P74: a first view
description
Transcript of P74: a first view
VISAS -
ODG
P74:
a first view
ESO Faculty meeting, 6 April 2004
Call and Proposal submission
No more PostScript, PDF only PDF: smaller & searchable
Totals P74
806 proposals received for La Silla and Paranal
14 Large Programs (Paranal 13, La Silla 1)
2 submitted via email!
Proposal arrivals vs. Time (P74)
Days
3 0 0 3 0 0 1 1 0 0 0 2 0 0 0 1 1 2 0 0 0 2 1 5 11 186 4
32
75
269
359
0
50
100
150
200
250
300
350
400
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Nu
mber
Proposal arrivals vs. Time (P74)
Days
Nu
mber
1
10
100
1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Country distribution (P74)
54% Fellows + students
Paranal vs. La Silla
0
100
200
300
400
500
600
700
P63 P64 P65 P66 P67 P68 P69 P70 P71 P72 P73 P74
Nu
mber
Scientific areas (P74)N
um
ber
0
50
100
150
200
250
A B C D
LS
LSLSLS
P PPP
Optimizing the community: the VLT sky
Optimizing the community: the VLT sky
Optimizing the community: the VLT sky
Optimizing the community: the VLT sky
Total Available vs. Total Requested
“Available” in this presentation means always 182 nights!
Predicting trouble: UT1
Real life P74: UT1
For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Predicting trouble: UT2
Real life P74: UT2
For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Predicting trouble: UT3
Real life P74: UT3
For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life P74: UT3 DARK TIME
For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
~18 times available time!!
Predicting trouble: UT4
Real life P74: UT4
For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life 3.6: P74
For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life NTT: P74
For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life 2.2: P74
For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
Real life 2.2: P74 DARK TIME
For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)
MP
IA ti
me
Telescope time allocation
The communityN
umbe
r of
pro
posa
ls
1977 Now
3.6 m
1.5 Dan0.9 Dut
1.4 Cat
2.2 m
SESTNTT
UT1UT2UT3
UT4
TaToo, the scheduler
TaToo, the scheduler
TaToo, the scheduler
TaToo, the scheduler