P922 (81H-L) Test Report Rev 1

9
Gulf Cooperation Council Interconnection Authority GCCIA TRANSMISSION & DISTRIBUTION Engineer GCC Interconnection Project - Phase I P922 Site Acceptance Test Report MiCOM P922 81H/ Ba! Re"# S$%station# SUMMARY REVISIO PAGES ! " " PURPOSE O# $ES$S 2 % & RE#ERECE 'OCUME$ 2 % ( SCOPE 2 % ) RE*AY $ERMI*OGY % + $ES$ E,UIPME$ % PRE-RE,UIS$ES % . PROCE'URES ' % / RECOR' $ES$ S0EE$ ( % 8)1 R*A+ IN,ORMATION 8)2 -T DATA# 8) PRODUCT CH*C.S 8)' M*ASURM*NT -AU* T*ST# 8) O-*R ,R*0U*NC+ PROT*CTION 8)( UND*R ,R*0U*NC+ PROT*CTION 8) BINAR+ INPUT T*ST # 8)8 BINAR+ OUTPUT T*ST# 8)9 ,I *D *D INDICATIONS T*ST# 8)13 *D INDICATIONS T*ST# 8)11 ,INA CH*C. AREVA T&D GCCIA /SNCL Signature Signature Name Name Date Date Doc.No. REV-1 Page 1 of 9

description

PROTECTION

Transcript of P922 (81H-L) Test Report Rev 1

1

Gulf Cooperation Council

Interconnection Authority

GCCIATRANSMISSION & DISTRIBUTION

Engineer

GCC Interconnection Project - Phase I

P922Site Acceptance Test Report

MiCOM P922

81H/LBay Ref:Substation:

SUMMARYREVISION

PAGES01

1PURPOSE OF TESTS2X

2REFERENCE DOCUMENT2X

3SCOPE2X

4RELAY TERMINLOGY 3X

5TEST EQUIPMENT3X

6PRE-REQUISTES3X

7PROCEDURES4X

8RECORD TEST SHEET6X

8.1 RELAY INFORMATION

8.2 VT DATA:

8.3 PRODUCT CHECKS

8.4 MEASURMENT VALUE TEST:

8.5 OVER FREQUENCY PROTECTION

8.6 UNDER FREQUENCY PROTECTION

8.7 BINARY INPUT TEST :

8.8 BINARY OUTPUT TEST:

8.9 FIXED LED INDICATIONS TEST:

8.10 LED INDICATIONS TEST:

8.11 FINAL CHECK

1 PURPOSE OF TESTSThe purpose of the tests is to check the full functionality of the protection relay.This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning procedures.This procedure does not intend to check all tripping matrix and PSL logic tests, this, when applicable, is described into a separate document, dedicated to the specific substation and feeder type.

2 REFERENCE DOCUMENTSDOCUMENTDOCUMENT REFERENCEVERSION/ DATEREMARKS

Protection Line Diagram

Schematic Drawing

Service Manual

Operation Manual

Protection Relay Coordination Principles

Relay setting Calculation

LED Display Configuration

3 SCOPE

Substation Name :-

Diameter:

Bay :

Panel Number :

Relay Denomination in Scheme

Scheme to be Checked Relay Functionality Test.

4 TERMINOLOGYCode ( ANSI) Terminology

81H/LOver/Under Frequency Relay

5 TEST EQUIPMENT USED

Sl NoDescriptionMakeEquipment

Sl No.Calibration dateCalibration due date

1.Secondary Injection Kit

2.Multimeter

3.LaptopNA

Setting software

Type : MICOM S1 Studio

Version : 2.14

6 PRE - REQUISITES

PRE-REQUISITESREMARKS

All Safety Condition Are Ok

All Competent Personnel Available For The Test

Ac & Dc Supply Availability And Security

PPE Safety Available.

All Other Relevant Safety Instructions Been Followed

Coordination With Other Parties ( GIS, Transformer, Etc..)

7 TEST PROCEDURESThe following procedures are written for demonstrating the main protection functions of the P922 relay using an Omicron test set or similar. The tests do not test the boundaries of all available function characteristics. They do test that the function is operating at a point on one chosen characteristic. This document is to be referred to when performing commissioning tests in association with the commissioning section of the service manual.

NOTE :

All the Test are performed in the Test Switch.

Omicron CMC156 Test Equipment or Any Equivalent To Be Used..

7.1 Testing Over/Under Frequency function

Note : stage (f1>) or (f1) (overfrequency), then configure it at (81) or (f1) or (tf1) check:

1. If time delay (tf1>) is short, gradually increase the frequency from the nominal frequency fn to the value of the stage (f1>): tripping should occur for a frequency in the range [(f1>) 10mHz, (f1>) + 10mHz].

2. If time delay (tf1>) is long, adjust the frequency to [(f1>) 50mHz] and check that tripping does not occur. Increase the frequency to 1.2x(f1>) and check that tripping occurs.

3. Gradually reduce the frequency and measure the value of the drop-off stage (f1>): the function must reset for a frequency less than or equal to [(f1>) 50mHz].

Stage (f1