P al product - Industries | UL Panels & tegory Rule N TRODUC rpose of th duct Catego nt results an...
Transcript of P al product - Industries | UL Panels & tegory Rule N TRODUC rpose of th duct Catego nt results an...
Pd InR VV
Product declarati
nsulated Roof and
VERSION OVALID THR
Categorion (EPD
Metal PaWall Pan
October 9, 2ROUGH Oct
ry RulesD) for Pr
anels & Mnels
2012 tober 9, 20
s for preroduct G
Metal Com
017
eparing aGroup:
mposite P
an envir
Panels, an
ronment
nd Metal C
tal prod
Cladding
uct
g:
Insulated MProduct Ca
ProduPanel
Scope of v
Content
Version
Version
1
Editor’s No
This propoinsulation aU.S. includreferences This propo
American IInstitute Alcoa ArchProducts ATAS InterCentria
Metal Panels & ategory Rule N
uct Categls, and M
validity of this
ns overview
Descript
Version b
otes:
sed PCR is baand constructiode: units, functio, and standard
sed PCR has b
ron and Steel
hitectural
rnational
Metal Composumber 000000
gory Ruleetal Clad
s PCR: InsulaRoof aThese
FurtheEnviro
w
tion
by UL Environm
sed on revisionon products, anonal unit, impas.
been prepared
site Panels, an0
e for Insudding: Ro
ated Metal Panand Wall Panee PCR determi- the creatio- the calcul
project reer requirementonmental Prod
ment with input
ns made to exind building metact assessment
with input from
FabrKingMcEMetaMitsPete
d Metal Claddi
lated Metoof and W
els & Metal Coels ne the producton of the Enviration of the Lifeport on the LCAts are given in Uuct Declaration
t from a coalitio
sting PCRs frotals. Revisions/t methods, test
m the following
ral gspan Elroy Metals al Sales ubishi Alpolic
ersen Aluminum
ing: Roof and W
tal PanelsWall Pane
omposite Pane
t group specificronmental Prodfe Cycle AssesA UL Requiremens.
on was approve
om other countr/discussion poiting methods a
organizations:
m
Wall Panels
s & Metals
ls, and Metal C
c rules for: duct Declaratiosment (LCA) a
ents for Product
ed by the pane
ries that addresints to make thnd requiremen
According to
l Compos
Cladding:
n (EPD) and the creation
t Category Rul
el 1
ss structural sthis PCR applicants, use phase
o ISO 14025
site
n of the
es and
History
0/9/2012
teel, able to the options,
Insulated MProduct Ca
The PCR re ChairpersonThomas P. GlorIndustrial Ecolog35 Bracebridge Newton, MA 024email: t.gloria@iweb: www.indus
Table of 1.0 INTRO2.0 RULE
2.4.12.4.22.4.22.4.22.7.12.7.22.9.1
3.0 RULE3.1.13.1.23.1.33.1.43.1.53.1.63.1.73.1.83.1.93.3.13.3.23.3.33.3.43.4.13.4.43.4.53.4.63.5.13.5.2
Appendix
Metal Panels & ategory Rule N
view, was condu
n ia, Ph. D. gy Consultants Rd. 459-1728 industrial-ecology.comstrial-ecology.com
f Contents
ODUCTION TES FOR COM1 System Bou2 Optional Sy2.2 Use Stage2.3 End of life1 Data acquis2 Inventory D1 Interpretatio
ES FOR THE 1 Materials ...2 Manufactur3 Application4 Product Per5 Quality Con6 Delivery Co7 Singular Eff8 Weathering9 Product Pro1 Rules for de2 Parameters3 Parameters4 Other enviro1 Transport to4 Reference S5 Use of Wate6 End-of-life .1 Indoor Air ..2 Soil and Wa1 .................
Metal Composumber 000000
ucted by:
m
s
TO THE PROPLETEING Tundary Requiystem Boundae ...................e stage ..........sition and dataata and Data
on .................CREATION O.....................ring ...............
n ....................rformance Dantrol ...............onditions andfects ............. ....................
ocessing/Instaeclaring LCA s describing es describing reonmental infoo the buildingService Life ..er ............................................................ater ....................................
site Panels, an0
Panel MemJamie Meil, MAthena Sustai119 Ross AveOttawa, OntarCanada K1Y Jamie.Meil@a
DUCT CATETHE LIFE CYCrements for tharies for the L..........................................a processing
a Quality .............................
OF THE ENV...............................................................
ata ...................................... Properties .............................................allation ..........information ..
environmentalesource use .ormation desc site ............................................................................................................................................
d Metal Claddi
mber Managing Director
inable Materials Instituenue, Suite 100 rio 0N6
athenasmi.org
GORY RULECLE ASSESShe Life Cycle
Life Cycle Inve.............................................................................................................IRONMENTA............................................................................................................................................................................................................................ impacts .............................cribing differe..........................................................................................................................................................
ing: Roof and W
ute: Head Office
E ...................SMENT.........Inventory ....
entory ....................................................................................................................
AL PRODUCT............................................................................................................................................................................................................................................................nt waste cate...................................................................................................................................................
Wall Panels
Panel MeRobert A. ZDirector, ReNCI Group,10943 NortHouston, TXBobZ@ncig
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................T DECLARAT............................................................................................................................................................................................................................................................
egories and o...................................................................................................................................................
According to
ember Zabcik, P.E., LEED A.Pesearch and Developm, Inc. h Sam Houston ParkwX 77064 group.com
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................TION ........................................................................................................................................................................................................................................................................utput flows ......................................................................................................................................................
o ISO 14025
P. BD+C ment
way West
................. 4
................. 6
................. 9
............... 10
............... 11
............... 12
............... 14
............... 14
............... 17
............... 18
............... 18
............... 20
............... 21
............... 21
............... 22
............... 22
............... 22
............... 22
............... 22
............... 25
............... 25
............... 26
............... 27
............... 28
............... 29
............... 30
............... 31
............... 31
............... 31
............... 34
Insulated MProduct Ca
1.0 IN
1.1 Pu
These ProassessmePanels, acommunic This informschemes,Environm The PCR EnvironmpromotionIBU (SeptEuropean2006, Env2006, Env This PCRprovision this type oare still coresults anquantitativrelevant sand use fonot guara
1.2 PC
The scopeMetal Cla
Metal Panels & ategory Rule N
NTRODUC
rpose of th
oduct Categoent results annd Metal Cladcation.
mation is inte procurementental Product
is based on tental Product
n of harmoniztember 2010)n context for revironmental mvironmental m
R also addressof a true qua
of metric is unomponents thnd applying thve metrics to sections to guor decision-mnteed for com
CR Scope V
e of coveragedding: Roof a
Metal Composumber 000000
CTION TO
his PCR
ory Rules cread other saliendding: Roof a
nded to compt policies, etct Declarations
the Europeant Declarationsation, the Ru
) was referencegional applic
management –management –
ses core issuentitative metrnavailable. Wat might influem for compacapture the uide users in i
making. The demparative pur
Validity
e for this PCRand Wall Pane
site Panels, an0
O THE PR
ate a commonnt environmenand Wall Pane
plement exist. For examples that may sa
n standard ENs – core rulesles for Enviroced to internacability in Nor– Life cycle a– Type III env
es in ISO 140ic to guide thehile conformaence the comarative decisiuncertainty. Anterpreting theclarer must poses. (See S
R is the followels.
d Metal Claddi
RODUCT C
n platform for ntal informatioels, for busine
ing environme, this productisfy optional
N15804: 2012s for the produonmental Prodational consistrth America. Tssessment –
vironmental d
025 Section 6e interpretatioance to this Pmparability of ons making. Tt a minimum,
he informationstate that diffSection 3.0 of
ing: Insulated
ing: Roof and W
CATEGO
communication for Insulateess-to-busine
ental impact ct category rucriteria within
2 - Sustainabiluct category oduct Declaratitence. HowevThe PCR comRequirementeclarations –
6.7.2 Requiremon of results i
PCR minimizeEPDs. CautiThe declarer the declarer
n contained wferences betwf the PCR)
d Metal Panel
Wall Panels
ORY RULE
ion of the life ed Metal Panss or busines
metrics for exle facilitates t
n LEED.
lity of construof constructioions - Structuver, adaptatio
mplies with thets and guideli
– Principles a
ments for Coms preferred. H
es that variatioon should bemust, where will provide q
within the EPDween environm
s & Metal Co
According to
E
cycle impact nels & Metal Css-to-consum
xisting certificthe creation o
uction works –n products. F
ural Steel pubons were made standard ISines, and ISOnd procedure
mparability. THowever, in mons and devia used when inpossible, use
qualitative guiD relative to comental declar
omposite Pane
o ISO 14025
Composite er
cation of
– For the lished by
de from the SO14044: O14025: e.
The most cases, ations, there nterpreting e idance in omparability rations are
els, and
Insulated MProduct Ca
These pro C
sh
Ftran
F
rerig
F
a so(A
The produ Section: 4 Division: 4Group: 42Class: 429 Not all pro2.3 Funct This PCRneeded by
1.3 PC
This PCR
co th
Metal Panels & ategory Rule N
oduct categorConstruction oheets. Other m
actory-made ansverse andnd sheets.
actory-made esist transversgid metal skin
actory-made building clad
olid thermoplaACM) is also c
ucts considere
4 - Metal prod
42 - Fabricate29 - Other fab99 - Other me
oducts that arional Unit mu
R is valid for 5 y UL Environ
CR Content
R determines tonducting an he developme
Metal Composumber 000000
ry rules (PCRof unpainted ometals such a
metal roof and in-plane loa
insulated mese and in-plann on both side
Metal Compoding as part oastic core to pcovered by th
ed in this PCR
ducts, machin
ed metal prodbricated metaletal goods
re consideredst be applied
years from thment.
t
the product gLife Cycle As
ent of an Envi
site Panels, an0
) are applicabor painted galvas copper, alu
nd wall claddinds and act as
tal sandwich ne loads, proves, made of th
osite Materialof either a seaprovide flatnehis PCR.
