P2(E)

6
Week 1—Episode 1 Who is needed Dates and Times Food Location Extra Information Monday Directors, Producers, Filming Crew 09/10/17 10am-4pm Food will be provided at each location for all during lunch time, between 12pm to 1pm. A catering company will be hired in order to ensure that everyone's needs are met, for example, those who are vegan, vegetarian, etc. This will also cut costs, saving people from going to different places for lunch, as well as ensuring that everyone stays on location and are ready to start work again once lunch ends. Studio—Liverpool Film Studios (L5 9YJ) Planning and prepping the scenes for shooting on Day 3. As well as reviewing the script and making changes (mostly to direction) to fit the design of the studio. Tuesday Directors, Producers, Filming Crew 10/10/17 10am-4pm School Location—Deyes High School Getting shots for transitions during editing, planning shooting for Day 4. Wednesday Two main characters Film Crew, Hair and Makeup, Producers and Directors 11/10/17 From 10am—4pm Studio—Liverpool Film Studios (L5 9YJ) Homes for both boys Half day used to shoot Wyatt’s home scenes, second half used to shoot Jamie’s home scenes. Thursday Main characters Extras for school shots, e.g. within classrooms, at lunch time, etc. Film Crew, Hair and Makeup, Producers and Directors 12/10/17 7am—2pm School Location— Deyes High School Parts of the schools will be cordoned off. All cast will be present for 7am to avoid rush of children entering school. Friday Make all cast available to finish off shoots if needed (Contingency) 13/10/17 Studio—Liverpool Film Studios (L5 9YJ) Or School Location—Deyes Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to Emma Fraser - P2(E)

Transcript of P2(E)

Page 1: P2(E)

Emma Fraser - P2(E)

Week 1—Episode 1 Who is needed Dates and Times Food Location Extra Information

Monday Directors, Producers, Filming Crew09/10/17

10am-4pm

Food will be provided at each location for all during lunch time, between 12pm

to 1pm.

A catering company will be hired in order to ensure

that everyone's needs are met, for example, those

who are vegan, vegetarian, etc.

This will also cut costs, saving people from going

to different places for lunch, as well as ensuring

that everyone stays on location and are ready to

start work again once lunch ends.

Studio—Liverpool Film Studios (L5 9YJ)

Planning and prepping the scenes for shooting on Day 3.

As well as reviewing the script and making changes (mostly to direction) to fit the design of

the studio.

Tuesday Directors, Producers, Filming Crew10/10/17

10am-4pmSchool Location—Deyes High

SchoolGetting shots for transitions during editing,

planning shooting for Day 4.

WednesdayTwo main characters

Film Crew, Hair and Makeup, Producers and Directors

11/10/17

From 10am—4pm

Studio—Liverpool Film Studios (L5 9YJ)

Homes for both boys

Half day used to shoot Wyatt’s home scenes, second half used to shoot Jamie’s home scenes.

Thursday

Main characters

Extras for school shots, e.g. within classrooms, at lunch time, etc.

Film Crew, Hair and Makeup, Producers and Directors

12/10/17

7am—2pm

School Location— Deyes High School

Parts of the schools will be cordoned off.

All cast will be present for 7am to avoid rush of children entering school.

Friday Make all cast available to finish off shoots if needed (Contingency) 13/10/17

Studio—Liverpool Film Studios (L5 9YJ)

Or

School Location—Deyes High School

Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or

refilm any scenes that need to be done.

Page 2: P2(E)

Emma Fraser - P2(E)

Week 2—Episode 2 Who is needed Dates and Times Food Location Extra Information

Monday Directors, Producers, Filming Crew16/10/17

10am-4pm

Food will be provided at each location for all during lunch time,

between 12pm to 1pm.

A catering company will be hired in order to

ensure that everyone's needs are met, for

example, those who are vegan, vegetarian, etc.

This will also cut costs, saving people from going

to different places for lunch, as well as

ensuring that everyone stays on location and are ready to start work again

once lunch ends.

Studio—Liverpool Film Studios (L5 9YJ)

Planning and prepping the scenes for shooting on Day 4.

As well as reviewing the script and making changes (mostly to direction) to fit the

design of the studio.

Tuesday Directors, Producers, Filming Crew17/10/17

10am-4pmSchool Location—Deyes High

SchoolGetting shots for transitions during editing,

planning shooting for Day 3.

Wednesday

Two main characters

Extras for school shots, e.g. within classrooms, at lunch time, etc.

