Overview of 2010 HCM Mark Vandehey Jim Schoen November 18, 2010

Transcript of Overview of 2010 HCM - Kittelson & Associates,...

Page 1: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Overview of 2010 HCM

Mark Vandehey

Jim Schoen

November 18, 2010

Page 2: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Highway Capacity Manual

• Widely accepted in the U.S. and internationally

• Managed by the Transportation Research Board (TRB) Committee

on Highway Capacity and Quality of Service

• Supporting research comes from a variety of sources

– National Cooperative Highway Research Program (NCHRP)

– Federal Highway Administration

– State Department of Transportation (DOT) research

– International research

– Others

• 2010 Edition is 5th major revision (1950, 1965, 1985, 2000)

Page 3: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

NCHRP 3-92 – Production of the 2010 HCM

• Project began in October 2007

• Final 2010 HCM Delivered to TRB in January 2010 (pending final

coordination needs)

• Scheduled for publication by TRB by the end of 2010

• Key tasks:

State of the Art Review and Inventory

Focus Group Survey

Supplemental Research for 2010 HCM

Prepare Draft Chapters

Assist TRB During Publication Process

Page 4: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Summary of Significant Changes

• Incorporation of New Research

• Integrated Multimodal Approach

• Increased Emphasis of Alternative Tools

• New Chapter on Active Traffic Management

Page 5: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Incorporation of New Research

• NCHRP 3-60 (Interchange Ramp Terminals)

• NCHRP 3-64 (HCM Applications Guide)

• NCHRP 3-65 (Roundabouts in the United States)

• NCHRP 3-70 (Multi-Modal Arterial Level of Service)

• NCHRP 3-75 (Analysis of Freeway Weaving)

• NCHRP 3-79 (Predicting Travel Speeds for Urban Streets)

• NCHRP 3-82 (Default Values for HCM)

• NCHRP 3-85 (Guidelines for the Use of Alternative Traffic Analysis Tools)

• NCHRP 20-7 (Two-lane Highways)

• FHWA Research on Active Traffic Management

• NCHRP 3-92

• Signalized Intersection Methodology (New Delay Method and Structure Changes reflecting Actuated Control)

• Gap Acceptance for Six-Lane, Two-Way Stop Controlled Intersections

• 75 Mph Speed Flow Curve for Freeways

Page 6: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

More Emphasis on Alternative Tools

• Explicit recognition that HCM analytical procedures may not always

be the best procedure

• Range of alternative tools

– Deterministic tools (e.g., TRANSYT-7F for arterial performance)

– Stochastic tools (e.g., VISSIM for network performance)

• Examples of applications

Page 7: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Alternative Tool Example: Backup from Signal

Mainline vehicles unable to reach the exit lanes

Wasted time on the signal approach

Page 8: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Active Traffic Management

• New ATM Chapter

– Describes ATM measures

– Provides known information/methods for evaluating impacts on freeway capacity and performance.

– Strategies for maximizing return on investment

– Advises on appropriateness of HCM and simulation methods of analysis and any special considerations.

– Managed lanes (HOV/HOT), Congestion Pricing, etc.

– Innovative Operations, Innovative Designs

Page 9: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Lane and Shoulder Treatments

FHWA

Managed Lanes Primer

Google Street View

Page 10: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Congestion Pricing

FHWA, MinnDOT

Technologies that Complement Congestion Pricing Primer

Congestion Pricing Primer

Page 11: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Innovative Interchange Designs

Page 12: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

High Capacity Intersection Designs

Page 13: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

HCM Evolution

• HCM scope has grown over time

– Increasing coverage of various system elements and modes

– User interest in more-detailed procedures

• HCM page count has grown correspondingly

– 1950: 160 pages

– 1965: 432 pages

– 1985: 512 pages

– 2000: 1,224 pages

Page 14: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Overall Organization

• The 2010 HCM will consist of four volumes

– Volume 1: Concepts

– Volume 2: Uninterrupted Flow

– Volume 3: Interrupted Flow

– Volume 4: Applications Guide

Page 15: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Volume 4

• Electronic-only

• Four main elements

– Methodological details

– Interpretations

– Technical reference library

– HCM applications guide

Page 16: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Methodological Details

• Supplemental chapters (24–34)

