Corporate Information
1
Overview of TPCH, subsidiaries, and partners
• Investment Progress
2
Progress Report
Permission Period Construction Period
Q2 2018 (2561)
Q2 2017 (2560)
Q1 2017 (2560)
Q4 2016 (2559)
Q2 2016 (2559)
Q4 2015 (2558)
Q1 2013 (2556)
SCODPGP
Q4 2018 (2561)
Q4 2018 (2561)
Q4 2019 (2562)
Q4 2018 (2561)
Q2 2019 (2562)
SGP
9.5 / 9.2
9.9 / 9.2
9.9 / 9.2
9.9 / 9.2
9.9 / 8.0
9.9 / 8.0
23 / 21
PTG
23 / 21
9.9 / 9.2
9.9 / 9.2
9.5 / 8.0
6.3/ 6.3 SP
0% 20% 40% 60% 80% 100% 120% 140% 160% 180% 200%
PTG 2
SP
TPCH 5
TPCH 2
TPCH 1
PTG 1
SGP
PGP
TSG
MGP
MWE
CRB
3
PHATTHALUNG GREEN POWER : PGP INSTALL CAPACITY 9.9 MW
Land
• Land Owned by
Company
Loan
• BBL
Technical
• EPC Contract
Permission
• Industrial Permission
• PPA (FiT)
Registered Capital: 250,000,000 Baht
Sell Capacity: 9.2 MW
Location: T.Pabon A.Pabon Phatthalung
Share 60%
WWE
Share 40%
Permission
Construction
100%
Civil&EPC 67 %
13
PGP Progress
Combustion Chemical Storage
Fuel Storage HouseTurbine House**Picture Update at November 21,2016 5
SATUN GREEN POWER : SGP INSTALL CAPACITY 9.9 MW
Registered Capital: 250,000,000 Baht
Sell Capacity: 9.2 MW
Location: T.Khuankalong A.Khuankalong Satun
Share 51%
WWE
Share 40%
GPP
Share 9%
Permission
Construction
100%
Land
• Land Owned by
Company
Loan
• BBL
Technical
• EPC Contract
Permission
• Industrial Permission
• PPA (FiT)
Civil&EPC 35%
SGP Progress
Turbine House Boiler Foundation
Water Storage & Clarifier Tank Generator & Turbine Deck
**Picture Update at November 21,2016 7
PATTANI GREEN : PTG INSTALL CAPACITY 46 MW
Land
• Land Owned by
Partner
Loan
• On Process
Technical
• EPC Contract : On
Process
Permission
• EIA Process
• PPA phase 1 LOI
• PPA phase 2 on
process
Registered Capital: 10,000,000 Bath
Sell Capacity: 21+21 MW
Location: Lipasango Nongchik Pattani
Share 65%
Permission
Construction
50%
0%
PATTANI GREEN : PTG INSTALL CAPACITY 46 MW
Reservoir job
Pipeline and Drainage**Picture Update at November 21,2016
TPCH 1&2 : Yala Public Participation on November 30, 2016
TPCH 5 : Narathiwat Public Participation on October 1, 2016
Overview of TPCH, subsidiaries, and partners
• Business Performance & Highlight
3
Overview of subsidiaries of TPCH
5
Shareholding of TPCH
(percent)73.1 85.0 46.0 65.0 60.0 51.0
Location Nakhon Si Thammarat Nakhon Sawan Samut Sakhon Nakhon Si Thammarat Phatthalung Satun
Capacity installed / Offer
(MW)9.5 / 9.2 9.9 / 8.0 9.5 / 8.0 9.5 / 9.2 9.9 / 9.2 9.9 / 9.2
Type of fuel Rubber and oil palm Chaff and WoodCoconut shell and coconut
frondRubber and oil palm Rubber and oil palm Rubber and oil palm
Supply
Fuel ,operation and
maintenance contract with
VSPP
Fuel ,operation
and maintenance contract
with GPP
Fuel supply contract with
CoCo FMC
Fuel ,operation and
maintenance contract with
VSPP
To be announced/ WWE
is a wood mill in the south
To be announced/ WWE
is a wood mill in the south
Status of the construction
processCOD On March 15, 2013 COD on October 12, 2015 COD on April 8, 2016 COD on October 3, 2016
Under construction
Expected to be completed
by Q1 2017
Under construction
Expected to be completed
by Q2 2017
State licenses
and a major
contracts
PPA
RG4
BOI
Estimated value of
investments
700 million baht
(D/E = 2.5:1)
700 million baht
(D/E = 2.5:1)
750 million baht
(D/E = 2.5:1)
750 million baht
(D/E = 2.5:1)
750million baht
(D/E = 2.5:1)
750 million baht
(D/E = 2.5:1)
Project management
Operation and
maintenance contract
VSPP
(5 yrs.)
Operation and
maintenance contract GPP
(1 yrs.)
Self management
Operation and
maintenance contract
VSPP
(3 yrs.)
Operation and
maintenance contract WW
(5 yrs.)
Operation and
maintenance contract WW
(5 yrs.)
