PAC on PARTICLE PHYSICS 32nd meeting, Jan 14-15, 2010
Recommandations and work towards the optimisation of the research programme
18/II/2010 1Egle Tomasi-Gustafsson
Egle Tomasi-Gustafsson
Scientific Council, Dubna, 18/II/2010
II. General recommendations on the implementation of the “Programme of the Scientific Research and Development of JINR” in the field of particle physics (2003–2009) and on the JINR Programme of Particle Physics Research proposed for 2010–2012
The PAC takes note of the reports presented by A. Sorin, Deputy Director of the Bogoliubov Laboratory of Theoretical Physics, V. Kekelidze, Director of the Veksler and Baldin Laboratory of High Energy Physics, A. Olshevskiy, Director of the Dzhelepov Laboratory of Nuclear Problems, and by V. Ivanov, Director of the Laboratory of Information Technologies. The PAC endorses the proposed main lines of the JINR Programme of Particle and Relativistic Nuclear Physics Research for the period 2010–2012 in accordance with the new seven-year JINR development plan.
18/II/2010 Egle Tomasi-Gustafsson 2
III. Recommendations on the progress towards realization of the Nuclotron-M projectThe PAC takes note of the report on the status of the Nuclotron-M project, presented by JINR Deputy Chief Engineer G. Trubnikov, and appreciates the significant progress in upgrading the VBLHEP accelerator complex and the rigorous implementation of the work schedule. The PAC is pleased to note that during the autumn run the obligations concerning the research programme were fulfilled and the stable operation of the accelerator complex at high intensity was demonstrated.
18/II/2010 Egle Tomasi-Gustafsson 3
Beam for physics
Position Required Achiev. by 2007
Status by 2009 %
Ion source 124Xe44+ (2T)+new 6T 56Fe28+ 84Kr28+ & 124Xe44+ 95
Linac Vacuum+optimization
New modulator and DT
No
No
Ready
Under manufacturing
80
10
RF system Noise reduction
Automatization
Adiabatic capture
Feedback with beam
1
no
no
No
1/15
partially
yes
No
95
70
80
10
Ring vacuum, Torr 5*10^-10 5*10^-7 2*10^-9 85
Field (energy) 2T (6 AGeV) 1T (2.2 AGeV) 1.4 (3.8 AGeV) 70
Intensity 10^11 (d), 10^8 (i) 2*10^10 (d) 5*1010 (d), 5*107 (Li) 50
Power supply Serial connection of magnets, new EES,
MF control
old (< 1Tesla)
|| connection
1 Gs prescision
Serial connection
ESS - 90% ready
0.1 Gs
70
90
99
New quench protection system
200 sensors 200 old New prototype tested 30 - for run
30
Slow extraction system (efficiency)
Extraction at 6 AGeV Max energy 2.2 AGeV (95%)
Prototype for 6 AGeV ready (95%)
80
Control, diagnostics Beam losses <10% 70-80% losses 30-40% losses 50
Cryogenics Safety + stability Worked-out Ready 99
Run stability 6 months/year 3 runs x 1month 2 runs x 1month 70
18/II/2010 4Egle Tomasi-Gustafsson
Injector (LU-20) modernization
It was planned for 2009:
- dismounting of the linac vessel and geodethy of all 59 druft tubes – performed (3 month);
- new power supplies for corrector magnets; commissioning of the new synchronization system for all linac control channels – done;
- exchange of some vacuum chamber parts of the injection channel (new fast vacuum shutters) – done;
Achieved deutron current from laser source >5 mA (before was 3 mA)- 2-3 dedicated beam runs – 4 done;
September 2009
G.Trubnikov18/II/2010 5Egle Tomasi-Gustafsson
Beam slow extraction system at maximum energy(V. Volkov)
Works on design of new high voltage power supply for the electro-static septum in the LHEP
design bureau were completed in autumn 2008. Prototype of such system was constructed and
successfully tested up to 140 kV (existing septum power supply allows up to 110 kV only – it
corresponds to 2,3 GeV/n extracted beam).
Now all the elements of new power supply had been manufactured at LHEP workshops and
this system is assembled – 03 Jan 2010: tested up to 220 kV. We plan to install it in the slow
extraction sector in order to provide experiments on beam extraction at energy 4 GeV/n during
next Nuclotron run.
G.Trubnikov18/II/2010 6Egle Tomasi-Gustafsson
V. Recommendations on the progress towards the NICA Technical Design Report
The PAC takes note of the report on the preparation of the NICA Technical Design Report, presented by JINR Deputy Chief Engineer G. Trubnikov, and notes the substantial progress in this work.