– Technical details

– Alternative tool applications

– Extra sample problems

• Emerging topics chapters

– Chapter 35, Active Traffic Management

• Ability to add new material between major HCM updates

Page 17: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Interpretations

• Interpretations

• Clarifications

• Errata

Page 18: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Technical Reference Library

• Source research

• Electronic copies of many references

• Computational engines

Page 19: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Applications Guide

• Examples of applying HCM to real-world problems

• Focus on process, rather than computational steps

• Case studies 1–5 available at hcmguide.com

• New case study 6 on simulation application

Page 20: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Interrupted Flow Chapters

– Urban Street Facilities

• Urban Street Segments

• Signalized Intersections

• Two-way Stop-Controlled Intersections

• All-way Stop-Controlled Intersections

• Roundabouts

• Interchange Ramp Terminals

– Exclusive Pedestrian and Bicycle Facilities

FDOT Quality/LOS Handbook 2002

Page 21: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 16

Urban Street Facilities

• Scope

– Facility (= two or more segments)

• 0.75 to 2.0 miles long in urbanized downtown areas

• 1.5 to 5.0 miles long in other areas

– Separate methodology for auto, ped, bike, and transit modes

– Emphasizes combined evaluation of auto, ped, bike, and transit

• Methodology

– Aggregates key segment performance measures

• Example Problems

– Demonstrate integrated multimodal evaluation process

Page 22: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 17

Urban Street Segments

• Scope

– Segment (= link + boundary intersections)

– Signal, TWSC, AWSC, or roundabout boundary intersections

– Models signal coordination

– Separate methodology for auto, ped, bike, and transit modes

Page 23: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 18

Signalized Intersections

• Scope

– Isolated signalized intersection

– Separate methodology for auto, ped, and bike modes

• A Closer Look

– Automobile Methodology

Page 24: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 18

Signalized Intersections

• Automobile Methodology

– Actuated phase duration prediction

• Controller operation inputs

– Simultaneous gap-out

– Flashing-yellow-arrow operation

• Controller phase inputs

– Passage time

– Minimum green

– Recall

– Dual entry

• Detector design

– Detector length

• Based on HCM 2000 Chapter 16 -Appendix B

X

Page 25: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 18

Signalized Intersections

• Automobile Methodology

– Performance measures

• Automobile control delay

• Queue storage ratio

– Percentile queue procedure

• Volume-to-capacity (v/c) ratio

• Level of service is based on control delay and v/c ratio

Page 26: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 19

Two-Way Stop-Controlled Intersections

• Gap acceptance parameters for six-lane streets added

• Interface with urban street segment methodology for upstream signal effects

• Analysis of major street U-turns on 4-lane and 6-lane streets

• Improved analysis of shared/short lanes

• Updated procedure for analyzing unsignalized pedestrian crossings

Page 27: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 20

All-Way Stop-Controlled Intersections

• Restructure of chapter to make procedure clearer

• Explicit incorporation of details to calculate AWSC with three-lane approaches (details in Volume 4)

• Queuing model added

Ph

oto

: L

ee R

od

egerd

ts

Page 28: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 21

Roundabouts

• Incorporates NCHRP Report 572 methodologies (with enhancements and extensions)

• Lane-by-lane analysis of multilane roundabouts

Ph

oto

: C

ase

y B

erg

h

Page 29: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 21

Roundabouts (cont.)

• LOS table for roundabouts

– Consistent with TWSC and AWSC due to similar delay formulation and lack of guaranteed service (unlike signals)

– Recognized need for additional research

Level of Service by Volume-to-Capacity Ratio* Control Delay (s/veh) v/c ≤ 1.0 v/c >1.0

0 – 10 A F >10 – 15 B F >15 – 25 C F >25 – 35 D F >35 – 50 E F

>50 F F

1

Page 30: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Chapter 22

Interchange Ramp Terminals

• Scope

– Operational evaluation of signalized ramp-crossroad Intersection

– Quick estimation method for interchange type selection

– Methodology addresses auto mode only

• Methodology

– Signalized intersection methodology in Chapter 18

– Roundabout methodology in Chapter 22

• Elements

– Additional saturation flow rate factors • Lane utilization factor

• Traffic pressure factor

• Turn radius factor

– Additional lost time procedure

Page 31: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Volume 2:

