    New Features in P3 2.0

    Interactive PERT (Primaveras Easy Relationship Tracing) View

    Cosmic view

    Trace logic view

    Zoom capabilities

    Over 15 preset activity box templates

    Activity box content configuration

    Activity box ends shape and color configuration

    Relationship line color and style configuration

    Activity grouping options

    Activity insert, extract and dissolve options

    WYSIWYG print preview and printing

    Full keyboard navigation support

    PERT is a powerful yet intuitive analysis tool which makes it easier to identify

    potential bottlenecks and understand the impact of change on the flow of a projec

    PERT enables you to build schedules, analyze problems and critical paths, and toeasily produce graphic reports.

  • 7/30/2019 P320FEAT

    2/7

    Resource Management

    Unlimited resource calendars

    Activity splitting, stretching, and crunching based on resource availability

    Resource dates displayed on bars

    Resource dates in Resources form

    Resource bars

    Ability to simultaneously level 500 resources (up from 125)

    P3s resource calendars allow managers to more precisely assign and trackindividual, high-value resources down to the hour. You can enter resources

    into projects as hierarchical structures with roll-up summary abilities and use

    resource availability to calculate the duration of resource-driven activities.

    P3s resource leveling options allow users to split, stretch and/or crunch

    activities based on availability.

  • 7/30/2019 P320FEAT

    3/7

    Internet Support/Web Wizards

    Web Publishing Wizard for publishing HTML reports on a Web page

    Direct link to Primaveras Web home page and technical support page

    Send Mail Wizard with independent E-mail progress sheet

    (Primavera Post Office)

    Hyperlinks to web pages in Activity Logs

    P3's Web Wizard automatically builds and updates structured web pages from

    P3 reports. It does much more than just export HTML reports from P3, it

    actually builds a summary reporting mechanism which arranges different

    reports into a multi-level structure which can be "drilled-down" into to find

    more detailed information.

  • 7/30/2019 P320FEAT

    4/7

    Primavera Post Office

    P3 offers extensive communication support allowing project managers andteam members to exchange project data through any MAPI or VIM compliant

    mail system. The Primavera Post Office is a front-end applet which allows

    team members to open Primavera-generated mail messages to be viewed and

    updated in a simple, tabular format. This Web Wizard has been included for

    more efficient e-mail creation by allowing e-mail addresses to be built-into its

    activity coding dictionary, allowing the manager to simultaneously broadcast

    unique messages to everyone on the project team.

  • 7/30/2019 P320FEAT

    5/7

    Activity Columns and Bar Enhancements

    Totals and subtotals in activity table by group code with summarized column

    data and bar Bar color/pattern (hatching) by activity code

    Necking of bars for non-work time (out-of-sequence progress, holidays,

    weekends)

    Enhanced placement of activity log text on bars

    Ability to add a blank column

    Display resource dates in columns

    Display activity type in columns

    Show resource ID or resource description in the columns

    Display milestones on summary bars Ability to show/hide critical color on individual bar types

    Improved positioning of text on bars

    Current percent complete on target bar

    Option to show day of week in timescale

    Ability to set ordinal start date for ordinal timescale

    Ability to show manufacturing weeks and days in the timescale

    Ability to show calendar dates along with ordinal dates in the timescale

  • 7/30/2019 P320FEAT

    6/7

    Filter and Organize Enhancements

    Append to current set of activities/remove from current set of activities

    Filter on activity type

    Filter on longest path

    Filter within a restricted access filter

    Transfer individual filter specifications

    Select activities by filter (for copying to clipboard, etc.)

    Display resource profile for selected activities only

    Jump to predecessor/successor not in current filter

    Find activity outside of a filter

    Organize by WBS Select levels of WBS to Organize by

    Set color by WBS level

    Option to display/hide empty WBS bands

    Option to hide unassigned and uncategorized activities

    Show group title/value bands in Bar area

    Organize by activity type

    Ability to jump between bands when organized

    Reports

    Rich text format (RTF) font support for custom report writer, matrix and

    resource/cost loading reports

    Increase resource limit from 500 to 1000 in tabular, control, and earned value

    reports.

    Enhancements to loading report

    Display activity type and leveling type in custom report writer and matrix reports

    Backup/Restore

    Added support for ZIP format

    Backup to floppy without overwriting the floppy's contents

    Added support for mailing projects (subprojects)

    Ability to exclude layout specifications

  • 7/30/2019 P320FEAT

    7/7

    Miscellaneous Enhancements

    Additional activity types: independent, meeting, WBS

    Add activity without the Activity form

    Automatic activity numbering for new activities Dissolve and extract activities in Bar chart view

    Autolink when adding activities in Bar chart view

    Repeat group title band on next page for output when page-break by code

    Additional date formats

    Display work period number on pop-up calendar with jump to functionality

    New project naming conventions: project groups and projects (previously called

    master project and subprojects)

    Windows Metafile support (Preview Picture)

    Ability to edit the Project Overview dialog box from within an open project

    Option to show a histogram on selected activities only

    Set the maximum height of the resource/cost profile for output

    Batch support of resource calendars, activity and leveling type, and ability to

    define project overview information when adding a subproject (project) through

    Batch.

    Uninstall function

    Additional set languages for use in P3 (27, up from 11)

    Microsoft Office Compliant Interface (Logo applied for)

    Bubble help available for all toolbar icons Windows 95 right-click support for Bar and PERT views

    Database engine upgraded to Btrieve 6.15, allowing direct SQL queries from

    Btrieve Technologies Scalable/SQL product