R fall under U
ery and equip
ducts, except l products
d under the afin order to be
he date of rev
roup specific ssessment (Lronmental Pr
d Metal Claddi
ble to: vanized or zinuminum, etc.
ng capable ofs a water and
panels (IMP)vide thermal he above des
s (MCM) capaled wall or ra
ess but not the
UNCPC Code
pment
machinery an
forementionede considered
view and is su
rules for: CA) and the droduct Declara
ing: Roof and W
nc-aluminum would also b
f functioning a air barriers, m
) capable of fuinsulation and
scribed coil an
able of resistain screen syermal insulati
e:
nd equipment
d UNCPC codunder this PC
ubject to annu
development ation (EPD)
Wall Panels
alloy coated e covered by
as structural emade from th
unctioning asd act as a wand sheets.
ing transversystem, made oon. Aluminum
t
de are applicaCR.
ual review and
of a project r
According to
steel, includin this PCR.
elements to rhe above desc
structural eleater and air ba
e loading suffof rigid metal m Composite
able to this P
d/or modificat
report on the
o ISO 14025
ng coil and
resist cribed coils
ements to arrier, with a
ficient to act skins with a Material
CR. Section
tion as
LCA
Insulated MProduct Ca
1.4 Ab
Abbreviat Insulated by a conti Metal Claelements, Metal Comcontaining
1.5 No
ISO 1404 ISO 1404 ISO 1402procedure ISO 2193 EN 15804product ca
2.0 RU
A life cyclplausible,declared rthe LCA, sproducts a
Metal Panels & ategory Rule N
bbreviation
ions and Defi
metal panel: nuous insulat
dding: Sheet , or for aesthe
mposite Mateg foam plastic
ormative Re
0: 2006 Envir
4: 2006 Envir
5: 2006 Envires
0: 2007 Susta
4: 2012 Sustaategory of co
ULES FO
e assessmentransparent a
results must bsee part 2 “Rare inadmissi
Metal Composumber 000000
ns and Defi
initions are pe
Factory fabricting core, whi
steel that hasetic purposes
rials: MCMs ac insulation.
eferences
ronmental ma
ronmental ma
ronmental lab
ainability in bu
ainability of construction pro
OR COMP
nt, complying and credible dbe clearly staules for the Cble.
site Panels, an0
initions
er ISO 14040
cated composich acts as an
s been roll for.
are comprised
anagement --
anagement --
bels and decla
uilding constr
onstruction wooducts
LETEING
with ISO 140data, must beted in the EP
Creation of the
d Metal Claddi
:2006, ISO 14
site panel comn air, water va
rmed into a p
d of two meta
Life cycle ass
Life cycle ass
arations -- Ty
ruction -- Env
orks. Environm
G THE LIF
40/14044, dee presented. MD. For methoe Background
ing: Roof and W
4044, 14025:
mprised of innapor, and ther
rofile intende
al skins with a
sessment -- P
sessment -- R
pe III environ
vironmental de
mental produ
FE CYCLE
escribing the dModel assumodical details od Report”. Co
Wall Panels
: 2006, ISO 2
ner and outerrmal barrier.
ed to control th
a solid thermo
Principles and
Requirements
mental decla
eclaration of b
ct declaration
E ASSES
declared prodmptions with a
on calculationmparative de
According to
1930 and EN
r metal skins
he infiltration
oplastic core n
d framework
s and guidelin
rations -- Prin
building produ
ns. Core rules
SSMENT
duct and baserelevant influ
n and documeescriptions wit
o ISO 14025
N 15804
separated
of weather
not
nes
nciples and
ucts
s for the
ed on uence on the entation of th other
Insulated MProduct Ca
For the redata mustreport stru The backgtaken intoThat is to recycling/considerestage genhypothetic The follow
2.1 Aim
The aim o
th in ta us
2.2. Pe
The prima12 month not requircurrent da The perio
2.3 De
Metal Panels & ategory Rule N
espective prodt be submitteducture compli
ground reporto account in th
say, the proddisposal are
ed, this fact hanerally dependcal use stage
wing sections
m of the St
of the study shhe reasons fontended use arget audiencse of the stud
eriod unde
ary data collecperiod is to b
red at the endata.
d under cons
clared/Fun
Metal Composumber 000000
duct, an LCA d. All model aes with the st
t must addreshe assessmeduction (cradlepart of the anas to be justifds on the conscenario ma
must be care
tudy
hall be descrir the executio
e dy for public c
r Consider
cted from thebegin no later d of the 5 year
sideration und
nctional Un
site Panels, an0
complying wiassumptions wtructure of this
ss all buildingnt must be the to gate) mu
nalysis, these ied. In this ca
nstruction andy be included
efully conside
bed, includingon of the stud
comparisons
ration
involved planthan 5 years
r period, howe
derlying the LC
nit
d Metal Claddi
ith ISO 14040with a decisivs document, f
material-speoroughly pres
ust always be stages must
ase, the proced environmentd. Assumption
red for any fo
g the followiny
nts should bes prior to the dever the stud
CA must be d
ing: Roof and W
0 and based ove influence ofollowing ISO
ecific stages osented in relathoroughly palso be addre
esses must bet, it is not reqns and key pa
orm of compa
ng attributes:
e average valudate of the LCy will be requ
documented.
Wall Panels
on plausible, on the result sO 14040.
of the life cycleation to the coresented. If uessed. If use e documenteduired within th
arameters mu
arative decisio
ues from a peCA calculationuired to be up
According to
transparent ashould be spe
e. The stagesonsidered prouse and/or
and/or dispod in detail. Ashis PCR. If de
ust be clearly
on-making.
eriod of 12 mons. A new LCAdated and ba
o ISO 14025
and credible ecified. The
s which are ocesses.
sal are not s the use esired, a stated.
onths. The A study is
ased on
Insulated MProduct Ca
Wall and that controspace of a A functiondeclared ubuilding lelife cycle soptions" Ereferencenormalizefor combinthe selecttypical ap The declaprocess efinal manu
2.4 Sys
LCA is cosystem bo This sectiprevious oincluded i The moduthroughoustages anproduct. The settin
1 EN15804: 2012 The study that
Metal Panels & ategory Rule N
roof panels caols noise, air,a building, as
nal unit is a quunit is used inevel is not stastages as infoEPD and whe
by means of ed (in a mathening material ted stages of plications of p
ared unit for thevaluated. Theufacturing pro
stem Boun
onducted by doundary defin
on specifies tor subsequenn each of the
ular set up of ut the life cyclnd the informa
ng of the syste
2 - Sustainability of cowas used as a refere
Metal Composumber 000000
an provide m, water, and thwell as other
uantified descnstead of the ated or is unknormation modn the EPD is
f which the maematical sensflows attributthe constructproducts.1
his PCR is “coe coverage aocess step, an
ndaries
efining produnes the unit pr
the boundary nt product syse life cycle sta
the LCA undee of the prod
ation modules
em boundarie
onstruction works – Ennce for the developme
site Panels, an0
ultiple functiohermal transmr functions su
cription of thefunctional unnown. The dedules, i.e. in thnot based onaterial flows oe) to produceted to the contion product’s
overage of 10rea refers to tnd does not a
uct systems asrocesses to b
of the producstems in the liages listed in S
erlying an EPuct. This apps included are
es follows two
nvironmental Product Dent of this PCR used e
d Metal Claddi
ons; among thmission betwech as load ca
e performanceit when the p
eclared unit shhe case of a "n a full “cradleof the informae data, expresnstruction prod
incomplete li
000 sq. ft. (92the projected
account for los
s models desbe included in
ct system undfe of a buildinSections 2.4.
PD allows easroach require
e transparent,
o principles:
Declarations – core ruenglish units, therefore
ing: Roof and W
hese are coveeen the externarrying capac
e of a productrecise functiohall be applie"cradle to gatee to grave” LCation module ossed on a comduct and for cife cycle. The
2.90 square mflat area cov
sses due to o
scribing the kethe system m
der study andng. It also spe1 and 2.4.2 b
sy organizatioes that the sys, well defined
ules for the product cae, the declared unit de
Wall Panels
ering a certainnal environmity and aesthe
t system for uon of the proded when an EPe" EPD and "
CA. The declaof a constructmmon basis. combining ene declared uni
meters)2 with mvered by the poverlap and sc
ey elements omodel.
d, in particularecifies the probelow.
on and expresstem boundarand applicab
tegory of constructionefined is in english unit
According to
n area, creatinent and the inetics.
use as a referduct or scenarPD covers on"cradle to gateared unit provtion product aIt provides thvironmental iit shall relate
metal productproduct as outcrap during in
of physical sy
r, the boundaocesses that a
ssion of data pries for the lifeble to any con
n products. ts.
o ISO 14025
ng a barrier nterior
ence. The rios at the ne or more e with
vides a are e reference mpacts for to the
t” for each tput by the nstallation.
ystems. The
ry with any are to be
packages e cycle
nstruction
Insulated MProduct Ca
Titsas
Tth
Example: processineffects onthe produ
2.4.1 Sy For the pu
A A A
2.4.1.1. P
The produ
Epr
R P
pr G
re E
th T P M M W
3 EN15804: 201
Metal Panels & ategory Rule N
he “modularits life cycle, thspects and imhe “polluter p
hat generates
The system g of resource
n the building’ct (see figure
ystem Bou
urposes of creA1 Raw MaterA2 Transport tA3 Manufactur
Product Sta
uction stage wxtraction androcessing (e.g
Reuse of produrocessing of rocesses that
Generation of efining and tranergy recove
hat are part ofransportationroduction of a
Manufacturing Manufacturing Waste disposa
2 - Sustainability of co
Metal Composumber 000000
ty principle”: Whey shall be ampacts are depays principle the waste un
boundaries foes, Installations energy perf
e 1).
ndary Req
eating EPDs fial extraction o the manufaring
age (include
will account fod processingg. agriculturaucts or matersecondary mt are part of thelectricity, ste
ansport; ery and other f waste proce
n up to the facancillary mateof products aof Packaging
al, including a
onstruction works – En
site Panels, an0
Where proceassigned to t
eclared in the e”: Processesntil the end-of
or the productn and Use, whformance, and
quirements
from this PCRand processi
acturer
es A1 throu
or: of raw matl or forestry orials from a pr
materials usedhe waste proceam and hea
recovery proessing in the pctory gate anderials or pre-pand co-producg; ny packaging
nvironmental Product D
d Metal Claddi
sses influenche module oflife cycle stag
s of waste prf-waste state
t are broken ihich includesd End of Life,
s for the Lif
R, the followining, processin
gh A3)
terials (e.g. operations); revious produd as input for cessing in the
at from primar
cesses from previous prodd internal tranproducts; cts;
g waste.
