I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces As of: 1 EP-3 Recovery Mr. Ross Higa HQ PACAF/CECI

Transcript of P 3 Recovery From China22mar07

Page 1: P 3 Recovery From China22mar07

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Pacific Air Forces

As of: 1

EP-3 Recovery

Mr. Ross Higa

HQ PACAF/CECI

Page 2: P 3 Recovery From China22mar07

As of: 2I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Background

CE Mission: Document pavement degradation from AN-124 traffic US responsible for pavement damage

Chinese tried, but could not “run up the bill”

Airfield designed for fighter aircraft Narrow taxiways, small aprons Limited pavement bearing strength

AN-124 has higher damage potential than C-5 Five AN-124 flights (first and last were heaviest) Cargo weight and fuel strictly controlled to avoid damage

First AN-124 arrived 16 Jun 01 to start recovery operations - completed 3 Jul 01

Page 3: P 3 Recovery From China22mar07

As of: 3I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Logistics and Security

Lodged at Gloria Resort Hotel in Sanya U.S. manager assisted in logistical support One hour bus ride to/from Lingshui Air Base Left hotel 0630, returned 1830

Operations kept low key Minimal news coverage Photographers and reporters kept away from

hotel and base Police stationed along route to Lingshui Exception: Numerous guests/photographers

on base during fuselage loading

Page 4: P 3 Recovery From China22mar07

As of: 4I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Lingshui (Naval) Air Base, Hainan Island, People's

Republic of ChinaEP-3

Page 5: P 3 Recovery From China22mar07

As of: 5I n t e g r i t y - S e r v i c e - E x c e l l e n c e

EP-3 and AN-124

Page 6: P 3 Recovery From China22mar07

As of: 6I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Crew members guided the AN-124 on narrow taxiways and through tight turns

Page 7: P 3 Recovery From China22mar07

As of: 7I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Kneeling AN -124 - Load bearing points on the pavement were closely monitored

Page 8: P 3 Recovery From China22mar07

As of: 8I n t e g r i t y - S e r v i c e - E x c e l l e n c e

The airfield already had existing defects

Page 9: P 3 Recovery From China22mar07

As of: 9I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Working Conditions

Lockheed Martin was well prepared Chartered Gulfstream IV on standby at Sanya

Airport for evacuation Physician on team - local hospitals inadequate

Temperatures reached 107 deg F with high humidity Heat stress encountered early on Administered medication as needed

Daily safety meetings - no injuries incurred Local contracts for work trailers, water,

transportation, meals, toilets, generator, etc. Cell phones with international capability

Page 10: P 3 Recovery From China22mar07

As of: 10I n t e g r i t y - S e r v i c e - E x c e l l e n c e

People's Liberation Army

PLA Navy monitored operations closely Continuous photography and video taping of

work and people U.S. workers restricted from crossing rope

barriers Routine review of photos and video taken by U.S. End of day meetings held to recap day's events

and resolve issues Key project officers from Beijing; not Lingshui

Non-threatening, but many "home turf" rules

Page 11: P 3 Recovery From China22mar07

As of: 11I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Page 12: P 3 Recovery From China22mar07

As of: 12I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Page 13: P 3 Recovery From China22mar07

As of: 13I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Three jack stands supported the aircraft during underside disassembly work

Page 14: P 3 Recovery From China22mar07

As of: 14I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Blowers vented residual fuel before cutting operations could begin

Page 15: P 3 Recovery From China22mar07

As of: 15I n t e g r i t y - S e r v i c e - E x c e l l e n c e

A safety line was installed for topside work

Page 16: P 3 Recovery From China22mar07

As of: 16I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Flaps, ailerons and leading edges were salvaged

Page 17: P 3 Recovery From China22mar07

As of: 17I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Tail section was cut off the fuselage

Page 18: P 3 Recovery From China22mar07

As of: 18I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Key components were salvaged

Page 19: P 3 Recovery From China22mar07

As of: 19I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Four engines were removed in one day

Page 20: P 3 Recovery From China22mar07

As of: 20I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Page 21: P 3 Recovery From China22mar07

As of: 21I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Gas powered saws were used to cut and remove the wings in sections

Page 22: P 3 Recovery From China22mar07

As of: 22I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Scrapped parts were also taken to Kadena on the AN-124

Page 23: P 3 Recovery From China22mar07

As of: 23I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Main and nose gears were removed when rain halted wing cutting operations

Page 24: P 3 Recovery From China22mar07

As of: 24I n t e g r i t y - S e r v i c e - E x c e l l e n c e

A specially made trailer was jacked up to support the aircraft

Page 25: P 3 Recovery From China22mar07

As of: 25I n t e g r i t y - S e r v i c e - E x c e l l e n c e

EP-3 rested solely on the raised trailer after the jack stands were removed

Page 26: P 3 Recovery From China22mar07

As of: 26I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Interior pipes and cables were pre-cut to facilitate removal of wing sections

Page 27: P 3 Recovery From China22mar07

As of: 27I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Nacelles were salvaged

Page 28: P 3 Recovery From China22mar07

As of: 28I n t e g r i t y - S e r v i c e - E x c e l l e n c e

The AN-124 was "cubed out" on almost every return flight

Page 29: P 3 Recovery From China22mar07

As of: 29I n t e g r i t y - S e r v i c e - E x c e l l e n c e

“You Call – We Haul”

Lockheed and Russian crews "busted butts" to load same-day turnaround flights

Page 30: P 3 Recovery From China22mar07

As of: 30I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Bridge cranes were used to load from the rear

Page 31: P 3 Recovery From China22mar07

As of: 31I n t e g r i t y - S e r v i c e - E x c e l l e n c e

A centerline marker was laid out to help align the

AN-124 to the EP-3

Page 32: P 3 Recovery From China22mar07

As of: 32I n t e g r i t y - S e r v i c e - E x c e l l e n c e

The AN-124 hit the mark perfectly

Page 33: P 3 Recovery From China22mar07

As of: 33I n t e g r i t y - S e r v i c e - E x c e l l e n c e

The AN-124 used portable extension ramps to reduce the incline

Page 34: P 3 Recovery From China22mar07

As of: 34I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Steel cables from the cargo bay were attached to the trailer

Page 35: P 3 Recovery From China22mar07

As of: 35I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Winches pulled the fuselage into the cargo bay

Page 36: P 3 Recovery From China22mar07

As of: 36I n t e g r i t y - S e r v i c e - E x c e l l e n c e

The wide wheels and narrow ramps left no room for error

Page 37: P 3 Recovery From China22mar07

As of: 37I n t e g r i t y - S e r v i c e - E x c e l l e n c e

The fuselage and trailer cleared by a few inches

Page 38: P 3 Recovery From China22mar07

As of: 38I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Page 39: P 3 Recovery From China22mar07

As of: 39I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Page 40: P 3 Recovery From China22mar07

As of: 40I n t e g r i t y - S e r v i c e - E x c e l l e n c e

The portable ramps were disassembled and loaded onto the AN-124

Page 41: P 3 Recovery From China22mar07

As of: 41I n t e g r i t y - S e r v i c e - E x c e l l e n c e

The Russian crew

Page 42: P 3 Recovery From China22mar07

As of: 42I n t e g r i t y - S e r v i c e - E x c e l l e n c e

After a refueling stop in the Philippines and crew rest in Hawaii, the fuselage was welcomed home at Dobbins ARB, GA (home

of Lockheed Martin Aeronautical Systems Co.)

Page 43: P 3 Recovery From China22mar07

As of: 43I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Additional Information

Additional Information and photos can be found on the PACOM website at:

http://www.pacom.mil/pages/ep3photos.htm