QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Total Document Pages: 12 Cummins Confidential PROJECT GUIDE DOCUMENT Subject QSK50-DPM Master Skid Overview (Technical Package) This PGD is for the following applications: PGD Number 33.01 Automotive Industrial Marine G-Drive Genset Date: March 17, 2015 Filtration Emissions Solution Engine Models included: QSK50-DPM Author: Christian Lobo Approver per Procedure VPI-CCE-9695 CHANGE LOG Date Author Description Page(s) Mar 17, 2015 Christian Lobo - Included information on walls and enclosures - Updated radiator options information - Added information on base rails size options - Added information on Dual Fuel system 1, 3, 7, and 12 Jul 11, 2014 Christian Lobo Original publication All

Transcript of P GUIDE DOCUMENT Subject QSK50-DPM ... - gce.cummins… · The QSK50-DPM MS utilizes a Cummins...

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Total Document Pages: 12

Cummins Confidential

PROJECT GUIDE DOCUMENT

Subject QSK50-DPM Master Skid Overview (Technical Package)

This PGD is for the following applications: PGD Number 33.01 Automotive Industrial Marine G-Drive Genset Date: March 17, 2015 Filtration Emissions Solution

Engine Models included: QSK50-DPM Author: Christian Lobo Approver per Procedure VPI-CCE-9695

CHANGE LOG

Date Author Description Page(s)

Mar 17, 2015 Christian Lobo - Included information on walls and enclosures

- Updated radiator options information

- Added information on base rails size options

- Added information on Dual Fuel system

1, 3, 7, and 12

Jul 11, 2014 Christian Lobo Original publication All

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 1 of 12

Cummins Confidential

QSK50-DPM MASTER SKID Overview (Technical Package)

_________________________________________________________________________________________

PURPOSE This document provides technical information on the mechanical and electrical systems of the QSK50 Drilling Power Module Master Skid (QSK50-DPM MS) and shall be used in conjunction with engine and package specific Application Engineering Bulletins (AEBs) published on the Global Customer Engineering (GCE) website (http://gce.cummins.com).

INTRODUCTION AND OVERVIEW The QSK50-DPM MS was developed by the Cummins Center of Excellence (COE) to meet land based drilling requirements in the Oil & Gas (O&G) industry. The QSK50-DPM MS utilizes a Cummins QSK50-DPM capable of generating 60 Hz of electrical power at 1,200 rpm. For more information, refer to PGD 31.01 – QSK50-DPM Power Module Overview. Also, the Master Skid offers a complete solution which may include genset base rails, canopy, walls, air and fuel connections and routing, and ancillary skids for air equipment.

Figure 1. QSK50-DPM Master Skid

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 2 of 12

Cummins Confidential

Figure 2. QSK50-DPM Master Skid

The product structure is accessible through the Central Product Information File (CPIF), options available for ordering in Cummins Online Specifications (COLS), and service documentation in Cummins Quickserve Online (QSOL). The configuration number for this product is D0Y0008GX03 and the COLS PRIC spec is PRIC07761. Follow AEB 20.12 – Installation Quality Assurance (IQA) Procedure for each new QSK50-DPM MS installation to ensure that all Cummins and OEM installation requirements are met. Direct questions regarding the document contents to Application Engineering at the COE.

DISCUSSION This section provides a comprehensive description of the QSK50-DPM MS subsystems, installation requirements, and installation recommendations. The QSK50-DPM MS can be divided in two categories: genset skid and ancillary skid. The genset skid contains the following subsystems:

1. Cooling system 2. Base rails 3. Canopy

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 3 of 12

Cummins Confidential

4. Walls/Enclosures 5. Fuel, air, and exhaust plumbing and connections

1. Cooling System The COE offers a remote and an engine driven radiator option (Figure 3). Both options contain three (3) cores: LTA circuit, jacket water circuit and fuel cooler.

