Charges

• Should the Tevatron run through the end of FY09 as currently planned?

• What are the factors and considerations which might lead to running beyond FY09?

Page 3: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Run through FY09?

• Will the accelerator deliver interesting level of integrated luminosity?

• Can the detectors handle the luminosity?

• Do the collaborations have the people to operate the detectors and analyze the data?

Subject of June 8 meeting

Page 4: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Running beyond FY09

• What is present reach and prospect for new discoveries? Trigger issues Endgame strategy

• Battling the sqrt N barrier--will a few more fb-1 matter?

Page 5: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Running beyond FY09

• What is present reach and prospect for new discoveries? Trigger issues Endgame strategy

• Battling the sqrt N barrier--will a few more fb-1 matter?

Might know more after analyses for Summer conferences

Meet again in September to consider

Page 6: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Accelerator projections

Close to presentperformance

Driving indicators• 25 mA/hr stacking• > 100 store hours per week

Page 7: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

D0 detector performance

• Basically running well, producing nice results

• Remaining issues for 09: Silicon radiation damage Fiber tracker occupancy

Page 8: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Silicon tracker

Good to go for 09

Page 9: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Fiber tracker

Beginningof store

More typical

Page 10: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

CDF Detector

• Running well, producing nice results

• Issues Inner silicon radiation damage Intermediate silicon cooling problem

Page 11: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Silicon radiation

Integrated Luminosity (fb–1)

Dep

letio

n V

olta

ge (

V)

Central Prediction

+1σ Prediction

–1σ Prediction

100

200

300

00 2 4 6 8

maximum bias voltage

Bias Scan Data

Model: S. Worm, Lifetime of the CDF Run II Silicon, VERTEX 2003

SVX Layer 0

Good to go through 09

Page 12: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

ISL cooling

good badhole

Port card cooling ring Manifold

Cooling Pipes

Repair in Aug with“reverse angioplasty”

Page 13: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

D0 people power 1--needs

actuals

Page 14: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

D0 people power 2- available

184 - 124 = 60

or

Page 15: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

CDF people power 1--needs

CY 07 CY 09

Detector Ops 56 51

Offline 26 20

Algorithms 32 21

Management 10 10

Total for Ops 124 102

* FTE’s

Page 16: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

CDF people power 2--available

CY 07 CY 09

Service Needs 124 102

Resources Available

392 236

Resources for Physics 392 – 124 =

268 FTE134 FTE

Page 17: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

CDF people power 3--expertise

TingMiao

TingMiao

TingMiao

TingMiao

TingMiao

TingMiao

TingMiao

TingMiao

TingMiao

TingMiao

TingMiao

TingMiao

10Pager

……EikoYu

EikoYu

EikoYu

EikoYu

EikoYu

EikoYu

EikoYu

EikoYu

25

ASD andCalibrations

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

Kevin

Burkett

15

Stage0/Monitoring

Morris

Binkley

Morris

Binkley

Morris

Binkley

Morris

Binkley

Morris

Binkley

Morris

Binkley

Morris

Binkley

Morris

Binkley

Morris

Binkley

Morris

Binkley

Morris

Binkley

Morris

Binkley

25Low Voltage

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

Aseet

Mukherjee

50SPL

BobWagner

BobWagner

BobWagner

BobWagner

BobWagner

BobWagner

BobWagner

BobWagner

BobWagner

BobWagner

BobWagner

BobWagner

50SPL

COT

090909090808080807070707%

Q4Q3Q2Q1Q4Q3Q2Q1Q4Q3Q2Q1FTEPROJECT

Committed Likely Unknown

Page 18: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Findings summary

• Accelerator running well and will likely deliver 6-7 fb-1 by end of FY09

• CDF and D0 detectors running well, some issues for 09 but no show-stoppers

• CDF resources matched to needs through FY09

• Concerns about D0 people power in FY09

• Examine case for running beyond 09 at next P5 meeting (likely end of September)

Page 19: P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Recommendations summary

• Tevatron should run through end of FY09

• Lab should work with D0 to augment human resources Visitors program is highly leveraged and cost-

effective Additional Applications Physicists?