Declarations – core ru
ing: Roof and W
ce the producf the life cyclege where theyrocessing shais reached.
nto Manufactperiodic main
, which includ
fe Cycle In
ng life cycle sng of seconda
mining proce
uct system; manufacturin
e previous prory energy res
secondary fuduct system; nsport;
ules for the product ca
Wall Panels
ct’s environmee where theyy appear;
all be assigne
turing, which ntenance anddes separation
nventory3
stages are reqary material (e
esses) and b
ng the producoduct systemources, also
els, but not in
tegory of construction
According to
ental performy occur; all en
ed to the pro
includes extrad replacemenn and final dis
quired: e.g. recycling
biomass pro
ct, but not inc; including the
ncluding thos
n products.
o ISO 14025
mance during nvironmental
duct system
action and t and sposition of
g processes)
duction and
cluding those
ir extraction,
se processes
Insulated MProduct Ca
Product sproductionand persosite are, in(e.g. clima Allocation
2.4.2 Op This PCR
C
4Forexample,intransport.5 EN15804: 201
Metal Panels & ategory Rule N
tage includesn stage Howeonnel related n general, notate control req
n associated w
Figur
ptional Sys
R also covers oCradle to gate
nthecaseoflow‐densit
2 - Sustainability of co
Metal Composumber 000000
s provision of ever, productiactivities are t considered, quired for inv
with transport
e 1: Types of EPD
stem Boun
optional EPDwith options
tyfinishedinsulationp
onstruction works – En
site Panels, an0
all materials, on of capital not included.and will only entory, etc.).
will be based
with respect to life
ndaries for
s. for modules A
roducts,thevolume,no
nvironmental Product D
d Metal Claddi
products, angoods, infras Heating, artibe considere
d on weight o
cycle stages and m
the Life C
A4 to A5 and
ottheweight,restricts
Declarations – core ru
ing: Roof and W
nd energy incltructure, prodficial lighting
ed if they are
r volume, as
modules covered fo
ycle Inven
B1 to B7 and
theamountofcargoo
ules for the product ca
Wall Panels
luding waste dduction of maand transportrelevant for th
appropriate f
or the building asse
ntory
d,
navehicle,andthusvo
tegory of construction
According to
disposal durinnufacturing ets within the phe production
for realistic mo
essment5
olumewillbeusedina
n products.
o ISO 14025
ng the equipment production n process
odeling.4
allocatingmaterialfor
Insulated MProduct Ca
C For the pu 2.4.2.1 C
When cho The const
A A
Constructprocessinincluded aproduction
2.4.2.2 U 2.4.2.2.1
When cho The use s
B B B B B
B1 througand accoraccordingand key pthe assum In the casetc. shoul
Metal Panels & ategory Rule N
Cradle to grave
urposes of cre
Construction
oosing to inco
truction stageA4: Transport tA5: Installation
tion Process Sg up to the enare all impactn, transport, a
Use Stage
Related to
oosing to inco
stage related
1: Use or app2: Maintenan3: Repair 4: Replaceme5: Refurbishm
gh B5 shall berding to manugly. Maintenanparameters mmptions made
se of a full repd be dived ov
Metal Composumber 000000
e would inclu
eating EPDs f
n Process S
orporate the c
e will report: to the building
n into the build
Stage includend-of-waste ss and aspectsand waste pro
the Buildin
orporate the b
to the building
plication of thence
ent ment
e incorporatedufacturers’ gunce/replacemust be clearly
e.
placement cycver the fractio
site Panels, an0
de the option
from this PCR
Stage (inclu
construction s
g site ding
es provision ostate or disposs related to aocessing and
ng Fabric
building fabric
g fabric includ
e installed pro
d under normaidelines. The ents are to be
y stated and t
cle, the total imon of expected
d Metal Claddi
s for modules
R the followin
udes A4 and
tage, module
of all materialssal of final resny losses durdisposal of th
, modules B1
des:
oduct
al conditions number of re
e modeled ache manufactu
mpacts of thed life. For exa
ing: Roof and W
s C1 to C4
g life cycle st
d A5)
es A4 and A5
s, products ansidues duringring this conshe lost produc
through B5 s
to achieve theplacements occording to mure is to subm
e product's maample, if a pr
Wall Panels
tages are opti
shall be inclu
nd energy, asg the construcstruction procects and mate
shall be includ
e defined refeof the membranufacturer’s
mit supporting
anufacturing,roduct lasts 50
According to
ional:
uded.
s well as wastction process ess stage (i.erials).
ded.
erence servicrane shall be s guidelines. Ag documentati
production, i0 years within
o ISO 14025
te stage. Also
e.
ce life (RSL) declared
Assumptions ion to justify
nstallation, n a 60 year
Insulated MProduct Ca
building lifshould be 2.4.2.2.2
When chocombinati
Bse
B
2.4.2.3 E When cho End-of-life
C C C C
2.5 Cu
Criteria foadditionalfor the excincluded ilimited to,assembly
Metal Panels & ategory Rule N
fe, then the fue dived over th
Related to
oosing to incoon or indepen
6: Operationaervices),
o The reof the
o Due tocalcularegion
7: Operationao This is
consis
End of life
oosing to inco
e stage includC1: DeconstruC2: Transport C3: Waste proC4: Disposal
t-off Criter
or the exclusio information aclusion of inpn the calculat fasteners, clof the produc
Metal Composumber 000000
ull impacts shhe remaining
the Operat
orporate the ondent of one
al energy use
eference serviproducts will o the compleations and res), calculational water use s not anticipatstency with EN
stage
orporate end-o
des: ction, demolitto waste proccessing for re
ria
on of inputs aare intended t
puts and outpution, for whichips, gaskets, ct.
site Panels, an0
hould be counlife required t
tion of the B
operation of thanother.
e (e.g. opera
ice life of the be declared a
exity of buildsults. When rn methods, so
ted to be a utN 15804, this
of-life, module
tion cessing euse, recover
nd outputs (cto support anuts shall be dh data are avasealants, trim
d Metal Claddi
nted for the firto service the
Building
he building, m
ation of the h
building is deaccordingly.
ding energy mreporting in thoftware/tools,
tilized as part is an optiona
es C1 through
ry, and/or recy
cut-off rules) in efficient calcocumented. Aailable, unles
m, flashing, an
ing: Roof and W
rst life cycle. Fe building. (10
modules B6 an
heating system
efined as 60 y
modeling, indhe EPD, ope, and other ke
t of the LCA cal reporting m
h C4 shall be
ycling
n the LCA anculation proceAll inputs ands otherwise sny other comp
Wall Panels
For the replac0/50 or 20% o
nd B7 may be
m and other
years and the
dependent rerational energ
ey parameters
calculation forodule.
e included.
d informationedure. Any apd outputs to a stated in this Pponents asso
According to
cement, the fuof the total)
e included eith
building rela
e number of re
eview is requgy use modes must be dec
r use phase, h
n modules andpplication of th
(unit) procesPCR, includin
ociated with th
o ISO 14025
ull impacts
her in
ted installed
eplacements
uired for the els for (insert clared.
however, for
d any he criteria s shall be
ng, but not he final
Insulated MProduct Ca
In case ofthe inclus
Mbe
Een
Ebehaexm
The sum oFor additio
2.6 All
Most induproduce obetween tbecome inprocessescarefully abe addres The allocaindicated,
A A C C
Whereby The avoidthat would
Metal Panels & ategory Rule N
f insufficient inion of inputs a
Mass: If a flowe excluded, pnergy: If a fnvironmental nvironmentale excluded. Iave a significxperts. If the
more informati
of the neglectonal clarificat
ocation ru
ustrial processone product athem are not nputs for othes, allocation sand should bessed with the
ations of relev at least:
Allocation in thAllocation of enCredits from reCredits from re
reference mu
ded burden apd have otherw
Metal Composumber 000000
nput data or dand outputs w
w is no more tproviding its eflow is no morelevance is relevance: Iff data is miss
cant environmproxy for anon must colle
ted input flowtion, reference
ules
ses produce mand sometimedistributed in
er processes. should be avoe justified. Meavoided burd
vance for calc
he use of recynergy, auxiliaecycling or enecycling or en
ust be made t
pproach subtrwise been pro
site Panels, an0
data gaps for within each sy
than 1% of thnvironmentalore than 1%minor.
f a flow resultssing and mee
mental impact, excluded ma
ected and eva
ws must not exe EN 15804 S
more than thees products ar
a simple wayWhen dealin
oided as far asetal scrap genden modeling
culation (appr
ycled and/or sary and operatnergy recoverynergy recovery
o the module
racts impacts oduced from p
d Metal Claddi
a unit procesystem bounda
he total mass relevance is of the total
s in less thanets the criteri, it is evaluateaterial resultsaluated in the
xceed 5% of tSection 6.3.5.
e intended prore co-producey. Intermediatg with systems possible. Wnerated duringapproach.
ropriation of e
secondary rawting materialsy of packaginy from the en
s in which the
from the maiprimary raw m
ing: Roof and W
ss, the followiary:
input of the minor. energy inpu
n 1% of the toa above for eed with proxies in a contribsystem to fur
the total mass.
oduct. Normaed with other te and discardms involving m
Where unavoidg manufactur
expenses acro
w materials s used for indng materials and of life of the
e allocations
in product sysmaterials. To b
Wall Panels
ng criteria sh
product syste
uts it may be
otal impact in exclusion, yees identified
bution that worther determin
s, energy or e
ally more thanproducts. As ded products multiple produdable, allocatiring is a valua
oss various p
ividual produand productioe product
are performe
stem for co-pbe consistent
According to
all be used to
em being mod
e excluded, p
any LCIA catt is thought tby chemical a
ould warrant ine inclusion/e
environmenta
n one input is a rule the macan be recyc
ucts and recycion should be
able co-produ
products) mus
cts in a factorn waste
d.
roducts or byt with the Wor
o ISO 14025
o determine
deled it may
providing its
tegory it may to potentially and material its inclusion, exclusion.
al relevance.
needed to aterial flows cled to cling
e considered ct and shall
st be
ry
y-products rldSteel
Insulated MProduct Ca
dataset fomodel whSept 2009 The “valueits inversegenerateddata publi This is a c(post-consproduction For all othallocation
2.7 Lif
QuantitatiModeling example, If several be done fo
2.7.1 Da Data acqu
2.7.2 Inv The invenrequireme
6Forexample,assurepresentedbythe“0.90minus0.25=0.aroundendoflifetrmeans.
Metal Panels & ategory Rule N
or galvanized ich utilized th9).
e of scrap” she is then to bed. A correspoished by the I
cradle-to-gatesumer). Recyn) which is kn
her allocationsprocedure of
e Cycle Inv
ve and qualitof the unit proin tabular for
products are or each produ
ata acquisi
uisition and da
ventory Da
ntory data collents as releva
umethesteelcontains25%“valueofscrap”.Uponendo.65kg.Separatethevalueoreatment.The“valueofscra
Metal Composumber 000000
Steel Coil, sche modeling a
hall be used ae consistentlynding “value oInternational A
e PCR, therefycling credit isnown to be re
s, reference Ef reuse, recyc
ventory An
ative descriptocesses undem or with the
declared in ouct or location
ition and d
ata processin
ata and Da
lected will be ant regarding
scrap.Therefore,theCradloflife,basedona90%recyfscrapusedduringproducap”itselfiscalculatedasthe
site Panels, an0
crap steel inpapproach desc
as the upstreay used again tof scrap” modAluminum Ins
fore no credit s only given tocycled.
EN 15804 6.4cling and reco
nalysis
tion of the unerlying the LChelp of flow-c
one EPD or if n, and weight
data proces
ng methods m
ta Quality
flow-based, cdata quality,
le‐to‐Gateproductionof1kclingrate,0.90kgofscrapstmanufacturefromthatpoedifferencebetweenproduc
d Metal Claddi
ut is given a bcribed in a stu
am burden of throughout thedel shall be crstitute and the
is applied foro scrap gener
4.3.2 on co-povery.
it processes sCA shall be recharts (e.g. sc
one product ing of the dat
ssing
must be report
complete ande.g. reproduc
kgofsteelreceivestheenvirsteelisrecovered,andthereotentiallyavailableatendofcingagivenamountofmat
ing: Roof and W
burden basedudy of recycli
any scrap inpe LCA to provreated for alue Aluminum A
r the potentialrated within th
roduct allocat
shall be includeported in a trcreenshots fr
is produced ata sets shall b
ted.
d follow ISO 1cibility, consis
ronmentalburdensassociaefore0.90kgworthof“valuflife.Thisisdonefortworeterialfrom100%primarym
Wall Panels
d on the Worldng methodolo
put in the provide credit for
uminum basedAssociation.6
l end of life rehe manufactu
tion and Sect
ded in the LCransparent warom LCA softw
at several locabe documente
4025, ISO 21stency, precis
atedwithcombining0.75kgueofscrap”iscredited.Inteasons:fortransparencyinmaterialandthesameamou
According to
dSteel ”valueogies (Avery &
duction of Ster any steel scd upon the alu
ecycling of theuring process
tion 6.4.3.3 o
CA inventory aay. This can bware).
ations, modeed.