Uninterrupted Flow

• CH 10: Freeway Facilities

• CH 11: Basic Freeway Segments

• CH 12: Freeway Weaving Segments

• CH 13: Freeway Merging and Diverging

• Segments

• CH 14: Multilane Highways

• CH 15: Two-Lane Highways

Page 32: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Ch: 10 Freeway Facilities

• Macroscopic Method by Segment

– Basic Freeway Segments

– Weaving Segments

– On-ramp and Off-Ramp Segments

• Directional Methodology

• Extended Time-Space Domain

– Distinguish Demand and Volume

– Queue Interaction between segments and time periods

• Two Flow Regimes

– Undersaturated (all d/c<1.0)

– Oversaturated (any d/c>1.0)

• Implemented in FREEVAL2010

Page 33: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

CH 11: BASIC FREEWAY SEGMENTS

• New Speed – Flow Curves → New MSF Values

• New algorithm and process for estimating FFS

• Recommended Default Values

Page 34: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

New Speed-Flow Curves:

Page 35: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

CH 12: FREEWAY WEAVING SEGMENTS

• New ways to consider length, width, and configuration.

• New speed-prediction algorithms.

• New approach to weaving capacity.

Page 36: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

CH 13: FREEWAY MERGING AND DIVERGING

SEGMENTS

• No significant changes to HCM 2000.

• “Reasonableness Check” added to initial predictions of flow in Lanes 1 and 2.

• Two minor changes in predictive equations for v12 to avoid discrepancies in extreme cases.

Page 37: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

CH 14: MULTILANE HIGHWAYS

• No major changes in base methodology.

• Like basic freeway segments, no interpolation between free flow curves.

• Added analysis procedure for bicycles on multilane highways.

Page 38: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

CH 15: TWO-LANE HIGHWAYS

• Two-way analysis methodology deleted.

• Some basic characteristic curves and tables were revised and updated.

• Third class of two-lane highway added as an alternative procedure: Two-Lane Highways in Built-Up Areas. FDOT procedure used.

• Procedure added for bicycles

on two-lane highways.

Page 39: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Multimodal LOS Measure Issues

• Current pedestrian & bicycle measures generally reflect a traffic engineer’s perspective

– Speed, delay, space

– Florida & NCHRP 3-70 research suggest these aren’t the key factors

– Auto volumes highly important to bike & ped service quality

• Transit measures reflect the passenger perspective, but four individual

measures can be difficult to apply

HCM2000: Ped LOS A HCM2000: Ped LOS D

Page 40: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

HCM Focus Group Findings

• Many jurisdictions don’t require multimodal analyses

– Therefore, most often they aren’t performed

• Jurisdictions that do want to perform pedestrian & bicycle analyses don’t find the current HCM measures useful

– For example, Maryland & Florida use measures of user comfort

• Most pedestrian and bicycle facilities don’t have capacity or speed issues

– No need to analyze them using HCM procedures

Page 41: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

2010 HCM Approach

• Focus on the traveler perspective

• Allow trade-offs between modes to be evaluated

– Presence of one mode affects the service quality of the other modes

Mode Affected

Impacting Mode

Auto Ped Bike Transit

Auto Auto & HV volumes Turning patterns

Lane configurations

Minimum green time

Turn conflicts Mid-block xings

Turn conflicts

Passing delay

Heavy vehicle

Blocking delay: stops

Signal priority

Ped

Auto & HV volumes Cycle length

Driver yielding Turn conflicts

Traffic separation

Sidewalk crowding Crosswalk crowding

Cross-flows

Shared-path conflicts

Bicyclist yielding

Heavy vehicle

Transit stop queues

Stop cross-flows Vehicle yielding

Bike

Auto & HV volumes

Auto & HV speed

On-street parking

Turn conflicts

Traffic separation

Shared-path conflicts

Min. green time

Turn conflicts Mid-block xings

Bike volumes

Heavy vehicle

Blocking delay: stops Tracks

Transit Auto volumes

Signal timing

Ped. env. quality Minimum green

time

Turn conflicts

Mid-block xings

Bike env. quality

Bike volumes Bus volumes

Page 42: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Service Measures in the 2010 HCM

