Owens Lake
Operations & Maintenance
Presented by:
Mrs. Jennifer Wong, M.S., P.E.
Manager of Owens Lake Engineering
Los Angeles Department of Water & Power
May 3, 2019
Agenda
1. Introduction
2. Owens Lake O&M Team
3. Owens Lake Infrastructure, Operations,
& Maintenance by BACM Type
4. Operational Constraints & Challenges
5. Q&A
2
Owens Lake O&M Team &
Supporting Groups
• Keeler Construction Yard Staff:
– Owens Lake Engineering
– Owens Lake Construction
– Hydrographers
– Watershed Management Group
– Electrical Mechanic Shop
• From Los Angeles to Bishop:
– WETS Engineering
– Fleet
– Survey
– Power Construction and Maintenance
– Supply Chain Services
– Corporate Environmental
– Legal
– Real Estate
3
Owens Lake Operations & Maintenance Assets
Owens Lake Facilities Post-OLDMP Phase 9/10:
– Length of Zonal Mainline Pipe: 31.8 miles
– Number of Turnouts: 35
– Number of Miles of Piping (> 2” dia.): 4,200
– Number of Miles of Berms & Access Roads: 128
4
Best Available Control Measure:
Shallow Flooding BACM
5
Best Available Control Measure:
Tillage with BACM Back-Up
6
Best Available Control Measure:
Brine with BACM Back-Up
7
Best Available Control Measure:
Managed Vegetation BACM
8
Best Available Control Measure:
Gravel Blanket BACM
9
Best Available Control Measure:
Permanent Sand Fence BACM @ T1-A-1
10
Operational Constraints & Challenges
11
Before Two weeks later
Questions?
12