Film Crew, Hair and Makeup, Producers and Directors

18/10/17

7am—2pmSchool Location— Deyes High

School

Parts of the schools will be cordoned off.

All cast will be present for 7am to avoid rush of children entering school.

Canteen scene shot—with many extras

Thursday

Two main characters

Extras for school shots, e.g. within classrooms, at lunch time, etc.

Film Crew, Hair and Makeup, Producers and Directors

19/10/17

7am—2pm

School Location— Deyes High School

Parts of the schools will be cordoned off.

All cast will be present for 7am to avoid rush of children entering school.

Classroom scenes shot—15 other extras to make up class, including teacher.

Friday

Extras for Politicians to film news scene announcing the new laws to be

enforced.

Make all cast available to finish off shoots if needed (Contingency)

20/10/17

10am-4pm

Studio—Liverpool Film Studios (L5 9YJ) - Definite for shooting

news scene

Or

School Location—Deyes High School (if needed)

Analyse footage and see if we have everything we need, if not use Friday to

catch up/fix or refilm any scenes that need to be done.

Page 3: P2(E)

Emma Fraser - P2(E)

Week 3—Episode 3 Who is needed Dates and Times Food Location Extra Information

Monday Directors, Producers, Filming Crew23/10/17

10am-4pm

Food will be provided at each location for all during lunch time,

between 12pm to 1pm.

A catering company will be hired in order to

ensure that everyone's needs are met, for

example, those who are vegan, vegetarian, etc.

This will also cut costs, saving people from going

to different places for lunch, as well as

ensuring that everyone stays on location and are ready to start work again

once lunch ends.

Studio—Liverpool Film Studios (L5 9YJ)

Planning and prepping the scenes for shooting on Day 3.

As well as reviewing the script and making changes (mostly to direction) to fit the design

of the studio.

Tuesday Directors, Producers, Filming Crew24/10/17

10am-4pmSchool Location—Deyes High

SchoolGetting shots for transitions during editing,

planning shooting for Day 4.

WednesdayTwo main characters

Film Crew, Hair and Makeup, Producers and Directors

25/10/17

From 10am—4pm

Studio—Liverpool Film Studios (L5 9YJ)

Homes for both boys

Filming scene in the bedroom where boys discover the laws have been changed.

Scenes of them talking about attacking their school.

Thursday

Main characters

Extras for school shots, e.g. within classrooms, at lunch time, etc.

Film Crew, Hair and Makeup, Producers and Directors

26/10/17

7am—2pm

School Location— Deyes High School

Parts of the schools will be cordoned off.

All cast will be present for 7am to avoid rush of children entering school.

Filming scenes in different parts of the school, e.g. Library, Science Labs, Classrooms,

etc.

Friday Make all cast available to finish off shoots if needed (Contingency) 27/10/17

Studio—Liverpool Film Studios (L5 9YJ)

Or

School Location—Deyes High School

Analyse footage and see if we have everything we need, if not use Friday to

catch up/fix or refilm any scenes that need to be done.

Page 4: P2(E)

Emma Fraser - P2(E)

Week 4—Episode 4 Who is needed Dates and Times Food Location Extra Information

Monday Directors, Producers, Filming Crew30/10/17

10am-4pm

Food will be provided at each location for all during lunch time,

between 12pm to 1pm.

A catering company will be hired in order to

ensure that everyone's needs are met, for

example, those who are vegan, vegetarian, etc.

This will also cut costs, saving people from going

to different places for lunch, as well as ensuring

that everyone stays on location and are ready to

start work again once lunch ends.

Studio—Liverpool Film Studios (L5 9YJ)

Planning and prepping the scenes for shooting on Day 3.

As well as reviewing the script and making changes (mostly to direction) to fit the design

of the studio.

Tuesday Directors, Producers, Filming Crew31/10/17

10am-4pmSchool Location—Deyes High

SchoolGetting shots for transitions during editing,

planning shooting for Day 4.

Wednesday

All Cast—including both main characters and additional actors for

family.

Film Crew, Hair and Makeup, Producers and Directors

01/11/17

From 10am—4pmStudio—Liverpool Film Studios

(L5 9YJ)Half day used to shoot Wyatts home scenes,

second half used to shoot Jamie’s.

Saturday

Main characters

Extras for school shots—students—many to flee during attack etc.

Film Crew, Hair and Makeup, Producers and Directors

04/11/17

6am—4pm

School Location— Deyes High School

Massacre scene shot—done on Saturday to avoid all school children/staff, etc.

