2
Purpose of today
� To explain our role
� To talk about UAG and it’s trending
� To give an overview of some of our analysis methods
3
Our Role
• National Grid is the Shrinkage Provider working on behalf of the gas community
• We have incentives to minimise and/or understand causes of shrinkage
• Shrinkage Gas = OUG + UAG + CV shrinkage
• UAG ~ 0.5% of throughput
• Shrinkage costs the community ~ £100m pa
small large very small
4
Our Obligations
Transmission Licence (from 1 April 2012) : -
• Modification of Special Condition C8F – SO external incentives.
• Special Condition C29
• Investigate the causes of UAG
• Report on UAG and our ongoing investigations/work activities to Ofgem via regular report.:
• http://www.nationalgrid.com/NR/rdonlyres/DA20FC28-F348-4F9B-882B-A36048F62203/55319/UAGReportJuly2012.pdf
5
-40,0
00
,00
0
-30,0
00
,00
0
-20,0
00
,00
0
-10,0
00
,00
0 0
10,0
00
,00
0
20,0
00
,00
0
30,0
00
,00
0
40,0
00
,00
0
50,0
00
,00
0
60,0
00
,00
0
70,0
00
,00
0
80,0
00
,00
0
30/03/2007
28/07/2007
25/11/2007
24/03/2008
22/07/2008
19/11/2008
19/03/2009
17/07/2009
14/11/2009
14/03/2010
12/07/2010
09/11/2010
09/03/2011
07/07/2011
04/11/2011
03/03/2012
01/07/2012
UA
G30-d
ay a
vera
ge
Marc
h 2
007 to
Sept 2
012
UAG
Trending U
AG Trending
UAG
Trending U
AG Trending
-40,0
00,0
00
-20,0
00,0
00 0
20,0
00,0
00
40,0
00,0
00
60,0
00,0
00
80,0
00,0
00
20/12/2010
20/01/2011
20/02/2011
20/03/2011
20/04/2011
20/05/2011
20/06/2011
20/07/2011
20/08/2011
20/09/2011
20/10/2011
20/11/2011
20/12/2011
20/01/2012
20/02/2012
20/03/2012
20/04/2012
20/05/2012
20/06/2012
20/07/2012
UA
G a
t Clo
se
-ou
t1U
CL
LC
LM
A 1
4 d
ay
Cum
ula
tive E
rror
-1,0
00,0
00,0
00
-800,0
00,0
00
-600,0
00,0
00
-400,0
00,0
00
-200,0
00,0
00 -
200,0
00,0
00
400,0
00,0
00
600,0
00,0
00
20/12/2010
20/01/2011
20/02/2011
20/03/2011
20/04/2011
20/05/2011
20/06/2011
20/07/2011
20/08/2011
20/09/2011
20/10/2011
20/11/2011
20/12/2011
20/01/2012
20/02/2012
20/03/2012
20/04/2012
20/05/2012
20/06/2012
20/07/2012
Cu
mu
lative
Erro
r
66
Understandingdata
IdentifyingPotential
Sources of UAG
Investigation ofSources of UAG
UAG
Analysis
AnalysisInvestigationChecklist
(42 points)
Offtakes
Terminals
Linepack
VLDMCs &Power Stations
Storage
methods
Compressors
DN contactQuarterly meetings
Metering Liaison meetingsControl Centre Liaison meetings
Site work
Site activity
Systematic approach to UAG investigation
7
Our Activities
(S)MERs
Site Witnessing
UncertaintyAnalysis
DataMining
Power StationEfficiency (PSET)
IFI work
Site workAnalysis
6yrtrending
UnderstandingData
Rapid response (5day)
Liaisonmeetings
CWV
UAG
8
Saltw
ick
H
0
0.5 1
1.5 2
2.5 3
3.5
18/10/2005
18/12/2005
18/02/2006
18/04/2006
18/06/2006
18/08/2006
18/10/2006
18/12/2006
18/02/2007
18/04/2007
18/06/2007
18/08/2007
18/10/2007
18/12/2007
18/02/2008
18/04/2008
18/06/2008
18/08/2008
18/10/2008
18/12/2008
18/02/2009
18/04/2009
18/06/2009
18/08/2009
18/10/2009
18/12/2009
18/02/2010
18/04/2010
18/06/2010
18/08/2010
18/10/2010
18/12/2010
18/02/2011
18/04/2011
18/06/2011
18/08/2011
18/10/2011
18/12/2011
6yr T
ren
din
g s
pre
ad
sh
ee
t –B
ad
da
ta/U
AG
??