1930, and ENsion, uncertain
gofprimarysteelwith0.25thisexample,the"netscrapnmodeling,andinrecognitiuntofmaterialthroughseco
o ISO 14025
e of scrap” & Coleman,
eel Coil, and crap uminum LCI
e products (post-
on the
analysis. be done, for
ling has to
N 15804 nty etc. Data
5kgofscrapsteelprecovered"isequaltoionoftheuncertaintyondaryproduction
Insulated MProduct Ca
shall be retechnolog
Tanbe
Gda
Tan
2.8 Imp
The impacfrom both(TRACI 2shall be re
gl oz ac eu ph de D
To provideshall be tafactors for See Sectienvironme
7 For the use of 8 TRACI 2.0 and
Metal Panels & ategory Rule N
epresentativegical requirememporal: Thend shall be noe older than 1
Geographical: ata shall be dechnological:nd/or product
pact Asses
ct assessmenthe US EPA
.0) shall be reeported for EP
lobal warmingzone depletiocidification of utrophicationhotochemicalepletion of ab
Depletion of ab
e results for aaken from ther ADP-fossil f
on 3.2.2 Paraental product
secondary data our si
d CML 2010 or the mo
Metal Composumber 000000
e of the manufments. e obtained infoo older than 510 years.7 DeThe geograp
documented. Data will ret. Industry ave
ssment
nt is carried oTool for the R
eported. CharPDs outside o
g; on; f land and wat; l ozone creatibiotic resourcebiotic resourc
abiotic depletie University offuels are the n
ameters descdeclaration.
de of North America,
ost current version of th
site Panels, an0
facturer’s dat
ormation from5 years from teviations shallphic region of
epresent techerage data sh
ut for the folloReduction andracterization fof North Ame
ter;
ion; es (elements)
ces in net calo
ion potential, f Leiden (CMnet calorific va
cribing environ
regional proxies are ahe characterization fac
d Metal Claddi
a and conditio
m the manufacthe date of us be justified.the productio
hnology in ushall be checke
owing impact d Assessmenfactors taken rica.8
); orific value (fo
an indicator nL) methodoloalues at the p
nmental impa
cceptable. For exampctors.
ing: Roof and W
ons according
cturing processe. Average b
on sites includ
se and refleced for plausib
categories. Ant of Chemicafrom the Univ
ossil).
not available ogy, last updapoint of extrac
acts for report
ple, the modification of
Wall Panels
g to temporal
ss will be annbackground (s
ded in the cal
ct the physicbility by the ve
At a minimumal and Other Eversity of Leid
in TRACI, imated in 2010. Tction of the fo
ting requireme
f electricity grid values
According to
l, geographica
nual approximsecondary) da
culation of re
al reality of erifier.
m characterizaEnvironmentaden (CML) me
pact characteThe charactessil fuels.
ents for a pub
s to applicable regions
o ISO 14025
al and
mate values, ata shall not
presentative
the material
ation factors al Impacts ethodology
erization rization
blished
s.
Insulated MProduct Ca
2.9 LC
This repoprogram o The resultaccuratelyindepende The reporinformatio The repor
G
G
S
Qal
C
L
Metal Panels & ategory Rule N
CA Project
rt is not part ooperator for th
ts, data, methy reported witent verificatio
rt should also on made avail
rt shall give th
General aspeco commo date oo statem
Goal of the stuo reason
informcomm
cope of the so declaro definitio calcula
o systemomissi
Quantification llocated to the
o assumCut-off criteria
o descripo list of e
Life cycle inveo qualita
the de
Metal Composumber 000000
Report
of the publishhe verification
hods, assumpthout bias. Th
on and to perm
allow the reslable in the re
he following:
cts: issioner of thef report;
ment that the sudy: ns for carryination and dunication; tudy: ed/functional ion, includingation rule for a
a group of sthe same p
m boundary ions of life cycof energy an
e declared prmptions about
for initial inclption of the aexcluded procentory analysiative/quantitatclared unit, ta
site Panels, an0
ed environmen of an enviro
ptions and limhey shall be trmit an unders
sults and interespective EPD
e LCA study,
study has bee
ng out the stdata for an
unit, includin relevant techaveraging datsimilar produc
product producaccording tocle stages, prnd material inoducts; and electricity prousion of inputpplication of ccesses. is: tive descriptioaking into acc
d Metal Claddi
ental product nmental prod
mitations and cransparent antanding of the
rpretation to bD.
internal or ex
en conducted
tudy and its EPD for bu
g hnical specificta, e.g. when cts produced ced at differeo the modulrocesses or dnputs and ou
oduction and ts and outputcut-off criteria
on of unit procount the prov
ing: Roof and W
declaration, bduct declaratio
conclusions ond presented e complexities
be used in su
xternal practit
according to
intended appusiness-to-bus
cation(s); the declaredby different s
ent productionar approach
data needs; utputs, taking
other relevants, including a and assump
cesses necesvisions of ISO
Wall Panels
but is a requiron.
of the LCA shin sufficient ds and trade-o
pport of the d
tioner of the L
o the requirem
plication and siness and/o
d/functional unsuppliers or n sites; as outlined
g into accoun
nt background
ptions;
ssary to modO 14025 regar
According to
red submissio
all be compledetail to allowoffs inherent in
data and addit
LCA study;
ments of ISO 1
audience, i.or business-t
nit is defined f
d in Figure
nt how plant-l
d data;
el the life cycrding data co
o ISO 14025
on to a
etely and w
n the LCA.
tional
14040/44.
e. providing to-consumer
for:
1, including
level data is
cle stages of nfidentiality;
Insulated MProduct Ca
A
L
L
2.9.1 Int The aggreassessmehave a sig
Tm
T A
da T
pr A F
To check are to be
Metal Panels & ategory Rule N
o sourceo validat
Allocation princ
o documo uniform
ife cycle impao the LCo the relo referen
in this o a state
categoLife cycle inte
o the reso assum
both mo the va
from so data qo full tra
terpretatio
egation factorent should be gnificant effec
he interpretatmodules);
he ratio of lifeAssumptions a
ata-related; he deviation fresented from
Assessment ofull transparen
the declaratiodivided accor
Metal Composumber 000000
es of generic tion of data, in
data qualityciples and pro
mentation andm application act assessmeCIA procedure
ationship of tnce to all chaPCR; ement that tory endpointsrpretation: sults;
mptions and limmethodology a
riance from teveral sourceuality assessnsparency in
n
rs of the life cinterpreted b
ct on the resu
tion of results
e cycle inventand limitations
from the averm several souf data quality;ncy in relation
on, a dominanrding to the re
site Panels, an0
data or literatncluding y assessmentocedures, inc justification oof allocation
ent: es, calculationhe LCIA resu
aracterization
the LCIA res, the exceedin
mitations assoand data relatthe means of es or for a ranment; terms of valu
ycle inventoryby assigning tlt. The interpr
s based on a s
tory results ans in relation to
rage of the imrces, or the re; and n to value judg
nce analysis selevant influen
d Metal Claddi
ture used to c
t; and treatmecluding of allocation pprocedures.
ns and resultsults to the LCI
models, char
sults are relang of thresho
ociated with tted; LCIA results
nge of similar
ue-choices, ra
y analysis andhem to the deretation of the
selected-dom
nd impact asso the interpret
mpact assessmesults are bas
gments, justif
should be carnces. The infl
ing: Roof and W
conduct the L
ent of missing
procedures; a
s of the study results; racterization f
ative expressolds, safety ma
the interpreta
s should be dproducts
ationales and
d the categoreclared unit ae background
minance analy
sessment restation of resu
ment results msed on a num
fications and
rried out. Primluence of ass
Wall Panels
CA;
g data;
and
;
factors and m
sions and doargins or risk
ation of results
described, if g
expert judgm
ries of the lifeand stating and report should
ysis of indicato
ults; lts in the EPD
must represenmber of simila
“expert judgm
mary energy asumptions due
According to
methods used
o not predict s.
s as declared
generic data a
ments.
cycle impactny specificatiod report at lea
ors (for the re
D, both metho
nted if generir products;
ments.”
and impact cae to data gap
o ISO 14025
d, as defined
impacts on
d in the EPD,
are declared
t ons, which ast:
elevant
ods, and
c data are
ategories s or other
Insulated MProduct Ca
uncertaintComparat
3.0 RUDECL
3.1 De
The follow
T T T P C
re A
than
Nw
T In
lif A
Pda
Inprrath
3.1.1 Ma
Metal Panels & ategory Rule N
ties should betive descriptio
ULES FOLARATIO
claration o
wing items of he declaratiohe name andhe descriptionroduct to whi
Construction pepresentation
A description ohe user of thend effective in
Name of the prwebsite;
he date the dnformation onfecycle stages
A statement thCR, ISO 140ata sources a
n the case whroducts, a staange/ variabilihose represen
aterials
Metal Composumber 000000
e assessed wons of differen
OR THE CN
of General
general informn number;
d address of thn of the constch the data re
product identif of the constr
of the main pr EPD to undenstallation, usrogram used
declaration wa which stagess;
hat EPD of co25, and wher
and data qualhere an EPD iatement to thaity of the LCIAnting them for
site Panels, an0
with a sensitivint building ma
REATION
Informatio
mation are re
he manufactutruction produelates; fication by naruction producroduct compoerstand the cose and disposand the prog
as issued ands are not cons
nstruction prore relevant ENity; s declared as
at effect shall A results if sigr whom the E
d Metal Claddi
ity analysis, aaterials within
N OF THE
on
quired and sh
urer(s); uct’s use and
me (includingct to which th
onents and or omposition of sal of the prodram operator
d the 5 year psidered, if the
oducts may nN 15804. Spe
s an average be included i
gnificant; the PD is represe
ing: Roof and W
as far as the an one EPD are
E ENVIRO
hall be declar
the functiona
g any producte data relatesmaterials. Th
f the product aduct; r’s name and
eriod of valide declaration
ot be comparecific attention
environmentain the declarasite(s), manuentative.
Wall Panels
assumptions ae inadmissible
ONMENTA
red in an EPD
al or declared
t code) and a s; his descriptionas delivered a
address and,
ity; is not based o
rable if they dn should be g
al performancation togetherufacturer or gr
According to
are relevant te.
AL PROD
D:
unit of the co
simple visua
n is intended and also supp
, if relevant, lo
on an LCA co
do not complyiven to compa
ce for a numbr with a descrroup of manuf
o ISO 14025
to the result.
