7 dads)
166 youth participated in programs that helped them go to college; a record number (27) went to college this year
Juvenile arrests have declined 88% since 2006
The neighborhood is safer (66% of parents now say the neighborhood is safe – up from 44% is 2006)
Success in “Moving the Needle” (continued)
College tour Baby Institute Graduation
Lessons Learned
Need a champion
Create partnerships
Understand local and regional objectives
Identify early wins and catalyst projects
Focus on building healthy communities
Be wary of the real or perceived threat of gentrification