?
05/0
606/0
708/0
907/0
809/1
010/1
1
11/1
2
9
Power
EnergyInput
2 SD
3 SD
Power Station Efficiency Tool (SPC chart)
10
CWV Time series plot
Regional CWV vs Demand
0
5
10
15
20
25
01/0
6 /200
801
/08 /2
008
01/1
0/200
801
/12/2
008
01/0
2 /200
901
/04/2
009
01/0
6/200
901
/08 /2
009
01/1
0 /200
901
/12/2
009
01/0
2/201
001
/04 /2
010
01/0
6 /201
001
/08/2
010
01/1
0/201
001
/12 /2
010
01/0
2/201
101
/04/2
011
01/0
6/201
101
/08 /2
011
01/1
0/201
101
/12/2
011
Re
gio
na
l D
em
an
d [
mc
m]
-5
0
5
10
15
20
Co
mp
os
ite
We
ath
er
Va
ria
ble
Regional Demand [mcm]
Composite Weather Variable
???
11
Data mining
•Is the process of analysing data from different perspectives & summarising into useful information
•Finds correlations/patterns in large databases i.e. UAG & “something”
•Importantly, it points towards solutions rather than giving absolute answers
12
� Step Process
� 1 Do site flow figures lie within max for the site?
� 1a Has flow reached maximum of the instrumentation capability (i.e. is it maxed out – reached Qmax?)
� 1b Check behaviour of Offtake outlet temperature (investigate if site is flowing when its not supposed to)
� 2 Do the dates coincide with an MER for Offtakes or known error reports for Power Stations ?
� 2a Did the site under investigation pass ME2, check whether there are any outstanding issues?
� 2b Examine meter validation history, does the site in question have trouble with a key piece of instrumentation ?
� 2c VLDMCs, use the Power Station efficiency tool to see if there are any obvious errors
� 3 Was there any site work going on? Have the NG control room logged any activity?
� 4 Check for amendments by EBT team and has he operator changed (amended) the flows due to say site work, were these done on site?
� 4a Should we change to telemeted data?
� 5 Check F1 profile for anomalies
� 5a JFP to see Andy Lees to write a list of sub-tools for 5 – not just looking for spikes in F1
� 5a Can we check on the commercial data for this site?
� 6 Check for alarms in iGMS
� 6a Malcolm Macdonald has reports on all alarms (probably), see if a query can be run with how many meter suspect alarms are being produced
� 6b Check VLDMC alarms – need to understand more about how these are structured
� 6c Check any site alarms – need to understand their structure.
� 7 Check the behaviour of the Pressure Control Valve PCV and FCV
� 8 Check GEMINI for consistency
� 8a Compare iGMS Dvol vs. GEMINI Dvols (set this up as a Business Objects query)
� 9a Look for contamination, have any of the deltaPs got –ve values?
� 9 Check HPMIS alarms page (need list of what to check)
� 10 Check HPMIS EOD page (need list of what to check, is following complete)
� 10a Compare EOD values in flow computer with GEMINI/iGMS volumes
� 10b Check for amendments made by the operator
� 10c Check for any missing data
� 11 Check HPMIS CV Audit page (need list of what to check)
� 11a Compare CV values in flow computer with GEMINI/iGMS values
� 11b Check HPMIS CV at adjacent sites to that under investigation
� 11c Check whether there was any CV capping on the days in question
� 12 Check HPMIS RBD page (need list of what to check)
� 12a Check Linepack calculation (if this is possible)
� 13 Review MAS visits to site in question
� 13a should trend how often sites have a problem & with what, then check site in question against this list to try to indicate where the problem is.
� 14 Review audit reports
� 15 Raise issue with site owner, we want them to check the following:
� 15a Any issues with low odour
� 15b Ask the site/asset owner for assistance� 15c Check the site behaviour with respect to the Pressure Control Valve PCV and FCV
� 15d Has the operator masked alarms/check their record of alarms?
� 16 Perform CWV analysis of the site
� 17a Re-constitute 4 min flow data as would be done as part of MER investigation.
EASY & QUICK
COMPLICATED &TIME CONSUMING
Analysis Investigation Checklist (42 points)
14
Contact Details
Please use the contact details below for help and advice
regarding publication frequencies of gas data, or for any other general queries about gas data availability or
content:
e-mail: [email protected]
Tel: +44 1926 65 6474