SundayMake all cast available, as well as some extras (around 20) to finish off shoots if

needed (Contingency)05/11/17

Studio—Liverpool Film Studios (L5 9YJ)

School Location—Deyes High School (if needed)

Analyse footage and see if we have everything we need, if not use Friday to catch

up/fix or refilm any scenes that need to be done.

Page 5: P2(E)

Emma Fraser - P2(E)

Week 5—Episode 5 Who is needed Dates and Times Food Location Extra Information

Monday Directors, Producers, Filming Crew06/11/17

10am-4pm

Food will be provided at each location for all during lunch time,

between 12pm to 1pm.

A catering company will be hired in order to

ensure that everyone's needs are met, for

example, those who are vegan, vegetarian, etc.

This will also cut costs, saving people from going

to different places for lunch, as well as ensuring

that everyone stays on location and are ready to

start work again once lunch ends.

Studio—Liverpool Film Studios (L5 9YJ)

Planning and prepping the scenes for shooting on Day 3.

As well as reviewing the script and making changes (mostly to direction) to fit the design

of the studio.

Tuesday All Cast—Family of both boys and Extras

Film Crew, Hair and Makeup, Producers and Directors

07/11/17

10am-4pm

Studio—Liverpool Film Studios (L5 9YJ)

Homes for both boys

Filming family relationships within the homes (of both main characters after their death and

homes of the victims)

WednesdayAll Cast—Family of both boys and Extras

Film Crew, Hair and Makeup, Producers and Directors

08/11/17

From 10am—4pm

Studio—Liverpool Film Studios (L5 9YJ)

School Location—Deyes High School (Outside for memorial)

Others scenes for news shows and scenes within the homes of the victims. Including

memorial outside of school.

Thursday Make all cast available to finish off shoots if needed (Contingency)

09/11/17

10am—4pm

Studio—Liverpool Film Studios (L5 9YJ)

Or

School Location—Deyes High School

Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or

refilm any scenes that need to be done.

Page 6: P2(E)

Emma Fraser - P2(E)

Contingency Plan: Throughout creating the production, the crew could face some factors that may effect the rate of production, for example, during filming in the school, there may be practise fire alarm which could cause all of the crew to evacuate the building, this would take up around 30-40 minutes away from the filming time and could result in parts of the production being un-filmed. Therefore at the end of each week, there is a day set aside to re-film or film any scenes that we didn't get throughout the week. The scenes that will need to be filmed or re-filmed will be figured out the day before and the crew and cast can be notified on what location to at the next day, for example the school or filming .

Who is needed Dates and Times Food Location Extra Information

Friday Make all cast available to finish off shoots if needed (Contingency) 13/10/17

Food will be provided at each location for all during lunch

time, between 12pm to 1pm.

A catering company will be hired in order to ensure that

everyone's needs are met, for example, those who are vegan,

vegetarian, etc.

This will also cut costs, saving people from going to different

places for lunch, as well as ensuring that everyone stays on location and are ready to start work again once lunch

ends.

Studio—Liverpool Film Studios (L5 9YJ)

Or

School Location—Deyes High School

Analyse footage and see if we have everything we need, if not use Friday to

catch up/fix or refilm any scenes that need to be done.

Friday

Extras for Politicians to film news scene announcing the new laws to

be enforced.

Make all cast available to finish off shoots if needed (Contingency)

20/10/17

10am-4pm

Studio—Liverpool Film Studios (L5 9YJ) - Definite for shooting news scene

Or

School Location—Deyes High School (if needed)

Analyse footage and see if we have everything we need, if not use Friday to

catch up/fix or refilm any scenes that need to be done.

Friday Make all cast available to finish off shoots if needed (Contingency) 27/10/17

Studio—Liverpool Film Studios (L5 9YJ)

Or

School Location—Deyes High School

Analyse footage and see if we have everything we need, if not use Friday to

catch up/fix or refilm any scenes that need to be done.

SundayMake all cast available, as well as some extras (around 20) to finish

off shoots if needed (Contingency)05/11/17

Studio—Liverpool Film Studios (L5 9YJ)

School Location—Deyes High School (if needed)

Analyse footage and see if we have everything we need, if not use Friday to

catch up/fix or refilm any scenes that need to be done.

Thursday Make all cast available to finish off shoots if needed (Contingency)

09/11/17

10am—4pm

Studio—Liverpool Film Studios (L5 9YJ)

Or

School Location—Deyes High School

Analyse footage and see if we have everything we need, if not use Friday to

catch up/fix or refilm any scenes that need to be done.