MAINTENANCE Calibrate motor current transducer (annual)

Transcript of Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR...

Page 1: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

MAINTENANCECalibrate motor current transducer (annual)

Page 2: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

MAINTENANCECalibrate capacity/volume slide valve (annual)

Page 3: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

Record Keeping Requirements [§5.3]

IIAR 6 Record Keeping RequirementsANSI/IIAR 6-2019 §5.3.3

PSI Documentation RequirementsTitle 8 CCR §5189(d)

Refrigeration flow drawings Block flow diagramP&ID

Defined operating limits Safe upper and lower limits for process variables such as temperatures, pressures, flows, levels and/or compositions

Safety system functional description Safety systems (such as interlocks, detection and suppression systems, etc.)

Relief valve list with PRV manufacturer, PRV model number and set pressure, and where applicable, the three-way valve manufacturer and model number;

Relief system design and design basis

Ventilation system functional description Ventilation system design

Installation, operation, and maintenance manuals; Materials of construction

Manufacturer data reports for all pressure vessels; Materials of construction

Equipment list P&IDs

Page 4: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

FLOW DRAWINGS

Page 5: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

FLOW DRAWINGS

Page 6: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

OPERATING LIMITS

Page 7: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

OPERATING LIMITS

Page 8: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

SAFETY SYSTEMS

Page 9: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

SAFETY SYSTEMS

Page 10: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

RELIEF VALVE LIST

Page 11: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

VENTILATION SYSTEM

Page 12: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

IOMS

Page 13: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

DATA REPORTS

Page 14: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

EQUIPMENT LISTS

Page 15: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

OPERATIONAL LOG

Page 16: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

AMMONIA PURITY

Page 17: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

OIL LOG

Page 18: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

Type of Record Retention Duration

Daily Inspection Records Most current 12 months

Daily Testing Records Most current 12 months

Daily Maintenance Records Most current 12 months

Annual Inspection Records Most current 5 years

Annual Testing Records Most current 5 years

Annual Maintenance Records Most current 5 years

Five Year Inspection Records Two (2) most current

Five Year Testing Records Two (2) most current

Five Year Maintenance Records Two (2) most current

Ten Year Maintenance Records Two (2) most current

Page 19: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

Type of Record Retention Duration

Engineering Design Documentation Life of the process

Pressure Vessel U-1, U-1A, U-3, UM Reports Equipment life

Log (Operator Transfer of Information) Most current 12 months

Secondary Coolant Records Most current 12 months

Ammonia Refrigerant Records Most current 5 years

Refrigeration Oil Records Most current 5 years

Lubrication Records Most current 5 years

Pressure Relief Valve (PRV) Records PRV life

Current System Records listed in Section 5.3.3 Life of the process

Instrument and Device Testing and Calibration Most current 5 years

Page 20: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

Type of Record Retention Duration

Engineering Design Documentation Life of the process

Pressure Vessel U-1, U-1A, U-3, UM Reports Equipment life

Log (Operator Transfer of Information) Most current 12 months

Secondary Coolant Records Most current 12 months

Ammonia Refrigerant Records Most current 5 years

Refrigeration Oil Records Most current 5 years

Lubrication Records Most current 5 years

Pressure Relief Valve (PRV) Records PRV life

Current System Records listed in Section 5.3.3 Life of the process

Instrument and Device Testing and Calibration Most current 5 years

Page 21: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

Break

Page 22: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 23: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 24: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 25: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 26: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 27: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 28: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 29: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 30: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 31: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 32: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 33: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 34: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 35: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 36: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 37: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 38: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 39: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 40: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 41: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 42: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 43: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 44: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 45: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 46: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 47: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

IIAR 6Part 1 –General

1 –

Purp

ose,

Sco

pe, a

nd A

pplic

.