18/II/2010 Egle Tomasi-Gustafsson 7
Версия 04/12/09
Ускорительно-накопительный комплекс NICA(Nuclotron-based Ion Collider fAcility)
ТЕХНИЧЕСКИЙ ПРОЕКТтом I
8
Introduction: NICA scheme &
layout
Introduction: NICA Layout & Main
Elements
Collider 2TC = 336 m
Synchrophasotron yoke
Nuclotron
Existing beam lines(Fixed target exp-s)
“Old” linac
KRION-6T & HILac
Beam transfer line
MPD
Spin Physics Detector
(SPD)
2.3 m
4.0 m
Booster
G.Trubnikov18/II/2010 Egle Tomasi-Gustafsson
MAC meeting (12-13 January 2010)MAC meeting (12-13 January 2010)
Machine Advisory Committee participants:
B.Sharkov (ITEP/FAIR)P.Belochitskii (CERN)S.Ivanov (IHEP, Protvino)M.Steck (GSI)A.Fedotov (BNL)S.Nagaitsev (FNAL)V.Lebedev (FNAL)A.Zlobin (FNAL)P.Zenkevich (ITEP)T.Katayama (Japan)
18/II/2010 9Egle Tomasi-Gustafsson
IV. Recommendation concerning the report from the Chairman of the Nuclotron-M/NICA Machine Advisory Committee
The PAC takes note of the report by the Chairman of the
Machine Advisory Committee (MAC) for the Nuclotron-M/NICA accelerator complex, Prof. B. Sharkov and recognizes the significant progress in the realization of the Nuclotron-M project. The PAC expresses its gratitude to the MAC Chairman, members and experts for fulfilling an extremely important role in the project realization. The PAC especially notes that the expertise performed by the MAC has confirmed the feasibility of the NICA project. The PAC recommends preparing a project on realization of the next stage of the NICA complex construction and presenting it at a future PAC meeting.
18/II/2010 Egle Tomasi-Gustafsson 10
18/II/2010 Egle Tomasi-Gustafsson 11
VI. Recommendations on the progress towards the MPD Conceptual Design Report
The PAC takes note of the report on the preparation of the MPD Conceptual Design Report, presented by VBLHEP Director V. Kekelidze. The PAC notes with interest the progress of work on the MPD conceptual design and supports the basic ideology of the construction of the detector which will be unique in acceptance and efficiency for the registration of charged hadrons in the energy field under the study. The PAC supports the strategy of stage-by-stage construction of this detector and notes the substantial progress in scrutinizing all the basic elements. The PAC recommends preparing a project of the first-stage realization of the multipurpose set-up MPD — the starting stage –– and presenting at the next meeting of the PAC.
18/II/2010 Egle Tomasi-Gustafsson 12
VII. Recommendations on the progress towards the NICA White Paper
The PAC takes note of the report by BLTP Deputy Director A. Sorin on the ongoing preparation of the white paper for the NICA programme on the mixed phase and spin physics. The PAC notes the progress achieved in this direction and recommends continuation of the work to elaborate a competitive research programme in view of its complementarity with studies planned at CERN, RHIC, and FAIR.
http://theor.jinr.ru/twiki-cgi/view/NICA/WebHome
Editorial board:D. BlaschkeD. KharzeevA. SissakianA. SorinO. TeryaevV. ToneevI. Tserruya
Round Table Discussion IVSearching for the mixed phase of strongly interacting QCD matter at the NICA: Physics at NICA (White Paper)JINR (Dubna), September 9 - 12, 2009http://theor.jinr.ru/meetings/2009/roundtable/
A. Sorin86 authors86 authors 40 scientific centers40 scientific centers
16 Countries (8 JINR members)16 Countries (8 JINR members)
• Phases of dense QCD matter and conditions for their possible realization• Characteristic processes as indicators of phase transformations• Estimates of various observables for events• Comparison to other experiments
18/II/2010 13Egle Tomasi-Gustafsson
VIII. Recommendations for activities at JINR related to the ILC
The PAC takes note of the report by JINR Chief Engineer G. Shirkov on the progress for ongoing developments at JINR related to the ILC and recommends further participation in this work.
18/II/2010 Egle Tomasi-Gustafsson 14
IX. Recommendations on the first experience of JINR physicists in data taking in the LHC experiments
The PAC takes note of the reports on the first experience of JINR physicists in data taking in the ALICE, ATLAS and CMS experiments. The PAC congratulates these teams for having fulfilled their obligations in the construction of the detectors and the commissioning phase. The PAC highly appreciates the presentation of the first physics results which witness the overall good operation of the detectors. The PAC recognizes the LIT important contribution to the first data analysis phase.