Drive Type Speed Fan Config. Discharge Direction

Coolant Capacity

Core Arrangement

Rating

480 V electric motor (50 hp)

Constant

Blower Vertical 117 gal Side by side 50 deg C VFD

controllable

Engine Constant Blower Horizontal 102 gal Stacked 50 deg C

Table 1. COE radiator options for QSK50-DPM

Figure 3. QSK50-DPM cooling system with plumbing

2. Base Rails The genset skid for the QSK50-DPM MS (Figure 4) contains a cable tray for load bank cables, fuel hoses box and Stage 1 fuel filter mounting bracket, radiator mounting locations, QSK50-DPM mounting locations, a grounding plate for the QSK50-DPM, five (5) Master Skid grounding locations (Figure 6), air starter plumbing, and a battery box. A rupture basin is built into the genset skid which allows for fluids to be collected and a drain piping system allows for fluids to be drained in two (2) locations: front and rear of the sump. QSK50-DPM MS base rails provide towable capabilities for transportation (Figure 5). The COE offers two different base rails sizes: a 32-foot long x 10-foot wide x 11.5-foot high and a 40-foot long x 10-foot wide x 11-foot high skid.

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 4 of 12

Cummins Confidential

Figure 4. QSK50-DPM MS Genset Skid

Figure 5. QSK50-DPM MS Towable Skid Front and Back Details

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 5 of 12

Cummins Confidential

Figure 6. QSK50-DPM MS Grounding Location Details

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 6 of 12

Cummins Confidential

3. Canopy A canopy is built into the QSK50-DPM MS (Figure 7). In addition to providing protection against the elements, it includes a gutter system to help with rain drainage. DOC mounting features and lighting are also included.

Figure 7. QSK50-DPM MS Canopy Details

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 7 of 12

Cummins Confidential

4. Walls/Enclosures The QSK50-DPM MS has the provisions to include optional walls or enclosures to protect the equipment from the elements (dust, snow, rain, etc.). The walls contain sets of louvers to ensure adequate air flow inside the room (Figure 8). Personnel doors are located on each side of the outer skids to allow for access and equipment servicing. Walls are currently only available for the 40-foot long skid.

Figure 8. QSK50-DPM MS Walls and Enclosure Details

5. Fuel, Air, and Exhaust Plumbing and Connections QSK50-DPM MS genset skids include fuel and air starting systems plumbing and connections as well as exhaust connections (Figure 9 and Figure 10). If a dual fuel setup is planned to be used, customers normally provide a Diesel Oxidation Catalyst (DOC) and bellows for the exhaust system to be installed by the COE. Otherwise, a muffler is included in a diesel only setup.

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 8 of 12

Cummins Confidential

Figure 9. QSK50-DPM MS Fuel and Air Plumbing Details

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 9 of 12

Cummins Confidential

Figure 10. QSK50-DPM MS Exhaust Connection Details

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 10 of 12

Cummins Confidential

Ancillary Skid The ancillary skid on the QSK50-DPM MS (Figure 11) includes additional equipment according to customer needs. Most of this equipment is normally procured by the customer and installed by the COE. It includes, but it is not limited to, air compressor equipment, air equipment installation hardware, air equipment installation features, cable tray, cable tray hardware, fuel and air tubing, fuel and air flexible tubing, quick disconnect fittings, and lighting. For more information on options available and design considerations, contact Application Engineering at the COE.

Figure 11. QSK50-DPM MS Ancillary Skid

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 11 of 12

Cummins Confidential

Master Skid Setup Normally, customers setup three (3) QSK50-DPM MS next to each to other and an ancillary skid on one end. Figure 12 and Figure 13 demonstrates a typical Master Skid arrangement. Refer to installation drawing 5360341 in GCE for specific installation requirements.

Figure 12. QSK50-DPM MS Typical Field Arrangement

QSK50-DPM Master Skid Overview (Technical Package) PGD 33.01 Page 12 of 12

Cummins Confidential

Figure 13. QSK50-DPM MS Typical Field Arrangement

Dual Fuel The COE offers a Dual Fuel solution for the QSK50-DPM MS. For more information on this system, reference PGD 72.01 - QSK50-DPM Dual Fuel System and PGD 05.01 – QSK50-DPM Dual Fuel Data Sheet.

REFERENCES Application Engineering Bulletins (AEBs): AEB 20.12 – Installation Quality Assurance (IQA) Project Guide Documents (PGDs): PGD 05.01 – QSK50-DPM Dual Fuel Data Sheet

PGD 31.01 – QSK50-DPM Power Module Overview

PGD 72.01 – QSK50-DPM Dual Fuel System