Insurance
CRB TSGMGPMWE PGP SGP
Construction 19.8/18.4Operate 38.4/34.4
13
Overview of subsidiaries of TPCH
5
Shareholding of TPCH
(percent)65.0 65.0 65 65 65 50 45
Location Pattani Pattani Yala Yala Narathiwat Nonthaburi Lampang
Capacity installed /
Offer (MW)23.0 / 21.0 23.0 / 21.0 9.9 / 9.2 9.9 / 9.2 6.3 / 6.3 9.5/ 8.0 25 Ton/Hour
Type of fuel Rubber and oil palm Rubber and oil palm Rubber and oil palm Rubber and oil palm Rubber and oil palm Municipal Waste Waste
Supply
To be announced/
Narapara is a wood mill
in the south
To be announced/
Narapara is a wood mill
in the south
To be announced/
Narapara is a wood
mill in the south
To be announced/
Narapara is a wood
mill in the south
To be announced/
Narapara is a wood
mill in the south
Self - Supply Ko Kha Municipality
Status of the
construction process
Construction has not
started
Construction has not
started
Construction has not
started
Construction has not
started
Construction has not
started
Construction has not
startedUnder construction
State
licenses
and a major
contracts
PPA LOI On process On process -
RG4 On process On process On process On process On process
BOI On process On process On process On process On process On process On process
Estimated value of
investments
1,600 million baht
(D/E = 2.5:1)
1,000 Million Baht
(D/E = 2.5:1)
700 million baht
(D/E = 2.5:1)
700 million baht
(D/E = 2.5:1)
500 million baht
(D/E = 2.5:1)
1,450 million baht
(D/E = 2.5:1)20 Million Bath
Project management Under consideration Under consideration Under consideration Under consideration Under consideration Under consideration Thermal Tech
Insurance On process On process On process On process On process
Terrorist Insurance On process On process On process - -
TPCH 2 SIAM POWER
Development Project 81.6/74.2
TPCH 5PTG1 PTG2 TPCH 1 PA
14
9.9 MW BIOMASS POWER PLANT PROJECT
Commercial of Date (COD) : 15 March 2014
Performance of CRB
Power units sold per Month (million units)
Average distribution
6.00 million units / month
6.70 6.29 6.61
5.49 4.94
6.38
4.43
6.66 6.50
-
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
Amount of Electricity Sold to PEA by CRB in 2016
98% 98% 97%83%
72%96%
65%
97% 98%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Percentage of Elevtricity Sold to PEA by CRB with the Highest Electricity Volume signed in a Contract
16
Performance of CRB
0
50
100
150
200
250
1-Oct-15 1-Nov-15 1-Dec-15 1-Jan-16 1-Feb-16 1-Mar-16 1-Apr-16 1-May-16 1-Jun-16 1-Jul-16 1-Aug-16 1-Sep-16 1-Oct-16
Uni
t in
Thou
sand
Electricity unit produced by CRB
Plant Trip
Maintenance Shutdown
Goal Line Productions
Capacity Factor 92.91%
8,000 hr/year
17
9.9 MW BIOMASS POWER PLANT PROJECT
Commercial of Date (COD) : 12 October 2015
Performance of MWE
Power units sold per Month (million units)
4.49
5.51 5.93 5.72 5.83
4.33
5.91 5.89 5.42
-
1.00
2.00
3.00
4.00
5.00
6.00
7.00
Amount of Electricity Sold to PEA by MWE in 2016
75%99% 100% 99% 98%
75%
99% 99% 94%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Percentage of Electricity Sold to PEA by MWE with the Highest Electricity Volume Signed in a Contract
Average distribution
5.45 million units / month
19
Performance of MWE
Maintenance Shutdown
Power units sold per Day (thousand units)
-
25.00
50.00
75.00
100.00
125.00
150.00
175.00
200.00
Uni
t in
Thou
sand
Electricity unit produced by MWE
Maintenance ShutdownTEST RUN
Goal Line Productions
Capacity Factor 95%
8,000 hr/year
20
9.5 MW BIOMASS POWER PLANT PROJECT
Commercial of Date (COD) : 8 April 2016
Performance of MGP
Power units sold per Month (million units)
- - -
1.81
1.14
4.43
2.60
5.54 5.70
-
1.00
2.00
3.00
4.00
5.00
6.00
Amount of Electricity Sold to PEA by MGP
31%19%
77%
44%
93% 99%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Percentage of Electricity Sold to PEA by MGP with the Highest Electricity Volume Signed in a Contract
22
-
25.00
50.00
75.00
100.00
125.00
150.00
175.00
200.00
8-Ap
r-16
15-A
pr-1
6
22-A
pr-1
6
29-A
pr-1
6
6-M
ay-1
6
13-M
ay-1
6
20-M
ay-1
6
27-M
ay-1
6
3-Ju
n-16
10-Ju
n-16
17-Ju
n-16
24-Ju
n-16
1-Ju
l-16
8-Ju
l-16
15-Ju
l-16
22-Ju
l-16
29-Ju
l-16
5-Au
g-16
12-A
ug-1
6
19-A
ug-1
6
26-A
ug-1
6
2-Se
p-16
9-Se
p-16
16-S
ep-1
6
23-S
ep-1
6
30-S
ep-1
6
7-O
ct-1
6
14-O
ct-1
6
21-O
ct-1
6
28-O
ct-1
6
Uni
t in
Thou
sand
Electricity unit produced by MGP
Performance of MGPPower units sold per Day (thousand units)
TEST RUN FINE TUNE
Goal Line Productions
Capacity Factor from
August 1, 2016: 96%
8,000 hr/year
23
9.9 MW BIOMASS POWER PLANT PROJECT
Commercial of Date (COD) : 2 October 2016
Performance of TSGPower units sold per Day (thousand units)
0
50
100
150
200
3-Oct-16 8-Oct-16 13-Oct-16 18-Oct-16 23-Oct-16 28-Oct-16
Uni
t in
Thou
sand
Electricity Unit Produced by TSG
TEST RUN
25