System Element

Service Measure Provided

Chapter Auto Ped Bike Transit

Freeway Facility 10

Basic Freeway Segment 11

Freeway Weaving Segment 12

Fwy. Merge/Diverge Seg. 13

Multilane Highway 14

Two-Lane Highway 15

Urban Street Facility 16

Urban Street Segment 17

Signalized Intersection 18

Two-Way Stop 19

All-Way Stop 20

Roundabout 21

Interchange Ramp Term. 22

Off-Street Ped-Bike Facility 23

Page 43: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

LOS at Unsignalized Crossings

• Estimates pedestrian delay

• Allows consideration of different crossing treatments

• Based on 4 factors

– Traffic volume - # of lanes crossed

– Crossing distance - Motorist yield rate

Example:

2-lane arterial with marked crosswalk, but nobody is yielding…

Inputs: 1,000 peak-hour vehicles

2 lanes crossed

30 feet crossing distance

10% yield rate

Output: Average delay = 44 seconds

Ped LOS = E

Page 44: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

LOS at Unsignalized Crossings

Example (cont.):

Install rapid-flash beacons to improve driver compliance…

Inputs: 1,000 peak-hour vehicles

2 lanes crossed

30 feet crossing distance

80% yield rate

Output: Average delay = 6 seconds

Ped LOS = B

Page 45: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

45

Multimodal LOS Defined for Urban Streets

• MMLOS measures the degree to which the urban street design and operations meets the needs of each mode’s users

• Four level of service results for the street:

–Auto, Transit, Bicycle, Pedestrian

• A combined LOS is not calculated

Main Street Level of Service

User Type AM Pk Hr PM Pk Hr

Auto C E

Transit B C

Bicycle D C

Pedestrian C D

Page 46: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

46

MMLOS Urban Street Applications

• Segments

– All four modes

• Signalized Intersections

– Auto, ped and bike mode

• Facility

– All four modes

segment facility

Page 47: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

47

Pedestrian LOS: Urban Street Segments

• Factors include:

– Outside travel lane width (+)

– Bicycle lane/shoulder width (+)

– Buffer presence (e.g., on-street parking, street trees) (+)

– Sidewalk presence and width (+)

– Volume and speed of motor vehicle traffic in outside lane (-)

Pedestrian density considered separately

Worse of density LOS/ segment LOS used to determine LOS

Page 48: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

48

Pedestrian LOS: Signalized Intersections

• Factors include:

– Permitted left turn and right-turn-on-red volumes (-)

– Cross-street motor vehicle volumes and speeds (-)

– Crossing length (-)

– Average pedestrian delay (-)

– Right-turn channelizing island presence (+)

Page 49: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

49

Bicycle LOS: Urban Street Segments

• Factors include:

– Volume and speed of traffic in outside travel lane (-)

– Heavy vehicle percentage (-)

– Pavement condition (+)

– Bicycle lane presence (+)

– Bicycle lane, shoulder, and outside lane widths (+)

– On-street parking presence and utilization (+/-)

Page 50: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

50

Bicycle LOS: Signalized Intersections

• Factors included:

– Width of outside through lane and bicycle lane (+)

– Cross-street width (-)

– Motor vehicle traffic volume in the outside lane (-)

Page 51: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

51

Transit LOS: Urban Street Segments

• Factors include:

– Service frequency (+)

– Average bus speed (+)

– Bus reliability (+)

– Average passenger load (-)

– Shelter, bench presence (+)

– Pedestrian LOS score for segment (+)

”Transit” covers buses, streetcars, street-running light rail

Page 52: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

52

Auto LOS: Urban Street Segments

• Traveler perception model factors include:

– Number of stops

– Left-turn lane presence

Perception model had the best fit to the data, but testing around the US found an agency preference for current speed-based LOS

2010 HCM will present both measures

Auto LOS to be based on average travel speed

NCHRP 3-70 performance measure will also be provided

Page 53: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Urban Street Facilities: Ped/Bike/Transit LOS

• Average segment LOS score, weighted by

segment length

• Average signalized intersection LOS score

• Segment and intersection LOS combined and

weighted to generate facility LOS

Page 54: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Urban Street Facilities: Auto LOS

• Factors included in NCHRP 3-70 model:

– Average segment auto LOS score, weighted

by segment length

• Traffic signal effects included in stops per mile input to the

segment score

• LOS to be based on average travel speed for the

facility

Page 55: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Traditional Data Needs