DUCT
onstruction;
l
to enable port safe
ogo and
overing all
y with this arability in
ber of iption of the facturers or
Insulated MProduct Ca
3.1.1.1 S
The followEuropean
TprwloCA
For EPDs
3.1.1.2 R
All raw maproduct gmust be d
3.1.1.3 A
Declaratiomaterials product, e
3.1.1.4 M
Material d
3.1.1.5
Informatiointermedia
P M
Metal Panels & ategory Rule N
Substances
wing is requiren market:
he declaratioroduct that ar
when their conocation of anyCandidate ListAgency.
s in all other m
Raw materia
aterials and/oroups, includi
declared in pe
Auxiliary su
on of all auxilior the manuf
e.g., adhesive
Material exp
designations l
Raw Mate
on on raw maate products rocess steps
Mining location
Metal Composumber 000000
of high con
ed for those E
n of material re listed in thentent exceedsy safety data st of Substance
markets, this s
als/primary
or intermediating plastic, m
ercentage by
ubstances/A
ary substancfactured buildes, joint ligam
planation
isted under th
rial Extrac
terial extractioused, for exafor the produ
ns
site Panels, an0
ncern
EPDs meant t
content of thee “Candidate s the limits forsheet can be es of Very Hig
section is con
products
e products, wetal, coatingsmass.
Additives
es and additiving product dents, blowing
he previous it
tion and O
on and on themple:
uction of interm
d Metal Claddi
to be in comp
e product shaList of Substa
r registration wprovided. „Sugh Concern fo
nsidered optio
which are useds, fire retardan
ves (substancuring the man
g agents etc. I
ems must be
Origin
e average tra
mediate prod
ing: Roof and W
pliance with E
all list as a minances of Verywith the Euroubstances of or Authorizati
onal.
d for the prodnts, foam sys
ces that comenufacturing pInformation lik
explained he
nsport distan
ucts
Wall Panels
N 15804:201
nimum substay High Concepean Chemicvery high conion of the Eur
duction of the stems, catalys
e in direct conrocess), and ke "... is free
ere.
ce for the raw
According to
2 and utilized
ances containrn for authoriz
cals Agency. Tncern" are listropean Chem
declared prosts and blowin
ntact with thewhich remainof ..." cannot
w materials or
o ISO 14025
d in the
ned in the zation” The source ted in the
micals
oducts or ng agents,
used raw n on the be used.
r
Insulated MProduct Ca
P S
It is accepmaterial re
3.1.1.6 A
Informatio R R R
Informatioto world c
3.1.2 M
The manushould bemodeled wsheets), a
If the EPDlocations provided.
Health Pro
Descriptiothe countr
9 For example, tthe west coast othe Philippines aMansfelder counsource of copperelatively easy tothat have been reserves that ca100 % which he
Metal Panels & ategory Rule N
roduction siteuppliers
ptable to referepresentation
Availability
on on generalResources, Reserves, Recycling or se
on on the avaconsumption i
Manufacturi
ufacturing proe representativwithin the LCAand the auxilia
D applies to mmust be desc
rotection in Pr
on of health pry of productio
the most significant coof South America (maialso have stocks worthntryside – there wereer as a raw material o carry out, based on developed will suffice
an economically be mlps conserve resource
Metal Composumber 000000
es
rence accepten.
of Raw Mat
and regional
ecndary mate
ilability of ress negligible...
ing
ocess shall beve of the domA. The coatinary materials
multiple locatiocribed where
roduction
rotection meaon). Precautio
opper mining areas incinly Chile and Peru) ah mentioning. In Europ only small quantitieswith increasing importhe easy refoundabilitfor several decades a
ined using today’s teces.
site Panels, an0
ed industry av
terials
l availability o
erial
ources must .”).9
e described anminant procesngs (e.g., stripused as a fun
ons, the produthe primary te
asures taken onary measu
clude this lake region nd Mexico. Furthermope, only the remaining
s of copper, and thesertance is the return oty of copper. The raw and there is still the pchnology are currently
d Metal Claddi
verage numbe
of the raw mat
be issue-rela
nd illustrated s and techno
p coating of conction of atmo
uction locatioechnology an
during producres for certain
in North America andore, the copper mines g copper deposits in Pe deposits have eithe
of the metal using spematerial copper is avaotential of developing
y estimated to contain
ing: Roof and W
ers as a repre
terials used, f
ated (not: “...th
with a simpleology and shoold-rolled sheospheric burd
ns must be dnd processes
ction processn process ste
d the South West of thof Kazakhstan and U
Poland and Turkey areer been exhausted or ecific separation proc
vailable anywhere, as g new resources. The approx. 320 m tons w
Wall Panels
esentation for
for example:
he company's
e chart or diaguld be repres
eets), surface den must also
isclosed and are not repre
s that exceed eps, if applicab
he USA, Zambia, and Uzbekistan. Australia, Ce of any economic impcan no longer be min
cesses – basically a ccopper is traded on thbase materials used aworldwide. The reuse
According to
r recycled con
s consumption
gram. The illusentative of th
coatings (e.go be addresse
the processeesented in the
national reguble.
the southern part of thChina, Indonesia, Papportance. In Germany ned in terms of econocommon practice for he ‘London Metal Exchare limited in their ava
e or recycling potentia
o ISO 14025
ntent or
n compared
ustration he process g., profile ed.
es of those e illustration
ulations (of
he African continent, pua New Guinea and
– for example in the omic efficiency. One thousands of years, hange. The reserves ailability. The copper l of copper is almost
Insulated MProduct Ca
Environm
Descriptioregulationair, wasteexistent).
3.1.3 A
The applic
Example: A
S
The charaimportant
Examples A A T E
The applicthrough fu
3.1.4 Pr
Metal Panels & ategory Rule N
ental Protecti
on of environmns or system-dewater, waste
pplication
cation of thes
Applications of• sheetin• ancho• suppo• Sub-st• Steel f
teel-Concrete• Self-su
acteristics of tpart of a spe
s may includeAir barrier propAcoustical prop
hermal propetc.
cations relateurther process
roduct Perf
Metal Composumber 000000
ion in Produc
mental protecdependent re, and noise-e
se products m
f building prodng in excavatr structures rting and retatructures and for compositee Composite, upporting san
roofs and roexterior wawalls (inclu
the product thcification dec
e but are not liperties perties
erties
e to the supplising by subse
formance D
site Panels, an0
ction
ction measureequirements, emissions. Info
must be specif
ducts, for exation pit
aining structurcovering for
e steel structuComposite S
ndwich elemeoofings; lls and wall coding partition
hat are a resucisions.
imited to:
ed product anequent manuf
Data
d Metal Claddi
es taken in thee.g., descriptiormation on t
fied.
ample:
res roof and wallres
Steel Structurents for:
overings; walls) and (s
ult of the appli
nd the intendefacturers.
ing: Roof and W
e production pion of especiahe Environme
es
sub) ceilings w
ication should
ed purpose(s
Wall Panels
process, whically eco-friendental Manage
within the bui
d also be spec
s) of use, even
According to
ch exceed natdly treatment ement System
lding envelop
cified. These
n if it is only a
o ISO 14025
tional of exhaust
m (if
pe.
could be an
achieved
Insulated MProduct Ca
The applicmust be in
See Appe
3.1.5 Qu
Informatiomanagemregulation
3.1.6 D
The dimedelivery cexact mea
3.1.7 Si 3.1.7.1 F
Informatio B S C M O
3.1.8 We For metallocation o1.
3.1.9 Pr
Metal Panels & ategory Rule N
cable standarndicated.
endix 1 for exa
uality Cont
on on quality cment systems ns or national
elivery Co
nsions of the onditions, a tyasurement of
ngular Effe
Fire
on on fire behuilding matermoke produc
Critical materiaMelting temperOther respons
eathering
lic surfaces, eof the samplin
roduct Proc
Metal Composumber 000000
rd(s) or the ge
amples.
trol
control must b(EMS) and faregulations c
nditions a
declared proypical range oall products a
ects
avior includinrials ction al temperaturerature es to fire.
empirical valug, and the du
cessing/In
site Panels, an0
eneral approv
be product-reactory-own prcan be indicat
nd Propert
ducts in delivof delivery coas delivered.
ng, if relevant:
e (failure tem
ues for the weuration of the w
stallation
d Metal Claddi
val by building
elated. Qualityroduction conted, if applica
ties
very condition onditions shou
:
perature)
eathering per weathering te
ing: Roof and W
g authorities o
y managementrol measuresble.
must be indiuld be specifie
year must beest must be d
Wall Panels
or a compara
nt systems (Qs according to
cated. Given ed. This is no
e declared. Theclared as ap
According to
ble national r
QMS), environo North Amer
the changes ot intended to
he data sourcpplicable. See
o ISO 14025
regulation
nmental rican
in the o require an
ce, the e Appendix
Insulated MProduct Ca
3.1.9.1 P
Descriptiosubstance
B
C
A T P
Indicationsafety and
3.1.9.2 O
Informatioand own s
3.1.9.3 R
The treatmdeclared.
3.1.9.4 P
Informatiopallets, fil
Metal Panels & ategory Rule N
Processing/
on of the proces, as well asasic principle
• TranspConstruction:
• With o• With o• Fasten• Details
Additional prodools rocessing op
• Easy/m• Requir• Mount• Proces
of the procesd environmen
Occupationa
on on measursystems, info
Residual Ma
ment of the re
Packaging
on on productms etc.); Indic
Metal Composumber 000000
Installation
cessing methos noise reductes: portation and
other metals other building ners (mechans which must ducts
eration: medium/difficured level of prting effort: Prossing conditio
ssing regulatintal protection
al Safety/En
res of occuparmation on sp
aterial
esidual mater
t-specific packcation of the w
site Panels, an0
Recommen
od, machinerytion measures
storage
materials nical, adhesivebe noted (life
ult to processrofessional coocessing stepons (e.g., outs
ons and stann, if possible.
nvironmenta
tional safety apecial hazard
ials, e.g. hand
kaging: type, waste code.
d Metal Claddi
ndations
y, tools, dust es.
e etc.) e time)
s; ompetence; ps (e.g., screwside temperat
dards, if poss
al Protectio
and environmpotentials (e
dling of the re
composition,
ing: Roof and W
extraction, et
wing, weldingture)
sible. Informa
on
mental protect.g., handling
esiduals, sorti
and possible
Wall Panels
c. to be empl
)
ation on techn
tion (e.g. profeof acids).
ing, recycling
e re-use of pa
According to
oyed, and au
nical rules and
fessional asso
, and disposa
ackaging mate
o ISO 14025
uxiliary
d rules on
ociations)
al must be
erial (paper,
Insulated MProduct Ca
Example:
3.2 Re
The verificand in comEnvironm The PCR
This decUnderwr ☐ IN
This life accordan
3.3 De
To illustrain the LCAapplicable This PCRprovision
Metal Panels & ategory Rule N
PE shrink film
ference PC
cation of the Empliance withental Product
R review was
claration was riters Laborato
NTERNAL
cycle assessnce with ISO
claration o
ate the producA. They shall e construction
R also addressof a true qua
Metal Composumber 000000
m (15 01 02 p
CR and Ve
Environmentah the requiremt Declaration
conducted by
independentlyories in accor
☐ EX
ment was ind14044 and th
of environm
ct system studbe sub-divide
n, use and en
ses core issuentitative metr
site Panels, an0
plastic packag
rification
al Product Dements of ISO 1
shall be indic
y:
y verified by rdance with IS
XTERNAL
dependently vhe reference P
mental par
died, the EPDed at least intd-of-life (see
es in ISO 140ic to guide the
d Metal Claddi
ging); disposa
eclaration sha14025. The Pcated, includin
SO 14025
verified in PCR by:
rameters d
D shall containo the life cyclFigure 1). Th
025 Section 6e interpretatio
ing: Roof and W
al of the film p
all be documeProduct Categng the version
(PROGRAM
(PANEL RE(ADDRESS
INSERT SIG
NAME, Dec
INSERT SIG
(NAME), LC
erived from
n a simple flole stages of th
he stages may
6.7.2 Requiremon of results i
Wall Panels
packaging
ented accordingory Rules unn.
