What we did well● Depth and thoroughness of work● Documentation of work● Team Work● Others?
What we need to improve on● Last minute work● Team brainstorming critical design features● Documenting work● Others?
What’s NextDetailed Design/Gate Review1. EMA Detailed Design2. Secondary Requirement Design3. Test Plans4. Finalize Risks & Bill of Materials5. Make Edge Pretty6. Test Transducer
EMA Detailed Design● Analyze each component
o Screw calculatoro Ansys of mounting fixturingo Locating pins?o Load cell connection
● Team brainstorm critical components ● Select critical component design with justification ● Consult subject matter experts on designs● Finalize 3D models & 2D drawings● Identify long lead items● Expand controls flow diagram if needed
Secondary Requirements● Identify secondary requirements● Consult morph for possible solutions● Explore options strengths and weaknesses(pugh)● Create 3D/2D designs for implementation● How will information be displayed?
o Excitation voltage required?o Signal conditioning?o Sampling rate?
● Bill of materials*● Risk assessment*
*these will be added to the main document later
Test PlansEMA to have extensive test plans
● Receive parts● Install software and get operational● Communicate with EMA through controller
○ Simple movement○ Force test
● ImplementSecondary requirements are simpler but still thorough
● Bench top testingo Example: Thermocouples in hot water, compare TC readings with thermometer
Keys:Estimated times for each process helps ganttThoroughness here will lead to easier MSDII
EDGE● Make sure there isn’t anything left from the template● Update roles● Update gantt charts● Add risk assessment ● Add project plans
Test Transducer● Theoretical Analysis
o How much displacement and force will x amount of volts produce?
o Call supplier and get quote on partso Based on forces iterate fixture designo Update B.O.M.o Test plan o Risk assessment
Addition of Physical Calendar• Show
progress
• Keeps DDR in sights
Addition of Physical Action Items• Allows us to see who’s
doing what
• Allows us to see our status of completion
• If your looking for more tasks you can see who to ask