• Typical Transportation Analysis Data Collection Efforts

– Peak Hour Traffic Counts • Passenger Vehicles

• Pedestrians

• Bicycles

• Heavy Vehicles

– Roadway Inventory • Sidewalks

• Bicycle Lanes

• Transit Stops/Amenities

• Transit Schedule

• Posted Roadway Speed

• Roadway Cross-Section

• Median Treatment

• Illumination

– Signalized Intersection Data • Signal Timing Sheets

• Signal Phasing

• Right-turn on Red

Source: Bing Maps

Page 56: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Additional Data Needs

• Additional MMLOS Data Collection

– Weekday PM Peak Hour Traffic

Counts • Number of Vehicles by Lane

– Roadway Inventory

• Length of Roadway Segment

• Roadway Cross-Section Dimensions

• Number of Trees/Bushes (in curb tight

landscape strip)

• Percent Occupancy of On-street Parking

• Pavement Condition Rating

• Jaywalking Occurrences

• Number of Driveways within Segment

– Transit Inventory • Bus Occupancy

• Transit Reliability

• Average Trip Length

Source: Google Maps

Page 57: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Data Forms: Segment Data

Page 58: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Data Forms: Roadway Cross-Section

Page 59: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Data Forms: Traffic Data

Page 60: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Data Forms: Transit Data

Page 61: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Analysis Results: Existing SW 185th Avenue Section

• Evergreen to Cornell (2 segments)

• Cornell to Walker (3 segments)

Page 62: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Analysis Results: Existing SW 185th Avenue Section

Note: HCM Auto LOS

would be LOS F based on

corridor average travel

speed of 11 mph.

Page 63: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Examples and Sensitivity

• Pedestrian Facilities

• Bicycle Facilities

• Transit Facilities

• Travel Lanes

Page 64: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Example: Enhancing Pedestrian Facilities

• Existing

• Widen ROW for landscape strip

Page 65: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

• Existing

• Provide landscape strip, 10-foot sidewalks, and on-street parking

Increased ROW

Street Score LOS

Auto 2.77 C

Transit 2.56 B

Bike 3.43 C

Ped 3.37 C

Street Score LOS

Auto 2.77 C

Transit 2.53 B

Bike 3.22 C

Ped 3.17 C

Ped. Ped. Ped. Ped.

Seg. Seg. Intersect Fac. LOS Facility

LOS # LOS # (#) LOS

1 2.46 2.88 3.02 C

2 2.47 4.23 3.32 C

3 2.90 2.24 3.02 C

4 3.20 2.24 3.12 C

5 2.79 4.29 3.44 C

Corridor 3.17 C

Ped. Ped. Ped. Ped.

Seg. Seg. Intersect Fac. LOS Facility

LOS # LOS # (#) LOS

1 3.07 2.88 3.21 C

2 3.08 4.23 3.51 D

3 3.50 2.24 3.21 C

4 3.80 2.24 3.31 C

5 3.39 4.29 3.63 D

Corridor 3.37 C

Ped Segment LOS = C

Ped Segment LOS = B

Page 66: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Bicycle Lanes

• Bicycle LOS is very sensitive to vehicle traffic volume and

speed

– Difficult to modify on a corridor such as 185th

• Bicycle LOS can help quantify and compare

benefits/disadvantages of

– road widening

– bicycle lane widening

– on-street parking

– traffic calming (reducing volume and speed)

– access management

• Highly suited to identifying most bicycle friendly routes

Page 67: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

• Existing (4 routes w/ 25 – 50 minute headways, appx. 10

buses per hour)

• Provide shelters at every stop and all routes with 4 buses/hour

• Downgrade transit service to one route on 30-minute

headways

Transit Improvements

Street Score LOS

Auto 2.77 C

Transit 2.56 B

Bike 3.43 C

Ped 3.37 C

Street Score LOS

Auto 2.77 C

Transit 2.28 B

Bike 3.47 C

Ped 3.35 C

Minor increase in transit LOS

Significant decrease in transit LOS

Street Score LOS

Auto 2.77 C

Transit 4.18 D

Bike 3.47 C

Ped 3.35 C

Page 68: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

• Existing

• Exchange one travel

lane for landscape

strip and wider bike

lanes and sidewalks

Removal Of Travel Lane

Street Score LOS

Auto F (v/c>1)

Transit 2.61 B

Bike 3.42 C

Ped 3.66 D

Street Score LOS

Auto 2.77 C

Transit 2.56 B

Bike 3.43 C

Ped 3.37 C

Decreased LOS for Peds because of

increased volume in outside lane and

intersection crossing delay. *Need to

consider adjustment of traffic

volumes and speeds if you reduce

vehicle capacity.