M OPERATOR
EVIEW CHAIR)
GNATURE
claration Verifi
GNATURE
CA Verifier
m LCA
ow diagram ofhe product: py be further s
ments for Coms preferred. H
According to
ng to the tempnderlying the
R)
R)
ier
f the processeroduction, anub-divided.
mparability. THowever, in m
o ISO 14025
plate below
es included d if
The most cases,
Insulated MProduct Ca
this type oare still coresults anquantitativrelevant sand use fonot guara
3.3.1 Ru The EPD
“Csh
“is
“st
In some ccases, theindicator r
3.3.2 Pa The followusing chaas followsAssessmefactors takAmerica) IMPACT CAGlobal Warm
Ozone Depl
AcidificationWater
Metal Panels & ategory Rule N
of metric is unomponents thnd applying thve metrics to sections to guor decision-mnteed for com
ules for de
shall specify Cradle to Gatehall be declarCradle to Gat
s possible onlyo The reo The nuo Mainte
Cradle to Gratages A to C)
cases, certaine irrelevant mresult of zero.
arameters d
wing informatiaracterization s: (At a miniment of Chemicken from the
ATEGORY ming
etion
for Soil and
Metal Composumber 000000
navailable. Wat might influem for compacapture the uide users in i
making. The demparative pur
claring LC
which EPD-tye” EPD: For ared as: “not spte with Optiony if all scenar
eference serviumber of replenance/replacave” EPD: Fo
a declaration
modules mamodule shall b
.
describing
on on environfactors. Thesum charactercal and OtherUniversity of
PARAMGlobal wDepletioozone layer, OD
Acidifica
site Panels, an0
hile conformaence the comarative decisiuncertainty. Anterpreting theclarer must poses.
CA informa
ype is declarea “Cradle to Gpecified”. Norns” EPD: For rios for the moice life of the acements of tcements are tr a “Cradle ton of the RSL i
y not be releve declared as
g environm
nmental impase predetermirization factorr EnvironmentLeiden (CML
ETER warming potentian potential of the
DP
ation potential of
d Metal Claddi
ance to this Pmparability of ons making. Tt a minimum,
he informationstate that diff
tion
ed: Gate” EPD a drmally in this ta “Cradle to Godules A1-A3building is dethe membranto be modeledo Grave” EPDs required.
vant to the ens “not relevan
mental impa
acts is expressned parameters from both thtal Impacts (T
L) methodolog
l, GWP e stratospheric
soil and water, A
ing: Roof and W
PCR minimizeEPDs. CautiThe declarer the declarer
n contained wferences betw
declaration oftype of EPD mGate with Op
3 and B1-B5 aefined as 60 yne shall be ded according to
D (life cycle de
nvironmental pnt”. Such a de
acts
sed with the iers are requirhe US EPA TTRACI 2.0) shgy shall be rep
Tkg C
kg CF
AP mol
Wall Panels
es that variatioon should bemust, where will provide q
within the EPDween environm
f the RSL is nmodule D is n
ptions” EPD thare given (seeyears. eclared accordo manufactureclaration cov
performance eclaration sha
impact categored and shall Tool for the Rehall be reporteported for EP
TRACI CO2 equiv
FC 11 equiv
H+ equiv.
According to
ons and devia used when inpossible, use
qualitative guiD relative to comental declar
not possible. Tnot declared;he declaratione Figure 1);
dingly. rer’s guidelinevering all mod
of a product. all not be rega
ory parametebe included ieduction and ed. Character
PDs outside of
Ckg CO
kg CFC
kg SO
o ISO 14025
ations, there nterpreting e idance in omparability rations are
The RSL
n of the RSL
es dules in the
In such arded as an
rs of LCIA n the EPD
rization f North
ML O2 Equiv
C-11 equiv
O2 equiv
Insulated MProduct Ca
EutrophicatiPhotochemiCreation Depletion ofResources –Depletion ofResources –* ADP-Elements** ADP-Fossil Fu
The categand statindifferencedescriptio
3.3.3 Pa The follownon-renewand shall PARAMETEUse of renewmaterials Use of renewTotal use of as raw mateUse of non-rmaterials Use of non-rmaterials Total use of energy and Use of secoUse of renewUse of non-rUse of net fr
In order toused as rarenewableas the diffmaterials.
Metal Panels & ategory Rule N
on cal Ozone
f Abiotic – Elements* f Abiotic – Fossil Fuels** s includes all non-reneuels includes all fossil
gories of the lng any specifices between enons of differen
arameters d
wing environmwable materiabe included i
ER wable primary en
wable primary enrenewable prima
erials) renewable prima
renewable prima
non-renewable primary energy rndary material wable secondaryrenewable seconreshwater
o identify the aw materials,e/non-renewaference betwe.
Metal Composumber 000000
EutrophiFormatioPOCP Abiotic dfor non-fAbiotic dfuels) for
ewable, abiotic materiaresources.
ife cycle impacations, whichnvironmental nt building ma
describing
mental parameal resources, n the EPD as
nergy excluding r
nergy resources ary energy resou
ary energy, exclu
ary energy resour
primary energy rresources used a
y fuels ndary fuels
input part of r the paramete
able primary eeen the total i
site Panels, an0
cation potential, on potential of tro
depletion potentiafossil resources. depletion potentiar fossil resourcesal resources (i.e. exce
act assessmeh have a signdeclarations
aterials within
g resource
eters apply darenewable an
s follows:
renewable prima
used as raw maturces (primary en
ding non-renewa
rces used as raw
resources (primaas raw materials)
renewable/noer “use of renenergy resourinput of prima
d Metal Claddi
EP opospheric ozone
al (ADP-element
al (ADP-fossil s. pting fossil resources)
ent should be nificant effect are not guaraone EPD are
use
ata based on nd non-renew
ary energy resour
terials nergy and primar
able primary ene
w
ary )
on-renewable newable/non-rrces used as ary energy an
ing: Roof and W
kg e,
kg
ts)
).
interpreted bon the result.
anteed for come inadmissible
the LCI. Thewable primary
rces used as raw
ry energy resour
ergy resources us
primary enerrenewable prraw materials
nd the input of
Wall Panels
N equiv
O3 equiv
by assigning th. The declaremparative pue.
ey describe thenergy and w
w
rces used
sed as raw
rgy used as arimary energys” is considerf energy reso
According to
kg (PO
kg Ethe
kg Sb
MJ, net ca
hem to the der must state trposes. Comp
e use of renewater. They a
UNIT
MJ, net calor
MJ, net calor
MJ, net calor
MJ, net calor
MJ, net calor
MJ, net calor
kgMJ, net calorMJ, net calor
m3
an energy carry, excluding red and can burces used a
o ISO 14025
4)3- equiv
ene equiv
b equiv
alorific value
eclared unit that parative
ewable and are required
TS
rific value
rific value
rific value
rific value
rific value
rific value
rific value rific value
rier and not
be calculated s raw
Insulated MProduct Ca
3.3.4 Oo
The paramare requir PARAMETEHazardous wNon-hazardoRadioactive ComponentsMaterials forMaterials forExported en
The paramhave reacwaste incboundariefuels. Mat60% or 65EC. Expo
3.4 Sc
Scenarioscorrespon3.3 suppooptional liaccordingoptional mAlternativewithout caand thus sin the modstage modparametethis shall paramete
Metal Panels & ategory Rule N
Other envioutput flow
meters descrired and shall
ER waste disposed ous waste disposwaste disposed
s for re-use r recycling r energy recover
nergy
meters in the ched the end-ineration. Wa
es. Waste incterials for ene5% for installarted energy re
enarios an
s for certain lifnding life cycleorts the consisfe cycle stage
g to Section 3modules shall ely, in the craalculating optisupport propedule to whichdules B.) Anyrs. If additionbe stated. Thrs.
Metal Composumber 000000
ronmentalws
bing waste cabe included in
sed
ry
table above a-of-life stage. aste incineratiineration plan
ergy recovery ations after 31elates to ener
nd addition
fe cycle stagee stage of thestent developes are declare.3 and be incbe calculated
adle to gate Eional life cycleer scenario deit refers (e.g.
y additional teal technical ine following ta
site Panels, an0
informat
ategories andn the EPD as
are calculatedThe parameton is a metho
nts have a loware based on
1st of Decemrgy exported
nal technic
es should supe building asspment of scened, the scenaluded in the Ed for specifiedPD, a manufae stages to enevelopment a. technical infchnical informnformation is ables are not e
d Metal Claddi
ion descr
d other materis follows:
d on the grosser “Materials
od of waste pwer energy effn thermal eneber 2008 in ofrom waste in
cal informa
pport the applsessment. Addarios by whic
arios to whichEPD. If an EPd scenarios aacturer may cnsure proper at the buildingformation abomation shall bnot completeexhaustive w
ing: Roof and W
ribing diff
ial flows are o
s amounts leafor energy rerocessing and
fficiency rate tergy efficiencyorder to be in ncineration an
ation
lication of proditional techn
ch the LCA de the calculate
PD claims to cnd the LCA d
choose to decunderstandin
g level. Additioout the use of be documentee at the produwith respect to
Wall Panels
ferent was
output flows d
aving the sysecovery” doesd is allocatedthan power py rate of a powline with the dnd landfill.