18/II/2010 Egle Tomasi-Gustafsson 15
X. Recommendations for new projects (I)
The PAC suggests supporting JINR’s participation in the physics research programmes at the LHC on the basis of a five-year term. The PAC recommends approval of the projects “JINR’s participation in the physics research at the LHC. ATLAS, ALICE, CMS” for execution until the end of 2014.
The PAC recommends that sufficient resources be allocated for the participation of JINR in the data taking and analysis, in order to match the strong commitment deployed during the construction phase with a corresponding effort during the physics and analysis phase. The PAC looks forward to receiving regular reports on these activities at its future meetings.
18/II/2010 Egle Tomasi-Gustafsson 16
X. Recommendations for new projects (II)
2. The PAC recommends approval of JINR’s participation in the project “STAR at RHIC” until the end of 2012. The PAC supports the participation in the beam energy scan and in the polarized proton-proton data programme which will provide world-class results and represent an important training ground for the NICA collider project.
(Results: Z-scaling, strangeness, critical point)
3. The PAC appreciated the ongoing activity at JINR and recommends approval of JINR’s participation in the project “PANDA. Experiments at FAIR” until the end of 2014, considering the time scale of the project.
(Magnet, DIRC and Muon mini-drift tubes)
18/II/2010 Egle Tomasi-Gustafsson 17
XI. Recommendations on the activities previously approved for completion in 2009 and proposed for continuation
1. The PAC takes note of the report on JINR’s participation in the HADES project, and highly appreciates the results obtained in this experiment and recommends continuation of this activity until the end of 2012.
2. The PAC takes note of the report on the theme “Development of high-precision straw detectors”, regards this work as promising and in great demand, and recommends continuation of this activity until the end of 2012. (ATLAS, COMPASS, OKA, SVD, NICA, CBM…)
18/II/2010 Egle Tomasi-Gustafsson 18
XII. Recommendations on the projects previously approved for completion in 2009 (I)
• NA48 project (report) • OKAPI project continue the work under the theme “Study of Rare Charged Kaon Decays in Experiments at the CERN
SPS (NA62 project)”.
• NIS project : continue the research work under the new project HyperNIS.• ALPOM project : continue the research work under the new project ALPOM-2.
18/II/2010 Egle Tomasi-Gustafsson 19
• XII. Recommendations on the projects previously approved for completion in 2009 (II)
• STRELA completed data taking .• pHe3 project • LNS project• DELTA-SIGMA : needs the polarized target and Nuclotron beams of
required parameters. • DELTA-2• MARUSYA • CLIC • “Development and introduction of compact electron and ion
accelerators for applied purposes”. • E391a
18/II/2010 Egle Tomasi-Gustafsson 20
.. continue the research work under the DSS project.
18/II/2010 Egle Tomasi-Gustafsson 21
XIII. Poster presentations by young scientists in the field of particle physics research
The PAC appreciates the poster presentations by young scientists and recommends that this form of presentations be included in the agenda of the future PAC meetings.
Next meeting : June 21-22
18/II/2010 Egle Tomasi-Gustafsson 22
Thank you for attention
Благодарю вас за внимание
First data: a perfect detector performance Monitoring data quality to spot “problematic” channels
Monitoring overall detector stability
HEC
C n
oise
(MeV
)
HEC
A p
edes
tals
(MeV
)
data09_900GeV run 140541 (~11 hours)
time slices time slices
N.Javadov, I.Pisarevdata09_900GeV run 140571 (~13 hours)
time slices time slices
V.A.Bednyakov, ATLAS
18/II/2010 23Egle Tomasi-Gustafsson
18/II/2010 24
Physics exploitation of ALICE has started for good !
Phase 1: rediscovering the standard model(QCD in the case of ALICE)
The average number of charged particlescreated perpendicular to the beam
in pp collisions at 900 GeV is:dN/d = 3.10 ± 0.13 (stat) ± 0.22 (syst)
National Geographic News (4 Dec.) ‘….a machine called ALICE....
found that a (!) proton-proton collision recorded on November 23 created the precise ratio of
omatter and antimatter particles predicted from theory..’
submitted to EPJC 28 Nov 2009
A. VodopianovEgle Tomasi-Gustafsson
First CMS Physics Results: Charged Multiplicity
25Egle Tomasi-Gustafsson
CMS 2009 Preliminary
Charged Particle MultiplicityCharged Particle Multiplicity
Average pTAverage pT
correlated systematic error
I.A.Golutvin, S.V.Shmatov, A.V.Zarubin
18/II/2010
26
Physics tasks for MultiPurpose Detector
event-by-event fluctuation in hadron productions (multiplicity, Pt etc.)