Reduced traffic volumes, increased

stops/mile.

Street Score LOS

Auto 3.13 C

Transit 2.56 B

Bike 3.17 C

Ped 3.32 C

Page 69: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Russell Street Corridor, Missoula Montana

1.5 Mile-long Study Area

1 of 5 Bridge Crossings

Parallels US 93 (major commercial corridor)

2/3 lane cross section with limited

pedestrian/bicycle facilities

ADT volumes of 25,000 (north end) to 20,000

(south end)

Important route for bicycle commuters

Primarily residential neighborhoods around

south half

Industrial and commercial uses around north

half

3rd St

14th St Mount Ave

5th St

Broadway St N

Ru

ss

ell

St

Page 70: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

70

Alternative Analysis – Cross-section and Traffic

Control

Page 71: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Bicycle, Pedestrian, and Transit LOS Summary

• Overall LOS for Alternatives and Option

DEIS Alternatives

Alt 1 – No Build

Existing 3 Lane

Volumes 5 Lane

Volumes Alt 2 Alt 3 Alt 4 Alt 5-R Option 6

Bike LOS - Southbound F F F F F E E F

Bike LOS – Northbound F F F F F E E F

Ped LOS - Southbound D D E C C C C D

Ped LOS – Northbound D D D C C C C C

Transit LOS - Southbound D D D D D D D D

Transit LOS – Northbound D D D D D D D D

Legend

LOS = A, B, or C

LOS = D

LOS = E or F

Page 72: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Overall Analysis Summary

DEIS Alternatives

Alt 1 (No Build)

Performance Measure 3-Lanes 5-Lanes Alt 2 Alt 3 Alt 4 Alt 5-R Option 6

Intersection Operations (LOS) 6 7 3 3 1 2 5

Corridor Operations (Travel Time) 2 3 4 4 1 4 7

Safety (Predicted Average Crash Frequencies)

6 7 2* 1* 4 3 5

Pedestrian LOS 6 7 3 3 1 1 5

Bicycle LOS 5 7 3 3 1 2 6

Transit LOS 2 2 1 1 1 1 1

* Best ranking due in large part to lower traffic volume scenario (3 lane demand versus 5 lane demand).

Page 73: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

Summary

• Alternative modes will be integrated into the 2010 HCM far

better than before

• Urban street LOS method will facilitate ”complete streets”

evaluations

– Relative service quality provided for each mode’s

travelers

– Trade-offs of different improvement alternatives or

future demand scenarios can be evaluated

• Provides agencies a way to quantify the relative benefits

and disadvantages of roadway cross-section standards

and design modifications

• Provides a methodology for multi-modal performance

standards or alternative mobility standards

Page 74: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

MMLOS Benefits and Applications

• Allows the testing of various multi-modal goals/strategies tailored to

individual corridors.

– Different performance criteria could be applied based on the

facilities’ intended purpose and function.

• Provides a comparison between different travel modes at the same

relative scale based on user perception.

• Provides agencies a way to quantify the relative benefits and

disadvantages of roadway cross-section standards and design

modifications.

• Some important policy considerations:

– Vehicular/Pedestrian/Bicycle/Transit Hierarchy?

– Multi-modal LOS standards?

Page 75: Overview of 2010 HCM - Kittelson & Associates, Inc.events.kittelson.com/system/datas/4/original/2010_HCM_Presentation... · NCHRP 3-92 – Production of the 2010 HCM ... High Capacity

NCHRP 3-70 Resources

• http://tes.kittelson.com/ (past events)

– Presentation

– Analysis spreadsheet

• Developed by Dowling Associates

• “Research quality”: no error-checking, unsupported

– Anticipated that commercial software developers will incorporate

the method into their HCM-implementing software after the HCM is

released in late 2010

• Final Report (NCHRP Report 616):

– http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_616.pdf

• User’s Guide (NCHRP Web Document 128):

– http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_w128.pdf