oduct related dnical informatierived parameed parameterscover all life cderived paramclare additionng of a produconal technicaa product in
ed separately ct level as sp
o examples or
According to
ste catego
derived from L
UNITkgkgkgkgkgkg
MJ per energ
tem boundarys not include md within the sylants using sewer plant not distinction ma
data in the ion as definedeters. Therefos relate shall
cycle stages, ameters shall b
al technical inct’s function inl information the appropriafrom the LCA
pecified in Secr given units a
o ISO 14025
ories and
LCI. They
TS
gy carrier
y when they materials for ystem econdary less than
ade by the
d in Section ore, if be specified all relevant e declared. nformation n a building is declared
ate use A derived ction 3.3, and
Insulated MProduct Ca
3.4.1 Tr If additionconstructisupport de PARAMETEFuel type anetc. Distance Capacity utiBulk densityVolume cap
Transportscenario o
3.4.2 Ins Informatiosafe and e If additioninformatioscenarios PARAMETER
Ancillary mateWater use Other resourcQuantitative dWastage of mby type) Output materienergy recoveDirect emissio
3.4.3 Us
Metal Panels & ategory Rule N
ansport to
nal technical inon site, the foevelopment o
ER nd consumption o
lization (includingy of transported pacity utilization fa
tation directly occurs and if
stallation i
on on where eeffective insta
nal technical inon shall be pros describing th
R
erials for installation
ce use description of energmaterials on the buil
als (specified by tyery, disposal (specions to ambient air,
se in the bu
Metal Composumber 000000
o the buildi
nformation is ollowing informof the scenario
of vehicle or veh
g empty returns)products actor (factor: =1
to the site doaffects the re
n the build
explanatory mallation, use a
nformation is ovided to spehe product’s i
n (specified by mat
gy type (regional mding site before wa
ype) as result of waified by route) soil and water
uilding
site Panels, an0
ng site
provided in thmation shall bos at the build
icle type used fo
or <1 or ≥ 1 for c
oes not alwayeporting of the
ding
material on insand disposal o
provided in thecify the produnstallation at
erial);
ix) and consumptioaste processing, ge
ste processing at t
d Metal Claddi
he EPD for trabe provided toding level:
r transport e.g. lo
compressed or n
ys occur and ie above param
stallation can of the product
he EPD for inuct’s installatithe level of th
on during the installenerated by the pro
he building site e.g
ing: Roof and W
ansport from o specify the
ong distance truc
nested packaged
t is possible tmeters, it sho
be found shat can be supp
nstallation in oion scenarioshe building as
lation process oduct’s installation
g. of collection for re
Wall Panels
the productiotransport sce
ck, boat
products)
to transport inould be clearly
all be stated inplied within th
or onto the bus or to supportssessment:
(specified
ecycling, for
According to
on gate to theenarios used o
UNIT
L of fuel type p
km%
kg/mN/A
n stages. Whey stated.
n the EPD. Ge EPD if desi
uilding, the folt developmen
UNIT
kgm3
kgMJkg
kg
kg
o ISO 14025
e or to
TS
per distance)
m3 A
en this
uidance on ired.
llowing nt of the
TS
Insulated MProduct Ca
If additionmaintenanprovided tlevel. InfoSection 3 PARAMETEMaintenance
Maintenance
MaintenanceAncillary maWastage maNet fresh waEnergy inpuamount, if aDirect emissRepair
Repair Proc
Inspection p
Repair cycleAncillary maWaste mateNew fresh wEnergy inpu
ReplacemenEnergy inpuapplicable aExchange ocycle, (e.g. zmaterials
Refurbishme
RefurbishmeEnergy inpuamount, if aMaterial inpu(e.g. lubricaWastage ma
3.4.4 Re
Metal Panels & ategory Rule N
nal technical innce required to specify the
ormation given.3.4:
ER e
e process
e cycle aterials for mainteaterial during maater consumptiont during maintenpplicable and relsions to ambient
ess
process
e aterials, (e.g. lubrrial during repair
water consumptiot during repair (e
nt cycle t during replacem
and relevant, f worn parts durizinc galvanized s
ent process
ent cycle t during maintenpplicable and relut for refurbishmnt, specify materaterial during ma
eference S
Metal Composumber 000000
nformation is for warranty), scenarios or
n for the follow
enance, (e.g. cleaintenance (specn during maintenance (e.g. vacuuevant air, soil and wate
ricant, specify mar (specify materiaon during repair e.g. crane activity
ment (e.g. crane
ng the product’s steel sheet), spec
ance (e.g. vacuuevant ent (e.g. bricks),rials)
aintenance (spec
ervice Life
site Panels, an0
provided in th, repair, replar to support thwing table sha
eaning agent, speify materials) ance
um cleaning), en
er
aterials) als)
y), energy carrier
activity), energy
life cify
um cleaning), en
including ancilla
ify materials)
e
d Metal Claddi
he EPD for pracement, or rehe developmeall be consist
ecify materials)
ergy carrier type
r type e.g. electriReplacement
y carrier type, (e.g
Refurbishmen
ergy carrier type
ary materials for t
ing: Roof and W
roducts requiefurbishment ent scenarios tent with the r
e e.g. electricity, a
icity, and amount
g. electricity) and
nt
e e.g. electricity, a
the refurbishmen
Wall Panels
ring maintenathe following of these mod
reference serv
and
nt
d amount if
and
nt process,
According to
ance (includininformation s
dules at the bvice life data
UNIT
Description odescrip
# per RSL kg/cyc
kgm3
kWh
kg
Description odescrip
Description odescrip
# per RSL kg/cyc
kgm3
kWh/R
# per RSL
kWh
kg
Description odescrip
# per RSL kWh
kg
kg
o ISO 14025
ng shall be uilding given in
TS
r source of ption
or yearcle
h
r source of ption r source of
ption or year
cle
RSL
or year
h
r source of ption
or yearh
Insulated MProduct Ca
The descror end of performanthe follow PARAMETE
Reference sDeclared proDesign applappropriate An assumedOutdoor envbuilding orieOutput matefor recyclingIndoor envirUsage condMaintenance
*Paramete
3.4.5 Us If additionor water rscenarios PARAMETE
Ancillary maNet fresh waType of enePower outpuCharacteristutilization etFurther assuoccupants)
Guidance15615 “ExPerforman
10 The North Am
Metal Panels & ategory Rule N
ription of the the service lifnce and the ding table, whe
ER
service life oduct properties ication parametepractices
d quality of work,vironment, (for ouentation, shadingerials (specified bg, for energy recoonment (for indoitions, e.g. freque e.g. required fr
rs listed in this
se of Wate
nal technical inrelated to the s or to support
ER
aterials specified ater consumptionrgy carrier, (e.g. ut of equipment tic performance (c.) umptions for sce
e on the selecxplanation of nce of Buildin
merican equivalent to C
Metal Composumber 000000
reference serfe. The referedeclared referere relevant:
(at the gate) anders (if instructed b
when installed iutdoor applicatio, temperature
by type) as resultovery, disposal (soor applications),ency of use, mec
requency, type a
table shall be
r
nformation is operation of tt the develop
by material n electricity, natur
(e.g. energy effic
nario developme
tion of standathe general re
ngs Directive”
CEN/TR 15615 is AST
site Panels, an0
rvice life may ence conditionrence service
d finishes, etc. by the manufactu
n accordance wins), e.g. weathe
t of waste processpecified by route e.g. temperaturechanical exposurnd quality and re
the same as th
provided in ththe building, tment of the u
ral gas, district he
ciency, emissions
ent, (e.g. frequen
ards to calculaelationship be.10
TM E2797 - 11 Standa
d Metal Claddi
be based on ns for achievinlife shall inclu
urer), including t
ith the manufacturing, pollutants, U
ssing at the builde) e, moisture, chere
eplacement of rep
he parameters
he EPD for buthe following se of energy
eating)
s, variation of pe
cy and time peri
ate operationetween variou
rd Practice for Building
ing: Roof and W
data collecteng the declarude the refere
the references to
urer’s instructionUV and wind exp
ding site e.g. of c
emical exposure
placeable compo
used in the LC
uilding integrainformation sand use of w
rformance with c
od of use, numb
al energy useus European
g Energy Performance
Wall Panels
ed as averagered technical aence service
o the
ns posure,
collection
onents.
CA model if app
ated technicahall be provid
water scenario
capacity
ber of
e can be obtastandards an
e Assessment
According to
e data or at thand functionalife data as d
UNIT
YearAs approAs appro
As approAs appro
As appro
As approAs approAs appro
propriate.
al systems usided to specifyos at the build
UNIT
As approm3
kWhkW
As appro
As appro
ained from CEnd the Energy
o ISO 14025
he beginning al escribed in
TS
rs opriateopriate
opriate opriate
opriate
opriate opriate opriate
ing energy y the ding level:
TS
opriate
h W opriate
opriate
EN/TR y
Insulated MProduct Ca
3.4.6 En If additionshall be pdevelopmrecycling PROCESSE
Collection p Recovery sy Disposal speAssumptions
3.5 Adand wa
3.5.1 Ind The followduring theto be used Emissio
dangerouprovisions If the horizproducts ustandards
3.5.2 So
Metal Panels & ategory Rule N
nd-of-life
nal technical inprovided for alment of the end
systems that
ES
rocess specified
ystem specified b
ecified by type s for scenario de
dditional inater during
door Air
wing informatie use stage ind in European
ons to indoor as substancess for Europea
zontal standausing harmons are not avai
oil and Wat
Metal Composumber 000000
nformation is ll constructiond-of-life scenahave been pr
by type
by type
evelopment
formation g the use s
on shall be pn order to supn markets:
air, accordings from construn or North Am
ards on measnized test metlable, the EPD
ter
site Panels, an0
provided in thn products to arios at the broven to be e
on releasestage
rovided for prpport use stag
g to the horizouction productmerican produ
urement of rethods accordiD can lack th
d Metal Claddi
he EPD abouspecify the enuilding level. conomically a
UNITS
kg collected sekg collected wkg for re-use kg for recyclingkg for energy rkg product or mAs appropriate
e of dange
roducts exposge scenarios w
ontal standardts using harmuct standards
elease of reguing to the prois information
ing: Roof and W
ut end-of-life pnd-of-life sceScenarios shand technical
eparately with mixed constru
g recovery material for final e
rous subs
sed to indoor with respect t
ds on measurmonized testins, where appli
ulated dangervisions for Eu
n.
Wall Panels
processes, thenarios used o
hall only modely viable.
uction waste
deposition
stances to
air after theirto health at th
rement of releng methods aicable.
rous substancuropean or No
According to
e following inor to support el processes,
indoor air,
r installation inhe building lev
ease of regulaccording to th
ces from consorth American
o ISO 14025
formation
e.g.