HBT correlations indicating the space-time size of the systems
involving π, K, p, Λ directed & elliptic flows for various hadrons multi-strange hyperon production:
yield & spectra (the probes of nuclear media phases) photon & electron probes search for P- & CP violation as a charge asymmetry
18/II/2010 Egle Tomasi-Gustafsson
should be studied for different ions (from p to Au) by scanning in b & energy (in the range SNN = 4 - 11
GeV/u)
V. Kekelidze
27
3D view of the MPD (conceptual design)
SC Solenoid
Forward spectrometer-B
Toroid18/II/2010 Egle Tomasi-Gustafsson
3 stages of putting into operation
1-st stage barrel part (TPC, Ecal, TOF) + ZDC, BBC, S-SC, …
2-nd stage IT,EC-subdetectors
3-d stage F-spectrometers(optional ?)
V. Kekelidze
28
Working Groups
TPC prototyping - Yu.Zanevski et. al. Magnet - A.Kovalenko, V.Borisov et.al. ECal - I.Tyapkin, A.Olchevsky et.al. TOF - V.Golovatyuk et.al. Straw wheels - V.Peshekhonov et.al. ZCal - A.Kurepin et.al. CPC - Yu.Kiryushin et.al. FFD - V.Yurevich et.al. BBC - R.Zulkarneev et.al. DAQ - V.Slepnev, S.Bazylev et.al. IT - Yu.Murin, V.Nikitin et.al.
18/II/2010 Egle Tomasi-Gustafsson
The CBM-MPD SST consortium: GSI - JINR – IHEP - …
in IT silicon module developmentis well progressing
V. Kekelidze
JINR Remote Operation Centre
Monitoring of detector systemsData Monitoring / Express AnalysisShift Operations (except for run control)Communications of JINR shifter with personal at CMS Control Room (SX5) and CMS Meyrin centreCommunications between JINR experts and CMS shifters Coordination of data processing and data management Training and Information
Monitoring of detector systemsData Monitoring / Express AnalysisShift Operations (except for run control)Communications of JINR shifter with personal at CMS Control Room (SX5) and CMS Meyrin centreCommunications between JINR experts and CMS shifters Coordination of data processing and data management Training and Information
29I.A.Golutvin, S.V.Shmatov, A.V.Zarubin18/II/2010 29Egle Tomasi-Gustafsson
ATLAS jobs in RDIG
Since January 2009
V.A.Bednyakov
18/II/2010 30Egle Tomasi-Gustafsson
We continue collaboration works with INR (Troitsk) on the development of the new high-intensity polarized deuteron source, and signed an addendum for work prolongation in 2009. We plan to complete TDR documentation in this year and start construction of some elements at INR.
Simulation, modeling and design of different elements of the future source are in active phase at LHEP.
Experimental hall for the future test bench with that source is prepared at LHEP building 203A, preparation electrical and water-cooling works were performed.
It is planned to purchase part of necessary vacuum equipment (TMN pumps) for the SPD realization in 2009 – done.
Development and creation of a high-intensity polarized deuteron source (V. Fimushkin)
G.Trubnikov18/II/2010 31Egle Tomasi-Gustafsson
New (elliptical) pick-up station prototype for Nuclotron (GSI design).
Elliptical pick-up designed and constructed at LHEP workshopsready for cryotraining
Aug’09
New diagnostics (elliptical pick-up stations)
G.Trubnikov18/II/2010 32Egle Tomasi-Gustafsson
33
HELIIMASH Chief Engineer and LHEP Chief Engineer
“Wet” turboexpanders (frequency 300000 turns/min)- 6 units were fixed by now
4-month marathone
Upgrade of the cryogenic supply system (Prof. N. Agapov)
18/II/2010 Egle Tomasi-Gustafsson
34
6. Cryogenic system
Modernized in framework of the Nuclotron-M project
23.12.09: We succesfully agreed with HELIIMASH to give the propertyon screw compressor to JINR (scale of 1MEuro). We will put into Reserve the piston compressors (youngest is made in 1978)
G.Trubnikov18/II/2010 Egle Tomasi-Gustafsson
Engineering infrastructure development
- Large volume of infrastructure (fixing and construction works) was performed in 2009
18/II/2010 35Egle Tomasi-Gustafsson