2 –

Def

initi

ons

3 –

Ref

eren

ce S

tand

ards

4 –

Prog

ram

Adm

inis

tratio

n

Part 2 – Program Requirement5

–G

ener

al

6 –

Com

pres

sors

7 –

Pum

ps

8 –

Con

dens

ers

9 –

Evap

orat

ors

10 –

Vess

els

11 –

Pipi

ng

12 –

Safe

ty S

yste

ms

13 –

Ove

rpre

ssur

e Pr

otec

tion

Dev

ices

14 -

Purg

ers

15 –

Amm

onia

and

Sec

onda

ry

Coo

lant

s

Part 3 Appendices

A –

Expl

anat

ory

Mat

eria

l

B –

Safe

ty C

heck

lists

C –

Wat

er C

onta

min

atio

n

D –

Avoi

ding

Abn

orm

al

Pres

sure

/Sho

ck

E –

Ris

k-Ba

sed

ITM

F -R

efer

ence

s

Page 48: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

Providing Solutions. Simplifying Regulation.

ITM Tasks [§6.1]• Inspection, Testing, and Maintenance Tasks. ITM tasks shall be

performed on the different compressor types at the indicated frequencies set forth in Table 6.1 or per manufacturers’ instructions, unless a different frequency is justified in accordance with Section 5.2.1. o Where a history of deficiencies has been recorded, the (ITM) task

frequencies shall be increased. Where a history of fault-free operation has been recorded, the (ITM) task frequencies are permitted to be decreased. In either case, a determined change in a (ITM) task frequency and its technical justification shall be documented. [§5.2.1]

Page 49: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

Providing Solutions. Simplifying Regulation.

Types of CompressorsRotary Vane CompressorReciprocating Compressor Rotary Screw Compressor

Page 50: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 51: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 52: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 53: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 54: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 55: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 56: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 57: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 58: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 59: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 60: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 61: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 62: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 63: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 64: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 65: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 66: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 67: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 68: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 69: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 70: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 71: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 72: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 73: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 74: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 75: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 76: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 77: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 78: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 79: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 80: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 81: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 82: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 83: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 84: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 85: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements
Page 86: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements

ITM Task Description Frequency

Inspection Screw Recip Rotary Vane

a) Runtime hours WA-D WA-D WA-D

b) Suction pressure D D D

c) Discharge pressure D D D

d) Oil pressure D D D

e) Oil temperature D WA-D D

f) Discharge temperature D WA-D D

g) Verify oil levels are adequate D D D

h) Oil filter differential pressure D WA-D NA

i) Oil leaks D D D

j) Lubricator oil level and drip rate NA NA D

k) Jacket cooling oil level NA NA D

l) Determine shaft seal leak rate WA-W WA-W WA-W

m) Indicator of Compressor Capacity D WA-D WA-D

n) Motor amperage (current) D WA-D WA-D

o) Recorded Alarms and Shutdowns D WA-D WA-D

p) Free from abnormal sounds and excessive vibration

D D D

ITM Task Frequency

Inspection Screw Recip Rotary Vane

q) Drive guard in place D D D

r) Foundation solid, in place, and free from evidence of deterioration

A A A

s) Visually inspect mounting bolts are in place

A A A

t) Visually inspect metal surfaces for pitting or surface damage

A A A

u) Visually inspect coupling for wear A WA-A WA-A

v) Visually inspect starter connections and associated timers and relays

A A A

w) Operation of oil heaters A A A

x) Operation of unloader M M M

y) Visually inspect alignment of compressor-motor drive shaft

A A A

Testing Screw Recip Rotary Vane

Test safety shutdowns:

a) Low suction pressure cutout A A A

b) High discharge pressure cutout (HPCO)See Section 6.1.1

A A A

Page 87: Overview of ANSI/IIAR 6-2019resourcecompliance.com/wp-content/uploads/2020/02/IIAR-6-Part-2.pdfIIAR 6 Record Keeping Requirements ANSI/IIAR 6-2019 §5.3.3. PSI Documentation Requirements