, soil
n buildings vel for EPDs
ated he
struction n product
Insulated MProduct Ca
The followbuildings level: Release
dangerouprovisions If the horizproducts uEuropean
3.6 Do
The projeas requirecopies or
la la do
thd
lapr
3.7 Da
To facilitataking into
an qu
th at LC
Metal Panels & ategory Rule N
wing informatiduring the us
e to soil and ws substancess European o
zontal standausing harmon
n product stan
ocumentati
ct report shaled in this PCRreferences:
aboratory resuaboratory resuocumentation
he LCA of theistances, RSL
aboratory resuroduct’s use s
ta availabi
ate verificationo account dat
nalysis of mauantitative de
he declared uttribution of pCIA results pe
Metal Composumber 000000
on shall be pse stage in ord
water accordins from construr North Amer
ards on measnized test metndards are no
on on add
l include any R. Such docum
ults/measuremults/measuremn on declared construction L according toults/measuremstage.
ility for ver
n it is consideta confidentia
terial and eneescription of unit; rocess and lifer modules of
site Panels, an0
rovided for prder to suppor
ng to the horizuction productican product
urement of rethods accordi
ot available, th
itional info
documentatiomentation on
ments for the ment of functitechnical infoproduct and
o Annex A, enments for the
rification
red good praclity according
ergy flows to junit processe
fe cycle data f unit process
d Metal Claddi
roducts exposrt use stage sc
zontal standats using harmstandards, w
elease of reguing to the prohe EPD can la
ormation
on on additionadditional en
content declaonal/technicaormation on lithat will be usnergy consumdeclaration o
ctice to makeg to ISO 2193
justify their ines that are de
to datasets oses, e.g. struc
ing: Roof and W
sed to soil ancenarios for s
ards on measmonized testinhere applicab
ulated dangervisions of theack this inform
nal environmenvironmental i
aration; al performancife cycle stagsed for the as
mption during of emissions t
e the following0:2007-10, cl
nclusion or exefined to mod
of an LCA-softctured accord
Wall Panels
d water after soil and water
urement of reng methods able.
rous substance respective temation.
ental informainformation m
ce; es that have ssessment ofuse, cleaning
to indoor air, s
g information lause 7.4 and
xclusion; del processes
tware (if usedding to life cyc
According to
their installatr pollution at t
elease of reguccording to th
ces from consechnical com
tion declaredmay include, e
not been conf buildings (e.gg cycles, etc.)soil and wate
available to td 9.1:
s and life cyc
d); cle stages;
o ISO 14025
tion in the building
ulated he
struction mittees for
in the EPD e.g. as
nsidered in g. transport ); r during the
he verifier,
cle stages of
Insulated MProduct Ca
LCsi
dosc
doth
3.8 Ve
After verifverified. Acircumstarecalculatestablishi A reasonaany one oEPD.
3.9 Re
All literatu Standards Example: (ISO 1404
Metal Panels & ategory Rule N
CIA results peimilar productocumentationcenario; ocumentation
he calculation
rification a
fication, an EPAn EPD shall ances that couted after 5 yeang the validity
able change iof the declared
ferences S
ure cited in the
s and laws cit
ISO 14040:240:2006)
Metal Composumber 000000
er productionts; n that substan
n that substans in the alloca
and validity
PD is valid foronly be reassuld alter the cars if the undey of an EPD s
n the environd parameters
Standards
e PCR has to
ted in the EPD
2006-10, Envi
site Panels, an0
plant/produc
ntiates the pe
ntiates the peation procedu
y of an EPD
r a 5 year persessed and uontent and acerlying data hshall be in acc
mental perfors of the EPD (
and Legis
o be reference
D must be co
ronmental ma
d Metal Claddi
ct if generic da
ercentages or
ercentages anure, if it differs
D
riod from the pdated as neccuracy of thehas not changcordance with
rmance of a p(see clause 7
lation
ed (see also r
rrectly referen
anagement -
ing: Roof and W
ata is declare
r figures used
nd figures (nus from the PC
date of issuecessary to ree declaration.ged significanh ISO 14025,
product to be ). Such a cha
references in
nced.
Life cycle ass
Wall Panels
ed from sever
d for the calc
umber of cycCR.
, after which eflect changes. An EPD doe
ntly. The proceISO 21930, a
reported to thange may req
this documen
sessment - P
According to
ral plants or fo
culations in th
les, prices, e
it shall be revs in technologes not have toess for verificand EN 15804
he verifier is +quire an updat
nt).
rinciples and
o ISO 14025
or a range of
he end-of-life
etc.) used for
viewed and gy or other o be cation and 4.
+/- 10% on te of the
framework
Insulated MProduct Ca
Appe
The applicthat may b For Metal AAMA 501AAMA 620SubstratesAAMA 621GalvanizedASCE 7 ASCE AssASHRAE 9ASTM A24ASTM A46ASTM A65ASTM A66ASTM A75Process foASTM A79ASTM A87ASTM A92ASTM B10ASTM B11ASTM B20ASTM B20ASTM B37ASTM C13EmissometASTM C15Solar RefleASTM C23Hot Box (WASTM D22ASTM D22ASTM D27ASTM D42ASTM D49ASTM D52ASTM D52ASTM D96
Metal Panels & ategory Rule N
ndix 1
cable standarbe indicated i
Cladding Ro
.1, Test Metho0, Voluntary Sps , Voluntary Sp
d (HDG) and Z
ignment of Aut90.1 Energy Sta40 - [Stainless 63 - [Aluminized53, Steel Sheet66 - [Annealed 55, Specificatior Exterior Expo
92, Steel Sheet75, Steel Sheet24, Hot Dip Coa01 - [Lead-coa7, Salt Spray C
09 - [Aluminum09, Specificatio70 - [Copper S371 - Standard ters
549 - Standard ectometer 36 - Standard TWithdrawn 2001244, Calculation247, Water Res794, Resistance214, Evaluation977, Granule A22, Mandrel Be23, Specular G68, Abrasion Re
Metal Composumber 000000
rd(s) or the genclude the fo
oof and Wall:
od for Water Peecification for H
ecification for Hinc-Aluminum C
thority and Resandard for BuilSteel] d Steel], (optiont, Zinc-Coated oor Cold Worken for Steel Sheosed Building Pt Coated with 5t Coated with 5ating Process ated copper sheCorrosion Test
m Sheet Materian for Aluminumheet and Strip Test Method fo
Test Method fo
Test Method for1) n of Color Diffesistance of Coae of Organic Co
n of Degree of Cdhesion nd Test of Attaloss esistance of Or
site Panels, an0
eneral approvollowing:
enetration of WHigh Performan
High PerformanCoated Steel S
sponsibility for tdings Except L
n-Mil-S-4174Bor Zinc Iron Alld Austenitic St
eet, Metallic CoProducts. 5% Al-Zn Alloy5% Al-Zn Alloy
eet]
al Specificationm and Aluminum
for Building Coor Determinatio
or Determinatio
r Steady-State
erence atings oatings to EffeChalking
ached Organic
rganic Coating
d Metal Claddi
vals by buildin
Windows, Curtaince Organic Co
nce Organic CoSubstrates
the Design of SLow-Rise Resid
) oy Coated by ttainless Steel Soated by the Ho
n] m Alloy Sheet aonstruction} on of Emittance
on of Solar Ref
Thermal Perfo
cts of Rapid De
Coatings
s by Falling Sa
ing: Roof and W
ng authorities
in Walls and Dooatings on Coi
oatings on Coi
Steel Structuredential Building
the Hot Dip CoSheet, Strip, Plot-Dip Process
and Plate
e of Materials n
flectance near
ormance of Bui
eformation
and
Wall Panels
s or a compar
oors Using Dynl Coated Archit
l Coated Archit
s gs
oating Process ate, and Flat B
s and Prepainte
near Room Tem
Ambient Temp
ilding Assembl
According to
able national
namic Pressuretectural Alumin
tectural Hot Di
Bar] ed by the Coil-C
mperature Usin
perature Using
ies by Means o
o ISO 14025
regulation
e num
pped
Coating
ng Portable
a Portable
of a Guarded
Insulated MProduct Ca
ASTM E10ASTM E11ASTM E15ASTM E16ASTM E16ASTM E28ASTM E33ASTM E33ASTM E72ASTM E84ASTM E40ENERGY SSMACNA, UL - BuildinUL, Fire ReUL 1897 UL 2218 UL 580 UL Fire Re For Metal AAMA 260AAMA 509AAMA 620ASCE 7 ASTM A65ASTM B20ASTM C13ASTM C15ASTM D17ASTM D19ASTM D33ASTM D63ASTM E28ASTM E32ASTM E33ASTM E33ASTM E84ASTM E 40NFPA 285 For Insula AAMA 501
Metal Panels & ategory Rule N
08 - [Fire Tests9 - [Fire Test
592 – [Structura646 - [Water Pe680 - [Air Infiltra83 - [Air Infiltra30 - [Structural31 - [Water Pe2, Standard Tes4 - [Surface B08 - Standard TSTAR® [Architectural Sng Materials Desistance Direc
esistance Direc
Composite P
05 9 0
53 09 371 549 781 929 359 35 83 29 30 31 4 08
ated Metal Pa
.1
Metal Composumber 000000
s of Roof Coatiof Building Conal Wind Uplift Tenetration] ation] tion] Test - Chamb
enetration] st Methods of C
Burning CharacTest Methods fo
Sheet Metal Mirectory ctory
ctory
Panels:
anels:
site Panels, an0
ngs] nstruction & MaTest]
er Method]
Conducting Strcteristics of Buior Total Norma
anual - Gutter
d Metal Claddi
aterials] When
ength Tests of lding Materials
al Emittance of
design and flas
ing: Roof and W
required, UL 2
f Panels for Bus]
Surfaces Usin
shing details]
Wall Panels
263 may be spe
ilding Construc
g Inspection-M
According to
ecified for fire t
ction
Meter Techniqu
o ISO 14025
tests
es
Insulated MProduct Ca
AAMA 501AAMA 620AAMA 621ANSI/FMGANSI/FMGASCE 7 AS-TL1923ASTM A 65ASTM A 75ASTM A24ASTM A65ASTM A75ASTM A79ASTM A92ASTM B11ASTM B20ASTM C13ASTM C13ASTM C15ASTM C20ASTM C27ASTM C51ASTM D10ASTM D16ASTM D16ASTM D16ASTM D17ASTM D19ASTM D22ASTM D22ASTM D27ASTM D33ASTM D41ASTM D42ASTM D45ASTM D45ASTM D47ASTM D52ASTM D70ASTM D96ASTM E 11ASTM E 16ASTM E 16ASTM E 19ASTM E 72
Metal Panels & ategory Rule N
.2 0
G 4471 G 4880
3A 53 55
40 53 55 92 24 7
09 371 363 549 09 73 8
014 621 622 623 729 929 244 247 794 359 45
214 585 587 752 23 091 68 19 646 680 980 2
Metal Composumber 000000
site Panels, an0
d Metal Claddiing: Roof and WWall Panels
According too ISO 14025
Insulated MProduct Ca
ASTM E 84ASTM E11ASTM E13ASTM E15ASTM E16ASTM E16ASTM E18ASTM E18ASTM E19ASTM E28ASTM E33ASTM E33ASTM E41ASTM E72ASTM E84ASTM E40ASTM E90ASTM F16ASTM G15ASTM G15CAN/ULC CAN/ULC CAN/ULC CAN/ULC CAN/ULC City of LosFM 4471 FM 4880 FM 4881 GSA-TS01Florida DepFlorida DepNFPA 259 NFPA 285 NFPA 286 T315-09 UL 1040 UL 1256 UL 1715 UL 1897 UL 263 UL 580 UL 723
Metal Panels & ategory Rule N
4 9
332-10a 592 646 680 8 886 996 83 30 31 3-87
2 4 08 0-99 642 51 54 S101 S102 S126 S134 S138 Angeles
-2003 partment of Bupartment of Bu
Metal Composumber 000000
usiness and Prousiness and Pro
site Panels, an0
ofessional Regofessional Reg
d Metal Claddi
ulation - Roofulation - Wall
ing: Roof and WWall Panels
According too ISO 14025